Loading...
HomeMy WebLinkAbout1626 E Trinidad Way - PlanSHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-2A OPTIMIZER CHART 1626 E Trinidad Way01/25/23 MS P JB A C IN V SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-3 ARRAY LAYOUT 2" X 6" RAFTERS @ 16" O.C MODULE DETAILS SCALE: 1/2" = 1'-0" 2 ROOF PLAN WITH MODULES LAYOUT SCALE: 3/32" = 1'-0" 1 (N) ROOF MOUNTS EVERY 64" O.C MAX (N) JUNCTION BOX (UNDER ARRAY) ADDITIONAL NOTES: · FINAL LOCATION OF ALL CONDUIT AND JUNCTION BOXES TO BE DETERMINED AT TIME OF INSTALLATION. · CONDUIT TO BE PAINTED TO MATCH EXTERIOR OF RESIDENCE WHERE APPLICABLE AND IS TO BE SUPPORTED EVERY 10' MAX. · 30" WIDE X 36" DEEP WORKING SPACE CLEARANCES REQUIRED ABOUT ALL ELECTRICAL EQUIPMENT. · STAGGER PENETRATIONS TO EVENLY DISTRIBUTE LOAD ACROSS ALL TRUSSES UNDER ARRAY. · ALL DIMENSIONS ARE APPROXIMATIONS. · DO NOT INSTALL INVERTER WHERE IT COULD BE EXPOSED TO DIRECT SUNLIGHT TO AVOID UNWANTED POWER REDUCTION DUE TO AN INCREASE IN THE INTERNAL TEMPERATURE OF THE INVERTER. CONSTRUCTION NOTES · ROOF PITCH: 18° · ROOF CLADDING: COMPOSITION SHINGLE · ROOF STRUCTURE: 2" X 6" RAFTERS @ 16" O.C O/C · MOUNTS ARE ON GRID SPACING, OCCURRING AT RAFTERS. · VERIFY RAFTER LOCATIONS IN FIELD. · REFER TO MODULE AND RACKING MFR'S INSTALL MANUALS. · MAX SPAN BETWEEN MOUNTS: 64" O.C. · PLUMBING AND MECHANICAL VENTS SHALL NOT BE COVERED BY SOLAR MODULES. · ALL FASTENERS STAINLESS STEEL U.O.N. (N) PV ARRAY AR-01 (127.87 SQ.FT.) STRING 2 STRING 1 ROOF AREA STATEMENT ROOF MODULES QTY PITCH TRUE ORIENTATION 1 6 18°90° 2 2 18°180° 3 9 18°270° 4 11 18°360° (N) PV ARRAY AR-02 (42.46 SQ.FT.) (N) PV ARRAY AR-03 (192.28 SQ.FT.) (N) PV ARRAY AR-04 (213.28 SQ.FT.) PV-4 1 18° 6 MODULES 90° AZIMUTH MODULE ROOF AREA: 454.88 SOLAR ARRAY AREA: 127.87 % AREA COVERAGE: 28.11% 2 MODULES 180° AZIMUTH MODULE ROOF AREA: 467.03 SOLAR ARRAY AREA: 42.46 % AREA COVERAGE: 9.09% 9 MODULES 270° AZIMUTH MODULE ROOF AREA: 541.00 SOLAR ARRAY AREA: 192.28 % AREA COVERAGE: 35.54% 11 MODULES 360° AZIMUTH MODULE ROOF AREA: 613.32 SOLAR ARRAY AREA: 213.28 % AREA COVERAGE: 34.77% NORTH SPECS: L : 67.8" W : 44.6" D : 1.2" 47.4 LBS 67.8" 44.6" 1.2" JA SOLAR JAM54S31-395/MR (N) SNAPNRACK RAIL (N) AC DISCONNECT SWITCH (E) MAIN SERVICE PANEL (SOLAR POINT OF CONNECTION) (N) SOLAR EDGE SE7600H-US (240V) [SI1-JUN20] INVERTER W/ INTEGRATED DC DISCONNECT (WEST WALL) (N) CONDUIT RUN: 3/4" EMT 18° 18° 18° 7'-11" 4'-7" 4'-7" 7'-11" 7'-11" 13'-4" 10'-2" 9'-1" This item has been digitally signed and sealed on 12/14/2022 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-3A FIRE NOTES 1204.1 General Solar photovoltaic systems shall be installed in accordance with sections 1204.2 through 1204.5, and the California Building Code or California Residential Code. The electrical portion of solar PV systems shall be installed in accordance with the California Electrical Code. 1204.2 Access and Pathways Chapter 12 Energy Systemshttps://up.codes/viewer_export/juris_key/california/pub/california_fire_code_2019/ref/12 6/24Roof access, pathways, and spacing requirements shall be provided in accordance with Sections 1204.2.1 through 1204.3.3. Pathways shall be over areas capable of supporting fire fighter accessing the roof. Pathways shall be located in areas with minimal obstructions, such as vent pipes, conduit or mechanical equipment.Exceptions:1. Detached, no habitable group structures including, but not limited to, detached garages serving group R-3 buildings, parking shade structures, carports, solar trellises and similar structures.2. Roof access, pathways and spacing requirements need not be provided where the fire code official has determined that rooftop operations will not be employed. 1204.2.1 Solar Photovoltaic Systems for Group R-3 Buildings Solar photovoltaic systems for Group R-3 buildings shall comply with Sections 1204.2.1.1 through 1204.2.1.3.Exceptions :1.These requirements shall not apply to structures designed and constructed in accordance with the California Residential Code.2. These requirements shall not apply to roofs with slopes of 2 units vertical in 12 units horizontal or less. 1204.2.1.1 Pathways to ridge not fewer than two 36-inch-wide (914 mm) pathways on separate roof planes, from lowest roof edge to ridge, shall be provided on all buildings. Not fewer than one pathway shall be provided on the street or driveway side of the roof. For each roof plane with a photovoltaic array, not fewer than one 36-inch-wide (914 mm) pathway from lowest roof edge to ridge shall be provided on the same roof plane as the photovoltaic array, on an adjacent roof plane or straddling the same and adjacent roof planes 1204.2.1.2 Setbacks at ridge for photovoltaic arrays occupying 33 percent or less of the plan view total roof area, a setback of not less than 18 inches (457 mm) wide is required on both sides of a horizontal ridge. For photovoltaic arrays occupying more than 33 percent of the plan view total roof area, a setback of not less than 36 inches (457 mm) wide is required on both sides of a horizontal ridge. 1204.2.1.3 Alternative setbacks at ridge where an automatic sprinkler system is installed within the dwelling in accordance with Section 903313 setbacks at the ridge shall conform within the dwelling in accordance with Section 903.3.1.3, setbacks at the ridge shall conform to one of the following:1For photovoltaic arrays occupying 66 percent or less of the plan view one of the following:1. For photovoltaic arrays occupying 66 percent or less of the plan view total roof area a setback of not less than 18inches (457 mm) wide is required on both sides total roof area, a setback of not less than 18inches (457 mm) wide is required on both sides of a horizontal ridge 2 For photovoltaic arrays occupying more than 66 percent of the plan view a horizontal ridge.3. For photovoltaic arrays occupying more than 66 percent of the plan view total roof area a setback of not less than 36inches (914 mm) wide is required on both sides total roof area, a setback of not less than 36inches (914 mm) wide is required on both sides of a horizontal ridge a horizontal ridge. 120.4.2.2 Emergen1204.2.2 Emergency escape and rescue openings panels and modules installed on Group R-3 buildings shall not be placed on the portion of a roof that is below an emergency escape buildings shall not be placed on the portion of a roof that is below an emergency escape and rescue opening A pathway of not less than 36 inches (914 mm) wide shall be provided and rescue opening. A pathway of not less than 36 inches (914 mm) wide shall be provided to the emergency escape and rescue opening the emergency escape and rescue opening.120.4.2.3 Locations of DC Conductors Conduit 1204.2.3 Locations of DC conductors conduit, wiring systems, and raceways for photovoltaic circuits shall be located as close as possible to the ridge or hip or valley and from the hip or circuits shall be located as close as possible to the ridge or hip or valley and from the hip or valley as directly as possible to an outside wall to reduce trip hazards and maximize ventilate valley as directly as possible to an outside wall to reduce trip hazards and maximize ventilation opportunities conduit runs between sub arrays and to DC combiner boxes shall be installed in opportunities. Conduit runs between sub arrays and to DC combiner boxes shall be installed in a manner that minimizes the total amount of conduit on the roof by taking the shortest path from a manner that minimizes the total amount of conduit on the roof by taking the shortest path from the array to the DC combiner box. The DC combiner boxes shall be located such that conduit the array to the DC combiner box. The DC combiner boxes shall be located such that conduit runs are minimized in the pathways between arrays DC wiring shall be installed in metallic runs are minimized in the pathways between arrays. DC wiring shall be installed in metallic conduit or raceways when located within enclosed spaces in a building Conduit shall run a conduit or raceways when located within enclosed spaces in a building. Conduit shall run along the bottom of load bearing members the bottom of load bearing members. 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-5 SINGLE LINE DIAGRAM NOTES: · CONDUTORS ON ROOF MUST BE SUNLIGHT RESISTANT, 90°C RATED AND SUITABLE FOR WET LOCATIONS. · SEE RACKING SPEC SHEETS FOR RACKING EQUIPMENT GROUNDING METHOD. · ALL GROUNDING CONDUCTORS MUST BE PROTECTED FROM DAMAGE IF NOT INSTALLED IN CONDUIT. · ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR SUCH USE. WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF OF THE ROOF. · ALL DEVICES USED FOR BONDING FRAMES OF MODULES OR OTHER EQUIPMENT TO THE GROUNDING SYSTEM MUST BE LISTED AND IDENTIFIED FOR THE PURPOSE. · SOLAREDGE OPTIMIZERS ARE TO BE BONDED TO RACKING BY USING EITHER AN OPTIMIZER ATTACHMENT KIT OR A SOLAREDGE GROUNDING PLATE. (SEE SPEC SHEETS). · ALL CONDUCTORS SHALL BE COPPER. · ALL ROOFTOP RACEWAYS SHALL BE INSTALLED A>=7/8" ABOVE ROOF. · INTEGRATED GROUNDING IN ACCORDANCE WITH THE RACKING MANUFACTURER INSTALLATION INSTRUCTIONS CAN ONLY BE USED FOR BONDING THE MODULES TO THE RACKING WHERE THE SPECIFIC MODULE CATALOG NUMBER HAS BEEN TESTED TO UL2703 STANDARDS BY AN ACCREDITED NRTL. WHERE THE MODULE CATALOG NUMBER IS NOT PART OF THE RACKING SYSTEM APPROVED MODULE LIST, BOND ALL MODULES AND ALL RAILS USING A UL2703 LISTED LAY-IN LUG SUCH AS ILSCO GBL-4DBT. 11.060 kW (DC) SOLAR ARRAY: (28) JA SOLAR JAM54S31-395/MR/1500V MODULES WITH (28) SOLAREDGE POWER OPTIMIZERS: S440 WITH (1) SOLAREDGE WAVE 7.6KW INVERTER: SE7600H-US (240V) [SI1-JUN20] (1) STRING OF (15) MODULES & (1) STRING OF (13) MODULES 3/4" EMT OR EQUIVALENT (ON ROOF, UNDER EAVES) (4) #10 AWG THWN-2 CONDUCTORS (1) #8 AWG THWN-2 GROUND CONDUCTORS EXPOSED TO FREE AIR (4) #10 AWG PV-WIRE 600V/RHW-2 (1) #6 AWG BARE COPPER GROUND WIRE IN CONDUIT CAN BE #8 AWG THWN-2 3/4" EMT OR EQUIVALENT (2) #8 AWG THWN-2 CONDUCTORS (1) #8 AWG THWN-2 NEUTRAL (1) #8 AWG THWN-2 GROUND AC DISCONNECT (WITHIN 10' OF MSP) NEMA TYPE 3R UL LISTED JUNCTION BOX AR-01, AR-02, AR-03 & AR-04 (28) JA SOLAR JAM54S31-395/MR/1500V MODULES IN (1) STRING OF (15) MODULES & (1) STRING OF (13) MODULES AT (18°) PITCH AND (90°, 180°, 270° & 360°) ORIENTATION AC OUT DC IN NOTE: INTEGRATED DC DISCONNECT IS INSTALLED WITH RAPID SHUTDOWN DEVICE BY MANUFACTURER IN COMPLIANCE WITH NEC 690.12. (28) SOLAREDGE: S440 DC OPTIMIZERS NEW SQUARE D DU222RB 60A, 240V, 2P NON-FUSED, NEMA 3R ENCLOSURE (OR EQUIV.) SOLAREDGE TECHNOLOGIES: SE7600H-US (240V) [SI1-JUN20] GRID TIED 2-POLE 7600 WATTS INVERTER AC MAX OUTPUT CURRENT OF 32A MAX OUTPUT CURRENT 34.56A 1.56 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.71 AMPACITY OF # WIRE (THWN-2 @ 90 °C) 55 MAXIMUM AMPACITY 34.56A * 1.56 = A < 55A CONTINUOUS DUTY AND HIGH IRIDESCENCE FACTOR DC AMPACITY CALCULATION 55 * 1.0 * 0.71 = A > 34.56A ADJUSTED AMPACITY INVERTER OUTPUT CURRENT 32A CONTINUOUS DUTY FACTOR 1.25 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.88 AMPACITY OF #8 WIRE (USE 75°)50A MAXIMUM AMPACITY 32A * 1.25 = 40.0A < 50A ADJUSTED AMPACITY INVERTER OCPD RATING AC AMPACITY CALCULATION FOR 7.6KW INVERTER 50A * 0.88 = 44.0A > 32A 40A 8 A 53.91 39.05 (2) 5/8" X 8' GND RODS SPACED 6' (MIN.) APART IF NO UFER 200A CENTER FED HOME LOADS 40A UTILITY METER POINT OF CONNECTION (E) 200A 120-240V UTILITY METER NO : SCE 322010-012815 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-5A ELEVATION (N) INVERTER (N) AC DISCONNECT (E) MAIN SERVICE PANEL (N) MODULES ELEVATION SCALE: 3/16" = 1'-0"1 (N) MODULES (N) MODULES 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-7 PLACARDS WARNING WARNING INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVICE. NEC SECTION LOCATION OF LABEL LABEL TEXT AND APPERANCE NEC SECTION LOCATION OF LABEL LABEL TEXT AND APPERANCE 690.54 ALL INTERACTIVE SYSTEM(S) POINTS OF INTERCONNECTION WITH OTHER SOURCES SHALL BE MARKED AT AN ACCESSIBLE LOCATION AT THE DISCONNECTING MEANS AS A POWER SOURCE AND WITH THE RATED AC OUTPUT CURRENT AND THE NOMINAL OPERATING AC VOLTAGE. 690.56(B) 690.4(D) 705.10 A PERMANENT PLAQUE OR DIRECTORY SHALL BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION, OR AT AN APPROVED READILY VISIBLE LOCATION. THE PLAQUE OR DIRECTORY SHALL DENOTE THE LOCATION OF EACH POWER SOURCE DISCONNECTING MEANS FOR THE BUILDING OR STRUCTURE AND BE GROUPED WITH OTHER PLAQUES OR DIRECTORIES FOR OTHER ON-SITE SOURCES. THE PLAQUE OR DIRECTORY SHALL BE MARKED WITH THE WORDING “C UTION: MULTIPLE SOURCES OF POWER͘” NY POSTED DIAGRAMS SHALL BE CORRECTLY ORIENTED WITH RESPECT TO THE DIAGRAM'S LOCATION. THE MARKING SHALL COMPLY WITH 110.21(B). 690.13(B) 690.15 705.20 EACH PV SYSTEM DISCONNECTING MEANS SHALL PLAINLY INDICATE WHETHER IN THE OPEN (OFF) OR CLOSED (ON) POSITION AND BE PERMANENTLY MARKED: “PV SYSTEM DISCONNECT” OR EQUIVALENT. 690.53 A PERMANENT READILY VISIBLE LABEL INDICATING THE HIGHEST MAXIMUM DC VOLTAGE IN A PV SYSTEM, CALCULATED IN ACCORDANCE WITH 690.7, SHALL BE PROVIDED BY THE INSTALLER AT ONE OF THE THREE LOCATIONS. 690.31 (D)(2) UNLESS THE PURPOSE IS EVIDENT, THE FOLLOWING WIRING METHODS AND ENCLOSURES THAT CONTAIN PV SYSTEM DC CIRCUIT CONDUCTORS SHALL BE MARKED: (1) EXPOSED RACEWAYS, CABLE TRAYS, AND OTHER WIRING METHODS (2) COVERS OR ENCLOSURES OF PULL BOXES AND JUNCTION BOXES (3) CONDUIT BODIES IN WHICH ANY OF THE AVAILABLE CONDUIT OPENINGS ARE UNUSED SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY SOLAR ELECTRIC PV PANELS WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A WARNING SIGN SHALL BE MOUNTED ON OR ADJACENT TO THE DISCONNECTING MEANS. 690.13(B) 690.15(C) 705.12 (B)(3)(2) 705.12 (B)(3)(3) 690.56 (C) A PERMANENT WARNING LABEL SHALL BE APPLIED TO THE DISTRIBUTION EQUIPMENT ADJACENT TO THE BACK-FED BREAKER FROM THE INVERTER. PHOTOVOLTAIC SYSTEM AC DISCONNECT PERMANENT WARNING LABELS SHALL BE APPLIED TO DISTRIBUTION EQUIPMENT (2) A RAPID SHUTDOWN SWITCH SHALL HAVE A LABEL LOCATED ON OR NO MORE THAN 3 FT FROM THE SWITCH THAT INCLUDES THIS WORDING. THE LABEL SHALL BE REFLECTIVE, WITH ALL LETTERS CAPITALIZED AND HAVING A MINIMUM HEIGHT OF 3/8 IN., IN WHITE ON RED BACKGROUND . BUILDINGS WITH PV SYSTEMS SHALL HAVE A PERMANENT LABEL LOCATED AT EACH SERVICE EQUIPMENT LOCATION TO WHICH THE PV SYSTEMS ARE CONNECTED OR AT AN APPROVED READILY VISIBLE LOCATION AND SHALL INDICATE THE LOCATION OF RAPID SHUTDOWN INITIATION DEVICES. THE LABEL SHALL INCLUDE A SIMPLE DIAGRAM OF A BUILDING WITH A ROOF AND SHALL INCLUDE THE FOLLOWING WORDS: THE TITLE “SOLAR PV SYSTEM IS EQUIPPED WITH RAPID SHUTDOWN” SHALL UTILIZE CAPITALIZED CHARACTERS WITH A MINIMUM HEIGHT OF 3/8 IN. IN BLACK ON YELLOW BACKGROUND, AND THE REMAINING CHARACTERS SHALL BE CAPITALIZED WITH A MINIMUM HEIGHT OF 3/16 IN. IN BLACK ON WHITE BACKGROUND. MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 240 VOLTS RAPI' SHUT'OWN SWIT&H )OR SOLAR P 9 S<STEM WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR. ELECTRICAL SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION PHOTOVOLTAIC DC DISCONNECT MAIN PHOTOVOLTAIC SYSTEM DISCONNECT MAXIMUM DC VOLTAGE OF PV SYSTEM SOLAR PV DC CIRCUIT PHOTOVOLTAIC POWER SOURCE (1) BUILDING WITH MORE THAN ONE RAPID SHUTDOWN TYPE. FOR BUILDINGS THAT HAVE PV SYSTEMS WITH BOTH RAPID SHUTDOWN TYPES OR A PV SYSTEM WITH A RAPID SHUTDOWN TYPE AND PV SYSTEM WITH NO RAPID SHUTDOWN, A DETAILED PLAN VIEW DIAGRAM OF THE ROOF SHALL BE PROVIDED SHOWING EACH DIFFERENT PV SYSTEM AND DOTTED LINE AROUND AREAS THAT REMAIN ENERGIZED AFTER THE RAPID SHUTDOWN SWITCH IS OPERATED. PHOTOVOLTAIC AC DISCONNECT CAUTION: MULTIPLE SOURCES OF POWER WITH DISCONNECTS LOCATED AS SHOWN N TR I N I D A D W A Y  NE& LA%ELING RE4UIREMENTS 32 AMPS MAIN SERVICE PANEL "YOU ARE HERE" PV AC DISCONNECT SWITCH PV DC DISCONNECT ON INVERTER (NEAR MSP) MSP J B AC INV 1626 E Trinidad Way01/25/23 Digitally sealed by RJM on Date: Job #: 22-20281 E.O.R.: Ryan McPherson, P.E. 9240 Limonite Ave Jurupa Valley, CA 92509 Mobile: (909) 566-0066 Email: SE@mcpe.group 12/14/22 Structural Analysis Report For Photovoltaic System Addition to Existing Structure At The TRIPLETT JR Residence 1626 TRINIDAD WAY Santa Ana, CA 92701 12/14/22 Designed in Accordance with CBC 2019, ASCE 7-16 12/14/2022 9:22 AM 1 of 7 ©McPherson Engineering 1626 E Trinidad Way01/25/23 McPherson Engineering By: F.A. Date: 12/14/22 Project Info 3 Gravity Loads 4 Lateral Loads 5 Wind Uplift Design 6 Summary 7 Table Of Contents 12/14/2022 9:22 AM 2 of 7 ©McPherson Engineering 1626 E Trinidad Way01/25/23 McPherson Engineering By: F.A. Date: 12/14/22 Location: 1626 TRINIDAD WAY Santa Ana, CA 92701 Existing Structure Info: Number of Stories = 1 Aroof = 2787 sq. ft. Roof Square Footage A3rd_flr = 0 sq. ft. Third Floor Square Footage (if applicable) A2nd_flr = 0 sq. ft.Second Floor Square Footage (if applicable) Site Properties: Lattitude = Longitude = Ss = 1.286 S1 = 0.459 Exposure Category = C Ult. Wind Speed = 130 m.p.h. P.V. Array Info: Model = JAM54S31-395/MR Height of Panel = 67.79 in. Width of Panel = 44.64 in. Area of Panel = 21.0 ft.2 Number of New Panels = 28 Number of Exis. Panels = 0 Total Area of Array = 588.4 ft.2 Spacing of Anchors = 5.3 ft. max. on center rows of racks per panel = 2 Panel Tilt = 7-27 deg 33.749553 -117.846261 Project Info 12/14/2022 9:22 AM 3 of 7 ©McPherson Engineering 1626 E Trinidad Way01/25/23 McPherson Engineering By: F.A. Date: 12/14/22 Existing Loads: Roof Design Loads: Roofing = 4.0 p.s.f.Composition roofing Sheathing = 1.5 p.s.f.1/2" Plywood Framing = 1.5 p.s.f.2x Rafter/Truss Framing Misc = 1.0 p.s.f. DLr1 = 8.0 p.s.f.Roofing Dead Load (applied to top of rafters/trusses only) Ceiling = 2.0 p.s.f. Drywall and 2x framing DLr2 = 10.0 p.s.f. Total Existing Roof Dead Load LLr = 20.0 p.s.f. Roof Live Load (Per C.B.C, Table 1607.1) SL = 0.0 p.s.f.Snow Load Floor Design Loads: (if applicable) Flooring = 10.0 p.s.f.Weight of floor finish Sheathing = 2.2 p.s.f.3/4" plywood Framing = 2.0 p.s.f.2x framing or manufactured floor truss Interior Partitions = 15.0 p.s.f.2x framed walls with drywall finish each side Ceiling = 5.0 p.s.f.Drywall ceiling finish below Misc. = 0.8 p.s.f. DLf = 35.0 p.s.f.Total Existing Floor Dead Load Proposed Loads: Panels = 2.8 p.s.f. weight of panels including rack system DLr1_proposed = 10.8 p.s.f. Proposed Roof Dead Load (applied to top only) DLr2_proposed = 12.8 p.s.f.Total Proposed Roof Dead Load LLr_proposed = 0.0 p.s.f. Check Proposed Gravity Loads: Total Existing Roof Load Wex = (DLr1 + LLr) (Aroof) = 78.0 kips Total Proposed Roof Load Wprop = (DLr1 + LLr) (Aroof - Aarray) + (DLr1_proposed + LLr_proposed) (Aarray) = 67.9 kips Proposed Load Demand Gravity Loads Roof Live Loads need not be applied to the area covered with by PV panel where the clear space between the panels and the roof sureface is 24in or less, 1607.13.5.1 item 1 Exception Wprop - Wex = -13.00% TOTAL DECREASE IN GRAVITY LOADS, PANELS OK! Wex 12/14/2022 9:22 AM 4 of 7 ©McPherson Engineering 1626 E Trinidad Way01/25/23 McPherson Engineering By: F.A. Date: 12/14/22 Seismic Design Parameters Risk Category = 2 Per Table 1-5-1 R = 6.5 Response Modification Factor (Table 12-2.1) Site Class = D Per 11.4.2 Ie = 1 Seismic Importance Factor (Table 1.5-2) Ss = 1.29 Short Period P.G.A. S1 = 0.46 1-Sec Period P.G.A. S.D.C. = D Seismic Design Category Per 11.6 Fa = 1.20 Site Coefficient per Table 11.4-1 ASCE 7-16 Supplement #1 Tables used for Fa and Fv Fv = 1.70 Site Coefficient per Table 11.4-2 (note: section 11.4.8 Exception #2 calc used) SMS = SDS Fa = 1.54 Short Period M.C.E. Per Eq. 11.4-1 SM1 = SD1 Fv = 0.78 1-Sec Period M.C.E. Per Eq. 11.4-2 SDS = 2/3 (SMS) = 1.03 Short Period Design Parameter Per Eq 11.4-3 SD1 = 2/3 (SM1) = 0.52 1-Sec Period Design Parameter Per Eq 11.4-4 Approximate Fundamental Period (Per 12.8.2.1) per Eq. 12.8-7 hn = 15 ft Ct = 0.02 (per table 12.8-2) x = 0.75 (per table 12.8-2) T = 0.15 sec Approximate Fundamental Period TL = 8 sec Long-Period Transition Period per Figure 22-12 Seismic Response Coefficient (Per 12.8.1.1) CS = (SDS Ie)/R = 0.16 Seismic Response Coefficient Per Eq. 12.8-2 Cs1 = 1.5*(SD1 Ie)/R T = 0.79 Max. Seismic Response Coefficient Per Eq. 12.8-3 if T ≤ TL Cs2 = 0.01 Min. Seismic Response Coefficient Per Eq. 12.8-5 Cs2 = 0.044 SDS Ie = 0.05 Min. Seismic Response Coefficient Per Eq. 12.8-5 Cs3 = 0.5 S1 Ie/R = 0.04 Min. Seismic Response Coefficient Per Eq. 12.8-6 if S 1 ≥ 0.6g CS = 0.16 Design Seismic Coefficient Check Additional Base Shear Wexisting = 27.9 kips Weight of Existing Structure Wpanels = 1.6 kips Weight of Proposed Panels Vexisting = Cs Wexisting = 4.4 kips Roof Level Shear of Existing Structure Vpanels = Cs Wpanels = 0.3 kips Additional Roof Level Shear of Proposed Panels Vpanels Vexisting Lateral Loads T = Ct (hn) x = 5.82% < 10%PER C.E.B.C. 502.5 EXCEPTION, STRUCTURE DOES NOT REQUIRE SEISMIC RETROFIT, PANELS OK! 12/14/2022 9:22 AM 5 of 7 ©McPherson Engineering 1626 E Trinidad Way01/25/23 McPherson Engineering By: F.A. Date: 12/14/22 Rooftop Solar Panels Wind Pressures (Section 29.4, ASCE 7-16) Vult = 130 mph Kzt = 1.00 (sec 26.8.2) h = 15 ft Exposure Category = C Kz = 0.85 (sec 26.10.1) Roof Zone = 2 Kd = 0.85 (sec 26.6) Roof θ = 7-27 deg Ke = 1.00 (sec 26.9) qh = 0.00256 Kz Kzt Kd Ke V 2 qh = 31.26 (eq. 26.10-1) GPp = -2 uplift γE = 1.5 (sec 29.4.4) γa = 0.73 (fig 29.4-8) γE = 1.5 FIG 29.4-7)γc = 0.94 (fig 29.4-7) hpt = 0 γa = 0.73 (fig 29.4-8)γ p = 0.9 (fig 29.4-7)ω = 0.00 deg (panel tilt) GPp = -2 uplift GCrm = 1.4 uplift p = qh (GPp) γ E γa (eq 29.4-7) p = qh (GCrn) γ E γC γp (eq 29.4-6) p = -68.4 p.s.f.p = 55.5 p.s.f. Check Anchorage to Existing Structure 0.6DL - 0.6W controlling load combination (eq. 16-15 for ASD) DL = 2.8 p.s.f.dead load of panel (inlcuding rack system) W = 68.4 p.s.f.wind load normal to face of panel Arealag = 15.0 sq. ft.area tributary to each anchor SPanc = 5.3 ft.spacing of anchors Puplift = Arealag (0.6DL - 0.6W) = 590.1 lbs total uplift on anchor Material = DFL lumber anchor material Dialag = 5/16 in. diameter of screw Penlag = 2.5 in. min. penetration to existing framing Wlag = 266 lb/in. withdrawal load per in. of penetration per NDS Table 11.2A CD = 1.6 load duration factor for wind per NDS Table 2.3.2 Ct = 0.8 temperature factor per NDS Table 2.3.3 Noscrews = 1 number of screws in withdrawal Pallow = Penlag (Wlag CD Ct) * Noscrews = 851.2 lbs total allowable withrawal on anchor Puplift Pallow Anchorage = USE (1) 5/16IN. DIA. LAG SCREW(S) AT 5.3FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION Wind Uplift Anchorage Flush Mounted Panels - ASCE Section 29.4.4 (where applicable) Flat Roof Panels - ASCE Section 29.4.3 (where applicable) = 0.69 < 1.00 Anchor is OK! 12/14/2022 9:22 AM 6 of 7 ©McPherson Engineering 1626 E Trinidad Way01/25/23 McPherson Engineering By: F.A. Date: 12/14/22 Gravity Loads: DEMAND DECREASED BY 13.% = OK! Lateral Loads: DEMAND INCREASED BY 5.82% < 10% = OK! Anchorage: DEMAND OF 590.1LB. < CAPACITY OF 851.2LB. = OK! USE (1) 5/16IN. DIA. LAG SCREW(S) AT 5.3FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION Summary: STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY ANCHORS ON EAVES/OVERHANGS ARE OK! Summary 12/14/2022 9:22 AM 7 of 7 ©McPherson Engineering 1626 E Trinidad Way01/25/23 Expedited Permit Process for PV Systems1 Expedited Permit Process for PV Systems Standard String System The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Standard String System to use with the Expe- dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 1626 E Trinidad Way01/25/23 Expedited Permit Process for PV Systems2 Expedited Permit Process for Small-Scale PV Systems Standard String System The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft 2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. Composition shingle Flashing & caulk SnapNrack RL Universal #242-92642 1,445.70 62 23 64 575.89 2.5 1626 E Trinidad Way01/25/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Standard String System Site Plan                                                          Penguin Home Solutions 21860 Van Burem Blvd Triplett Jr, Stanley Riverside, CA 92518 1626 Trinidad Way (951) 583-1116 10.220 1626 E Trinidad Way01/25/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Standard String System Electrical Diagram                                                                                                                                                                                                                                                 JA SOLAR JAM54S31-395/MR/1500V MODULES 120-240V 200 200 40 15 13 Penguin Home Solutions 21860 Van Burem Blvd Triplett Jr, Stanley Riverside, CA 92518 1626 Trinidad Way (951) 583-1116 10.220 1626 E Trinidad Way01/25/23 Ex p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for Standard String System Electrical Diagram Contractor Name, Address and Phone: _________________ _________________ _________________ _________________ Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: __________________________ Site Address: ________________________ System AC Size: ______________________ SIZE FSCM NO DWG NO REV SCALE NTS Date: SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS A V V A A W V MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING V W V A A INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE REQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THE REQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAX CURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER OCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTAL SUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)? YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHEST MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC 2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED 47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1 oC). FOR LESS THAN 9 CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT AT LEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF 47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLER FUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES WITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLER FUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE ® REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) RATED MPP CURRENT RATED MPP VOLTAGE MAX SYSTEM VOLTAGE MAX CIRCUIT CURRENT A V V A PHOTOVOLTAIC POWER SOURCE WARNING: ELECTRICAL SHOCK HAZARD–LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION AC OUTPUT CURRENT NOMINAL AC VOLTAGE A V SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Penguin Home Solutions 21860 Van Burem Blvd Triplett Jr, Stanley Riverside, CA 92518 1626 Trinidad Way (951) 583-1116 10.220 1626 E Trinidad Way01/25/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.  Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1626 Trinidad Way, Santa Ana, CA 92701 Penguin Home Solutions 1033658 X X X X X X X X X X Caylan Obando (951) 583-1116 12/30/22 permit@penguin1.com 1626 E Trinidad Way01/25/23 JAM54S31 380-405/MR/1500V Stäubli MC4-EVO2 QC Solar QC 4.10-35 Fire Safety Class Class C 19.5kg or 21.5kg Front Glass 2.8mm or 3.2mm Global_EN_20220329A 1626 E Trinidad Way01/25/23 1626 E Trinidad Way01/25/23 PowerOptimizer )RU5HVLGHQWLDO,QVWDOODWLRQV S4, S50 25 YEAR WARRANTY (QDEOLQJPVpower optimization at the module level Specificallydesigned toworkwithSolarEdge residential inverters 'HWHFWVDEQRUPDO39FRQQHFWRUEHKDYLRU SUHYHQWLQJSRWHQWLDOVDIHW\LVVXHV  0RGXOHOHYHOYROWDJHVKXWGRZQIRULQVWDOOHUDQG ILUHILJKWHUVDIHW\ Superior efficiency(99.5%) 0LWLJDWHVDOOW\SHVRIPRGXOHPLVPDWFKORVVIURP PDQXIDFWXULQJWROHUDQFHWRSDUWLDOVKDGLQJ )DVWHULQVWDOODWLRQVZLWKVLPSOLILHGFDEOH PDQDJHPHQWDQGHDV\DVVHPEO\XVLQJDVLQJOHEROW Flexible systemdesign formaximumspace utilization Compatible withbifacial PVmodules * )XQFWLRQDOLW\VXEMHFWWRLQYHUWHUPRGHODQGILUPZDUHYHUVLRQ solaredge.com PO W E R OP T I M I Z E R PowerOptimizer )RU5HVLGHQWLDO,QVWDOODWLRQV S4, S50 S4S50UNIT Rated Input DCPower(1)40 500 W Absolute MaximumInput Voltage (Voc)60 Vdc MPPT Operating Range 8 - 60 Vdc Maximum Short Circuit Current (Isc) of Connected PV Module 14.5 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.6 % Overvoltage Category II OUTPUT DURING OPERATION Maximum Output Current 15 Adc Maximum Output Voltage 60 Vdc OUTPUT DURING STANDBY (POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimizer 1 Vdc STANDARD COMPLIANCE EMC FCCPart 15 Class B,IEC61000-6-2, IEC61000-6-3&,635(1 Safety IEC62109-1 (class II safety), UL1741 Material UL94 V-0,UV Resistant RoHS Yes Fire Safety VDE-AR-E 2100-712:2013-05 INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Dimensions (W x L x H) 129 x 15x 30 mm Weight (including cables) 655 / 1.5 gr / lb Input Connector MC4(2) Input Wire Length 0.1 m Output Connector MC4 Output Wire Length (+) 2.3, (-) 0.10 m Operating Temperature Range(3) -40 to +85 Ü& Protection Rating IP68 / NEMA6P Relative Humidity 0 - 100 %  Rated power of the module at STCwill not exceed the 3ower 2ptimizer Rated Input DCPower. Modules with up to +5% power tolerance are allowed  For other connector types please contact SolarEdge  For ambient temperature above +70°C / +158°F power de-rating is applied. Refer to Power Optimizers Temperature De-Rating Technical Note for more details  If the inverters rated AC power • maximum nominal power per string, then the maximum power per string will be able to reach up to the inverters maximum input DC power Refer to: https://www.solaredge.com/sites/default/files/se-power-optimizer-single-string-design-application-note.pdf  For the 230/400V grid: it is allowed to install up to 13,500W per string when the maximumpower difference between each string is 2,000W  For the 277/480V grid: it is allowed to install up to 15,000W perstring when the maximumpower difference between each string is 2,000W  It is not allowed to mix S-series and P-series 3ower 2ptimizers in new installations © SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BYSOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All othertrademarks mentioned herein are trademarks of their respective owners. Date:/2021 DS-0000-1.-(1*. Subject tochange without notice. PVSystem Design Using a SolarEdge Inverter Single Phase HD-Wave Three Phase Three Phase for 277/480V Grid Minimum String Length (Power Optimizers)S440, S500 8 16 18 MaximumString Length (Power Optimizers)25 50 Maximum Nominal Power per String(4)5700 11250(5)12750(6) W Parallel Strings ofDifferent Lengths orOrientations Yes 15 1626 E Trinidad Way01/25/23 DESCRIPTION: PART NUMBER(S): DRAWN BY: SNAPNRACK, RL UNIVERSAL, SPEEDSEAL™ MOUNT KIT 242-92642 mwatkins Solar Mounting Solutions THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SUNRUN SOUTH LLC. 595 MARKET STREET, 29TH FLOOR ● SAN FRANCISCO, CA 94105 USA PHONE (415) 580-6900 ● FAX (415) 580-6902A REVISION: MATERIALS: DESIGN LOAD (LBS): ULTIMATE LOAD (LBS): TORQUE SPECIFICATION: CERTIFICATION: WEIGHT (LBS): 6000 SERIES ALUMINUM, STAINLESS STEEL, FOAM 623 UP, 674 DOWN, 505 SIDE N/A 12 LB-FT UL 2703, FILE E359313; WIND-DRIVEN RAIN TEST FROM UL SUBJECT 2582 1.39 PARTS LIST DESCRIPTIONQTYITEM SNAPNRACK, SPEEDSEAL TRACK, 7-1/2IN, SEALING, MILL11 SNAPNRACK, RL UNIVERSAL, MOUNT12 1 2 DESCRIPTION: PART NUMBER(S): DRAWN BY: SNAPNRACK, RL UNIVERSAL, SPEEDSEAL™ MOUNT KIT 242-92642 mwatkins Solar Mounting Solutions THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SUNRUN SOUTH LLC. 595 MARKET STREET, 29TH FLOOR ● SAN FRANCISCO, CA 94105 USA PHONE (415) 580-6900 ● FAX (415) 580-6902A REVISION: ALL DIMENSIONS IN INCHES 3.59 4.591.50 1.09 P2.37 7.50 3.75P1.59 P.33 P2.39 .10.32 1.28 .10 3.10 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-1 COVER SHEET PROJECT NARRATIVE: SYSTEM DESCRIPTION: 1. 11.060 KW DC GRID-TIED SOLAR PHOTOVOLTAIC SYSTEM 2. (4) ARRAY ON A SINGLE STORY RESIDENCE WITH A COMPOSITION SHINGLE ROOF. 3. (1) INVERTER LOCATED WEST WALL. 4. CONNECT SYSTEM TO MSP WITH A NEW 2-POLE PV BREAKER. 5. RUN EMT ON ROOF, UNDER EAVES ON THE EXTERIOR OF THE RESIDENCE. 6. ROOF STRUCTURE: 2" X 6" RAFTERS @ 16" O.C 7. FIRE RATING: JA TYPE-2 MODULE WITH SNAPNRACK CLASS-A RACKING SYSTEM EQUIPMENT LIST: (28) JA SOLAR JAM54S31-395/MR/1500V MODULES (28) SOLAREDGE POWER OPTIMIZERS: S440 (1) SOLAREDGE WAVE 7.6KW INVERTER: SE7600H-US (240V) [SI1-JUN20] (40) SNAPNRACK, ULTRA RAIL MID CLAMPS (32) SNAPNRACK, ULTRA RAIL END CLAMPS (62) SNAPNRACK, UR SPEEDSEAL FOOT (~158FT) SNAPNRACK UR-40 RAIL (1) 40 AMP 2-POLE PV BREAKER (AT MSP) REFERENCE CODES AND CONSTRUCTION NOTES: THIS PROJECT SHALL COMPLY WITH THE FOLLOWING CODES: 2019 CALIFORNIA ELECTRICAL CODE (CEC), 2019 CALIFORNIA RESIDENTIAL CODE (CRC), 2019 CALIFORNIA BUILDING CODE (CBC), 2019 CALIFORNIA FIRE CODE (CFC), 2019 CALIFORNIA PLUMBING CODE (CPC), 2019 CALIFORNIA MECHANICAL CODE (CMC), MANUFACTURER AND PV INDUSTRY STANDARDS, AND ALL STATE AND JURISDICTION BY-LAWS AND ORDINANCES. PROJECT SHALL BE INSTALLED BY A LICENSED CONTRACTOR. VICINITY MAP: (NOT TO SCALE)FRONT OF RESIDENCE PV SYSTEM SUMMARY : 11.060KW ROOF MOUNT RESIDENTIAL PHOTOVOLTAIC SYSTEM SYYSTEM SIZE (DC) : STC: 28 X 395 = 11060 W DC : PTC: 28 X 368.70 = 10323.60 W DC SYSTEM SIZE (CEC-AC): 28 X 368.70 X 99% = 10220.36 W AC MODULES : 28 X JA SOLAR JAM54S31-395/MR/1500V MODULES INVERTER : 1 X SOLAR EDGE SE7600H-US (240V) [SI1-JUN20] ROOF : COMPOSITION SHINGLE TILT : 18° PITCH AZIMUTH : 90°, 180°, 270° & 360° SHEET INTEX PV-1 COVER PV-2 SITE PLAN PV-2A OPTIMIZER CHART PV-3 ARRAY LAYOUT PV-3A FIRE NOTES PV-4 STRUCTURAL ELEVATION PV-5 SINGLE LINE DIAGRAM PV-5A ELEVATION PV-6 ELECTRICAL NOTES PV-7 PLACARDS ATTACHMENTS: + MODULE SPEC SHEET + INVERTER SPEC SHEET + RACKING SPEC SHEET + ENGINEERING LETTER # OF ARRAYS PITCH ORIENTATION 4 18° 90°, 180°, 270° & 360° JURISDICTION CITY OF SANTA ANA DIG ALERT 811 TO BE CONTACTED IN COMPLIANCE WITH EXCAVATION SAFETY IN ACCORDANCE TO GOVERMENT CODE 4216 WILL BE FOLLOW PRIOR TO ANY EXCAVATION TAKING PLACE. BLDG# 101113430 ISS. ELEC# 20178395 ISS. The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. 1626 E Trinidad Way 01/25/23 MS P JB A C IN V SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 SITE PLAN SCALE: 1/16" = 1'-0"1 PV-2 SITE PLAN NOTES: · SMOKE / CARBON MONOXIDE ALARMS ARE REQUIRED TO BE INSTALLED AND IN WORKING CONDITION. · NOTIFY UTILITY COMPANY BEFORE ACTIVATION OF PV SYSTEM. · DO NOT INSTALL INVERTER WHERE IT COULD BE EXPOSED TO DIRECT SUNLIGHT TO AVOID UNWANTED POWER REDUCTION DUE TO AN INCREASE IN THE INTERNAL TEMPERATURE OF THE INVERTER. NORTHNORTH APN #: 398-401-16 SPRINKLER SYSTEM: NO TOTAL ROOF AREA: 2787.39 SOLAR ARRAY AREA: 575.89 % AREA COVERAGE: 20.66% (N) AC DISCONNECT SWITCH (E) RESIDENCE (E) MAIN SERVICE PANEL (SOLAR POINT OF CONNECTION) (N) PV ARRAY AR-01 (E) PROPERTY LINE 54'-8" (N) SOLAR EDGE SE7600H-US (240V) [SI1-JUN20] INVERTER W/ INTEGRATED DC DISCONNECT (WEST WALL) TRINIDAD WAY (E) DRIVEWAY 1204.2.1.1 PATHWAYS TO RIDGE NOT FEWER THAN TWO 36-INCH-WIDE (914 MM) PATHWAYS ON SEPARATE ROOF PLANES, FROM LOWEST ROOF EDGE TO RIDGE, SHALL BE PROVIDED ON ALL BUILDINGS. NOT FEWER THAN ONE PATHWAY SHALL BE PROVIDED ON THE STREET OR DRIVEWAY SIDE OF THE ROOF. FOR EACH ROOF PLANE WITH A PHOTOVOLTAIC ARRAY, NOT FEWER THAN ONE 36-INCH-WIDE (914 MM) PATHWAY FROM LOWEST ROOF EDGE TO RIDGE SHALL BE PROVIDED ON THE SAME ROOF PLANE AS THE PHOTOVOLTAIC ARRAY, ON AN ADJACENT ROOF PLANE OR STRADDLING THE SAME AND ADJACENT ROOF PLANES FIRE CODE 1204.2.1.2 SETBACKS AT RIDGE FOR PHOTOVOLTAIC ARRAYS OCCUPYING 33 PERCENT OR LESS OF THE PLAN VIEW TOTAL ROOF AREA, A SETBACK OF NOT LESS THAN 18 INCHES (457 MM) WIDE IS REQUIRED ON BOTH SIDES OF A HORIZONTAL RIDGE. FOR PHOTOVOLTAIC ARRAYS OCCUPYING MORE THAN 33 PERCENT OF THE PLAN VIEW TOTAL ROOF AREA, A SETBACK OF NOT LESS THAN 36 INCHES (457 MM) WIDE IS REQUIRED ON BOTH SIDES OF A HORIZONTAL RIDGE. (N) PV ARRAY AR-02 (N) PV ARRAY AR-03 (N) PV ARRAY AR-04 ROOF ACCESS POINT ROOF ACCESS POINT 1 1 6 ' - 8 " 1 1 6 ' - 8 " 54'-8" This item has been digitally signed and sealed on 01/03/2023 1626 E Trinidad Way01/25/23 MS P JB A C IN V SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 SITE PLAN SCALE: 1/16" = 1'-0"1 PV-2 SITE PLAN NOTES: · SMOKE / CARBON MONOXIDE ALARMS ARE REQUIRED TO BE INSTALLED AND IN WORKING CONDITION. · NOTIFY UTILITY COMPANY BEFORE ACTIVATION OF PV SYSTEM. · DO NOT INSTALL INVERTER WHERE IT COULD BE EXPOSED TO DIRECT SUNLIGHT TO AVOID UNWANTED POWER REDUCTION DUE TO AN INCREASE IN THE INTERNAL TEMPERATURE OF THE INVERTER. NORTHNORTH APN #: 398-401-16 SPRINKLER SYSTEM: NO TOTAL ROOF AREA: 2787.39 SOLAR ARRAY AREA: 575.89 % AREA COVERAGE: 20.66% (N) AC DISCONNECT SWITCH (E) RESIDENCE (E) MAIN SERVICE PANEL (SOLAR POINT OF CONNECTION) (N) PV ARRAY AR-01 (E) PROPERTY LINE 54'-8" (N) SOLAR EDGE SE7600H-US (240V) [SI1-JUN20] INVERTER W/ INTEGRATED DC DISCONNECT (WEST WALL) TRINIDAD WAY (E) DRIVEWAY 1204.2.1.1 PATHWAYS TO RIDGE NOT FEWER THAN TWO 36-INCH-WIDE (914 MM) PATHWAYS ON SEPARATE ROOF PLANES, FROM LOWEST ROOF EDGE TO RIDGE, SHALL BE PROVIDED ON ALL BUILDINGS. NOT FEWER THAN ONE PATHWAY SHALL BE PROVIDED ON THE STREET OR DRIVEWAY SIDE OF THE ROOF. FOR EACH ROOF PLANE WITH A PHOTOVOLTAIC ARRAY, NOT FEWER THAN ONE 36-INCH-WIDE (914 MM) PATHWAY FROM LOWEST ROOF EDGE TO RIDGE SHALL BE PROVIDED ON THE SAME ROOF PLANE AS THE PHOTOVOLTAIC ARRAY, ON AN ADJACENT ROOF PLANE OR STRADDLING THE SAME AND ADJACENT ROOF PLANES FIRE CODE 1204.2.1.2 SETBACKS AT RIDGE FOR PHOTOVOLTAIC ARRAYS OCCUPYING 33 PERCENT OR LESS OF THE PLAN VIEW TOTAL ROOF AREA, A SETBACK OF NOT LESS THAN 18 INCHES (457 MM) WIDE IS REQUIRED ON BOTH SIDES OF A HORIZONTAL RIDGE. FOR PHOTOVOLTAIC ARRAYS OCCUPYING MORE THAN 33 PERCENT OF THE PLAN VIEW TOTAL ROOF AREA, A SETBACK OF NOT LESS THAN 36 INCHES (457 MM) WIDE IS REQUIRED ON BOTH SIDES OF A HORIZONTAL RIDGE. (N) PV ARRAY AR-02 (N) PV ARRAY AR-03 (N) PV ARRAY AR-04 ROOF ACCESS POINT ROOF ACCESS POINT 1 1 6 ' - 8 " 1 1 6 ' - 8 " 54'-8" This item has been digitally signed and sealed on 01/03/2023 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-6 ELECTRICAL CALCS ASSUMPTIONS: HIGH TEMPERATURE = 37 °C LOW TEMPERATURE = -10 °C ADDED TEMPERATURE FOR CONDUIT RUN ON ROOF = 22 °C 90 °C RATED WIRE FOR DC CURRENT 75 °C RATED WIRE FOR AC CURRENT THAT TERMINATES AT A BREAKER ELECTRICAL NOTES: · ALL PV MODULES, ARRAY FRAMING AND RACKING SHALL BE GROUNDED PER MFR'S SPECIFICATIONS. · ALL EQUIPMENT WILL BE UL 1703, UL 1741, OR UL 2703 LISTED AND CERTIFIED. · INTEGRATED GROUNDING IN ACCORDANCE WITH THE RACKING MANUFACTURER INSTALLATION INSTRUCTIONS CAN ONLY BE USED FOR BONDING THE MODULES TO THE RACKING WHERE THE SPECIFIC MODULE CATALOG NUMBER HAS BEEN TESTED TO UL2703 STANDARDS BY AN ACCREDITED NRTL. WHERE THE MODULE CATALOG NUMBER IS NOT PART OF THE RACKING SYSTEM APPROVED MODULE LIST, BOND ALL MODULES AND ALL RAILS USING A UL2703 LISTED LAY-IN LUG SUCH AS ILSCO GBL-4DBT. · ALL WIRE TERMINATIONS, SPLICES AND CONNECTIONS SHALL BE MADE USING A LISTED DEVICE OR ELECTRICAL BOX SUITED FOR THE PURPOSE. ALL WIRES NOT IN CONDUIT TO BE PROVIDED WITH STRAIN RELIEF AT ENTRY INTO JUNCTION BOXES. · PROVIDE AND INSTALL CONDUIT EXPANSION FITTINGS, PER MANUFACTURER'S SPECIFICATIONS, IN CONDUIT RUNS WHERE THERMAL EXPANSION IS 0.25" OR MORE, BASED ON RECORD MAXIMUM AND MINIMUM TEMPERATURES FOR THE SITE (SEE NEC TABLE 310.15(B)(2)(C), AND USING EXPANSION COEFFICIENT OF STEEL. · BOTH ENDS OF ALL METALLIC CONDUIT CONTAINING GROUNDING ELECTRODE CONDUCTORS SHALL BE BONDED PER NEC 250.64(E). · PROVIDE AND INSTALL ALL GROUNDING AS REQUIRED BY NEC ARTICLES 250, 690 AND SYSTEM MANUFACTURER. · INSTALLATIONS WHICH USE TRANSFORMER-LESS INVERTERS - PV WIRE-600V/RHW-2 TYPE IS REQUIRED FOR ALL DC WIRE RUNS IN FREE AIR, OR NOT IN CONDUIT. · EACH CURRENT CARRYING CONDUCTOR IN ALL PV SOURCE CIRCUITS OR PV OUTPUT CIRCUITS SHALL BE DISCONNECTED/ FUSED, WHEN NECESSARY. ·CONTRACTOR SHALL VERIFY EXISTENCE OF UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATIONS. ·ELECTRICAL TRENCH RUNS, WHERE USED, SHALL USE SCHEDULE 40 PVC CONDUIT AND PROVIDE 18" MIN CLEARANCE FROM TOP OF CONDUIT TO GRADE, AND MAGNETIC WARNING TAPE AT 12" BELOW GRADE. 24" CLEARANCE AND SCHEDULE 80 PVC IS REQUIRED IN AREAS WHERE SUBJECT TO VEHICLE TRAFFIC. · CHECK WITH LOCAL JURISDICTION FOR ANY ADDITIONAL FILL AND COMPACTION REQUIREMENTS, SPOILS TREATMENT AND/OR EROSION CONTROL MEASURES PRIOR TO EXCAVATION. · INSTALLATIONS IN LIGHTENING-PRONE LOCATIONS ARE RECOMMENDED TO UTILIZE DC LIGHTENING ARRESTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ·SUPPLY SIDE CONNECTIONS SHALL ONLY BE MADE WITH LISTED AND APPROVED TAPS. ·ALL WIRE RUNS SHALL NOT EXCEED 2% CALCULATED VOLTAGE DROP. ·USE WATERPROOF FITTINGS FOR ALL EXTERIOR CONDUIT. ·GROUNDING CONDUCTOR (DC SIDE OF INVERTER) IS #10 IF IN CONDUIT, OR #6 awg IF EXPOSED AND SUBJECT TO DAMAGE (NEC 690.46). PV MODULE SPECS MAKE MODEL SHORT CIRCUIT CURRENT OPEN CIRCUIT VOLTAGE OPERATING CURRENT OPERATING VOLTAGE NOMINAL POWER 11.060 kW (DC) SOLAR ARRAY: (28) JA SOLAR JAM54S31-395/MR/1500V MODULES WITH (28) SOLAREDGE POWER OPTIMIZERS: S440 WITH (1) SOLAREDGE WAVE 7.6KW INVERTER: SE7600H-US (240V) [SI1-JUN20] (1) STRING OF (15) MODULES & (1) STRING OF (13) MODULES POWER OPTIMIZER SPECS MAKE MODEL RATED DC POWER MAX INPUT VOLTAGE MPPT OPERATING RANGE MAX ISC INPUT CURRENT MAX OUTPUT CURRENT BUS BAR RATING 200A MAIN BREAKER RATING 200A TOTAL SOLAR BACKFEED NEEDED 40A MAX ALLOWABLE BACKFEED (200A X 120%) - 200A FEEDER BREAKER = 40A ALLOWABLE = 40A SOLAR, SO OK TO CONNECT (PER NEC 705.12) ALLOWABLE SOLAR BACKFEED CALCULATION AT MSP MAX OUTPUT CURRENT 34.56A 1.56 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.71 AMPACITY OF #8 WIRE (THWN-2 @ 90 °C) 55A MAXIMUM AMPACITY 34.56A * 1.56 = 53.91A < 55A CONTINUOUS DUTY AND HIGH IRIDESCENCE FACTOR DC AMPACITY CALCULATION 55A * 1.0 * 0.71 = 39.05A > 34.56A ADJUSTED AMPACITY CALCULATIONS: Vmpp = 400V Vmax = 480V Impp = (28 MODULES) * 395W / 400V = 27.65A Imax = 27.65 * 1.25 = 34.56A INVERTER OUTPUT CURRENT 32A CONTINUOUS DUTY FACTOR 1.25 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.88 AMPACITY OF #8 WIRE (USE 75°)50A MAXIMUM AMPACITY 32A * 1.25 = 40.0A < 50A ADJUSTED AMPACITY INVERTER OCPD RATING AC AMPACITY CALCULATION FOR 7.6KW INVERTER 50A * 0.88 = 44.0A > 32A 40A OPERATING OUTPUT VOLTAGE MAX ALLOWED SYSTEM VOLTAGE NUMBER OF UNITS PER STRING MAX POWER PER STRING INVERTER SPECS RATED AC POWER MODEL MAKE TRANSFORMERLESS, UNGROUNDED MAX INPUT VOLTAGE MAX INPUT CURRENT RATED AC VOLTAGE NOMINAL INPUT VOLTAGE AC VOLTAGE RANGE MAX AC OUTPUT CURRENT AC OVERCURRENT PROTECTION SOLAR EDGE S440 440 W 60 VDC 8 - 60 VDC 14.5A 15 A 60 VDC 480 VDC 8-18 5700 W SOLAR EDGE SE7600H-US 7600W YES 480 VDC 400 VDC 20A 240 VAC 211 - 264 VAC 32A 40.0 A 36.98V 12.81A 30.84V 395W JA SOLAR JAM54S31-395/MR (395)W 13.70A 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-4 STRUCTURAL ELEVATION QUANTITY WEIGHT / UNIT TOTAL WEIGHT MODULE 28 47.4 LBS 1327.20 LBS OPTIMIZER 28 1.40 LBS 39.20 LBS FOOTINGS 62 1.25 LBS 77.50 LBS RAILING 158FT 0.75 LBS/FT 118.50 LBS UFO CLAMPS 40 0.10 LBS 4.0 LBS END CLAMPS 32 0.10 LBS 3.20 LBS WEIGHT OF ARRAY 1569.60 LBS AREA 2076.23 SQFT WEIGHT PER AREA 0.76 LBS/SQFT STRUCTURAL EVALUATION: DEAD LOAD: 0.76 PSF < 4.0 PSF OK 24.9 LBS/PEN < 45 LBS/PEN OK FOOTING SPACING: 64" = 64"" OK TOP PLATE LOAD BEARING WALL RIDGE BOARD 2" X 6" RAFTERS @ 16" O.C SOLAR MODULE 18° SNAPNRACK RACKING MATERIAL LIST 1 SOLAR EDGE SE7600H-US (240V) [SI1-JUN20] QTY EQUIPMENT DESCRIPTION 28 JA SOLAR JAM54S31-395/M R/1500V MODULES 1 JUNCTION BOX 600VDC, NEMA 3R, UL LISTED 1 AC DISCONNECT DISCONNECT, SQD, DU222RB, 60A, 240, 2P, N-FUSIBLE, 3R 1 PV BREAKER 2 POLE, 240V, 40A 62 ATTACHMENTS SNAPNRACK, UR SPEEDSEAL FOOT 158' RAIL SNAPNRACK RACKING 40 MID CLAMPS SNAPNRACK, ULTRA RAIL MID CLAMPS 32 END CLAMPS SNAPNRACK, ULTRA RAIL END CLAMPS 50' CONDUIT 3/4" OR LARGER EMT CONDUIT 32 END CAP SNAPNRACK, UL-40 END CAP 8 SPLICE SNAPNRACK, UL-40 SPLICE 28 ATTACHMENT KIT SNAPNRACK, MLPE RAIL ATTACHMENT KIT 60 WASHER SNAPNRACK, SEALING WASHER LAG, 4-1/2IN, SS 28 SOLAREDGE: S440 DC OPTIMIZERS SOLAREDGE, S440-5 SERIES-SXX, DC OPTIMIZERS , 440W, MAX VOC 60V 1/2" PLYWOOD SHEATHING COMPOSITION SHINGLE ROOF @ 18° PITCH LAG BOLT SCHEDULE LOCATION INFIELD 3' SIDE ZONES 3' CORNER ZONES SELF TAPING SCREWS 5/16" x 2.5" 5/16" x 2.5"5/16" x 2.5" 4" MAX. DC INPUT VOLTAGE : MAX. AC OUTPUT VOLTAGE RANGE : MAX. AC OUTPUT CURRENT : MAX. AC POWER OUPUT : CEC EFFICIENCY : 480V 211-264V 32.0A 7600W 99% OPEN CIRCUIT VOLTAGE (Voc) : MAX. POWER VOLTAGE (Vmp) : SHORT CIRCUIT CURRENT (Isc) : MAX. POWER CURRENT (Imp) : PTC RATING : 36.98V 30.84V 13.70A 12.81A 368.7W This item has been digitally signed and sealed on 12/14/2022 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-4 STRUCTURAL ELEVATION QUANTITY WEIGHT / UNIT TOTAL WEIGHT MODULE 28 47.4 LBS 1327.20 LBS OPTIMIZER 28 1.40 LBS 39.20 LBS FOOTINGS 62 1.25 LBS 77.50 LBS RAILING 158FT 0.75 LBS/FT 118.50 LBS UFO CLAMPS 40 0.10 LBS 4.0 LBS END CLAMPS 32 0.10 LBS 3.20 LBS WEIGHT OF ARRAY 1569.60 LBS AREA 2076.23 SQFT WEIGHT PER AREA 0.76 LBS/SQFT STRUCTURAL EVALUATION: DEAD LOAD: 0.76 PSF < 4.0 PSF OK 24.9 LBS/PEN < 45 LBS/PEN OK FOOTING SPACING: 64" = 64"" OK TOP PLATE LOAD BEARING WALL RIDGE BOARD 2" X 6" RAFTERS @ 16" O.C SOLAR MODULE 18° SNAPNRACK RACKING MATERIAL LIST 1 SOLAR EDGE SE7600H-US (240V) [SI1-JUN20] QTY EQUIPMENT DESCRIPTION 28 JA SOLAR JAM54S31-395/M R/1500V MODULES 1 JUNCTION BOX 600VDC, NEMA 3R, UL LISTED 1 AC DISCONNECT DISCONNECT, SQD, DU222RB, 60A, 240, 2P, N-FUSIBLE, 3R 1 PV BREAKER 2 POLE, 240V, 40A 62 ATTACHMENTS SNAPNRACK, UR SPEEDSEAL FOOT 158' RAIL SNAPNRACK RACKING 40 MID CLAMPS SNAPNRACK, ULTRA RAIL MID CLAMPS 32 END CLAMPS SNAPNRACK, ULTRA RAIL END CLAMPS 50' CONDUIT 3/4" OR LARGER EMT CONDUIT 32 END CAP SNAPNRACK, UL-40 END CAP 8 SPLICE SNAPNRACK, UL-40 SPLICE 28 ATTACHMENT KIT SNAPNRACK, MLPE RAIL ATTACHMENT KIT 60 WASHER SNAPNRACK, SEALING WASHER LAG, 4-1/2IN, SS 28 SOLAREDGE: S440 DC OPTIMIZERS SOLAREDGE, S440-5 SERIES-SXX, DC OPTIMIZERS , 440W, MAX VOC 60V 1/2" PLYWOOD SHEATHING COMPOSITION SHINGLE ROOF @ 18° PITCH LAG BOLT SCHEDULE LOCATION INFIELD 3' SIDE ZONES 3' CORNER ZONES SELF TAPING SCREWS 5/16" x 2.5" 5/16" x 2.5"5/16" x 2.5" 4" MAX. DC INPUT VOLTAGE : MAX. AC OUTPUT VOLTAGE RANGE : MAX. AC OUTPUT CURRENT : MAX. AC POWER OUPUT : CEC EFFICIENCY : 480V 211-264V 32.0A 7600W 99% OPEN CIRCUIT VOLTAGE (Voc) : MAX. POWER VOLTAGE (Vmp) : SHORT CIRCUIT CURRENT (Isc) : MAX. POWER CURRENT (Imp) : PTC RATING : 36.98V 30.84V 13.70A 12.81A 368.7W This item has been digitally signed and sealed on 12/14/2022 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-6 ELECTRICAL CALCS ASSUMPTIONS: HIGH TEMPERATURE = 37 °C LOW TEMPERATURE = -10 °C ADDED TEMPERATURE FOR CONDUIT RUN ON ROOF = 22 °C 90 °C RATED WIRE FOR DC CURRENT 75 °C RATED WIRE FOR AC CURRENT THAT TERMINATES AT A BREAKER ELECTRICAL NOTES: · ALL PV MODULES, ARRAY FRAMING AND RACKING SHALL BE GROUNDED PER MFR'S SPECIFICATIONS. · ALL EQUIPMENT WILL BE UL 1703, UL 1741, OR UL 2703 LISTED AND CERTIFIED. · INTEGRATED GROUNDING IN ACCORDANCE WITH THE RACKING MANUFACTURER INSTALLATION INSTRUCTIONS CAN ONLY BE USED FOR BONDING THE MODULES TO THE RACKING WHERE THE SPECIFIC MODULE CATALOG NUMBER HAS BEEN TESTED TO UL2703 STANDARDS BY AN ACCREDITED NRTL. WHERE THE MODULE CATALOG NUMBER IS NOT PART OF THE RACKING SYSTEM APPROVED MODULE LIST, BOND ALL MODULES AND ALL RAILS USING A UL2703 LISTED LAY-IN LUG SUCH AS ILSCO GBL-4DBT. · ALL WIRE TERMINATIONS, SPLICES AND CONNECTIONS SHALL BE MADE USING A LISTED DEVICE OR ELECTRICAL BOX SUITED FOR THE PURPOSE. ALL WIRES NOT IN CONDUIT TO BE PROVIDED WITH STRAIN RELIEF AT ENTRY INTO JUNCTION BOXES. · PROVIDE AND INSTALL CONDUIT EXPANSION FITTINGS, PER MANUFACTURER'S SPECIFICATIONS, IN CONDUIT RUNS WHERE THERMAL EXPANSION IS 0.25" OR MORE, BASED ON RECORD MAXIMUM AND MINIMUM TEMPERATURES FOR THE SITE (SEE NEC TABLE 310.15(B)(2)(C), AND USING EXPANSION COEFFICIENT OF STEEL. · BOTH ENDS OF ALL METALLIC CONDUIT CONTAINING GROUNDING ELECTRODE CONDUCTORS SHALL BE BONDED PER NEC 250.64(E). · PROVIDE AND INSTALL ALL GROUNDING AS REQUIRED BY NEC ARTICLES 250, 690 AND SYSTEM MANUFACTURER. · INSTALLATIONS WHICH USE TRANSFORMER-LESS INVERTERS - PV WIRE-600V/RHW-2 TYPE IS REQUIRED FOR ALL DC WIRE RUNS IN FREE AIR, OR NOT IN CONDUIT. · EACH CURRENT CARRYING CONDUCTOR IN ALL PV SOURCE CIRCUITS OR PV OUTPUT CIRCUITS SHALL BE DISCONNECTED/ FUSED, WHEN NECESSARY. ·CONTRACTOR SHALL VERIFY EXISTENCE OF UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATIONS. ·ELECTRICAL TRENCH RUNS, WHERE USED, SHALL USE SCHEDULE 40 PVC CONDUIT AND PROVIDE 18" MIN CLEARANCE FROM TOP OF CONDUIT TO GRADE, AND MAGNETIC WARNING TAPE AT 12" BELOW GRADE. 24" CLEARANCE AND SCHEDULE 80 PVC IS REQUIRED IN AREAS WHERE SUBJECT TO VEHICLE TRAFFIC. · CHECK WITH LOCAL JURISDICTION FOR ANY ADDITIONAL FILL AND COMPACTION REQUIREMENTS, SPOILS TREATMENT AND/OR EROSION CONTROL MEASURES PRIOR TO EXCAVATION. · INSTALLATIONS IN LIGHTENING-PRONE LOCATIONS ARE RECOMMENDED TO UTILIZE DC LIGHTENING ARRESTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ·SUPPLY SIDE CONNECTIONS SHALL ONLY BE MADE WITH LISTED AND APPROVED TAPS. ·ALL WIRE RUNS SHALL NOT EXCEED 2% CALCULATED VOLTAGE DROP. ·USE WATERPROOF FITTINGS FOR ALL EXTERIOR CONDUIT. ·GROUNDING CONDUCTOR (DC SIDE OF INVERTER) IS #10 IF IN CONDUIT, OR #6 awg IF EXPOSED AND SUBJECT TO DAMAGE (NEC 690.46). PV MODULE SPECS MAKE MODEL SHORT CIRCUIT CURRENT OPEN CIRCUIT VOLTAGE OPERATING CURRENT OPERATING VOLTAGE NOMINAL POWER 11.060 kW (DC) SOLAR ARRAY: (28) JA SOLAR JAM54S31-395/MR/1500V MODULES WITH (28) SOLAREDGE POWER OPTIMIZERS: S440 WITH (1) SOLAREDGE WAVE 7.6KW INVERTER: SE7600H-US (240V) [SI1-JUN20] (1) STRING OF (15) MODULES & (1) STRING OF (13) MODULES POWER OPTIMIZER SPECS MAKE MODEL RATED DC POWER MAX INPUT VOLTAGE MPPT OPERATING RANGE MAX ISC INPUT CURRENT MAX OUTPUT CURRENT BUS BAR RATING 200A MAIN BREAKER RATING 200A TOTAL SOLAR BACKFEED NEEDED 40A MAX ALLOWABLE BACKFEED (200A X 120%) - 200A FEEDER BREAKER = 40A ALLOWABLE = 40A SOLAR, SO OK TO CONNECT (PER NEC 705.12) ALLOWABLE SOLAR BACKFEED CALCULATION AT MSP MAX OUTPUT CURRENT 34.56A 1.56 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.71 AMPACITY OF #8 WIRE (THWN-2 @ 90 °C) 55A MAXIMUM AMPACITY 34.56A * 1.56 = 53.91A < 55A CONTINUOUS DUTY AND HIGH IRIDESCENCE FACTOR DC AMPACITY CALCULATION 55A * 1.0 * 0.71 = 39.05A > 34.56A ADJUSTED AMPACITY CALCULATIONS: Vmpp = 400V Vmax = 480V Impp = (28 MODULES) * 395W / 400V = 27.65A Imax = 27.65 * 1.25 = 34.56A INVERTER OUTPUT CURRENT 32A CONTINUOUS DUTY FACTOR 1.25 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.88 AMPACITY OF #8 WIRE (USE 75°)50A MAXIMUM AMPACITY 32A * 1.25 = 40.0A < 50A ADJUSTED AMPACITY INVERTER OCPD RATING AC AMPACITY CALCULATION FOR 7.6KW INVERTER 50A * 0.88 = 44.0A > 32A 40A OPERATING OUTPUT VOLTAGE MAX ALLOWED SYSTEM VOLTAGE NUMBER OF UNITS PER STRING MAX POWER PER STRING INVERTER SPECS RATED AC POWER MODEL MAKE TRANSFORMERLESS, UNGROUNDED MAX INPUT VOLTAGE MAX INPUT CURRENT RATED AC VOLTAGE NOMINAL INPUT VOLTAGE AC VOLTAGE RANGE MAX AC OUTPUT CURRENT AC OVERCURRENT PROTECTION SOLAR EDGE S440 440 W 60 VDC 8 - 60 VDC 14.5A 15 A 60 VDC 480 VDC 8-18 5700 W SOLAR EDGE SE7600H-US 7600W YES 480 VDC 400 VDC 20A 240 VAC 211 - 264 VAC 32A 40.0 A 36.98V 12.81A 30.84V 395W JA SOLAR JAM54S31-395/MR (395)W 13.70A 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-6 ELECTRICAL CALCS ASSUMPTIONS: HIGH TEMPERATURE = 37 °C LOW TEMPERATURE = -10 °C ADDED TEMPERATURE FOR CONDUIT RUN ON ROOF = 22 °C 90 °C RATED WIRE FOR DC CURRENT 75 °C RATED WIRE FOR AC CURRENT THAT TERMINATES AT A BREAKER ELECTRICAL NOTES: · ALL PV MODULES, ARRAY FRAMING AND RACKING SHALL BE GROUNDED PER MFR'S SPECIFICATIONS. · ALL EQUIPMENT WILL BE UL 1703, UL 1741, OR UL 2703 LISTED AND CERTIFIED. · INTEGRATED GROUNDING IN ACCORDANCE WITH THE RACKING MANUFACTURER INSTALLATION INSTRUCTIONS CAN ONLY BE USED FOR BONDING THE MODULES TO THE RACKING WHERE THE SPECIFIC MODULE CATALOG NUMBER HAS BEEN TESTED TO UL2703 STANDARDS BY AN ACCREDITED NRTL. WHERE THE MODULE CATALOG NUMBER IS NOT PART OF THE RACKING SYSTEM APPROVED MODULE LIST, BOND ALL MODULES AND ALL RAILS USING A UL2703 LISTED LAY-IN LUG SUCH AS ILSCO GBL-4DBT. · ALL WIRE TERMINATIONS, SPLICES AND CONNECTIONS SHALL BE MADE USING A LISTED DEVICE OR ELECTRICAL BOX SUITED FOR THE PURPOSE. ALL WIRES NOT IN CONDUIT TO BE PROVIDED WITH STRAIN RELIEF AT ENTRY INTO JUNCTION BOXES. · PROVIDE AND INSTALL CONDUIT EXPANSION FITTINGS, PER MANUFACTURER'S SPECIFICATIONS, IN CONDUIT RUNS WHERE THERMAL EXPANSION IS 0.25" OR MORE, BASED ON RECORD MAXIMUM AND MINIMUM TEMPERATURES FOR THE SITE (SEE NEC TABLE 310.15(B)(2)(C), AND USING EXPANSION COEFFICIENT OF STEEL. · BOTH ENDS OF ALL METALLIC CONDUIT CONTAINING GROUNDING ELECTRODE CONDUCTORS SHALL BE BONDED PER NEC 250.64(E). · PROVIDE AND INSTALL ALL GROUNDING AS REQUIRED BY NEC ARTICLES 250, 690 AND SYSTEM MANUFACTURER. · INSTALLATIONS WHICH USE TRANSFORMER-LESS INVERTERS - PV WIRE-600V/RHW-2 TYPE IS REQUIRED FOR ALL DC WIRE RUNS IN FREE AIR, OR NOT IN CONDUIT. · EACH CURRENT CARRYING CONDUCTOR IN ALL PV SOURCE CIRCUITS OR PV OUTPUT CIRCUITS SHALL BE DISCONNECTED/ FUSED, WHEN NECESSARY. ·CONTRACTOR SHALL VERIFY EXISTENCE OF UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATIONS. ·ELECTRICAL TRENCH RUNS, WHERE USED, SHALL USE SCHEDULE 40 PVC CONDUIT AND PROVIDE 18" MIN CLEARANCE FROM TOP OF CONDUIT TO GRADE, AND MAGNETIC WARNING TAPE AT 12" BELOW GRADE. 24" CLEARANCE AND SCHEDULE 80 PVC IS REQUIRED IN AREAS WHERE SUBJECT TO VEHICLE TRAFFIC. · CHECK WITH LOCAL JURISDICTION FOR ANY ADDITIONAL FILL AND COMPACTION REQUIREMENTS, SPOILS TREATMENT AND/OR EROSION CONTROL MEASURES PRIOR TO EXCAVATION. · INSTALLATIONS IN LIGHTENING-PRONE LOCATIONS ARE RECOMMENDED TO UTILIZE DC LIGHTENING ARRESTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ·SUPPLY SIDE CONNECTIONS SHALL ONLY BE MADE WITH LISTED AND APPROVED TAPS. ·ALL WIRE RUNS SHALL NOT EXCEED 2% CALCULATED VOLTAGE DROP. ·USE WATERPROOF FITTINGS FOR ALL EXTERIOR CONDUIT. ·GROUNDING CONDUCTOR (DC SIDE OF INVERTER) IS #10 IF IN CONDUIT, OR #6 awg IF EXPOSED AND SUBJECT TO DAMAGE (NEC 690.46). PV MODULE SPECS MAKE MODEL SHORT CIRCUIT CURRENT OPEN CIRCUIT VOLTAGE OPERATING CURRENT OPERATING VOLTAGE NOMINAL POWER 11.060 kW (DC) SOLAR ARRAY: (28) JA SOLAR JAM54S31-395/MR/1500V MODULES WITH (28) SOLAREDGE POWER OPTIMIZERS: S440 WITH (1) SOLAREDGE WAVE 7.6KW INVERTER: SE7600H-US (240V) [SI1-JUN20] (1) STRING OF (15) MODULES & (1) STRING OF (13) MODULES POWER OPTIMIZER SPECS MAKE MODEL RATED DC POWER MAX INPUT VOLTAGE MPPT OPERATING RANGE MAX ISC INPUT CURRENT MAX OUTPUT CURRENT BUS BAR RATING 200A MAIN BREAKER RATING 200A TOTAL SOLAR BACKFEED NEEDED 40A MAX ALLOWABLE BACKFEED (200A X 120%) - 200A FEEDER BREAKER = 40A ALLOWABLE = 40A SOLAR, SO OK TO CONNECT (PER NEC 705.12) ALLOWABLE SOLAR BACKFEED CALCULATION AT MSP MAX OUTPUT CURRENT 34.56A 1.56 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.71 AMPACITY OF #8 WIRE (THWN-2 @ 90 °C) 55A MAXIMUM AMPACITY 34.56A * 1.56 = 53.91A < 55A CONTINUOUS DUTY AND HIGH IRIDESCENCE FACTOR DC AMPACITY CALCULATION 55A * 1.0 * 0.71 = 39.05A > 34.56A ADJUSTED AMPACITY CALCULATIONS: Vmpp = 400V Vmax = 480V Impp = (28 MODULES) * 395W / 400V = 27.65A Imax = 27.65 * 1.25 = 34.56A INVERTER OUTPUT CURRENT 32A CONTINUOUS DUTY FACTOR 1.25 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.88 AMPACITY OF #8 WIRE (USE 75°)50A MAXIMUM AMPACITY 32A * 1.25 = 40.0A < 50A ADJUSTED AMPACITY INVERTER OCPD RATING AC AMPACITY CALCULATION FOR 7.6KW INVERTER 50A * 0.88 = 44.0A > 32A 40A OPERATING OUTPUT VOLTAGE MAX ALLOWED SYSTEM VOLTAGE NUMBER OF UNITS PER STRING MAX POWER PER STRING INVERTER SPECS RATED AC POWER MODEL MAKE TRANSFORMERLESS, UNGROUNDED MAX INPUT VOLTAGE MAX INPUT CURRENT RATED AC VOLTAGE NOMINAL INPUT VOLTAGE AC VOLTAGE RANGE MAX AC OUTPUT CURRENT AC OVERCURRENT PROTECTION SOLAR EDGE S440 440 W 60 VDC 8 - 60 VDC 14.5A 15 A 60 VDC 480 VDC 8-18 5700 W SOLAR EDGE SE7600H-US 7600W YES 480 VDC 400 VDC 20A 240 VAC 211 - 264 VAC 32A 40.0 A 36.98V 12.81A 30.84V 395W JA SOLAR JAM54S31-395/MR (395)W 13.70A 1626 E Trinidad Way01/25/23 SHEET: DRAFTER SIGNATURE PROJECT ADDRESS: REVISION # DATE: 12/14/2022 DRAWING TYPE PENGUIN HOME SOLUTIONS TRIPLETT JR, STANLEY 1626 TRINIDAD WAY, (714) 679-1808 21860 VAN BUREN BLVD, BLDG 11, SUITE 101, RIVERSIDE, CA 92518 (888) 488 8001 LICENSE#: C-10 1033658 SANTA ANA, CA 92701 PV-6 ELECTRICAL CALCS ASSUMPTIONS: HIGH TEMPERATURE = 37 °C LOW TEMPERATURE = -10 °C ADDED TEMPERATURE FOR CONDUIT RUN ON ROOF = 22 °C 90 °C RATED WIRE FOR DC CURRENT 75 °C RATED WIRE FOR AC CURRENT THAT TERMINATES AT A BREAKER ELECTRICAL NOTES: · ALL PV MODULES, ARRAY FRAMING AND RACKING SHALL BE GROUNDED PER MFR'S SPECIFICATIONS. · ALL EQUIPMENT WILL BE UL 1703, UL 1741, OR UL 2703 LISTED AND CERTIFIED. · INTEGRATED GROUNDING IN ACCORDANCE WITH THE RACKING MANUFACTURER INSTALLATION INSTRUCTIONS CAN ONLY BE USED FOR BONDING THE MODULES TO THE RACKING WHERE THE SPECIFIC MODULE CATALOG NUMBER HAS BEEN TESTED TO UL2703 STANDARDS BY AN ACCREDITED NRTL. WHERE THE MODULE CATALOG NUMBER IS NOT PART OF THE RACKING SYSTEM APPROVED MODULE LIST, BOND ALL MODULES AND ALL RAILS USING A UL2703 LISTED LAY-IN LUG SUCH AS ILSCO GBL-4DBT. · ALL WIRE TERMINATIONS, SPLICES AND CONNECTIONS SHALL BE MADE USING A LISTED DEVICE OR ELECTRICAL BOX SUITED FOR THE PURPOSE. ALL WIRES NOT IN CONDUIT TO BE PROVIDED WITH STRAIN RELIEF AT ENTRY INTO JUNCTION BOXES. · PROVIDE AND INSTALL CONDUIT EXPANSION FITTINGS, PER MANUFACTURER'S SPECIFICATIONS, IN CONDUIT RUNS WHERE THERMAL EXPANSION IS 0.25" OR MORE, BASED ON RECORD MAXIMUM AND MINIMUM TEMPERATURES FOR THE SITE (SEE NEC TABLE 310.15(B)(2)(C), AND USING EXPANSION COEFFICIENT OF STEEL. · BOTH ENDS OF ALL METALLIC CONDUIT CONTAINING GROUNDING ELECTRODE CONDUCTORS SHALL BE BONDED PER NEC 250.64(E). · PROVIDE AND INSTALL ALL GROUNDING AS REQUIRED BY NEC ARTICLES 250, 690 AND SYSTEM MANUFACTURER. · INSTALLATIONS WHICH USE TRANSFORMER-LESS INVERTERS - PV WIRE-600V/RHW-2 TYPE IS REQUIRED FOR ALL DC WIRE RUNS IN FREE AIR, OR NOT IN CONDUIT. · EACH CURRENT CARRYING CONDUCTOR IN ALL PV SOURCE CIRCUITS OR PV OUTPUT CIRCUITS SHALL BE DISCONNECTED/ FUSED, WHEN NECESSARY. ·CONTRACTOR SHALL VERIFY EXISTENCE OF UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATIONS. ·ELECTRICAL TRENCH RUNS, WHERE USED, SHALL USE SCHEDULE 40 PVC CONDUIT AND PROVIDE 18" MIN CLEARANCE FROM TOP OF CONDUIT TO GRADE, AND MAGNETIC WARNING TAPE AT 12" BELOW GRADE. 24" CLEARANCE AND SCHEDULE 80 PVC IS REQUIRED IN AREAS WHERE SUBJECT TO VEHICLE TRAFFIC. · CHECK WITH LOCAL JURISDICTION FOR ANY ADDITIONAL FILL AND COMPACTION REQUIREMENTS, SPOILS TREATMENT AND/OR EROSION CONTROL MEASURES PRIOR TO EXCAVATION. · INSTALLATIONS IN LIGHTENING-PRONE LOCATIONS ARE RECOMMENDED TO UTILIZE DC LIGHTENING ARRESTORS IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ·SUPPLY SIDE CONNECTIONS SHALL ONLY BE MADE WITH LISTED AND APPROVED TAPS. ·ALL WIRE RUNS SHALL NOT EXCEED 2% CALCULATED VOLTAGE DROP. ·USE WATERPROOF FITTINGS FOR ALL EXTERIOR CONDUIT. ·GROUNDING CONDUCTOR (DC SIDE OF INVERTER) IS #10 IF IN CONDUIT, OR #6 awg IF EXPOSED AND SUBJECT TO DAMAGE (NEC 690.46). PV MODULE SPECS MAKE MODEL SHORT CIRCUIT CURRENT OPEN CIRCUIT VOLTAGE OPERATING CURRENT OPERATING VOLTAGE NOMINAL POWER 11.060 kW (DC) SOLAR ARRAY: (28) JA SOLAR JAM54S31-395/MR/1500V MODULES WITH (28) SOLAREDGE POWER OPTIMIZERS: S440 WITH (1) SOLAREDGE WAVE 7.6KW INVERTER: SE7600H-US (240V) [SI1-JUN20] (1) STRING OF (15) MODULES & (1) STRING OF (13) MODULES POWER OPTIMIZER SPECS MAKE MODEL RATED DC POWER MAX INPUT VOLTAGE MPPT OPERATING RANGE MAX ISC INPUT CURRENT MAX OUTPUT CURRENT BUS BAR RATING 200A MAIN BREAKER RATING 200A TOTAL SOLAR BACKFEED NEEDED 40A MAX ALLOWABLE BACKFEED (200A X 120%) - 200A FEEDER BREAKER = 40A ALLOWABLE = 40A SOLAR, SO OK TO CONNECT (PER NEC 705.12) ALLOWABLE SOLAR BACKFEED CALCULATION AT MSP MAX OUTPUT CURRENT 34.56A 1.56 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.71 AMPACITY OF #8 WIRE (THWN-2 @ 90 °C) 55A MAXIMUM AMPACITY 34.56A * 1.56 = 53.91A < 55A CONTINUOUS DUTY AND HIGH IRIDESCENCE FACTOR DC AMPACITY CALCULATION 55A * 1.0 * 0.71 = 39.05A > 34.56A ADJUSTED AMPACITY CALCULATIONS: Vmpp = 400V Vmax = 480V Impp = (28 MODULES) * 395W / 400V = 27.65A Imax = 27.65 * 1.25 = 34.56A INVERTER OUTPUT CURRENT 32A CONTINUOUS DUTY FACTOR 1.25 MULTIPLE CONDUCTOR FACTOR 1.0 TEMP CORRECTION FACTOR 0.88 AMPACITY OF #8 WIRE (USE 75°)50A MAXIMUM AMPACITY 32A * 1.25 = 40.0A < 50A ADJUSTED AMPACITY INVERTER OCPD RATING AC AMPACITY CALCULATION FOR 7.6KW INVERTER 50A * 0.88 = 44.0A > 32A 40A OPERATING OUTPUT VOLTAGE MAX ALLOWED SYSTEM VOLTAGE NUMBER OF UNITS PER STRING MAX POWER PER STRING INVERTER SPECS RATED AC POWER MODEL MAKE TRANSFORMERLESS, UNGROUNDED MAX INPUT VOLTAGE MAX INPUT CURRENT RATED AC VOLTAGE NOMINAL INPUT VOLTAGE AC VOLTAGE RANGE MAX AC OUTPUT CURRENT AC OVERCURRENT PROTECTION SOLAR EDGE S440 440 W 60 VDC 8 - 60 VDC 14.5A 15 A 60 VDC 480 VDC 8-18 5700 W SOLAR EDGE SE7600H-US 7600W YES 480 VDC 400 VDC 20A 240 VAC 211 - 264 VAC 32A 40.0 A 36.98V 12.81A 30.84V 395W JA SOLAR JAM54S31-395/MR (395)W 13.70A 1626 E Trinidad Way01/25/23