HomeMy WebLinkAbout2411 N North Park Blvd - 101123193 & 20185555 - PlanBldg #101123193 Elect #20185555 Approval per PV checklist & Solar ABC forms. ***The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown.*** 2411 N North Park Blvd4/24/2025 PV-2 WE A T H E R F O R D , T R A C E Designed & Drafted - John@ designs.solar SO L A R T E C H E N E R G Y S Y S T E M S I N C 24 1 1 N O R T H P A R K B O U L E V A R D 94 9 - 4 3 9 - 6 5 3 1 AP N 2 0 6 3 2 6 61 9 - 7 4 3 - 9 1 9 3 11 0 6 7 7 7 - C - 4 6 AUTHORIZED SIGNEE EQ U I P M E NT September 4, 2024 (2 5 ) S U N P O W E R S P R - M 4 2 5 - H - A C MO D U L E S GENERAL NOTES SA N T A A N A , C A 9 2 7 0 6 DISCONNECT MEANS MUST HAVE DEDICATED CLEAR UNOBSTRUCTED WORKING SPACE NOT LESS THAN 3' DEEP BY 2.5' WIDE TO NOT LESS THAN 6.5' ABOVE WALKABLE SURFACES IN FRONT OF DISTRIBUTION PANEL. ALL SOLAR MODULES, EQUIPMENT, AND METALLIC COMPONENTS TO BE BONDED. PV ARRAY NOT TO EXCEED HIGHEST POINT OF THE ROOF. SOLARTECH ENERGY SYSTEMS INC CU S T O M E R (2 5 ) I N T E G R A T E D ( 2 4 0 ) IN V E R T E R ( S ) CO NTR A C T O R EL C A J O N , C A 9 2 0 2 1 94 1 0 B O N D A V E N U E Azimuth: 180°ROOF AREA: 2922 - ARRAY AREA: 519 COVERAGE: 17.76% SITE PLAN Slope: 1° or 0:12 pitch JOHN LAVENDER 26 This item has been digitally signed and sealed on Sep 04, 2024 STRUCTURAL ONLY 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 Date: Job #: Jurupa Valley, CA 92509 Email: ryan@mcpherson.engineering 1/4/24 24‐00025 Mobile: (909) 569‐2244 Structural Analysis Report For Photovoltaic System Addition to Existing Structure At The Weatherford  Residence 2411 North Park Boulevard  Santa Ana , CA 92706 Designed in Accordance with CBC 2022, ASCE 7‐16, NDS 2018 E.O.R.: Ryan McPherson, P.E. 9240 Limonite Ave, 1/4/2024  10:45 AM 1 of 9 ©McPherson Engineering 26 This item has been digitally signed and sealed on Sep 04, 2024 2411 N North Park Blvd4/24/2025 McPherson Engineering By: J.R.  Date: 1/4/24 Project Info 3 Gravity Loads 4 Lateral Loads 6 Wind Uplift Design 8 Summary 9 Table Of Contents 1/4/2024  10:45 AM 2 of 9 ©McPherson Engineering 2411 N North Park Blvd4/24/2025 McPherson Engineering By: J.R.  Date: 1/4/24 Location: 2411 North Park Boulevard  Santa Ana , CA 92706 Existing Structure Info: Number of Stories = 1 Aroof =2400 sq. ft.Roof Square Footage A3rd_flr =0 sq. ft.Third Floor Square Footage (if applicable) A2nd_flr =1900 sq. ft.Second Floor Square Footage (above basement level garage) Adetached =700 sq. ft.Square Footage of roof on detatched structure Adetached2nd_flr =0 sq. ft.Square Footage of 2nd floor detatched structure (if applicable) Site Properties: Lattitude = Longitude = Ss = 1.329 S1 = 0.473 Exposure Category = C Ult. Wind Speed = 130 m.p.h. P.V. Array Info: Model = SPR‐M425‐H‐AC Height of Panel = 73.70 in. Width of Panel = 40.60 in. Area of Panel = 20.8 ft.2 Number of Panels = 9 no. of panels on main hous 16 no. of panels on detatched structur 25 total no. of panels Total Area of Array = 519.5 ft.2 Spacing of Anchors =6.0 ft. max. on cente rows of racks per panel =2 Panel Tilt = 0.00 deg Project Info 33.769138 ‐117.872065 1/4/2024  10:45 AM 3 of 9 ©McPherson Engineering 2411 N North Park Blvd4/24/2025 McPherson Engineering By: J.R.  Date: 1/4/24 Existing Loads: Roof Design Loads: Roofing = 4.0 p.s.f.Composition roofing Sheathing = 1.5 p.s.f.1/2" Plywood Framing = 1.5 p.s.f.2x Rafter/Truss framing Misc = 3.0 p.s.f. DLr1 =10.0 p.s.f.Roofing Dead Load (applied to top of rafters/trusses only) Ceiling = 2.0 p.s.f.Drywall and 2x framing DLr2 =12.0 p.s.f.Total Existing Roof Dead Load LLr = 20.0 p.s.f.Roof Live Load (Table 1607.1) Floor Design Loads: (if applicable) Flooring = 10.0 p.s.f.Weight of floor finish Sheathing = 2.2 p.s.f.3/4" plywood Framing = 2.0 p.s.f.2x framing or manufactured floor truss Interior Partitions = 15.0 p.s.f.2x framed walls with drywall finish each side Ceiling = 5.0 p.s.f.Drywall ceiling finish below Misc. = 0.8 p.s.f. DLf = 35.0 p.s.f.Total Existing Floor Dead Load Proposed Loads: Panels = 2.8 p.s.f.weight of panels including rack system DLr1_proposed =12.8 p.s.f.Proposed Roof Dead Load (applied to top only) DLr2_proposed =14.8 p.s.f.Total Proposed Roof Dead Load LLr_proposed = 0.0 p.s.f. Check Proposed Gravity Loads: Total Existing Roof Load Wex = (D r1 + LLr) (Aroof) =72.0 kips Total Proposed Roof Load Wprop = (D r1 + LLr) (Aroof ‐ Aarray) + (D r1_proposed + LLr_proposed) (Aarray) =68.8 kips Proposed Load Demand Roof Live Load (panels cannot support live loads, including the weight  of stacked materials or workers) Gravity Loads ‐ Main Residence Wprop ‐ Wex  =‐4.46%Wex TOTAL DECREASE IN GRAVITY LOADS, PANELS OK! 1/4/2024  10:45 AM 4 of 9 ©McPherson Engineering 2411 N North Park Blvd4/24/2025 McPherson Engineering By: J.R.  Date: 1/4/24 Existing Loads: Roof Design Loads: Roofing = 4.0 p.s.f.Composition roofing Sheathing = 1.5 p.s.f.1/2" Plywood Framing = 1.5 p.s.f.2x Rafter/Truss framing Misc = 3.0 p.s.f. DLr1 =10.0 p.s.f.Roofing Dead Load (applied to top of rafters/trusses only) Ceiling = 2.0 p.s.f.Drywall and 2x framing DLr2 =12.0 p.s.f.Total Existing Roof Dead Load LLr = 20.0 p.s.f.Roof Live Load (Table 1607.1) Floor Design Loads: (if applicable) Flooring = 10.0 p.s.f.Weight of floor finish Sheathing = 2.2 p.s.f.3/4" plywood Framing = 2.0 p.s.f.2x framing or manufactured floor truss Interior Partitions = 15.0 p.s.f.2x framed walls with drywall finish each side Ceiling = 5.0 p.s.f.Drywall ceiling finish below Misc. = 0.8 p.s.f. DLf = 35.0 p.s.f.Total Existing Floor Dead Load L= 120.0 ft Length of walls Proposed Loads: Panels = 2.8 p.s.f.weight of panels including rack system DLr1_proposed =12.8 p.s.f.Proposed Roof Dead Load (applied to top only) DLr2_proposed =14.8 p.s.f.Total Proposed Roof Dead Load LLr_proposed = 0.0 p.s.f. Check Proposed Gravity Loads: Total Existing Roof Load Wex = (D r1 + LLr) (Aroof) =21.0 kips Total Proposed Roof Load Wprop = (D r1 + LLr) (Aroof ‐ Aarray) + (D r1_proposed + LLr_proposed) (Aarray) =15.3 kips Proposed Load Demand Roof Live Load (panels cannot support live loads, including the weight  of stacked materials or workers) Wprop ‐ Wex  =‐27.21% TOTAL DECREASE IN GRAVITY LOADS, PANELS OK!Wex Gravity Loads ‐ Detached Structure 1/4/2024  10:45 AM 5 of 9 ©McPherson Engineering 2411 N North Park Blvd4/24/2025 McPherson Engineering By: J.R.  Date: 1/4/24 Seismic Design Parameters Risk Category = 2 Per Table 1‐5‐1 R = 6.5 Response Modification Factor (Table 12‐2.1) Site Class = D Per 11.4.2 Ie =1 Seismic Importance Factor (Table 1.5‐2) Ss =1.33 Short Period P.G.A. S1 =0.47 1‐Sec Period P.G.A. S.D.C. = D Seismic Design Category Per 11.6 Fa =1.00 Site Coefficient per Table 11.4‐1 ASCE 7‐16 Supplement #1 Tables used for Fa and Fv Fv =1.70 Site Coefficient per Table 11.4‐2 (note: section 11.4.8 Exception #2 calc used) SMS = SDS Fa =1.33 Short Period M.C.E. Per Eq. 11.4‐1 SM1 = SD1 Fv =0.80 1‐Sec Period M.C.E. Per Eq. 11.4‐2 SDS = 2/3 (SMS) =0.89 Short Period Design Parameter Per Eq 11.4‐3 SD1 = 2/3 (SM1) =0.54 1‐Sec Period Design Parameter Per Eq 11.4‐4 Approximate Fundamental Period (Per 12.8.2.1 per Eq. 12.8‐7 hn = 15 ft Ct =0.02 (per table 12.8‐2) x = 0.75 (per table 12.8‐2) T = 0.15 sec Approximate Fundamental Period TL =8 sec Long‐Period Transition Period per Figure 22‐12 Seismic Response Coefficient (Per 12.8.1.1) CS = (SDS Ie)/R = 0.14 Seismic Response Coefficient Per Eq. 12.8‐2 Cs1 = (SD1 Ie)/R T =  0.54 Max. Seismic Response Coefficient Per Eq. 12.8‐3 if T ≤ TL  Cs2 =0.01 Min. Seismic Response Coefficient Per Eq. 12.8‐5 Cs2 = 0.044 SDS Ie =0.04 Min. Seismic Response Coefficient Per Eq. 12.8‐5 Cs3 = 0.5 S1 Ie/R =0.04 Min. Seismic Response Coefficient Per Eq. 12.8‐6 if S 1 ≥ 0.6g CS =0.14 Design Seismic Coefficient Check Additional Base Shea Wexisting =95.3 kips Weight of Existing Structure Wpanels =0.5 kips Weight of Proposed Panels Vexisting = Cs Wexisting =13.0 kips Base Shear of Existing Structure Vpanels = Cs Wpanels =0.1 kips Base Shear of Proposed Panels Vpanels Vexisting Lateral Loads ‐ Main Residence T = Ct (hn)x  = 0.55% < 10%PER C.E.B.C. 502.5 EXCEPTION, STRUCTURE DOES NOT  REQUIRE SEISMIC RETROFIT, PANELS OK! 1/4/2024  10:45 AM 6 of 9 ©McPherson Engineering 2411 N North Park Blvd4/24/2025 McPherson Engineering By: J.R.  Date: 1/4/24 Seismic Design Parameters Risk Category = 2 Per Table 1‐5‐1 R = 6.5 Response Modification Factor (Table 12‐2.1) Site Class = D Per 11.4.2 Ie =1 Seismic Importance Factor (Table 1.5‐2) Ss =1.33 Short Period P.G.A. S1 =0.47 1‐Sec Period P.G.A. S.D.C. = D Seismic Design Category Per 11.6 Fa =1.20 Site Coefficient per Table 11.4‐1 ASCE 7‐16 Supplement #1 Tables used for Fa and Fv Fv =1.70 Site Coefficient per Table 11.4‐2 (note: section 11.4.8 Exception #2 calc used) SMS = SDS Fa =1.59 Short Period M.C.E. Per Eq. 11.4‐1 SM1 = SD1 Fv =0.80 1‐Sec Period M.C.E. Per Eq. 11.4‐2 SDS = 2/3 (SMS) =1.06 Short Period Design Parameter Per Eq 11.4‐3 SD1 = 2/3 (SM1) =0.54 1‐Sec Period Design Parameter Per Eq 11.4‐4 Approximate Fundamental Period (Per 12.8.2.1 per Eq. 12.8‐7 hn = 15 ft Ct =0.02 (per table 12.8‐2) x = 0.75 (per table 12.8‐2) T = 0.15 sec Approximate Fundamental Period TL =8 sec Long‐Period Transition Period per Figure 22‐12 Seismic Response Coefficient (Per 12.8.1.1) CS = (SDS Ie)/R = 0.16 Seismic Response Coefficient Per Eq. 12.8‐2 Cs1 = (SD1 Ie)/R T =  0.54 Max. Seismic Response Coefficient Per Eq. 12.8‐3 if T ≤ TL  Cs2 =0.01 Min. Seismic Response Coefficient Per Eq. 12.8‐5 Cs2 = 0.044 SDS Ie =0.05 Min. Seismic Response Coefficient Per Eq. 12.8‐5 Cs3 = 0.5 S1 Ie/R =0.04 Min. Seismic Response Coefficient Per Eq. 12.8‐6 if S 1 ≥ 0.6g CS =0.16 Design Seismic Coefficient Check Additional Base Shea Wexisting =15.6 kips Weight of Existing Structure Wpanels =0.9 kips Weight of Proposed Panels Vexisting = Cs Wexisting =2.6 kips Base Shear of Existing Structure Vpanels = Cs Wpanels =0.2 kips Base Shear of Proposed Panels Vpanels Vexisting < 10%PER C.E.B.C. 502.5 EXCEPTION, STRUCTURE DOES NOT  REQUIRE SEISMIC RETROFIT, PANELS OK!5.99% Lateral Loads ‐ Detatched Structure T = Ct (hn)x  =  1/4/2024  10:45 AM 7 of 9 ©McPherson Engineering 2411 N North Park Blvd4/24/2025 McPherson Engineering By: J.R.  Date: 1/4/24 Rooftop Solar Panels Wind Pressures (Section 29.4, ASCE 7‐16) Vult =130 mph Kzt =1.00 (sec 26.8.2)h = 15 ft Exposure Category = C Kz = 0.85 (sec 26.10.1) Roof Zone = 2 Kd =0.85 (sec 26.6) Panel θ = 0.0 deg Ke =1.00 (sec 26.9) qh = 0.00256 Kz Kzt Kd Ke V qh =31.26 (eq. 26.10‐1) γE =1.5 FIG 29.4‐7)γc =0.80 (fig 29.4‐7)hpt =0 ft γa =0.69 (fig 29.4‐8)γp =0.9 (fig 29.4‐7)ω =0.00 deg GPp =‐2 uplift GCrn =‐1.4 uplift p = qh (GPp) γE γa (eq 29.4‐7)p = qh (GCrn) γE γC γp (eq 29.4‐6) p =‐65.1 p.s.f.p =‐47.3 p.s.f. Check Anchorage to Existing Structur 0.6DL ‐ 0.6W controlling load combination (eq. 16‐15 for ASD) DL = 2.8 p.s.f.dead load of panel (inlcuding rack system) W = 65.1 p.s.f.wind load normal to face of panel Arealag =18.4 sq. ft.area tributary to each anchor SPanc =6.0 ft.spacing of anchors Puplift = Arealag (0.6DL - 0.6W) =688.2 lbs total uplift on anchor Material = DFL lumber anchor material Dialag =5/16 in.diameter of screw Penlag = 2.5 in.min. penetration to existing framing W lag =205 lb/in.withdrawal load per in. of penetration per NDS Table 11.2A CD = 1.6 load duration factor for wind per NDS Table 2.3.2 Ct = 0.8 temperature factor per NDS Table 2.3.3 Noscrews =2 number of screws in withdrawal Pallow = Penlag (Wlag CD Ct) * Noscrews =1312 lbs total allowable withrawal on anchor Puplift Pallow Anchorage =USE (2) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION 0.52 < 1.00 Anchor is OK! Wind Uplift Anchorage Flush Mounted Panels ‐ ASCE Section  29.4.4 (where applicable) Flat Roof Panels ‐ ASCE Section 29.4.3  (where applicable) = 1/4/2024  10:45 AM 8 of 9 ©McPherson Engineering 2411 N North Park Blvd4/24/2025 McPherson Engineering By: J.R.  Date: 1/4/24 Gravity Loads: Main Structure DEMAND DECREASED BY 4.46% = OK! Detached Structure DEMAND DECREASED BY 27.21% = OK! Lateral Loads: Main Structure DEMAND INCREASED BY .55% < 10% = OK! Detached Structure DEMAND INCREASED BY 5.99% < 10% = OK! Anchorage: DEMAND OF 688.2LB. < CAPACITY OF 1312.LB. = OK! USE (2) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION Summary: STRUCTURES ARE ADEQUATE FOR THE PROPOSED PV ARRAY Summary 1/4/2024  10:45 AM 9 of 9 ©McPherson Engineering 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 Expedited Permit Process for PV Systems 1 Expedited Permit Process for PV Systems Standard String System The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Standard String System to use with the Expe- dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. 2411 N North Park Blvd4/24/2025 Expedited Permit Process for PV Systems 2 Expedited Permit Process for Small-Scale PV Systems Standard String System The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. 4 Yes 4 Flashing 4 Sunpower Sunpower Invisimount 1523 40 38.08 72 519 2.934 2411 N North Park Blvd4/24/2025 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Standard String System Site Plan               SOLARTECH ENERGY SYSTEMS INC 9410 BOUND AVENUE WEATHERFORD,TRACE EL CAJON,CA 92021 2411 NORTH PARK BOULEVARD SANTA ANA,CA 92706 (619)743-9193 8.93 AC kW 2411 N North Park Blvd4/24/2025 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Standard String System Electrical Diagram                                                                                                            Sunpower SPR-M425-H-AC Sunpower SPR-M425-H-AC X25 UL LISTED NEMA 3R J-BOX WITH WEUL LISTED NEMA 3R J-BOX WITH WEATHERPROOF COVER (AS NEEDED) NONE SOLAR ONLY SUB PANEL USED NONE (Enphase IQ7HS)INTERGRATED INVERTERS X25 100 AMP NON FUSED KNIFE BLADE 2 AC DISCONNECTS USED 200 40175 Sunpower SPR-M4 Sunpower SPR-M4 Sunpower SPR-M4 n 12 3 SOLARTECH ENERGY SYSTEMS INC 9410 BOUND AVENUE WEATHERFORD,TRACE 6 1 n 10 2 AND 4 EMT 3/4"EL CAJON,CA 92021 n 2411 NORTH PARK BOULEVARD SANTA ANA,CA 92706 (619)743-9193 8.93 AC kW n 8 AND 1 3 EMT 3/4"&1 1/4" 4 1 BARE 5/8"X 8' 2411 N North Park Blvd4/24/2025 E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for Standard String System Electrical Diagram Contractor Name, Address and Phone: _________________ _________________ _________________ _________________ Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: __________________________ Site Address: ________________________ System AC Size: ______________________ SIZE FSCM NO DWG NO REV SCALE NTS Date:SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS A V V A A W V MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING V W V A A INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THEREQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THEREQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAXCURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTEROCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTALSUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)?YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEANEXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TOINSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHESTMONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TOINSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC 2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT ATLEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULESWITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLERFUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULESWITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLERFUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE® REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) RATED MPP CURRENT RATED MPP VOLTAGE MAX SYSTEM VOLTAGE MAX CIRCUIT CURRENT A V V A PHOTOVOLTAIC POWER SOURCE WARNING: ELECTRICAL SHOCK HAZARD–LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION AC OUTPUT CURRENT NOMINAL AC VOLTAGE A V SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) SUNPOWER SPR-M425-H-AC 10.68 11.55 48.1 39.8 384 39.8 -0.239 ENPHASE IQ7HS 1.60 20 240 40 1.7 38.6 2 n SOLARTECH ENERGY SYSTEMS INC 9410 BOUND AVENUE WEATHERFORD,TRACE EL CAJON,CA 92021 2411 NORTH PARK BOULEVARD SANTA ANA,CA 92706 (619)743-9193 8.93 AC kW 2411 N North Park Blvd4/24/2025 40 PSF PER FOOTING 38.08 24 1 1 N O R T H P A R K B O U L E V A R D CO N T R A C T O R SO L A R T E C H E N E R G Y S Y S T E M S I N C 94 1 0 B O N D A V E N U E SA N T A A N A , C A 9 2 7 0 6 WE A T H E R F O R D , T R A C E 94 9 - 4 3 9 - 6 5 3 1 PV-3NUMBER OF FOOTINGS SOLARTECH ENERGY SYSTEMS INC 61 9 - 7 4 3 - 9 1 9 3 11 0 6 7 7 7 - C - 4 6 Designed & Drafted - John@ designs.solar SIDE VIEW OF PV ARRAY (NOT TO SCALE) CU S T O M E R September 4, 2024 EQ U I P M E N T AUTHORIZED SIGNEE EL C A J O N , C A 9 2 0 2 1 (2 5 ) S U N P O W E R S P R - M 4 2 5 - H - A C MO D U L E S AP N 2 0 6 3 2 6 (2 5 ) I N T E G R A T E D ( 2 4 0 ) IN V E R T E R ( S ) TOTAL MODULE WEIGHT (LBS) TOTAL AREA TOTAL WEIGHT RACKING 41 GENERAL NOTES LOADING (PSF) 1523 1.97 519 1025 SIDE VIEW OF FOOTING MODULE WEIGHT (LBS) 498 LOADING (PSF) PV ARRAY PLAN (NOT TO SCALE) 25 2 - 1/2" MIN. EMBEDMENT INTO ROOF RAFTER TOTAL LOADING (PSF) # OF MODULES 0.96 PV MODULES AND ARRAY RACKING SHALL NOT OBSTRUCT OR INTEFERE WITH FUNCTION OF MECHANICAL VENTS, EXHAUSTS, OR INTAKES. ROOF SHEETED WITH 1/2" PLYWOOD. UPPER SURFACE OF PLYWOOD FACED WITH FELT PAPER, FINISHED ROOF SURFACE IS SHINGLE ROOF MOUNTING SYSTEM TO BE ATTACHED TO 2X4 TRUSS. MOUNTING SURFACE:SHINGLE ( LAYERS) 24" OC 6' OC 2.93 JOHN LAVENDER 26 This item has been digitally signed and sealed on Sep 04, 2024 2411 N North Park Blvd4/24/2025 40 PSF PER FOOTING 38.08 24 1 1 N O R T H P A R K B O U L E V A R D CO NTR A C T O R SO L A R T E C H E N E R G Y S Y S T E M S I N C 94 1 0 B O N D A V E N U E SA N T A A N A , C A 9 2 7 0 6 WE A T H E R F O R D , T R A C E 94 9 - 4 3 9 - 6 5 3 1 PV-3NUMBER OF FOOTINGS SOLARTECH ENERGY SYSTEMS INC 61 9 - 7 4 3 - 9 1 9 3 11 0 6 7 7 7 - C - 4 6 Designed & Drafted - John@ designs.solar SIDE VIEW OF PV ARRAY (NOT TO SCALE) CU S T O M E R September 4, 2024 EQ U I P M E NT AUTHORIZED SIGNEE EL C A J O N , C A 9 2 0 2 1 (2 5 ) S U N P O W E R S P R - M 4 2 5 - H - A C MO D U L E S AP N 2 0 6 3 2 6 (2 5 ) I N T E G R A T E D ( 2 4 0 ) IN V E R T E R ( S ) TOTAL MODULE WEIGHT (LBS) TOTAL AREA TOTAL WEIGHT RACKING 41 GENERAL NOTES LOADING (PSF) 1523 1.97 519 1025 SIDE VIEW OF FOOTING MODULE WEIGHT (LBS) 498 LOADING (PSF) PV ARRAY PLAN (NOT TO SCALE) 25 2 - 1/2" MIN. EMBEDMENT INTO ROOF RAFTER TOTAL LOADING (PSF) # OF MODULES 0.96 PV MODULES AND ARRAY RACKING SHALL NOT OBSTRUCT OR INTEFERE WITH FUNCTION OF MECHANICAL VENTS, EXHAUSTS, OR INTAKES. ROOF SHEETED WITH 1/2" PLYWOOD. UPPER SURFACE OF PLYWOOD FACED WITH FELT PAPER, FINISHED ROOF SURFACE IS SHINGLE ROOF MOUNTING SYSTEM TO BE ATTACHED TO 2X4 TRUSS. MOUNTING SURFACE:SHINGLE ( LAYERS) 24" OC 6' OC 2.93 JOHN LAVENDER PV ARRAY TO REMAIN BELOW 26 This item has been digitally signed and sealed on Sep 04, 2024 2411 N North Park Blvd4/24/2025 40 PSF PER FOOTING 38.08 24 1 1 N O R T H P A R K B O U L E V A R D CO NTR A C T O R SO L A R T E C H E N E R G Y S Y S T E M S I N C 94 1 0 B O N D A V E N U E SA N T A A N A , C A 9 2 7 0 6 WE A T H E R F O R D , T R A C E 94 9 - 4 3 9 - 6 5 3 1 PV-3NUMBER OF FOOTINGS SOLARTECH ENERGY SYSTEMS INC 61 9 - 7 4 3 - 9 1 9 3 11 0 6 7 7 7 - C - 4 6 Designed & Drafted - John@ designs.solar SIDE VIEW OF PV ARRAY (NOT TO SCALE) CU S T O M E R September 4, 2024 EQ U I P M E NT AUTHORIZED SIGNEE EL C A J O N , C A 9 2 0 2 1 (2 5 ) S U N P O W E R S P R - M 4 2 5 - H - A C MO D U L E S AP N 2 0 6 3 2 6 (2 5 ) I N T E G R A T E D ( 2 4 0 ) IN V E R T E R ( S ) TOTAL MODULE WEIGHT (LBS) TOTAL AREA TOTAL WEIGHT RACKING 41 GENERAL NOTES LOADING (PSF) 1523 1.97 519 1025 SIDE VIEW OF FOOTING MODULE WEIGHT (LBS) 498 LOADING (PSF) PV ARRAY PLAN (NOT TO SCALE) 25 2 - 1/2" MIN. EMBEDMENT INTO ROOF RAFTER TOTAL LOADING (PSF) # OF MODULES 0.96 PV MODULES AND ARRAY RACKING SHALL NOT OBSTRUCT OR INTEFERE WITH FUNCTION OF MECHANICAL VENTS, EXHAUSTS, OR INTAKES. ROOF SHEETED WITH 1/2" PLYWOOD. UPPER SURFACE OF PLYWOOD FACED WITH FELT PAPER, FINISHED ROOF SURFACE IS SHINGLE ROOF MOUNTING SYSTEM TO BE ATTACHED TO 2X4 TRUSS. MOUNTING SURFACE:SHINGLE ( LAYERS) 24" OC 6' OC 2.93 JOHN LAVENDER PV ARRAY TO REMAIN BELOW 26 This item has been digitally signed and sealed on Sep 04, 2024 2411 N North Park Blvd4/24/2025 =TM;NVEQc"8AWENMc">ECHMNKNGX 8dX[c b_TRXtRP[[h U^a dbT fXcW cWT Gd]D^fTa ;`dX]^g® bhbcT\& cWT ^][h Ud[[h X]cTVaPcTS b^[Pa b^[dcX^] STbXV]TS& T]VX]TTaTS& P]S fPaaP]cTS Qh ^]T R^\_P]h( 6IGHERS";NVEQ"02"3EMRISX"0UAIKABKE' HWT _PcT]cTS& b^[XS'R^__Ta U^d]SPcX^] AP gT^] =T] 0 RT[[ Xb ^eTa /" [PaVTa cWP] _aX^a VT]TaPcX^]b& ST[XeTaX]V cWT WXVWTb c TvRXT]R h 79 b^[Pa _P]T[ PePX[PQ[T( 6IGHERS"7IFESILE"4MEQGX"AMD"=AUIMGR" :TbXV]TS c^ ST[XeTa 0*" \^aT T]TaV h ^eTa ,/ hTPab X] aTP['f^a[S R^]SXcX^]b [XZT _Pa cXP[ bWPST P]S WXVW cT\_TaPcdaTb(, 1ERS"<EKIABIKISX%"1ERS"@AQQAMSX" KXcW \^aT cWP] .,(0 \X[[X^] P]S +/ =K \^Sd[Tb ST_[^hTS Pa^d]S cWT f^a[S& Gd]D^fTa cTRW]^[^V h Xb _a^eT] c^ [Pbc ( HWPc ob fWh fT b cP]S QTWX]S ^da \^Sd[T P]S \XRa^X]eTa cTa fXcW cWT X]Sdb ca h ob QTb c ,/'hTPa 9^\QX]TS D^fTa P]S Da^SdR c KPaaP]c h( 3ASARHEES ;AQS"NF"SHE"=TM;NVEQ" 4PTIMNWc"=NKAQ"=XRSEL _9^\_PcXQ[T fXcW \hGd]D^fTaHAHA \^]Xc^aX]V _ GTP\[Tbb PTbcWTcXRb 5ACSNQX&IMSEGQASED"8ICQNIMUEQSEQ _>XVWTbc'_^fTa X]cTVaPcTS 79 \^Sd[T X] b^[Pa _;]VX]TTaTS P]S RP[XQaPcTS Qh Gd]D^fTa U^a Gd]D^fTa 79 \^Sd[Tb 0(-1 X] N+0+(1 \\O 0(/. X] N+00 \\O ,*(&,,(@"<ERIDEMSIAK"02"8NDTKE 8&=EQIER/"8,,("Y"8,+-"Y"8,+("Y"8,*-"Y"8,*(Gd]D^fTa® FTbXST]cXP[ 79 A^Sd[T + 8PbTS ^] SPcPbWTTc aTeXTf ^U fTQbXcTb ^U c^_ ,* \P]dUPRcdaTab _Ta K^^S APRZT]iXT IG DJ @TPSTaQ^PaS E- ,*,+( , APgT^] .-/ K& ,,(/" TvRXT]c& R^\_PaTS c^ P 9^]eT]cX^]P[ DP]T[ ^] bP\T'bXiTS PaaPhb #,0* K& +0" TvRXT]c& P__a^g( +(0 \l$& 1(3" \^aT T]TaVh _Ta fPcc #QPbTS ^] DJGhbc _P] t[Tb U^a PeV( IG R[X\PcT$& *(/")ha b[^fTa STVaPSPcX^] aPcT #?^aSP]& Tc( P[( pF^Qdbc DJ :TVaPSPcX^] ATcW^S^[^Vh P]S 7__[XRPcX^](qDJG9 ,*+2$( - J^[cPVT aP]VT RP] QT TgcT]STS QTh^]S ]^\X]P[ XU aT`dXaTS Qh cWT dcX[Xch( . @X\Xcb \Ph ePah( FTUTa c^ [^RP[ aT`dXaT\T]cb c^ STt]T cWT ]d\QTa ^U \XRa^X]eTacTab _Ta QaP]RW X] h^da PaTP( / <PRc^ah bTc c^ w;;; +/.1P',*+. STUPd[c bTccX]Vb( 97 Fd[T ,+ STUPd[c bTccX]Vb _a^t[T bTc SdaX]V R^\\XbbX^]X]V( 0 GcP]SPaS HTbc 9^]SXcX^]b #+*** K)\l XaaPSXP]RT& 7A +(/& ,/k9$( 7[[ :9 e^[cPVT Xb Ud[[h R^]cPX]TS fXcWX] cWT \^Sd[T( 1 I@ @XbcTS Pb DJFG; P]S R^]U^a\b fXcW B;9 ,*+1 P]S B;9 ,*,* 03*(+, P]S 9,,(+',*+/ Fd[T 0.',+2 FP_XS GWdcS^f] ^U DJ GhbcT\b& U^a 79 P]S :9 R^]SdRc^ab5 fWT] X]bcP[[TS PRR^aSX]V c^ \P]dUPRcdaTaob X]bcadRcX^]b( 2 D[TPbT aTPS cWT bPUTch P]S X]bcP[[PcX^] X]bcadRcX^]b U^a \^aT X]U^a\PcX^] aTVPaSX]V [^PS aPcX]Vb P]S \^d]cX]V R^]tVdaPcX^]b( GTT fff(bd]_^fTa(R^\)R^\_P]h U^a \^aT aTUTaT]RT X]U^a\PcX^]( G_TRXtRPcX^]b X]R[dSTS X] cWXb SPcPbWTTc PaT bdQYTRc c^ RWP]VT fXcW^dc ]^cXRT( j,*,, Gd]D^fTa 9^a_^aPcX^]( 7[[ aXVWcb aTbTaeTS( GIBDCK;F& cWT GIBDCK;F [^V^& ;EIwBCL P]S AMGIBDCK;F PaT caPST\PaZb ^a aTVXbcTaTS caPST\PaZb ^U Gd]D^fTa 9^a_^aPcX^] X] cWT I(G( A7L;CB Xb P aTVXbcTaTS caPST\PaZ ^U APgT^] G^[Pa HTRW]^[^VXTb& @cS( <^a \^aT X]U^a\PcX^] eXbXc fff(\PgT^](R^\)[TVP[( 02"4KECSQICAK"3ASA w]eTacTa A^ST[4 Hh_T > #;]_WPbT wE1>G$ 6,.* J79 6,*2 J79 DTPZ Cdc_dc D^fTa #J7$-2.-03 APg( 9^]cX]d^db Cdc_dc D^fTa #J7$-2.-03 B^\( #@n@$ J^[cPVT)FP]VT #J$,.* ) ,++n,0.,*2 ) +2-n,,3 APg( 9^]cX]d^db Cdc_dc 9daaT]c #7a\b$+(0*+(11 APg( I]Xcb _Ta ,* 7 #@n@$ 8aP]RW 9XaRdXc. +*+*3 9;9 KTXVWcTS ;vRXT]Rh 31(*"30(/" B^\( <aT`dT]Rh 0* >i ;gcT]STS <aT`dT]Rh FP]VT .1n02 >i 79 GW^ac 9XaRdXc <Pd[c 9daaT]c CeTa - 9hR[Tb .(2, 7 a\b CeTae^[cPVT 9[Pbb 79 D^ac www 79 D^ac 8PRZUTTS 9daaT]c +2 \7 D^fTa <PRc^a GTccX]V +(* D^fTa <PRc^a #PSYdbcPQ[T$*(2/ #X]SdRcXeT$ ) *(2/ #RP_PRXcXeT$ 32";NVEQ"3ASA GDF'A..*' >'79 GDF'A.-/' >'79 GDF'A.-*' >'79 GDF'A.,/' >'79 GDF'A.,*' >'79 B^\( D^fTa0 #D]^\$ K ..*.-/.-*.,/.,* D^fTa H^[TaP]RT %/)s*" A^Sd[T ;vRXT]Rh ,,(2",,(/",,(-",,(*",+(1" HT\_( 9^TU( #D^fTa$s*(,3" ) k9 GWPST H^[TaP]RT w]cTVaPcTS \^Sd[T'[TeT[ \Pg( _^fTa _^X]c caPRZX]V >ERSED":OEQASIMG"2NMDISINMR C_TaPcX]V HT\_('.*k < c^ %+2/k< #'.*k9 c^ %2/k9$ APg( 7\QXT]c HT\_(+,,k< #/*k9$ APg( HTbc @^PS2 KX]S4 +,/ _bU& 0*** DP& 0++ ZV)\l QPRZ G]^f4 +21 _bU& 3*** DP& 3+1 ZV)\l Ua^]c APg( :TbXV] @^PS KX]S4 1/ _bU& -0** DP& -01 ZV)\l QPRZ G]^f4 +,/ _bU& 0*** DP& 0++ ZV)\l Ua^]c w\_PRc FTbXbcP]RT + X]RW #,/ \\$ SXP\TcTa WPX[ Pc /, \_W #,- \)b$ 8ECHAMICAK"3ASA G^[Pa 9T[[b 00 APgT^] =T] 0 <a^]c =[Pbb >XVW'caP]b\XbbX^] cT\_TaTS V[Pbb fXcW P]cX'aTuTRcXeT R^PcX]V ;]eXa^]\T]cP[ FPcX]V CdcS^^a aPcTS <aP\T 9[Pbb + Q[PRZ P]^SXiTS #WXVWTbc 77A7 aPcX]V$ KTXVWc .2 [Q #,+(2 ZV$ FTR^\\T]STS APg( A^Sd[T G_PRX]V +(- X]( #-- \\$ @AQQAMSIER%"2EQSI!CASINMR%"AMD"2NLOKIAMCE KPaaP]cXTb r ,/'hTPa [X\XcTS _^fTa fPaaP]ch r ,/'hTPa [X\XcTS _a^SdRc fPaaP]ch 9TacXtRPcX^]b P]S 9^\_[XP]RT r I@ +1.+ ) w;;;'+/.1 r I@ +1.+ 79 A^Sd[T #Hh_T , taT aPcTS$ r I@ 0+1-* r I@ 0,+*3'+ ) w;9 0,+*3', r <99 DPac +/ 9[Pbb 8 r w9;G'***- 9[Pbb 8 r 97B)9G7'9,,(, BC( +*1(+'*+ r 97 Fd[T ,+ #I@ +1.+ G7$5 #X]R[dSTb J^[c)JPa P]S FTPRcXeT D^fTa DaX^aXch$ r I@ @XbcTS DJ FP_XS GWdcS^f] ;`dX_\T]c ;]PQ[Tb X]bcP[[PcX^] X] PRR^aSP]RT fXcW4 r B;9 03*(0 #79 \^Sd[T$ r B;9 03*(+, FP_XS GWdcS^f] #X]bXST P]S ^dcbXST cWT PaaPh$ r B;9 03*(+/ 79 9^]]TRc^ab& 03*(--#7$n#;$#+$ KWT] dbTS fXcW 79 \^Sd[T E 9PQ[Tb P]S PRRTbb^aXTb #I@ 01*- P]S I@ ,,-2$ r FPcTS U^a [^PS QaTPZ SXbR^]]TRc KWT] dbTS fXcW w]eXbXA^d]c aPRZX]V P]S w]eXbXA^d]c PRRTbb^aXTb #I@ ,1*-$4 r A^Sd[T Va^d]SX]V P]S Q^]SX]V cWa^dVW w]eXbXA^d]c r 9[Pbb 7 taT aPcTS Dw: HTbc +*** J4 w;9 0,2*. ;ACJAGIMG"2NM!GTQASINM A^Sd[Tb _Ta _P[[Tc ,/,/ DPRZPVX]V Q^g SX\T]bX^]b 1/(. m .,(, m .2(* X]( #+3+/ m +*1, m +,,* \\$ DP[[Tc Va^bb fTXVWc +-**(1 [Q #/3* ZV$ DP[[Tcb _Ta R^]cPX]Ta -,-, BTc fTXVWc _Ta R^]cPX]Ta .+&0,- [Q #+2&22* ZV$ )&.((&=?9;:@4<"Y"RTMONVEQ'CNL /-331- FTe: 7_aX[ ,*,, D[TPbT aTPS cWT bPUTch P]S X]bcP[[PcX^] X]bcadRcX^]b U^a STcPX[b( 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025 2411 N North Park Blvd4/24/2025