HomeMy WebLinkAbout3205 S Deegan Dr #2 - PlanBldg #101120235
APPROVALS:
PLNG - C. Santana
BLDG - CSG
POLICE - B. Martin
PUBLIC WORKS - B. Sarlak
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
CG
-
1
C
A
L
I
F
O
R
N
I
A
G
R
E
E
N
B
U
I
L
D
I
N
G
3205 S Deegan Dr
#23/10/2025
CG
-
2
C
A
L
I
F
O
R
N
I
A
G
R
E
E
N
B
U
I
L
D
I
N
G
3205 S Deegan Dr
#23/10/2025
RESTRICTIVE NOTICE
DATE REVISIONS
SHEET DESCRIPTION
PROJECT OWNER
PROJECT ADDRESS
STAMP
NO:
REVISIONS
DATE SIGNED: 8/28/24
THESE DESIGNS, DRAWINGS, AND
SPECIFICATIONS ARE THE EXCLUSIVE
PROPERTY OF DONG ENGINEERING.
THESE DRAWINGS CANNOT BE COPIED,
TRANSFERRED, OR REPRODUCED NOR
CAN ANY OTHER STRUCTURES BE BUILT
FROM THEM WITHOUT WRITTEN CONSENT.
SHEET
DE#:
TEL- 714-617-5979
GARDEN GROVE, CA 92841
7661 GARDEN GROVE BLVD.,
DONG ENGINEERING, INC.
INFO@DONGENGINEERING.COM
240165
AD
U
32
0
5
S
.
D
E
E
G
A
N
D
R
,
U
N
I
T
#
2
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
4
08/28/2024 PLAN CHECK01
3205 S Deegan Dr
#23/10/2025
RESTRICTIVE NOTICE
DATE REVISIONS
SHEET DESCRIPTION
PROJECT OWNER
PROJECT ADDRESS
STAMP
NO:
REVISIONS
DATE SIGNED: 8/28/24
THESE DESIGNS, DRAWINGS, AND
SPECIFICATIONS ARE THE EXCLUSIVE
PROPERTY OF DONG ENGINEERING.
THESE DRAWINGS CANNOT BE COPIED,
TRANSFERRED, OR REPRODUCED NOR
CAN ANY OTHER STRUCTURES BE BUILT
FROM THEM WITHOUT WRITTEN CONSENT.
SHEET
DE#:
TEL- 714-617-5979
GARDEN GROVE, CA 92841
7661 GARDEN GROVE BLVD.,
DONG ENGINEERING, INC.
INFO@DONGENGINEERING.COM
240165
AD
U
32
0
5
S
.
D
E
E
G
A
N
D
R
,
U
N
I
T
#
2
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
4
08/28/2024 PLAN CHECK01
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Submittal Criteria Form
Required for Single Family or Duplex Residences
(Use Commercial form for lots with 3+ dwelling units or new residential tracts)
Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification.
Project Information
New Single Family Residence/Duplex Addition/Remodel ADU Other
Address:
Unit #: City or Unincorporated County Area: ZIP:
Scope of Work:
Existing
Area:
Area to
be Added:
Total Resulting
Area:
Stories: Area Added in Past 2 Years
(excluding this project):
Yes No Questionnaire OCFA Plan Type if “Yes”
1. New – Is this a new single family residence or duplex? *(PR160) Residential Site
with Water Availability
(PR400-402) Fire Sprinkler
2. ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has
fire sprinklers or a house that will have fire sprinklers added as part of this project?
(PR400-402) Fire Sprinkler
3. Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire
sprinkler retrofit based on a threshold set by local ordinance?
(PR400-402) Fire Sprinkler
4. Distance – Is the most remote portion of the addition, ADU or other detached structure greater than
140-feet from the fire access roadway?
*(PR160) Residential Site
5. Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non-
sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all
enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet?
*(PR160) Residential Site
with Water Availability
6. Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or
removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed
contractor to determine if a fire sprinkler modification is needed.
(PR400-402) Fire Sprinkler
7. Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a
garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold
set by local ordinance?
*(PR160) Residential Site
(PR400-402) Fire Sprinkler
8. Gate – Is a gate being installed across a driveway or road that is designated as a fire department
access roadway, or a driveway or road that serves more than a single home/duplex?
(PR180) Gate
9. Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal
Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas
seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only
applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000
sf, and ADU’s).
*(PR160) Residential Site
*(PR172-174) Methane
Test/Mitigation Plans
10. Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to
slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation,
or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as
defined by the State, or (D) near an area that could be affected by a wildfire in the open space.
*(PR125) Fuel Modification
(PR182) Accessory
Structure
*OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals.
Applicant Certification
I certify, under penalty of perjury, under the laws of the State of California, that the information above is true:
Print Name:_______________________________________ Signature:___________________________________________ Date:______________
Phone Number:_____________________________________________ Email:_____________________________________________________________
Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a
written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required.
______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes”
and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral
Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination.
For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100
SFR
3205 S Deegan Dr
#23/10/2025
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Referral Form
Required for OCFA to review plans upon the request of the Building Department when
the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”.
City Official Requesting Review: City Reference #: __________________________
City / County: _____________________________________ Date: __________________________________
Contact Name: _____________________________________ E-Mail: __________________________________
Title: _____________________________________ Phone #: _________________________________
** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. **
Reason(s) for Review:
Please describe why OCFA Plan Review is or may be required by the City/County:
OCFA COMMENTS:
No further action required on this specific plan type, based
on information provided on: ____/______/______.
Project to be taken in for OCFA Review.
Other:
Name: _________________________________________
Contact #: ______________________________________
Date: _________________________________
OCFA Authorization
Updated: 06/02/2020 rs
3205 S Deegan Dr
#23/10/2025
Dong Engineering, Inc.
7661 GARDEN GROVE BLVD. , GARDEN GROVE, CA 92841
Office: (714) 617-5979
Email: info@dongengineering.com
DATE:4/18/2024
CLIENT:
JOB NO.:240165
Project:
ADU
STRUCTURAL CALCULATIONS FOR THE BUILDING AT:
Page 1 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU Job#: 240165
3205 S.DEEGAN DR, SANTA ANA, CA 92704 Date: 4/15/2024
ROOF:SHINGLE
Slope 5:12
Live Load 20 psf
Roof'g Material 3 psf
Sheathing 2.0 psf
Trusses / Rafters 2.0 psf
Ceiling Joists 2.0 psf
Drywall 2.0 psf
Sprinkler 0.5 psf
Solar 3.0 psf
Miscellaneous 0.5 psf
Total D.L.15 psf
Total Load 35 psf
EXTERIOR WALL:INTERIOR WALL:
EXTERIOR:9 DRYWALL:3
DRYWALL:3.0 DRYWALL:3.0
STUDS:2.0 STUDS:2.0
MISC.:1.0 MISC.:2.0
DL=15.0 PSF DL=10.0 PSF
REVISIONS:
1 Sheets:Date:
Init:Remark:
2 Sheets:Date:
Init:Remark:
3 Sheets:Date:
Init:Remark:
4 Sheets:Date:
Init:Remark:
5 Sheets:Date:
Init:Remark:
6 Sheets:Date:
Init:Remark:
LOADING CONDITIONS
Page 2 of 20
3205 S Deegan Dr
#23/10/2025
USGS web services were down for some period of time and as a result this tool wasn't operational, resulting in timeout error.
USGS web services are now operational so this tool should work as expected.
3205 S Deegan Dr, Santa Ana, CA 92704, USA
Latitude, Longitude: 33.7050383, -117.9032655
Date 4/15/2024, 12:03:24 AM
Design Code Reference Document ASCE7-16
Risk Category II
Site Class D - Default (See Section 11.4.3)
Type Value Description
SS 1.297 MCER ground motion. (for 0.2 second period)
S1 0.465 MCER ground motion. (for 1.0s period)
SMS 1.556 Site-modified spectral acceleration value
SM1 null -See Section 11.4.8 Site-modified spectral acceleration value
SDS 1.038 Numeric seismic design value at 0.2 second SA
SD1 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA
Type Value Description
SDC null -See Section 11.4.8 Seismic design category
Fa 1.2 Site amplification factor at 0.2 second
Fv null -See Section 11.4.8 Site amplification factor at 1.0 second
PGA 0.556 MCEG peak ground acceleration
FPGA 1.2 Site amplification factor at PGA
PGAM 0.667 Site modified peak ground acceleration
TL 8 Long-period transition period in seconds
SsRT 1.297 Probabilistic risk-targeted ground motion. (0.2 second)
SsUH 1.406 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration
SsD 1.9 Factored deterministic acceleration value. (0.2 second)
S1RT 0.465 Probabilistic risk-targeted ground motion. (1.0 second)
S1UH 0.504 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration.
S1D 0.653 Factored deterministic acceleration value. (1.0 second)
PGAd 0.779 Factored deterministic acceleration value. (Peak Ground Acceleration)
PGAUH 0.556 Uniform-hazard (2% probability of exceedance in 50 years) Peak Ground Acceleration
CRS 0.922 Mapped value of the risk coefficient at short periods
CR1 0.923 Mapped value of the risk coefficient at a period of 1 s
CV 1.359 Vertical coefficient Page 3 of 20
3205 S Deegan Dr
#23/10/2025
DISCLAIMER
While the information presented on this website is believed to be correct, SEAOC /OSHPD and its sponsors and contributors assume no
responsibility or liability for its accuracy. The material presented in this web application should not be used or relied upon for any specific
application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed
professionals. SEAOC / OSHPD do not intend that the use of this information replace the sound judgment of such competent professionals,
having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in
interpreting and applying the results of the seismic data provided by this website. Users of the information from this website assume all liability
arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for
building code approval and interpretation for the building site described by latitude/longitude location in the search results of this website.
Page 4 of 20
3205 S Deegan Dr
#23/10/2025
1Y
1X
1
2
A B
(N
)
B
E
D
#
2
9'
-
0
"
C
L
G
(N
)
B
A
.
#
1
9'
-
0
"
C
L
G
(N
)
W
.
I
.
C
.
9'
-
0
"
C
L
G
CLOSET
(N
)
B
A
.
#
2
9'
-
0
"
C
L
G
(N
)
B
E
D
1
9'
-
0
"
C
L
G
IS
L
A
N
D
(N
)
L
I
V
I
N
G
9'
-
0
"
C
L
G
(N
)
K
I
T
C
H
E
N
9'
-
0
"
C
L
G
(N
)
P
O
R
C
H
89
S
.
F
LA
N
D
I
N
G
RO
O
F
S
H
E
A
R
W
A
L
L
L
A
Y
O
U
T
Page 5 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job#: 240165
Date: 4/15/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1X
Number of Story: 1 Section width: 20(ft)Section length: 44.5(ft)
Base height: 0(ft)Slope roof height: 15.5(ft)Gable mean roof height: 12.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 20(ft), L = 44.5(ft), H = 12.5(ft)-->L/B = 2.23, H/L = 0.28
Wall coefficient: Cpw = 0.8, Cpl = -0.29
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2,01*(15/zg)^(2/anpha)qz = 0,00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Rx = 6.5, Site class :D, SDS = 2FaSs/3 =1.038, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Rx = 0.7*1.038*1*W/6.5 = 0.1118*W
Total Seismic Load = 104.8 = 104.8 PLF
Redistrib: 937.5*9 = 8437.5 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 149.71 x 20 / (2 x 44.5) = 33.64 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 149.71 x 20^2 / (8 x 44.5) = 168.21 LBS
Splice w/ min. (1) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15, 0.85, 22.35, 20.68)
ROOF
Roof = 15*44.5 = 667.5 PLF
Wall = 15*2*4.5 + 10*3*4.5 = 270 PLF
Shear = 0.1118(667.5+270) = 0.1118*937.5 = 104.81 PLF
Plate height: ROOF = 9(ft)
SHEAR ROOF = 104.8*937.5*9/8437.5 = 104.8 PLF
SHEAR ROOF = 0.6*W = 99.28(plf)
ROOF 104.8 PLF SEISMIC GOVERN
Page 6 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job#: 240165
Date: 4/15/2024
PLAN: 1
CODE: CBC 2022
SECTION: 1Y
Number of Story: 1 Section width: 44.5(ft)Section length: 20(ft)
Base height: 0(ft)Slope roof height: 15.5(ft)Gable mean roof height: 12.5(ft)
WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS:
Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1
Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1
B = 44.5(ft), L = 20(ft), H = 12.5(ft)-->L/B = 0.45, H/L = 0.63
Wall coefficient: Cpw = 0.8, Cpl = -0.5, Roof coefficient: Cpw = (0.06;-0.41), Cpl = -0.6
Wind exposure = C-->anpha = 9.5, zg = 900
Kz = 2,01*(15/zg)^(2/anpha)qz = 0,00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh)
WIND LOAD:
SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE:
Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.038, SD1 = 2FvS1/3 =0,
Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.038*1*W/6.5 = 0.1118*W
Total Seismic Load = 53.66 = 53.66 PLF
Redistrib: 480*9 = 4320 PLFxFT
DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10
ROOF DIAPHRAGM
Max shear = 76.66 x 40 / (2 x 20) = 76.66 PLF
Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c.
Chord force = 76.66 x 40^2 / (8 x 20) = 766.6 LBS
Splice w/ min. (5) 16d sinker nails each side of splice at 8" o.c. (standard construction)
(z, Kz, qz, P): (15.5, 0.85, 22.51, 24.8); (15, 0.85, 22.35, 24.7)
ROOF
Roof = 15*20 = 300 PLF
Wall = 15*2*4.5 + 10*1*4.5 = 180 PLF
Shear = 0.1118(300+180) = 0.1118*480 = 53.66 PLF
Plate height: ROOF = 9(ft)
SHEAR ROOF = 53.66*480*9/4320 = 53.66 PLF
SHEAR ROOF = 0.6*W = 115.71(plf)
ROOF 115.71 PLF WIND GOVERN
Page 7 of 20
3205 S Deegan Dr
#23/10/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
AD
U
32
0
5
S
.
D
E
E
G
A
N
D
R
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
4
Jo
b
#
:
2
4
0
1
6
5
Da
t
e
:
4
/
1
5
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
1
1
"
|
4
*
d
*
1
.
4
=
0
.
6
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
0.
5
0
8.
0
0
11
.
2
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
Co
m
.
(
k
i
p
s
)
3.
1
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
3.
0
Co
m
.
(
k
i
p
s
)
3.
1
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[3
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
LI
N
E
1
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
8
3
5
l
b
s
|
S
e
i
s
m
i
c
:
1
7
0
9
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
B
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
1
9
.
7
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
4
4
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
3
5
4
p
l
f
(
W
i
n
d
)
/
2
1
4
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
2
.
6
/
2
.
6
)
=
2
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
3
.
6
/
3
.
6
)
=
3
.
6
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
P1
72
-16
1
5
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 8 of 20
3205 S Deegan Dr
#23/10/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
AD
U
32
0
5
S
.
D
E
E
G
A
N
D
R
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
4
Jo
b
#
:
2
4
0
1
6
5
Da
t
e
:
4
/
1
5
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
9
"
|
4
*
d
*
1
.
4
=
0
.
5
3
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
6.
2
5
8.
0
0
2.
5
0
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
4
Co
m
.
(
k
i
p
s
)
2.
6
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
2.
4
Co
m
.
(
k
i
p
s
)
2.
6
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
LI
N
E
2
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
2
3
1
5
l
b
s
|
S
e
i
s
m
i
c
:
1
3
9
5
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
2
0
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
1
1
6
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
2
8
9
p
l
f
(
W
i
n
d
)
/
1
7
4
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
3.
2
5
P1
10
9
9
-28
9
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 9 of 20
3205 S Deegan Dr
#23/10/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
AD
U
32
0
5
S
.
D
E
E
G
A
N
D
R
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
4
Jo
b
#
:
2
4
0
1
6
5
Da
t
e
:
4
/
1
5
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
9
"
|
4
*
d
*
1
.
4
=
0
.
5
1
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
4.
5
0
4.
7
5
4.
0
0
8.
0
0
6.
2
5
8.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
P1
2.
2
5
2.
2
5
4.
2
5
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
LI
N
E
A
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
9
9
3
l
b
s
|
S
e
i
s
m
i
c
:
1
3
6
2
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
2
4
p
l
f
(
W
i
n
d
)
/
1
7
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
58
2
-64
9
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 10 of 20
3205 S Deegan Dr
#23/10/2025
Do
ng
E
n
g
i
n
e
e
r
i
n
g
I
n
c
.
AD
U
32
0
5
S
.
D
E
E
G
A
N
D
R
,
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
4
Jo
b
#
:
2
4
0
1
6
5
Da
t
e
:
8
/
2
8
/
2
0
2
4
PL
A
N
:
1
CO
D
E
:
C
B
C
2
0
2
2
Ma
x
p
a
n
e
l
d
e
f
l
e
c
t
i
o
n
:
=
0
.
0
9
"
|
4
*
d
*
1
.
4
=
0
.
5
1
"
<
0
.
0
2
x
1
0
8
=
2
.
1
6
"
4.
5
0
1.
2
5
4.
0
0
8.
0
0
3.
5
0
2.
0
0
3.
0
0
2.
7
5
OV
E
R
T
U
R
N
A
N
A
L
Y
S
I
S
Le
f
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
Ri
g
h
t
S
i
d
e
Ho
l
d
D
o
w
n
HD
U
2
Po
s
t
S
i
z
e
4x
4
Te
n
s
i
o
n
(
k
i
p
s
)
1.
4
Co
m
.
(
k
i
p
s
)
2.
3
An
c
h
o
r
B
o
l
t
5/
8
"
x
1
2
"
[2
]
sp
a
c
e
d
e
q
u
a
l
l
y
4.
2
5
6.
5
0
Dr
a
g
F
o
r
c
e
:
A:
S
i
m
p
s
o
n
M
S
T
A
3
0
(
1
8
8
0
L
B
)
-
A
l
t
o
n
e
r
o
w
(
9
)
#
1
6
e
a
.
s
i
d
e
o
f
s
p
l
i
c
e
Fr
a
m
i
n
g
C
l
i
p
s
S
p
a
c
i
n
g
S
e
e
S
h
e
a
r
W
a
l
l
S
c
h
e
d
u
l
e
9.00 ft
LI
N
E
B
(
D
i
r
e
c
t
i
o
n
:
X
)
@
F
I
R
S
T
F
L
O
O
R
|
W
i
n
d
:
9
9
3
l
b
s
|
S
e
i
s
m
i
c
:
1
3
6
2
l
b
s
|
S
h
e
a
r
P
a
n
e
l
T
y
p
e
:
A
|
(
þ
=
1
.
3
)
To
t
a
l
L
e
n
g
t
h
=
4
5
f
t
|
T
o
t
a
l
S
h
e
a
r
W
a
l
l
L
e
n
g
t
h
=
8
f
t
|
S
h
e
a
r
D
i
a
p
h
r
a
g
m
=
3
3
p
l
f
|
D
e
s
i
g
n
S
h
e
a
r
W
a
l
l
=
1
2
4
p
l
f
(
W
i
n
d
)
/
1
7
0
p
l
f
(
S
e
i
s
m
i
c
)
Se
i
s
m
i
c
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
(
1
.
0
+
0
.
1
4
S
DS
)D
+
H
+
F
+
0
.
7
Q
E (
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
(
0
.
6
-
0
.
1
4
S
DS
)D
+
H
+
0
.
7
Q
E (
T
e
n
s
i
o
n
)
W
i
n
d
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
:
D
+
0
.
7
5
L
+
0
.
7
5
(
0
.
6
W
)
(
C
o
m
p
r
e
s
s
i
o
n
)
|
L
o
a
d
C
o
m
b
i
n
a
t
i
o
n
U
s
e
:
0
.
6
D
+
H
+
0
.
6
W
(
T
e
n
s
i
o
n
)
Se
i
s
m
i
c
C
a
p
a
c
i
t
y
:
P
1
(
1
.
8
/
1
.
8
)
=
1
.
8
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
W
i
n
d
C
a
p
a
c
i
t
y
:
P
1
(
2
.
5
/
2
.
5
)
=
2
.
5
k
i
p
s
(
S
e
c
t
.
4
.
3
.
3
.
4
.
1
)
5.
2
5
P1
49
9
-73
2
d
=
8𝑣
ℎ3
𝐸
�
�
�
�
+
𝑣ℎ
10
0
0
�
�
𝑎
+
ℎ𝑏
∆𝑎
Page 11 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job#: 240165
Date: 4/15/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (X-X Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
A 1 1X 20 99 105 9 8 170 A
B 1 1X 20 99 105 9 7.25 188 A
v(plf) = V/L
V2 = Seismic*Span/2 + Added Vseismic
Line shear V = Maximum(V1;V2)
V1 = Wind*Span/2 + Added Vwind
SUMMARY SHEAR WALL
Page 12 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job#: 240165
Date: 4/15/2024
PLAN: 1
CODE: CBC 2022
Shear Wall (Y-Y Direction)
Line Story Section Span Wind Seismic Added V (lb)H L v Type
###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf)
1 1 1Y 49 116 54 9 8 354 B
2 1 1Y 40 116 54 9 8 289 A
v(plf) = V/L
Line shear V = Maximum(V1;V2)
SUMMARY SHEAR WALL
V1 = Wind*Span/2 + Added Vwind
V2 = Seismic*Span/2 + Added Vseismic
Page 13 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job#: 240165
Date: 4/15/2024
PLAN: 1
CODE: CBC 2022
Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic
(#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb)
1 :Wind = 2835(lb), Seismic = 1709(lb)
1 1Y 1 115.7 53.7 49 2835 1315 l---------------49.0(ft)---------------l
2 :Wind = 2315(lb), Seismic = 1395(lb)
2 1Y 1 115.7 53.7 40 2314 1073 l---------------40.0(ft)---------------l
A :Wind = 993(lb), Seismic = 1362(lb)
A 1X 1 99.3 104.8 20 993 1048 l---------------20.0(ft)---------------l
B :Wind = 993(lb), Seismic = 1362(lb)
B 1X 1 99.3 104.8 20 993 1048 l---------------20.0(ft)---------------l
#N/A #N/A
#N/A #N/A
#N/A #N/A
Description
V_(lb)=v_(plf)*Span*Span/2/(Span+Offset)
LATERAL
p Factor: X Direction: p=1.3; Y Direction: p=1.3
Page 14 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job #: 240165
Date : 04/15/2024
Plan : 1
BEAM : 1 - CONT. CLG AT LIVING
Loads(Downward+)
Beam Weight 9.6 plf from 0 ft to 19.5 ft
Roof Primary: (15+20)(10) = (DL=150PLF; LLr=200PLF) form 0 to 19.5
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 -845/0 -383
2 5565/5565 0
3 2151/2152 0
USE 4 x 12
Critcal Shear = 3134 LB @4.5' 1.5xV/(F'v x A)= 0.53
F'v = 225, A = 39.38
Critcal Moment = -7369 LB-FT @4.5' M/(F'b x S)= 0.87
F'b = 1375, S = 73.83
Critical Deflection for TL = -0.305 INCH @ 12.52 L/240 = 0.75"
Critical Deflection for LL = -0.167 INCH @ 12.52 L/360 = 0.5"
1 2 3
Moment
Shear
Deflection
4.5'15'
BEAM : 2 - CLG AT BEDROOM
Loads(Downward+)
Beam Weight 9.6 plf from 0 ft to 11.25 ft
Roof Primary: (15+20)(10) = (DL=150PLF; LLr=200PLF) form 0 to 11.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 2023/2023 0
2 2023/2023 0
USE 4 x 12
Critcal Shear = 2022 LB @0' 1.5xV/(F'v x A)= 0.34
F'v = 225, A = 39.38
Critcal Moment = 5686 LB-FT @5.5' M/(F'b x S)= 0.67
F'b = 1375, S = 73.83
Critical Deflection for TL = -0.183 INCH @ 5.5 L/240 = 0.562"
Critical Deflection for LL = -0.102 INCH @ 5.5 L/360 = 0.375"
1 2
Moment
Shear
Deflection
11.25'
Page 15 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job #: 240165
Date : 04/15/2024
Plan : 1
BEAM : 3 - DROP AT PORCH
Loads(Downward+)
Beam Weight 12.7 plf from 0 ft to 19.25 ft
Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 19.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 19.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 861/861 0
2 861/861 0
USE 6 x 10
Critcal Shear = 860 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 212, A = 52.25
Critcal Moment = 4142 LB-FT @9.62' M/(F'b x S)= 0.35
F'b = 1688, S = 82.73
Critical Deflection for TL = -0.439 INCH @ 9.62 L/240 = 0.962"
Critical Deflection for LL = -0.131 INCH @ 9.62 L/360 = 0.642"
1 2
Moment
Shear
Deflection
19.25'
BEAM : 4 - HDR AT PORCH
Loads(Downward+)
Beam Weight 9.6 plf from 0 ft to 3.25 ft
Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 3.25
Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 3.25
Point load @ 0.75 : Load from beam 1 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 4532/4533 0
2 1492/1492 0
USE 4 x 12
Critcal Shear = 4532 LB @0' 1.5xV/(F'v x A)= 0.76
F'v = 225, A = 39.38
Critcal Moment = 3366 LB-FT @0.75' M/(F'b x S)= 0.39
F'b = 1375, S = 73.83
Critical Deflection for TL = -0.009 INCH @ 1.75 L/240 = 0.162"
Critical Deflection for LL = -0.005 INCH @ 1.75 L/360 = 0.108"
1 2
P1
Moment
Shear
Deflection
3.25'
Page 16 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job #: 240165
Date : 04/15/2024
Plan : 1
BEAM : 5 - HDR AT BEDROOM
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 3.25 ft
Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 3.25
Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 3.25
Point load @ 2.5 : Load from beam 2 at Support 2(P1)
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 648/648 0
2 1737/1737 0
USE 4 x 6
Critcal Shear = -1737 LB @3.25' 1.5xV/(F'v x A)= 0.6
F'v = 225, A = 19.25
Critcal Moment = 1271 LB-FT @2.5' M/(F'b x S)= 0.59
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.022 INCH @ 1.75 L/240 = 0.162"
Critical Deflection for LL = -0.011 INCH @ 1.75 L/360 = 0.108"
1 2
P1
Moment
Shear
Deflection
3.25'
BEAM : 6 - HDR AT BEDROOM
Loads(Downward+)
Beam Weight 4.7 plf from 0 ft to 6.25 ft
Roof Primary: (15+20)(5.2) = (DL=78.8PLF; LLr=105PLF) form 0 to 6.25
Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 6.25
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 683/683 0
2 683/683 0
USE 4 x 6
Critcal Shear = -682 LB @6.25' 1.5xV/(F'v x A)= 0.23
F'v = 225, A = 19.25
Critcal Moment = 1064 LB-FT @3' M/(F'b x S)= 0.49
F'b = 1462, S = 17.65
Critical Deflection for TL = -0.096 INCH @ 3 L/240 = 0.312"
Critical Deflection for LL = -0.046 INCH @ 3 L/360 = 0.208"
1 2
Moment
Shear
Deflection
6.25'
Page 17 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job #: 240165
Date : 04/15/2024
Plan : 1
BEAM : C1 - C.J. 2X6# @ 16" O.C. TYP. (MAX L=15'-0")
Loads(Downward+)
Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 140/140 0
2 140/140 0
USE 2 x 6
Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11
F'v = 225, A = 8.25
Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75"
Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5"
1 2
Moment
Shear
Deflection
15'
BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0")
Loads(Downward+)
Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12
Reactions (D+Lr+L/Max. Load comb.)
Bearing Down Up
1 248/248 0
2 248/248 0
USE 2 x 6
Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2
F'v = 225, A = 8.25
Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7
F'b = 1682, S = 7.56
Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6"
Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4"
1 2
Moment
Shear
Deflection
12'
Page 18 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job#: 240165
Date: 8/28/2024
PLAN: 1
CODE: CBC 2022
2100 psf
Trib Trib Wall Height
DL(psf) LL(psf) roof(ft) DL(psf) LL(psf) floor(ft) DL(psf) wall(ft)
15 20 20 10 9
Roof: (DL+LL) (Trib) = 700 plf
Floor: (DL+LL) (Trib) = 0 plf
Wall: DL (Height)= 90 plf
790 plf
790 /(12"/12) = 790 psf< 2100 psf
P(allowable)
P allowable = 6,300 #
18 in
FOUNDATION - 1-STORY
Allowable soil bearing value:
Roof Floor
use 12" wide cont. ftg w/ 2-#4 top & bott.
45
Page 19 of 20
3205 S Deegan Dr
#23/10/2025
Dong Engineering Inc.
ADU
3205 S.DEEGAN DR, SANTA ANA, CA 92704
Job#: 240165
Date: 8/28/2024
PLAN: 1
CODE: CBC 2022
BEAM NO. BM#4 Support 1 P =4,532 #
Use 2' - 0"Square x 18" Deep Concrete Pad With
3-#4 Each way
PAD SCHEDULE
Page 20 of 20
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 1 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
GENERAL INFORMATION
01 Project Name 240165
02 Run Title Title 24 Analysis
03 Project Location 3205 S.DEEGAN DR, Unit #2,
04 City SANTA ANA 05 Standards Version 2022
06 Zip code 92704 07 Software Version EnergyPro 9.2
08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)0
10 Building Type Single family 11 Number of Dwelling Units 1
12 Project Scope Newly Constructed 13 Number of Bedrooms 2
14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 1
16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.3
18 Total Cond. Floor Area (ft2)799 19 Glazing Percentage (%)16.21%
20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a
22 Fuel Type Natural gas 23 No Dwelling Unit:No
COMPLIANCE RESULTS
01 Building Complies with Computer Performance
02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider.
03 This building incorporates one or more Special Features shown below
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 2 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
ENERGY DESIGN RATINGS
Energy Design Ratings Compliance Margins
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Source Energy
(EDR1)
Efficiency1 EDR
(EDR2efficiency)
Total2 EDR
(EDR2total)
Standard Design 37.1 38.6 27.7
Proposed Design 37.1 38 27.4 0 0.6 0.3
RESULT3: PASS
1Efficiency EDR includes improvements like a better building envelope and more efficient equipment
2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries
3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded
•Standard Design PV Capacity: 2.08 kWdc
•PV System resized to 2.08 kWdc (a factor of 2.080) to achieve 'Standard Design PV' PV scaling
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 3 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
ENERGY USE SUMMARY
Energy Use Standard Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Standard Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Proposed Design Source
Energy (EDR1) (kBtu/ft2 -yr)
Proposed Design TDV Energy
(EDR2) (kTDV/ft2 -yr)
Compliance
Margin (EDR1)
Compliance
Margin (EDR2)
Space Heating 0.09 0.52 1.03 7.62 -0.94 -7.1
Space Cooling 1.32 30.67 0.88 27.86 0.44 2.81
IAQ Ventilation 0.45 4.7 0.45 4.7 0 0
Water Heating 2.24 23.53 1.77 18.3 0.47 5.23
Self
Utilization/Flexibility
Credit
0 0
Efficiency Compliance
Total 4.1 59.42 4.13 58.48 -0.03 0.94
Photovoltaics -2.85 -85.98 -2.85 -85.31
Battery 0 0
Flexibility
Indoor Lighting 0.94 8.79 0.94 8.79
Appl. & Cooking 6.53 42.19 6.49 41.79
Plug Loads 5.69 57.9 5.69 57.9
Outdoor Lighting 0.21 1.81 0.21 1.81
TOTAL COMPLIANCE 14.62 84.13 14.61 83.46
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 4 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
ENERGY USE INTENSITY
Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage
Gross EUI1 22.67 21.9 0.77 3.4
Net EUI2 8.15 7.38 0.77 9.45
Notes
1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.
2. Net EUI is Energy Use Total (including PV) / Total Building Area.
REQUIRED PV SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
DC System Size
(kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth
(deg)
Tilt
Input
Array Angle
(deg)
Tilt: (x in
12)
Inverter Eff.
(%)
Annual
Solar Access
(%)
2.08 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98
REQUIRED SPECIAL FEATURES
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
•Ducts with high level of insulation
•Insulation below roof deck
•Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 5 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
HERS FEATURE SUMMARY
The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional
detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry
•Quality insulation installation (QII)
•Indoor air quality ventilation
•Minimum Airflow
•Verified SEER/SEER2
•Verified Refrigerant Charge
•Fan Efficacy Watts/CFM
•Verified HSPF
•Verified heat pump rated heating capacity
•Duct leakage testing
•Verified Duct Design
•Duct design specifies Buried Ducts
•Compact distribution system expanded credit
BUILDING - FEATURES INFORMATION
01 02 03 04 05 06 07
Project Name Conditioned Floor Area (ft2)Number of Dwelling
Units Number of Bedrooms Number of Zones Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
240165 799 1 2 1 0 1
ZONE INFORMATION
01 02 03 04 05 06 07
Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status
Living Conditioned HVAC1 799 9 DHW Sys 1 New
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Front wall Living R-15 Wall 0 Front 180 44 90
Left wall Living R-15 Wall 90 Left 360 20 90
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 6 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
OPAQUE SURFACES
01 02 03 04 05 06 07 08
Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door
Area (ft2)Tilt (deg)
Rear wall Living R-15 Wall 180 Back 180 9 90
Right wall Living R-15 Wall 270 Right 360 76.5 90
Roof Attic Living R-30 + R-13 Roof Attic n/a n/a 799 n/a n/a
ATTIC
01 02 03 04 05 06 07 08
Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof
Attic Living Attic RoofLiving Ventilated 5 0.1 0.85 No No
FENESTRATION / GLAZING
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Name Type Surface Orientation Azimuth Width
(ft)
Height
(ft)Mult.Area
(ft2)U-factor U-factor
Source SHGC SHGC Source Exterior Shading
W 6040 Window Front wall Front 0 1 24 0.3 NFRC 0.23 NFRC Bug Screen
W 4030 Window Left wall Left 90 1 12 0.3 NFRC 0.23 NFRC Bug Screen
W 2020 Window Left wall Left 90 1 4 0.3 NFRC 0.23 NFRC Bug Screen
W 2020 2 Window Left wall Left 90 1 4 0.3 NFRC 0.23 NFRC Bug Screen
W 3030 Window Rear wall Back 180 1 9 0.3 NFRC 0.23 NFRC Bug Screen
D 6068 Window Right wall Right 270 1 40.5 0.3 NFRC 0.23 NFRC Bug Screen
W 5040 Window Right wall Right 270 1 20 0.3 NFRC 0.23 NFRC Bug Screen
W 4040 Window Right wall Right 270 1 16 0.3 NFRC 0.23 NFRC Bug Screen
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 7 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
OPAQUE DOORS
01 02 03 04
Name Side of Building Area (ft2)U-factor
D 3068 Front wall 20 0.5
SLAB FLOORS
01 02 03 04 05 06 07 08
Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value
and Depth
Edge Insul. R-value
and Depth Carpeted Fraction Heated
Slab-on-Grade Living 799 120 none 0 80%No
OPAQUE SURFACE CONSTRUCTIONS
01 02 03 04 05 06 07 08
Construction Name Surface Type Construction Type Framing Total Cavity
R-value
Interior / Exterior
Continuous
R-value
U-factor Assembly Layers
R-15 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095
Inside Finish: Gypsum Board
Cavity / Frame: R-15 / 2x4
Exterior Finish: 3 Coat Stucco
Attic RoofLiving Attic Roofs Wood Framed
Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078
Roofing: Light Roof (Asphalt Shingle)
Roof Deck: Wood
Siding/sheathing/decking
Cavity / Frame: R-13.0 / 2x4
Around Roof Joists: R-0.0 insul.
R-30 + R-13 Roof Attic Ceilings (below
attic)
Wood Framed
Ceiling 2x4 @ 16 in. O. C.R-30 None / None 0.032
Over Ceiling Joists: R-20.9 insul.
Cavity / Frame: R-9.1 / 2x4
Inside Finish: Gypsum Board
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 8 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
BUILDING ENVELOPE - HERS VERIFICATION
01 02 03 04 05
Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50
Required Not Required N/A n/a n/a
WATER HEATING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Distribution Type Water Heater Name Number of Units Solar Heating
System
Compact
Distribution HERS Verification Water Heater
Name (#)
DHW Sys 1 Domestic Hot
Water (DHW)Standard DHW Heater 1 1 n/a Expanded DHW Sys
1-hers-dhw DHW Heater 1 (1)
WATER HEATERS - NEEA HEAT PUMP
01 02 03 04 05 06 07 08
Name # of Units Tank Vol. (gal)NEEA Heat Pump
Brand
NEEA Heat Pump
Model Tank Location Duct Inlet Air Source Duct Outlet Air Source
DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH Outside Living Living
WATER HEATING - COMPACT DISTRIBUTION
01 02 03 04 05 06 07
Dwelling Unit type Water Heating System
Name
Master Bath distance of
furthest fixture to Water
Heater (ft)
Kitchen distance of
furthest fixture to Water
Heater (ft)
Furthest Third furthest
fixture to Water Heater
(ft)
Compactness Factor HERS Verification
Dwelling DHW Sys 1 n/a n/a n/a 0.6 Expanded Credit
WATER HEATING - HERS VERIFICATION
01 02 03 04 05 06 07
Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution
Type Recirculation Control Shower Drain Water Heat
Recovery
DHW Sys 1 - 1/1 Not Required Not Required Required Expanded Not Required Not Required
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 9 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
SPACE CONDITIONING SYSTEMS
01 02 03 04 05 06 07 08 09
Name System Type Heating Unit Name Heating Equipment
Count Cooling Unit Name Cooling Equipment
Count Fan Name Distribution Name Required
Thermostat Type
HVAC1 Heat pump
heating cooling
Heat Pump System
1 1 Heat Pump System
1 1 HVAC Fan 1 Air Distribution
System 1 Setback
HVAC - HEAT PUMPS
01 02 03 04 05 06 07 08 09 10 11 12 13
Name System Type Number of
Units
Heating Cooling
Zonally
Controlled
Compressor
Type HERS VerificationHeating
Efficiency
Type
HSPF/HS
PF2/COP Cap 47 Cap 17
Cooling
Efficiency
Type
SEER/SE
ER2
EER/EER
2/CEER
Heat Pump
System 1 Central split HP 1 HSPF 9 30000 15500 EERSEER 17 12 Not Zonal Single
Speed
Heat Pump System
1-hers-htpump
HVAC HEAT PUMPS - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Verified Airflow Airflow Target Verified EER/EER2 Verified
SEER/SEER2
Verified Refrigerant
Charge
Verified
HSPF/HSPF2
Verified Heating
Cap 47
Verified Heating
Cap 17
Heat Pump System
1-hers-htpump Required 350 Not Required Required Yes Yes Yes Yes
HVAC - DISTRIBUTION SYSTEMS
01 02 03 04 05 06 07 08 09 10 11 12
Name Type Design Type
Duct Ins. R-value Duct Location Surface Area
Bypass Duct Duct Leakage HERS Verification
Supply Return Supply Return Supply Return
Air Distribution
System 1
Unconditioned
attic Verified Design
See
duct
design
See
duct
design
Attic Attic 4.93 0 No Bypass Duct Sealed and Tested Air Distribution
System 1-hers-dist
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 10 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
HVAC DISTRIBUTION - HERS VERIFICATION
01 02 03 04 05 06 07 08 09
Name Duct Leakage
Verification
Duct Leakage
Target (%)
Verified Duct
Location
Verified Duct
Design Buried Ducts Deeply Buried
Ducts
Low-leakage Air
Handler
Low Leakage
Ducts Entirely in
Conditioned
Space
Air Distribution
System 1-hers-dist Yes 5.0 Not Required Required Required Credit not taken Not Required No
HVAC - FAN SYSTEMS
01 02 03 04
Name Type Fan Power (Watts/CFM)Name
HVAC Fan 1 HVAC Fan 0.25 HVAC Fan 1-hers-fan
HVAC FAN SYSTEMS - HERS VERIFICATION
01 02 03
Name Verified Fan Watt Draw Required Fan Efficacy (Watts/CFM)
HVAC Fan 1-hers-fan Required 0.25
INDOOR AIR QUALITY (IAQ) FANS
01 02 03 04 05 06 07 08 09
Dwelling Unit Airflow (CFM)Fan Efficacy
(W/CFM)IAQ Fan Type
Includes
Heat/Energy
Recovery?
IAQ Recovery
Effectiveness -
SRE/ASRE
Includes Fault
Indicator Display?HERS Verification Status
SFam IAQVentRpt 46 0.35 Exhaust No n/a / n/a No Yes
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
3205 S Deegan Dr
#23/10/2025
CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E
Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 11 of 11)
Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x
Registration Number:Registration Date/Time: HERS Provider:
CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000
Schema Version: rev 20220901
Report Generated: 2024-08-28 14:04:13
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. I certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:Documentation Author Signature:
Company:Signature Date:
Address:CEA/ HERS Certification Identification (If applicable):
City/State/Zip:Phone:
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance.
2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets,
calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
Responsible Designer Name:Responsible Designer Signature:
Company:Date Signed:
Address:License:
City/State/Zip:Phone:
Truong Dong
Dong Engineering 08/28/2024
10692 silver cir
garden grove, CA 92843 (714) 204-2874
Truong Dong
Dong Engineering 08/28/2024
10692 silver cir N/A
garden grove, CA 92843 (714) 204-2874
424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS
NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for,
and cannot guarantee, the accuracy or completeness of the information contained in this document.
Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of
this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information.
3205 S Deegan Dr
#23/10/2025
SANTA ANA CITY COUNCIL
Mayor
vamezcua@santa-ana.org
Mayor Pro Tem, Ward 1
tphan@santa-ana.org
Ward 2
bvazquez@santa-ana.org
Ward 3
jessielopez@santa-ana.org
Ward 4
pbacerra@santa-ana.org
Ward 5
jryanhernandez@santa-ana.org
Ward 6
dpenaloza@santa-ana.org
MAYOR
Valerie Amezcua
MAYOR PRO TEM
Thai Viet Phan
COUNCILMEMBERS
Phil Bacerra
Johnathan Ryan Hernandez
Jessie Lopez
David Penaloza
Benjamin Vazquez
CITY OF SANTA ANA
PLANNING AND BUILDING AGENCY
20 Civic Center Plaza ● P.O. Box 1988
Santa Ana, California 92702
www.santa-ana.org
INTERIM CITY MANAGER
Alvaro Nuñez
CITY ATTORNEY
Sonia R. Carvalho
CITY CLERK
Jennifer L. Hall
June 19, 2024
Also sent via email to: grayscale.concept@gmail.com
Jenny Chau Nguy
3205 South Deegan Drive
Santa Ana, CA 92707
Subject: Address Assignment for a Detached Accessory Dwelling Unit located at 3205
South Deegan Drive (APN: 412-152-22) in Santa Ana, CA
Dear Jenny,
The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal
addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment
for a 799-square-foot ADU located at 3205 South Deegan Drive (APN: 412-152-22). Notice is
hereby given that the following assigned address shall be posted onsite per the approved address
plan, attached hereto as Exhibit A.
Address to be Activated/Posted
To subdivide commercial and/or residential units into multiple units, a building permit (and all other
associated permits), plans, and inspection approvals by the PBA are required. Address will be
verified during inspections by the Building Safety Division.
Please update your records accordingly. Should you have any questions, feel free to contact me
by phone at (714) 664-2753 or by email at PRaj@santa-ana.org.
Sincerely,
Punkaj Raj
Planning Technician
Exhibit A – Address Plan
3205 S Deegan Dr
#23/10/2025
Address Letter for 3205 South Deegan Drive
Page 2 of 2
c:
Vencent Quaglia, United States Post Office
Chris Tuiolosega, United States Post Office
Cipriano Corona, Marketing Manager, United States Post Office
Alex Alvarez, Postmaster Santa Ana, United States Post Office
Federal Express, Administration
Cathy Joseph, Garden Grove Unified School District
Christine Hy, Garden Grove Unified School District
Cathy Slader, Orange Unified School District
Orin Williams, Santa Ana Unified School District
Yvette Miranda, Santa Ana Unified School District
Cristina Bernal, Tustin Unified School District
Mishele Richards, Orange County Fire Authority, GEO Files Coordinator
Orange County Fire Authority
Neal Kelly, Registrar of Voters
Members, Board of Supervisors
Southern California Gas Company
Southern California Edison Company
Claude Parrish, County Assessor's Office
SAG, AT&T
UPS, Administration
City Manager’s Office
Beverly Martin, Police Community Services Specialist
Boris Duran, Police Systems Manager
Jennifer Mendoza, Police Communications Manager
Chris Hubbard, Police Systems Support Analyst
Alejandra Gutierrez, Treasury & Customer Services Manager
Hector Jimenez, Revenue Supervisor
Alfonso Chavez, Utilities Customer Services Supervisor
Judson Brown, Housing & Neighborhood Development Manager
Rudy Rosas, Principal Civil Engineer
Zdenek (Zed) Kekula, Principal Civil Engineer
Jason Kwak, Building Safety Manager
Evelyn LaRocca, Permit Supervisor
Kathy Hernandez, Permit Technician
Julie Amsden, Permit Technician
Ali Pezeshkpour, Planning Manager
Jerry Guevara, Senior Planner
Alvaro Nunez, PBA Assistant Director and Code Enforcement Manager
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
Planning & Building Agency
Building and Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714)-647-5800
www.santa-ana.org
GRADING PERMIT
REQUIREMENTS FOR
DETACHED ADU PROJECTS
PCC-15
REV: 09/03/2020 Page 1 of 1
A grading permit is required for all new detached buildings including new detached Accessory
Dwelling Unit (ADU) projects. Grading plans prepared and stamped by a registered professional
engineer shall be submitted for approval prior to issuance of the building permit, and shall be
required to be submitted before or concurrently with the architectural plans submittal to the
Building Safety Division.
Grading Permit Exemption: Residential detached Accessory Dwelling Unit (ADU) projects that
meet all of the following may be exempted from grading permit requirements:
1. The maximum amount of soil being moved is less than 50 cubic yards. The soil quantities
shall be calculated by a California registered professional civil engineer
2. A site drainage plan prepared by a California registered professional civil engineer shall
be provided with the following minimum information, but not limited to:
a. Plan(s) shall be stamped, signed and dated by a California registered civil engineer
b. Location of all existing and proposed structures, property lines, right-of-way lines,
and easements, including dimensions and setbacks
c. Drainage slopes and flow patterns
d. Drainage system such as swales, french drains, water collection and disposal
system, etc.
e. Drainage plan shall indicate how the site grading or drainage system will manage
all surface water flows to be diverted away from buildings and adjoining property
lines, in accordance with all applicable codes
f. The grade shall fall not fewer than 6 inches within the first 10 feet from the
foundation wall. Where lot lines, walls, slopes or other physical barriers prohibit 6
inches of fall within 10 feet, drains, or swales shall be constructed to ensure
drainage away from the structure. Impervious surfaces within 10 feet of the building
foundation shall be sloped not less than 2 percent away from the building.
3. A final certification letter from the professional engineer of record stating that the grades
were constructed per the approved site drainage plan, shall be submitted to the building
inspector prior to final inspection
4. The “Detached ADU Grading Permit Exemption Checklist” shall be completed by the
California registered professional civil engineer and shall be made a part of the building
plans.
5. The site drainage plan and the completed checklist shall be required at the time of
architectural plans submittal as part of the building plans package.
The building official reserves the right to require a grading plan based on site conditions. This
grading permit exemption does not apply to projects in the FEMA Flood Zone.
3205 S Deegan Dr
#23/10/2025
Planning & Building Agency
Building and Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714)-647-5800
www.santa-ana.org
DETACHED ADU -
GRADING PERMIT EXEMPTION
CHECKLIST
PCC-16
REV: 11/10/2020 Page 1 of 1
THIS FORM SHALL BE COMPLETED BY A CALIFORNIA REGISTERED CIVIL ENGINEER.
Instructions: In order to qualify for the grading permit exemption for detached Accessory
Dwelling Unit (ADU) projects per handout PCC-15, the registered civil engineer of record shall
complete all sections, check all boxes and sign the certification section below. A copy of this
checklist shall be attached to each of TWO sets of plans. If answering NO to any of the
questions, a grading plan and permit shall be required.
Project Address:
Yes No
1. ☐ ☐ I have verified that the project address is NOT located on a FEMA designated
flood zone (Zone A or AE).
2. ☐ ☐ I have provided two sets of site drainage plans that is stamped, signed and
dated by a California professional civil engineer, to be submitted with the
building submittal package.
3. ☐ ☐ I have calculated the total amount of soil being cut or filled on this project is less
than 50 cubic yards.
4. ☐ ☐
The site drainage plans include the following, but not limited to, location of all
existing and proposed structures, property lines, right-of-way lines, and
easements, including dimensions and setbacks; drainage slopes and flow
patterns, drainage systems such as swales, french drains, water collection
and disposal systems, etc.
5. ☐ ☐ I have designed drainage such that surface water flows away from buildings and
adjoining property lines, in accordance with all applicable codes.
6. ☐ ☐ I have designed grading such that it will not adversely affect the adjoining
properties.
7. ☐ ☐
I have designed the grade to fall not fewer than 6 inches within the first 10 feet
from the foundation walls except where lot lines, walls, slopes or other physical
barriers prohibit 6 inches of fall within 10 feet, I have designed drains or swales
to ensure drainage away from the buildings. Any impervious surfaces within 10
feet of the building foundation are sloped not less than 2 percent away from the
building.
8. ☐ ☐ I will provide a final certification letter stating that the grades were constructed
per the approved site drainage plan, and will submit this certification letter to the
building inspector prior to final inspection.
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Licensed Number: Date:
Phone Number: Email Address:
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025
3205 S Deegan Dr
#23/10/2025