Loading...
HomeMy WebLinkAbout3205 S Deegan Dr #2 - PlanBldg #101120235 APPROVALS: PLNG - C. Santana BLDG - CSG POLICE - B. Martin PUBLIC WORKS - B. Sarlak 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 CG - 1 C A L I F O R N I A G R E E N B U I L D I N G 3205 S Deegan Dr #23/10/2025 CG - 2 C A L I F O R N I A G R E E N B U I L D I N G 3205 S Deegan Dr #23/10/2025 RESTRICTIVE NOTICE DATE REVISIONS SHEET DESCRIPTION PROJECT OWNER PROJECT ADDRESS STAMP NO: REVISIONS DATE SIGNED: 8/28/24 THESE DESIGNS, DRAWINGS, AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF DONG ENGINEERING. THESE DRAWINGS CANNOT BE COPIED, TRANSFERRED, OR REPRODUCED NOR CAN ANY OTHER STRUCTURES BE BUILT FROM THEM WITHOUT WRITTEN CONSENT. SHEET DE#: TEL- 714-617-5979 GARDEN GROVE, CA 92841 7661 GARDEN GROVE BLVD., DONG ENGINEERING, INC. INFO@DONGENGINEERING.COM 240165 AD U 32 0 5 S . D E E G A N D R , U N I T # 2 S A N T A A N A , C A 9 2 7 0 4 08/28/2024 PLAN CHECK01 3205 S Deegan Dr #23/10/2025 RESTRICTIVE NOTICE DATE REVISIONS SHEET DESCRIPTION PROJECT OWNER PROJECT ADDRESS STAMP NO: REVISIONS DATE SIGNED: 8/28/24 THESE DESIGNS, DRAWINGS, AND SPECIFICATIONS ARE THE EXCLUSIVE PROPERTY OF DONG ENGINEERING. THESE DRAWINGS CANNOT BE COPIED, TRANSFERRED, OR REPRODUCED NOR CAN ANY OTHER STRUCTURES BE BUILT FROM THEM WITHOUT WRITTEN CONSENT. SHEET DE#: TEL- 714-617-5979 GARDEN GROVE, CA 92841 7661 GARDEN GROVE BLVD., DONG ENGINEERING, INC. INFO@DONGENGINEERING.COM 240165 AD U 32 0 5 S . D E E G A N D R , U N I T # 2 S A N T A A N A , C A 9 2 7 0 4 08/28/2024 PLAN CHECK01 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Submittal Criteria Form Required for Single Family or Duplex Residences (Use Commercial form for lots with 3+ dwelling units or new residential tracts) Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification. Project Information  New Single Family Residence/Duplex  Addition/Remodel  ADU  Other Address: Unit #: City or Unincorporated County Area: ZIP: Scope of Work: Existing Area: Area to be Added: Total Resulting Area: Stories: Area Added in Past 2 Years (excluding this project): Yes No Questionnaire OCFA Plan Type if “Yes” 1.   New – Is this a new single family residence or duplex? *(PR160) Residential Site with Water Availability (PR400-402) Fire Sprinkler 2.   ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has fire sprinklers or a house that will have fire sprinklers added as part of this project? (PR400-402) Fire Sprinkler 3.   Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire sprinkler retrofit based on a threshold set by local ordinance? (PR400-402) Fire Sprinkler 4.   Distance – Is the most remote portion of the addition, ADU or other detached structure greater than 140-feet from the fire access roadway? *(PR160) Residential Site 5.   Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non- sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet? *(PR160) Residential Site with Water Availability 6.   Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed contractor to determine if a fire sprinkler modification is needed. (PR400-402) Fire Sprinkler 7.   Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold set by local ordinance? *(PR160) Residential Site (PR400-402) Fire Sprinkler 8.   Gate – Is a gate being installed across a driveway or road that is designated as a fire department access roadway, or a driveway or road that serves more than a single home/duplex? (PR180) Gate 9.   Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000 sf, and ADU’s). *(PR160) Residential Site *(PR172-174) Methane Test/Mitigation Plans 10.   Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation, or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as defined by the State, or (D) near an area that could be affected by a wildfire in the open space. *(PR125) Fuel Modification (PR182) Accessory Structure *OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals. Applicant Certification I certify, under penalty of perjury, under the laws of the State of California, that the information above is true: Print Name:_______________________________________ Signature:___________________________________________ Date:______________ Phone Number:_____________________________________________ Email:_____________________________________________________________ Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required. ______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes” and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination. For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100 SFR 3205 S Deegan Dr #23/10/2025 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City Official Requesting Review: City Reference #: __________________________ City / County: _____________________________________ Date: __________________________________ Contact Name: _____________________________________ E-Mail: __________________________________ Title: _____________________________________ Phone #: _________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County: OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ OCFA Authorization Updated: 06/02/2020 rs 3205 S Deegan Dr #23/10/2025 Dong Engineering, Inc. 7661 GARDEN GROVE BLVD. , GARDEN GROVE, CA 92841 Office: (714) 617-5979 Email: info@dongengineering.com DATE:4/18/2024 CLIENT: JOB NO.:240165 Project: ADU STRUCTURAL CALCULATIONS FOR THE BUILDING AT: Page 1 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU Job#: 240165 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Date: 4/15/2024 ROOF:SHINGLE Slope 5:12 Live Load 20 psf Roof'g Material 3 psf Sheathing 2.0 psf Trusses / Rafters 2.0 psf Ceiling Joists 2.0 psf Drywall 2.0 psf Sprinkler 0.5 psf Solar 3.0 psf Miscellaneous 0.5 psf Total D.L.15 psf Total Load 35 psf EXTERIOR WALL:INTERIOR WALL: EXTERIOR:9 DRYWALL:3 DRYWALL:3.0 DRYWALL:3.0 STUDS:2.0 STUDS:2.0 MISC.:1.0 MISC.:2.0 DL=15.0 PSF DL=10.0 PSF REVISIONS: 1 Sheets:Date: Init:Remark: 2 Sheets:Date: Init:Remark: 3 Sheets:Date: Init:Remark: 4 Sheets:Date: Init:Remark: 5 Sheets:Date: Init:Remark: 6 Sheets:Date: Init:Remark: LOADING CONDITIONS Page 2 of 20 3205 S Deegan Dr #23/10/2025 USGS web services were down for some period of time and as a result this tool wasn't operational, resulting in timeout error. USGS web services are now operational so this tool should work as expected. 3205 S Deegan Dr, Santa Ana, CA 92704, USA Latitude, Longitude: 33.7050383, -117.9032655 Date 4/15/2024, 12:03:24 AM Design Code Reference Document ASCE7-16 Risk Category II Site Class D - Default (See Section 11.4.3) Type Value Description SS 1.297 MCER ground motion. (for 0.2 second period) S1 0.465 MCER ground motion. (for 1.0s period) SMS 1.556 Site-modified spectral acceleration value SM1 null -See Section 11.4.8 Site-modified spectral acceleration value SDS 1.038 Numeric seismic design value at 0.2 second SA SD1 null -See Section 11.4.8 Numeric seismic design value at 1.0 second SA Type Value Description SDC null -See Section 11.4.8 Seismic design category Fa 1.2 Site amplification factor at 0.2 second Fv null -See Section 11.4.8 Site amplification factor at 1.0 second PGA 0.556 MCEG peak ground acceleration FPGA 1.2 Site amplification factor at PGA PGAM 0.667 Site modified peak ground acceleration TL 8 Long-period transition period in seconds SsRT 1.297 Probabilistic risk-targeted ground motion. (0.2 second) SsUH 1.406 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration SsD 1.9 Factored deterministic acceleration value. (0.2 second) S1RT 0.465 Probabilistic risk-targeted ground motion. (1.0 second) S1UH 0.504 Factored uniform-hazard (2% probability of exceedance in 50 years) spectral acceleration. S1D 0.653 Factored deterministic acceleration value. (1.0 second) PGAd 0.779 Factored deterministic acceleration value. (Peak Ground Acceleration) PGAUH 0.556 Uniform-hazard (2% probability of exceedance in 50 years) Peak Ground Acceleration CRS 0.922 Mapped value of the risk coefficient at short periods CR1 0.923 Mapped value of the risk coefficient at a period of 1 s CV 1.359 Vertical coefficient Page 3 of 20 3205 S Deegan Dr #23/10/2025 DISCLAIMER While the information presented on this website is believed to be correct, SEAOC /OSHPD and its sponsors and contributors assume no responsibility or liability for its accuracy. The material presented in this web application should not be used or relied upon for any specific application without competent examination and verification of its accuracy, suitability and applicability by engineers or other licensed professionals. SEAOC / OSHPD do not intend that the use of this information replace the sound judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the results of the seismic data provided by this website. Users of the information from this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible for building code approval and interpretation for the building site described by latitude/longitude location in the search results of this website. Page 4 of 20 3205 S Deegan Dr #23/10/2025 1Y 1X 1 2 A B (N ) B E D # 2 9' - 0 " C L G (N ) B A . # 1 9' - 0 " C L G (N ) W . I . C . 9' - 0 " C L G CLOSET (N ) B A . # 2 9' - 0 " C L G (N ) B E D 1 9' - 0 " C L G IS L A N D (N ) L I V I N G 9' - 0 " C L G (N ) K I T C H E N 9' - 0 " C L G (N ) P O R C H 89 S . F LA N D I N G RO O F S H E A R W A L L L A Y O U T Page 5 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job#: 240165 Date: 4/15/2024 PLAN: 1 CODE: CBC 2022 SECTION: 1X Number of Story: 1 Section width: 20(ft)Section length: 44.5(ft) Base height: 0(ft)Slope roof height: 15.5(ft)Gable mean roof height: 12.5(ft) WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS: Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1 Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1 B = 20(ft), L = 44.5(ft), H = 12.5(ft)-->L/B = 2.23, H/L = 0.28 Wall coefficient: Cpw = 0.8, Cpl = -0.29 Wind exposure = C-->anpha = 9.5, zg = 900 Kz = 2,01*(15/zg)^(2/anpha)qz = 0,00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh) WIND LOAD: SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE: Light frame wood-->Rx = 6.5, Site class :D, SDS = 2FaSs/3 =1.038, SD1 = 2FvS1/3 =0, Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Rx = 0.7*1.038*1*W/6.5 = 0.1118*W Total Seismic Load = 104.8 = 104.8 PLF Redistrib: 937.5*9 = 8437.5 PLFxFT DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10 ROOF DIAPHRAGM Max shear = 149.71 x 20 / (2 x 44.5) = 33.64 PLF Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c. Chord force = 149.71 x 20^2 / (8 x 44.5) = 168.21 LBS Splice w/ min. (1) 16d sinker nails each side of splice at 8" o.c. (standard construction) (z, Kz, qz, P): (15, 0.85, 22.35, 20.68) ROOF Roof = 15*44.5 = 667.5 PLF Wall = 15*2*4.5 + 10*3*4.5 = 270 PLF Shear = 0.1118(667.5+270) = 0.1118*937.5 = 104.81 PLF Plate height: ROOF = 9(ft) SHEAR ROOF = 104.8*937.5*9/8437.5 = 104.8 PLF SHEAR ROOF = 0.6*W = 99.28(plf) ROOF 104.8 PLF SEISMIC GOVERN Page 6 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job#: 240165 Date: 4/15/2024 PLAN: 1 CODE: CBC 2022 SECTION: 1Y Number of Story: 1 Section width: 44.5(ft)Section length: 20(ft) Base height: 0(ft)Slope roof height: 15.5(ft)Gable mean roof height: 12.5(ft) WIND PARAMETERS PER ASCE7-16, CHAPTER 27, MWFRS BUILDINGS OF ALL HEIGHTS: Wind speed = 110, Wind exposure = C, Wind importance factor Iw = 1 Coefficients: Kd = 0.85, Kzt = 1, G = 0.85, Gcpi = +/-0.18, omega = 1 B = 44.5(ft), L = 20(ft), H = 12.5(ft)-->L/B = 0.45, H/L = 0.63 Wall coefficient: Cpw = 0.8, Cpl = -0.5, Roof coefficient: Cpw = (0.06;-0.41), Cpl = -0.6 Wind exposure = C-->anpha = 9.5, zg = 900 Kz = 2,01*(15/zg)^(2/anpha)qz = 0,00256*Kz*Kzt*Kd*V^2*Iw P = G(Cpw*qz+Cpl*qh) WIND LOAD: SEISMIC PARAMETERS PER ASCE7-16, CHAPTER 12.8, ELF PROCEDURE: Light frame wood-->Ry = 6.5, Site class :D, SDS = 2FaSs/3 =1.038, SD1 = 2FvS1/3 =0, Seismic design category: D, I = 1, 0.7*V = 0.7*SDS*I*W/Ry = 0.7*1.038*1*W/6.5 = 0.1118*W Total Seismic Load = 53.66 = 53.66 PLF Redistrib: 480*9 = 4320 PLFxFT DIAPHRAGM & CHORD FORCE PER ASCE07-16 SECTION 12.10 ROOF DIAPHRAGM Max shear = 76.66 x 40 / (2 x 20) = 76.66 PLF Use: 15/32" apa rated unblock 32/16 w/8d common nails at 6", 6", 12" o.c. Chord force = 76.66 x 40^2 / (8 x 20) = 766.6 LBS Splice w/ min. (5) 16d sinker nails each side of splice at 8" o.c. (standard construction) (z, Kz, qz, P): (15.5, 0.85, 22.51, 24.8); (15, 0.85, 22.35, 24.7) ROOF Roof = 15*20 = 300 PLF Wall = 15*2*4.5 + 10*1*4.5 = 180 PLF Shear = 0.1118(300+180) = 0.1118*480 = 53.66 PLF Plate height: ROOF = 9(ft) SHEAR ROOF = 53.66*480*9/4320 = 53.66 PLF SHEAR ROOF = 0.6*W = 115.71(plf) ROOF 115.71 PLF WIND GOVERN Page 7 of 20 3205 S Deegan Dr #23/10/2025 Do ng E n g i n e e r i n g I n c . AD U 32 0 5 S . D E E G A N D R , S A N T A A N A , C A 9 2 7 0 4 Jo b # : 2 4 0 1 6 5 Da t e : 4 / 1 5 / 2 0 2 4 PL A N : 1 CO D E : C B C 2 0 2 2 Ma x p a n e l d e f l e c t i o n : = 0 . 1 1 " | 4 * d * 1 . 4 = 0 . 6 3 " < 0 . 0 2 x 1 0 8 = 2 . 1 6 " 0. 5 0 8. 0 0 11 . 2 5 OV E R T U R N A N A L Y S I S Le f t S i d e Ho l d D o w n HD U 2 Po s t S i z e 4x 4 Te n s i o n ( k i p s ) 3. 0 Co m . ( k i p s ) 3. 1 Ri g h t S i d e Ho l d D o w n HD U 2 Po s t S i z e 4x 4 Te n s i o n ( k i p s ) 3. 0 Co m . ( k i p s ) 3. 1 An c h o r B o l t 5/ 8 " x 1 2 " [3 ] sp a c e d e q u a l l y Dr a g F o r c e : A: S i m p s o n M S T A 3 0 ( 1 8 8 0 L B ) - A l t o n e r o w ( 9 ) # 1 6 e a . s i d e o f s p l i c e Fr a m i n g C l i p s S p a c i n g S e e S h e a r W a l l S c h e d u l e 9.00 ft LI N E 1 ( D i r e c t i o n : X ) @ F I R S T F L O O R | W i n d : 2 8 3 5 l b s | S e i s m i c : 1 7 0 9 l b s | S h e a r P a n e l T y p e : B | ( þ = 1 . 3 ) To t a l L e n g t h = 1 9 . 7 5 f t | T o t a l S h e a r W a l l L e n g t h = 8 f t | S h e a r D i a p h r a g m = 1 4 4 p l f | D e s i g n S h e a r W a l l = 3 5 4 p l f ( W i n d ) / 2 1 4 p l f ( S e i s m i c ) Se i s m i c L o a d C o m b i n a t i o n : ( 1 . 0 + 0 . 1 4 S DS )D + H + F + 0 . 7 Q E ( C o m p r e s s i o n ) | L o a d C o m b i n a t i o n U s e : ( 0 . 6 - 0 . 1 4 S DS )D + H + 0 . 7 Q E ( T e n s i o n ) W i n d L o a d C o m b i n a t i o n : D + 0 . 7 5 L + 0 . 7 5 ( 0 . 6 W ) ( C o m p r e s s i o n ) | L o a d C o m b i n a t i o n U s e : 0 . 6 D + H + 0 . 6 W ( T e n s i o n ) Se i s m i c C a p a c i t y : P 1 ( 2 . 6 / 2 . 6 ) = 2 . 6 k i p s ( S e c t . 4 . 3 . 3 . 4 . 1 ) W i n d C a p a c i t y : P 1 ( 3 . 6 / 3 . 6 ) = 3 . 6 k i p s ( S e c t . 4 . 3 . 3 . 4 . 1 ) P1 72 -16 1 5 d = 8𝑣 ℎ3 𝐸 � � � � + 𝑣ℎ 10 0 0 � � 𝑎 + ℎ𝑏 ∆𝑎 Page 8 of 20 3205 S Deegan Dr #23/10/2025 Do ng E n g i n e e r i n g I n c . AD U 32 0 5 S . D E E G A N D R , S A N T A A N A , C A 9 2 7 0 4 Jo b # : 2 4 0 1 6 5 Da t e : 4 / 1 5 / 2 0 2 4 PL A N : 1 CO D E : C B C 2 0 2 2 Ma x p a n e l d e f l e c t i o n : = 0 . 0 9 " | 4 * d * 1 . 4 = 0 . 5 3 " < 0 . 0 2 x 1 0 8 = 2 . 1 6 " 6. 2 5 8. 0 0 2. 5 0 OV E R T U R N A N A L Y S I S Le f t S i d e Ho l d D o w n HD U 2 Po s t S i z e 4x 4 Te n s i o n ( k i p s ) 2. 4 Co m . ( k i p s ) 2. 6 Ri g h t S i d e Ho l d D o w n HD U 2 Po s t S i z e 4x 4 Te n s i o n ( k i p s ) 2. 4 Co m . ( k i p s ) 2. 6 An c h o r B o l t 5/ 8 " x 1 2 " [2 ] sp a c e d e q u a l l y Dr a g F o r c e : A: S i m p s o n M S T A 3 0 ( 1 8 8 0 L B ) - A l t o n e r o w ( 9 ) # 1 6 e a . s i d e o f s p l i c e Fr a m i n g C l i p s S p a c i n g S e e S h e a r W a l l S c h e d u l e 9.00 ft LI N E 2 ( D i r e c t i o n : X ) @ F I R S T F L O O R | W i n d : 2 3 1 5 l b s | S e i s m i c : 1 3 9 5 l b s | S h e a r P a n e l T y p e : A | ( þ = 1 . 3 ) To t a l L e n g t h = 2 0 f t | T o t a l S h e a r W a l l L e n g t h = 8 f t | S h e a r D i a p h r a g m = 1 1 6 p l f | D e s i g n S h e a r W a l l = 2 8 9 p l f ( W i n d ) / 1 7 4 p l f ( S e i s m i c ) Se i s m i c L o a d C o m b i n a t i o n : ( 1 . 0 + 0 . 1 4 S DS )D + H + F + 0 . 7 Q E ( C o m p r e s s i o n ) | L o a d C o m b i n a t i o n U s e : ( 0 . 6 - 0 . 1 4 S DS )D + H + 0 . 7 Q E ( T e n s i o n ) W i n d L o a d C o m b i n a t i o n : D + 0 . 7 5 L + 0 . 7 5 ( 0 . 6 W ) ( C o m p r e s s i o n ) | L o a d C o m b i n a t i o n U s e : 0 . 6 D + H + 0 . 6 W ( T e n s i o n ) Se i s m i c C a p a c i t y : P 1 ( 1 . 8 / 1 . 8 ) = 1 . 8 k i p s ( S e c t . 4 . 3 . 3 . 4 . 1 ) W i n d C a p a c i t y : P 1 ( 2 . 5 / 2 . 5 ) = 2 . 5 k i p s ( S e c t . 4 . 3 . 3 . 4 . 1 ) 3. 2 5 P1 10 9 9 -28 9 d = 8𝑣 ℎ3 𝐸 � � � � + 𝑣ℎ 10 0 0 � � 𝑎 + ℎ𝑏 ∆𝑎 Page 9 of 20 3205 S Deegan Dr #23/10/2025 Do ng E n g i n e e r i n g I n c . AD U 32 0 5 S . D E E G A N D R , S A N T A A N A , C A 9 2 7 0 4 Jo b # : 2 4 0 1 6 5 Da t e : 4 / 1 5 / 2 0 2 4 PL A N : 1 CO D E : C B C 2 0 2 2 Ma x p a n e l d e f l e c t i o n : = 0 . 0 9 " | 4 * d * 1 . 4 = 0 . 5 1 " < 0 . 0 2 x 1 0 8 = 2 . 1 6 " 4. 5 0 4. 7 5 4. 0 0 8. 0 0 6. 2 5 8. 7 5 OV E R T U R N A N A L Y S I S Le f t S i d e Ho l d D o w n HD U 2 Po s t S i z e 4x 4 Te n s i o n ( k i p s ) 1. 4 Co m . ( k i p s ) 2. 3 Ri g h t S i d e Ho l d D o w n HD U 2 Po s t S i z e 4x 4 Te n s i o n ( k i p s ) 1. 4 Co m . ( k i p s ) 2. 3 An c h o r B o l t 5/ 8 " x 1 2 " [2 ] sp a c e d e q u a l l y P1 2. 2 5 2. 2 5 4. 2 5 Dr a g F o r c e : A: S i m p s o n M S T A 3 0 ( 1 8 8 0 L B ) - A l t o n e r o w ( 9 ) # 1 6 e a . s i d e o f s p l i c e Fr a m i n g C l i p s S p a c i n g S e e S h e a r W a l l S c h e d u l e 9.00 ft LI N E A ( D i r e c t i o n : X ) @ F I R S T F L O O R | W i n d : 9 9 3 l b s | S e i s m i c : 1 3 6 2 l b s | S h e a r P a n e l T y p e : A | ( þ = 1 . 3 ) To t a l L e n g t h = 4 5 f t | T o t a l S h e a r W a l l L e n g t h = 8 f t | S h e a r D i a p h r a g m = 3 3 p l f | D e s i g n S h e a r W a l l = 1 2 4 p l f ( W i n d ) / 1 7 0 p l f ( S e i s m i c ) Se i s m i c L o a d C o m b i n a t i o n : ( 1 . 0 + 0 . 1 4 S DS )D + H + F + 0 . 7 Q E ( C o m p r e s s i o n ) | L o a d C o m b i n a t i o n U s e : ( 0 . 6 - 0 . 1 4 S DS )D + H + 0 . 7 Q E ( T e n s i o n ) W i n d L o a d C o m b i n a t i o n : D + 0 . 7 5 L + 0 . 7 5 ( 0 . 6 W ) ( C o m p r e s s i o n ) | L o a d C o m b i n a t i o n U s e : 0 . 6 D + H + 0 . 6 W ( T e n s i o n ) Se i s m i c C a p a c i t y : P 1 ( 1 . 8 / 1 . 8 ) = 1 . 8 k i p s ( S e c t . 4 . 3 . 3 . 4 . 1 ) W i n d C a p a c i t y : P 1 ( 2 . 5 / 2 . 5 ) = 2 . 5 k i p s ( S e c t . 4 . 3 . 3 . 4 . 1 ) 58 2 -64 9 d = 8𝑣 ℎ3 𝐸 � � � � + 𝑣ℎ 10 0 0 � � 𝑎 + ℎ𝑏 ∆𝑎 Page 10 of 20 3205 S Deegan Dr #23/10/2025 Do ng E n g i n e e r i n g I n c . AD U 32 0 5 S . D E E G A N D R , S A N T A A N A , C A 9 2 7 0 4 Jo b # : 2 4 0 1 6 5 Da t e : 8 / 2 8 / 2 0 2 4 PL A N : 1 CO D E : C B C 2 0 2 2 Ma x p a n e l d e f l e c t i o n : = 0 . 0 9 " | 4 * d * 1 . 4 = 0 . 5 1 " < 0 . 0 2 x 1 0 8 = 2 . 1 6 " 4. 5 0 1. 2 5 4. 0 0 8. 0 0 3. 5 0 2. 0 0 3. 0 0 2. 7 5 OV E R T U R N A N A L Y S I S Le f t S i d e Ho l d D o w n HD U 2 Po s t S i z e 4x 4 Te n s i o n ( k i p s ) 1. 4 Co m . ( k i p s ) 2. 3 Ri g h t S i d e Ho l d D o w n HD U 2 Po s t S i z e 4x 4 Te n s i o n ( k i p s ) 1. 4 Co m . ( k i p s ) 2. 3 An c h o r B o l t 5/ 8 " x 1 2 " [2 ] sp a c e d e q u a l l y 4. 2 5 6. 5 0 Dr a g F o r c e : A: S i m p s o n M S T A 3 0 ( 1 8 8 0 L B ) - A l t o n e r o w ( 9 ) # 1 6 e a . s i d e o f s p l i c e Fr a m i n g C l i p s S p a c i n g S e e S h e a r W a l l S c h e d u l e 9.00 ft LI N E B ( D i r e c t i o n : X ) @ F I R S T F L O O R | W i n d : 9 9 3 l b s | S e i s m i c : 1 3 6 2 l b s | S h e a r P a n e l T y p e : A | ( þ = 1 . 3 ) To t a l L e n g t h = 4 5 f t | T o t a l S h e a r W a l l L e n g t h = 8 f t | S h e a r D i a p h r a g m = 3 3 p l f | D e s i g n S h e a r W a l l = 1 2 4 p l f ( W i n d ) / 1 7 0 p l f ( S e i s m i c ) Se i s m i c L o a d C o m b i n a t i o n : ( 1 . 0 + 0 . 1 4 S DS )D + H + F + 0 . 7 Q E ( C o m p r e s s i o n ) | L o a d C o m b i n a t i o n U s e : ( 0 . 6 - 0 . 1 4 S DS )D + H + 0 . 7 Q E ( T e n s i o n ) W i n d L o a d C o m b i n a t i o n : D + 0 . 7 5 L + 0 . 7 5 ( 0 . 6 W ) ( C o m p r e s s i o n ) | L o a d C o m b i n a t i o n U s e : 0 . 6 D + H + 0 . 6 W ( T e n s i o n ) Se i s m i c C a p a c i t y : P 1 ( 1 . 8 / 1 . 8 ) = 1 . 8 k i p s ( S e c t . 4 . 3 . 3 . 4 . 1 ) W i n d C a p a c i t y : P 1 ( 2 . 5 / 2 . 5 ) = 2 . 5 k i p s ( S e c t . 4 . 3 . 3 . 4 . 1 ) 5. 2 5 P1 49 9 -73 2 d = 8𝑣 ℎ3 𝐸 � � � � + 𝑣ℎ 10 0 0 � � 𝑎 + ℎ𝑏 ∆𝑎 Page 11 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job#: 240165 Date: 4/15/2024 PLAN: 1 CODE: CBC 2022 Shear Wall (X-X Direction) Line Story Section Span Wind Seismic Added V (lb)H L v Type ###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf) A 1 1X 20 99 105 9 8 170 A B 1 1X 20 99 105 9 7.25 188 A v(plf) = V/L V2 = Seismic*Span/2 + Added Vseismic Line shear V = Maximum(V1;V2) V1 = Wind*Span/2 + Added Vwind SUMMARY SHEAR WALL Page 12 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job#: 240165 Date: 4/15/2024 PLAN: 1 CODE: CBC 2022 Shear Wall (Y-Y Direction) Line Story Section Span Wind Seismic Added V (lb)H L v Type ###(ft)(plf)(plf)Wind Seismic (ft)(ft)(plf) 1 1 1Y 49 116 54 9 8 354 B 2 1 1Y 40 116 54 9 8 289 A v(plf) = V/L Line shear V = Maximum(V1;V2) SUMMARY SHEAR WALL V1 = Wind*Span/2 + Added Vwind V2 = Seismic*Span/2 + Added Vseismic Page 13 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job#: 240165 Date: 4/15/2024 PLAN: 1 CODE: CBC 2022 Wall Sec.Sto.Wind Seismic Span Offset Wind Seismic (#)(#)(#)v_(plf)v_(plf)(ft)(ft)V_(lb)V_(lb) 1 :Wind = 2835(lb), Seismic = 1709(lb) 1 1Y 1 115.7 53.7 49 2835 1315 l---------------49.0(ft)---------------l 2 :Wind = 2315(lb), Seismic = 1395(lb) 2 1Y 1 115.7 53.7 40 2314 1073 l---------------40.0(ft)---------------l A :Wind = 993(lb), Seismic = 1362(lb) A 1X 1 99.3 104.8 20 993 1048 l---------------20.0(ft)---------------l B :Wind = 993(lb), Seismic = 1362(lb) B 1X 1 99.3 104.8 20 993 1048 l---------------20.0(ft)---------------l #N/A #N/A #N/A #N/A #N/A #N/A Description V_(lb)=v_(plf)*Span*Span/2/(Span+Offset) LATERAL p Factor: X Direction: p=1.3; Y Direction: p=1.3 Page 14 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job #: 240165 Date : 04/15/2024 Plan : 1 BEAM : 1 - CONT. CLG AT LIVING Loads(Downward+) Beam Weight 9.6 plf from 0 ft to 19.5 ft Roof Primary: (15+20)(10) = (DL=150PLF; LLr=200PLF) form 0 to 19.5 Reactions (D+Lr+L/Max. Load comb.) Bearing Down Up 1 -845/0 -383 2 5565/5565 0 3 2151/2152 0 USE 4 x 12 Critcal Shear = 3134 LB @4.5' 1.5xV/(F'v x A)= 0.53 F'v = 225, A = 39.38 Critcal Moment = -7369 LB-FT @4.5' M/(F'b x S)= 0.87 F'b = 1375, S = 73.83 Critical Deflection for TL = -0.305 INCH @ 12.52 L/240 = 0.75" Critical Deflection for LL = -0.167 INCH @ 12.52 L/360 = 0.5" 1 2 3 Moment Shear Deflection 4.5'15' BEAM : 2 - CLG AT BEDROOM Loads(Downward+) Beam Weight 9.6 plf from 0 ft to 11.25 ft Roof Primary: (15+20)(10) = (DL=150PLF; LLr=200PLF) form 0 to 11.25 Reactions (D+Lr+L/Max. Load comb.) Bearing Down Up 1 2023/2023 0 2 2023/2023 0 USE 4 x 12 Critcal Shear = 2022 LB @0' 1.5xV/(F'v x A)= 0.34 F'v = 225, A = 39.38 Critcal Moment = 5686 LB-FT @5.5' M/(F'b x S)= 0.67 F'b = 1375, S = 73.83 Critical Deflection for TL = -0.183 INCH @ 5.5 L/240 = 0.562" Critical Deflection for LL = -0.102 INCH @ 5.5 L/360 = 0.375" 1 2 Moment Shear Deflection 11.25' Page 15 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job #: 240165 Date : 04/15/2024 Plan : 1 BEAM : 3 - DROP AT PORCH Loads(Downward+) Beam Weight 12.7 plf from 0 ft to 19.25 ft Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 19.25 Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 19.25 Reactions (D+Lr+L/Max. Load comb.) Bearing Down Up 1 861/861 0 2 861/861 0 USE 6 x 10 Critcal Shear = 860 LB @0' 1.5xV/(F'v x A)= 0.11 F'v = 212, A = 52.25 Critcal Moment = 4142 LB-FT @9.62' M/(F'b x S)= 0.35 F'b = 1688, S = 82.73 Critical Deflection for TL = -0.439 INCH @ 9.62 L/240 = 0.962" Critical Deflection for LL = -0.131 INCH @ 9.62 L/360 = 0.642" 1 2 Moment Shear Deflection 19.25' BEAM : 4 - HDR AT PORCH Loads(Downward+) Beam Weight 9.6 plf from 0 ft to 3.25 ft Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 3.25 Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 3.25 Point load @ 0.75 : Load from beam 1 at Support 2(P1) Reactions (D+Lr+L/Max. Load comb.) Bearing Down Up 1 4532/4533 0 2 1492/1492 0 USE 4 x 12 Critcal Shear = 4532 LB @0' 1.5xV/(F'v x A)= 0.76 F'v = 225, A = 39.38 Critcal Moment = 3366 LB-FT @0.75' M/(F'b x S)= 0.39 F'b = 1375, S = 73.83 Critical Deflection for TL = -0.009 INCH @ 1.75 L/240 = 0.162" Critical Deflection for LL = -0.005 INCH @ 1.75 L/360 = 0.108" 1 2 P1 Moment Shear Deflection 3.25' Page 16 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job #: 240165 Date : 04/15/2024 Plan : 1 BEAM : 5 - HDR AT BEDROOM Loads(Downward+) Beam Weight 4.7 plf from 0 ft to 3.25 ft Roof Primary: (15+20)(1.3) = (DL=20PLF; LLr=26.7PLF) form 0 to 3.25 Exterior Wall: (15)(4) = (DL=60PLF) form 0 to 3.25 Point load @ 2.5 : Load from beam 2 at Support 2(P1) Reactions (D+Lr+L/Max. Load comb.) Bearing Down Up 1 648/648 0 2 1737/1737 0 USE 4 x 6 Critcal Shear = -1737 LB @3.25' 1.5xV/(F'v x A)= 0.6 F'v = 225, A = 19.25 Critcal Moment = 1271 LB-FT @2.5' M/(F'b x S)= 0.59 F'b = 1462, S = 17.65 Critical Deflection for TL = -0.022 INCH @ 1.75 L/240 = 0.162" Critical Deflection for LL = -0.011 INCH @ 1.75 L/360 = 0.108" 1 2 P1 Moment Shear Deflection 3.25' BEAM : 6 - HDR AT BEDROOM Loads(Downward+) Beam Weight 4.7 plf from 0 ft to 6.25 ft Roof Primary: (15+20)(5.2) = (DL=78.8PLF; LLr=105PLF) form 0 to 6.25 Exterior Wall: (15)(2) = (DL=30PLF) form 0 to 6.25 Reactions (D+Lr+L/Max. Load comb.) Bearing Down Up 1 683/683 0 2 683/683 0 USE 4 x 6 Critcal Shear = -682 LB @6.25' 1.5xV/(F'v x A)= 0.23 F'v = 225, A = 19.25 Critcal Moment = 1064 LB-FT @3' M/(F'b x S)= 0.49 F'b = 1462, S = 17.65 Critical Deflection for TL = -0.096 INCH @ 3 L/240 = 0.312" Critical Deflection for LL = -0.046 INCH @ 3 L/360 = 0.208" 1 2 Moment Shear Deflection 6.25' Page 17 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job #: 240165 Date : 04/15/2024 Plan : 1 BEAM : C1 - C.J. 2X6# @ 16" O.C. TYP. (MAX L=15'-0") Loads(Downward+) Ceiling Joist: (4+10)(1.3) = (DL=5.3PLF; LLr=13.4PLF) form 0 to 15 Reactions (D+Lr+L/Max. Load comb.) Bearing Down Up 1 140/140 0 2 140/140 0 USE 2 x 6 Critcal Shear = 140 LB @0' 1.5xV/(F'v x A)= 0.11 F'v = 225, A = 8.25 Critcal Moment = 525 LB-FT @7.5' M/(F'b x S)= 0.49 F'b = 1682, S = 7.56 Critical Deflection for TL = -0.64 INCH @ 7.5 L/240 = 0.75" Critical Deflection for LL = -0.457 INCH @ 7.5 L/360 = 0.5" 1 2 Moment Shear Deflection 15' BEAM : R1 - R.R. 2X6#2 @ 16" O.C. TYP. (MAX L=12'-0") Loads(Downward+) Roof Rafter: (11+20)(1.3) = (DL=14.7PLF; LLr=26.7PLF) form 0 to 12 Reactions (D+Lr+L/Max. Load comb.) Bearing Down Up 1 248/248 0 2 248/248 0 USE 2 x 6 Critcal Shear = 248 LB @0' 1.5xV/(F'v x A)= 0.2 F'v = 225, A = 8.25 Critcal Moment = 744 LB-FT @6' M/(F'b x S)= 0.7 F'b = 1682, S = 7.56 Critical Deflection for TL = -0.58 INCH @ 6 L/240 = 0.6" Critical Deflection for LL = -0.374 INCH @ 6 L/360 = 0.4" 1 2 Moment Shear Deflection 12' Page 18 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job#: 240165 Date: 8/28/2024 PLAN: 1 CODE: CBC 2022 2100 psf Trib Trib Wall Height DL(psf) LL(psf) roof(ft) DL(psf) LL(psf) floor(ft) DL(psf) wall(ft) 15 20 20 10 9 Roof: (DL+LL) (Trib) = 700 plf Floor: (DL+LL) (Trib) = 0 plf Wall: DL (Height)= 90 plf 790 plf 790 /(12"/12) = 790 psf< 2100 psf P(allowable) P allowable = 6,300 # 18 in FOUNDATION - 1-STORY Allowable soil bearing value: Roof Floor use 12" wide cont. ftg w/ 2-#4 top & bott. 45௢ Page 19 of 20 3205 S Deegan Dr #23/10/2025 Dong Engineering Inc. ADU 3205 S.DEEGAN DR, SANTA ANA, CA 92704 Job#: 240165 Date: 8/28/2024 PLAN: 1 CODE: CBC 2022 BEAM NO. BM#4 Support 1 P =4,532 # Use 2' - 0"Square x 18" Deep Concrete Pad With 3-#4 Each way PAD SCHEDULE Page 20 of 20 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 1 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 GENERAL INFORMATION 01 Project Name 240165 02 Run Title Title 24 Analysis 03 Project Location 3205 S.DEEGAN DR, Unit #2, 04 City SANTA ANA 05 Standards Version 2022 06 Zip code 92704 07 Software Version EnergyPro 9.2 08 Climate Zone 8 09 Front Orientation (deg/ Cardinal)0 10 Building Type Single family 11 Number of Dwelling Units 1 12 Project Scope Newly Constructed 13 Number of Bedrooms 2 14 Addition Cond. Floor Area (ft2)0 15 Number of Stories 1 16 Existing Cond. Floor Area (ft2)n/a 17 Fenestration Average U-factor 0.3 18 Total Cond. Floor Area (ft2)799 19 Glazing Percentage (%)16.21% 20 ADU Bedroom Count n/a 21 ADU Conditioned Floor Area n/a 22 Fuel Type Natural gas 23 No Dwelling Unit:No COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 2 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 ENERGY DESIGN RATINGS Energy Design Ratings Compliance Margins Source Energy (EDR1) Efficiency1 EDR (EDR2efficiency) Total2 EDR (EDR2total) Source Energy (EDR1) Efficiency1 EDR (EDR2efficiency) Total2 EDR (EDR2total) Standard Design 37.1 38.6 27.7 Proposed Design 37.1 38 27.4 0 0.6 0.3 RESULT3: PASS 1Efficiency EDR includes improvements like a better building envelope and more efficient equipment 2Total EDR includes efficiency and demand response measures such as photovoltaic (PV) system and batteries 3Building complies when source energy, efficiency and total compliance margins are greater than or equal to zero and unmet load hour limits are not exceeded •Standard Design PV Capacity: 2.08 kWdc •PV System resized to 2.08 kWdc (a factor of 2.080) to achieve 'Standard Design PV' PV scaling 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 3 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 ENERGY USE SUMMARY Energy Use Standard Design Source Energy (EDR1) (kBtu/ft2 -yr) Standard Design TDV Energy (EDR2) (kTDV/ft2 -yr) Proposed Design Source Energy (EDR1) (kBtu/ft2 -yr) Proposed Design TDV Energy (EDR2) (kTDV/ft2 -yr) Compliance Margin (EDR1) Compliance Margin (EDR2) Space Heating 0.09 0.52 1.03 7.62 -0.94 -7.1 Space Cooling 1.32 30.67 0.88 27.86 0.44 2.81 IAQ Ventilation 0.45 4.7 0.45 4.7 0 0 Water Heating 2.24 23.53 1.77 18.3 0.47 5.23 Self Utilization/Flexibility Credit 0 0 Efficiency Compliance Total 4.1 59.42 4.13 58.48 -0.03 0.94 Photovoltaics -2.85 -85.98 -2.85 -85.31 Battery 0 0 Flexibility Indoor Lighting 0.94 8.79 0.94 8.79 Appl. & Cooking 6.53 42.19 6.49 41.79 Plug Loads 5.69 57.9 5.69 57.9 Outdoor Lighting 0.21 1.81 0.21 1.81 TOTAL COMPLIANCE 14.62 84.13 14.61 83.46 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 4 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 ENERGY USE INTENSITY Standard Design (kBtu/ft2 - yr )Proposed Design (kBtu/ft2 - yr )Compliance Margin (kBtu/ft2 - yr )Margin Percentage Gross EUI1 22.67 21.9 0.77 3.4 Net EUI2 8.15 7.38 0.77 9.45 Notes     1. Gross EUI is Energy Use Total (not including PV) / Total Building Area.     2. Net EUI is Energy Use Total (including PV) / Total Building Area. REQUIRED PV SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 12 DC System Size (kWdc)Exception Module Type Array Type Power Electronics CFI Azimuth (deg) Tilt Input Array Angle (deg) Tilt: (x in 12) Inverter Eff. (%) Annual Solar Access (%) 2.08 NA Standard (14-17%)Fixed none true 150-270 n/a n/a <=7:12 96 98 REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. •Ducts with high level of insulation •Insulation below roof deck •Northwest Energy Efficiency Alliance (NEEA) rated heat pump water heater; specific brand/model, or equivalent, must be installed 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 5 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 HERS FEATURE SUMMARY The following is a summary of the features that must be field-verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building tables below. Registered CF2Rs and CF3Rs are required to be completed in the HERS Registry •Quality insulation installation (QII) •Indoor air quality ventilation •Minimum Airflow •Verified SEER/SEER2 •Verified Refrigerant Charge •Fan Efficacy Watts/CFM •Verified HSPF •Verified heat pump rated heating capacity •Duct leakage testing •Verified Duct Design •Duct design specifies Buried Ducts •Compact distribution system expanded credit BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft2)Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems 240165 799 1 2 1 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft2)Avg. Ceiling Height Water Heating System 1 Status Living Conditioned HVAC1 799 9 DHW Sys 1 New OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door Area (ft2)Tilt (deg) Front wall Living R-15 Wall 0 Front 180 44 90 Left wall Living R-15 Wall 90 Left 360 20 90 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 6 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft2)Window and Door Area (ft2)Tilt (deg) Rear wall Living R-15 Wall 180 Back 180 9 90 Right wall Living R-15 Wall 270 Right 360 76.5 90 Roof Attic Living R-30 + R-13 Roof Attic n/a n/a 799 n/a n/a ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise (x in 12)Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic Living Attic RoofLiving Ventilated 5 0.1 0.85 No No FENESTRATION / GLAZING 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Name Type Surface Orientation Azimuth Width (ft) Height (ft)Mult.Area (ft2)U-factor U-factor Source SHGC SHGC Source Exterior Shading W 6040 Window Front wall Front 0 1 24 0.3 NFRC 0.23 NFRC Bug Screen W 4030 Window Left wall Left 90 1 12 0.3 NFRC 0.23 NFRC Bug Screen W 2020 Window Left wall Left 90 1 4 0.3 NFRC 0.23 NFRC Bug Screen W 2020 2 Window Left wall Left 90 1 4 0.3 NFRC 0.23 NFRC Bug Screen W 3030 Window Rear wall Back 180 1 9 0.3 NFRC 0.23 NFRC Bug Screen D 6068 Window Right wall Right 270 1 40.5 0.3 NFRC 0.23 NFRC Bug Screen W 5040 Window Right wall Right 270 1 20 0.3 NFRC 0.23 NFRC Bug Screen W 4040 Window Right wall Right 270 1 16 0.3 NFRC 0.23 NFRC Bug Screen 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 7 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 OPAQUE DOORS 01 02 03 04 Name Side of Building Area (ft2)U-factor D 3068 Front wall 20 0.5 SLAB FLOORS 01 02 03 04 05 06 07 08 Name Zone Area (ft2)Perimeter (ft)Edge Insul. R-value and Depth Edge Insul. R-value and Depth Carpeted Fraction Heated Slab-on-Grade Living 799 120 none 0 80%No OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 08 Construction Name Surface Type Construction Type Framing Total Cavity R-value Interior / Exterior Continuous R-value U-factor Assembly Layers R-15 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O. C.R-15 None / None 0.095 Inside Finish: Gypsum Board Cavity / Frame: R-15 / 2x4 Exterior Finish: 3 Coat Stucco Attic RoofLiving Attic Roofs Wood Framed Ceiling 2x4 @ 24 in. O. C.R-13 None / 0 0.078 Roofing: Light Roof (Asphalt Shingle) Roof Deck: Wood Siding/sheathing/decking Cavity / Frame: R-13.0 / 2x4 Around Roof Joists: R-0.0 insul. R-30 + R-13 Roof Attic Ceilings (below attic) Wood Framed Ceiling 2x4 @ 16 in. O. C.R-30 None / None 0.032 Over Ceiling Joists: R-20.9 insul. Cavity / Frame: R-9.1 / 2x4 Inside Finish: Gypsum Board 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 8 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 05 Quality Insulation Installation (QII)High R-value Spray Foam Insulation Building Envelope Air Leakage CFM50 CFM50 Required Not Required N/A n/a n/a WATER HEATING SYSTEMS 01 02 03 04 05 06 07 08 09 Name System Type Distribution Type Water Heater Name Number of Units Solar Heating System Compact Distribution HERS Verification Water Heater Name (#) DHW Sys 1 Domestic Hot Water (DHW)Standard DHW Heater 1 1 n/a Expanded DHW Sys 1-hers-dhw DHW Heater 1 (1) WATER HEATERS - NEEA HEAT PUMP 01 02 03 04 05 06 07 08 Name # of Units Tank Vol. (gal)NEEA Heat Pump Brand NEEA Heat Pump Model Tank Location Duct Inlet Air Source Duct Outlet Air Source DHW Heater 1 1 40 Rheem Rheem HPLD40-1RH Outside Living Living WATER HEATING - COMPACT DISTRIBUTION 01 02 03 04 05 06 07 Dwelling Unit type Water Heating System Name Master Bath distance of furthest fixture to Water Heater (ft) Kitchen distance of furthest fixture to Water Heater (ft) Furthest Third furthest fixture to Water Heater (ft) Compactness Factor HERS Verification Dwelling DHW Sys 1 n/a n/a n/a 0.6 Expanded Credit WATER HEATING - HERS VERIFICATION 01 02 03 04 05 06 07 Name Pipe Insulation Parallel Piping Compact Distribution Compact Distribution Type Recirculation Control Shower Drain Water Heat Recovery DHW Sys 1 - 1/1 Not Required Not Required Required Expanded Not Required Not Required 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 9 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 07 08 09 Name System Type Heating Unit Name Heating Equipment Count Cooling Unit Name Cooling Equipment Count Fan Name Distribution Name Required Thermostat Type HVAC1 Heat pump heating cooling Heat Pump System 1 1 Heat Pump System 1 1 HVAC Fan 1 Air Distribution System 1 Setback HVAC - HEAT PUMPS 01 02 03 04 05 06 07 08 09 10 11 12 13 Name System Type Number of Units Heating Cooling Zonally Controlled Compressor Type HERS VerificationHeating Efficiency Type HSPF/HS PF2/COP Cap 47 Cap 17 Cooling Efficiency Type SEER/SE ER2 EER/EER 2/CEER Heat Pump System 1 Central split HP 1 HSPF 9 30000 15500 EERSEER 17 12 Not Zonal Single Speed Heat Pump System 1-hers-htpump HVAC HEAT PUMPS - HERS VERIFICATION 01 02 03 04 05 06 07 08 09 Name Verified Airflow Airflow Target Verified EER/EER2 Verified SEER/SEER2 Verified Refrigerant Charge Verified HSPF/HSPF2 Verified Heating Cap 47 Verified Heating Cap 17 Heat Pump System 1-hers-htpump Required 350 Not Required Required Yes Yes Yes Yes HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 08 09 10 11 12 Name Type Design Type Duct Ins. R-value Duct Location Surface Area Bypass Duct Duct Leakage HERS Verification Supply Return Supply Return Supply Return Air Distribution System 1 Unconditioned attic Verified Design See duct design See duct design Attic Attic 4.93 0 No Bypass Duct Sealed and Tested Air Distribution System 1-hers-dist 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 10 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08 09 Name Duct Leakage Verification Duct Leakage Target (%) Verified Duct Location Verified Duct Design Buried Ducts Deeply Buried Ducts Low-leakage Air Handler Low Leakage Ducts Entirely in Conditioned Space Air Distribution System 1-hers-dist Yes 5.0 Not Required Required Required Credit not taken Not Required No HVAC - FAN SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM)Name HVAC Fan 1 HVAC Fan 0.25 HVAC Fan 1-hers-fan HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name Verified Fan Watt Draw Required Fan Efficacy (Watts/CFM) HVAC Fan 1-hers-fan Required 0.25 INDOOR AIR QUALITY (IAQ) FANS 01 02 03 04 05 06 07 08 09 Dwelling Unit Airflow (CFM)Fan Efficacy (W/CFM)IAQ Fan Type Includes Heat/Energy Recovery? IAQ Recovery Effectiveness - SRE/ASRE Includes Fault Indicator Display?HERS Verification Status SFam IAQVentRpt 46 0.35 Exhaust No n/a / n/a No Yes 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. 3205 S Deegan Dr #23/10/2025 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD CF1R-PRF-01-E Project Name:240165 Calculation Date/Time:2024-08-28T14:03:28-07:00 (Page 11 of 11) Calculation Description:Title 24 Analysis Input File Name:1 STORY ADU NO GARAGE Z8.ribd22x Registration Number:Registration Date/Time:    HERS Provider: CA Building Energy Efficiency Standards - 2022 Residential Compliance Report Version: 2022.0.000 Schema Version: rev 20220901 Report Generated: 2024-08-28   14:04:13 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Company:Signature Date: Address:CEA/ HERS Certification Identification (If applicable): City/State/Zip:Phone: RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1.I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2.I certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3.The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name:Responsible Designer Signature: Company:Date Signed: Address:License: City/State/Zip:Phone:   Truong Dong Dong Engineering 08/28/2024 10692 silver cir garden grove, CA 92843 (714) 204-2874 Truong Dong Dong Engineering 08/28/2024 10692 silver cir N/A garden grove, CA 92843 (714) 204-2874 424-P010192357A-000-000-0000000-0000 08/28/2024 14:34 CHEERS NOTICE: This document has been generated by California Home Energy Efficiency Rating Services (CHEERS) using information uploaded by third parties not affiliated with or related to CHEERS. Therefore, CHEERS is not responsible for, and cannot guarantee, the accuracy or completeness of the information contained in this document. Digitally signed by California Home Energy Efficiency Rating Services (CHEERS). This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 3205 S Deegan Dr #23/10/2025 SANTA ANA CITY COUNCIL Mayor vamezcua@santa-ana.org Mayor Pro Tem, Ward 1 tphan@santa-ana.org Ward 2 bvazquez@santa-ana.org Ward 3 jessielopez@santa-ana.org Ward 4 pbacerra@santa-ana.org Ward 5 jryanhernandez@santa-ana.org Ward 6 dpenaloza@santa-ana.org MAYOR Valerie Amezcua MAYOR PRO TEM Thai Viet Phan COUNCILMEMBERS Phil Bacerra Johnathan Ryan Hernandez Jessie Lopez David Penaloza Benjamin Vazquez CITY OF SANTA ANA PLANNING AND BUILDING AGENCY 20 Civic Center Plaza ● P.O. Box 1988 Santa Ana, California 92702 www.santa-ana.org INTERIM CITY MANAGER Alvaro Nuñez CITY ATTORNEY Sonia R. Carvalho CITY CLERK Jennifer L. Hall June 19, 2024 Also sent via email to: grayscale.concept@gmail.com Jenny Chau Nguy 3205 South Deegan Drive Santa Ana, CA 92707 Subject: Address Assignment for a Detached Accessory Dwelling Unit located at 3205 South Deegan Drive (APN: 412-152-22) in Santa Ana, CA Dear Jenny, The City of Santa Ana Planning and Building Agency (PBA) is the responsible agency for legal addressing within the City of Santa Ana’s jurisdiction. This letter confirms the address assignment for a 799-square-foot ADU located at 3205 South Deegan Drive (APN: 412-152-22). Notice is hereby given that the following assigned address shall be posted onsite per the approved address plan, attached hereto as Exhibit A. Address to be Activated/Posted To subdivide commercial and/or residential units into multiple units, a building permit (and all other associated permits), plans, and inspection approvals by the PBA are required. Address will be verified during inspections by the Building Safety Division. Please update your records accordingly. Should you have any questions, feel free to contact me by phone at (714) 664-2753 or by email at PRaj@santa-ana.org. Sincerely, Punkaj Raj Planning Technician Exhibit A – Address Plan 3205 S Deegan Dr #23/10/2025 Address Letter for 3205 South Deegan Drive Page 2 of 2 c: Vencent Quaglia, United States Post Office Chris Tuiolosega, United States Post Office Cipriano Corona, Marketing Manager, United States Post Office Alex Alvarez, Postmaster Santa Ana, United States Post Office Federal Express, Administration Cathy Joseph, Garden Grove Unified School District Christine Hy, Garden Grove Unified School District Cathy Slader, Orange Unified School District Orin Williams, Santa Ana Unified School District Yvette Miranda, Santa Ana Unified School District Cristina Bernal, Tustin Unified School District Mishele Richards, Orange County Fire Authority, GEO Files Coordinator Orange County Fire Authority Neal Kelly, Registrar of Voters Members, Board of Supervisors Southern California Gas Company Southern California Edison Company Claude Parrish, County Assessor's Office SAG, AT&T UPS, Administration City Manager’s Office Beverly Martin, Police Community Services Specialist Boris Duran, Police Systems Manager Jennifer Mendoza, Police Communications Manager Chris Hubbard, Police Systems Support Analyst Alejandra Gutierrez, Treasury & Customer Services Manager Hector Jimenez, Revenue Supervisor Alfonso Chavez, Utilities Customer Services Supervisor Judson Brown, Housing & Neighborhood Development Manager Rudy Rosas, Principal Civil Engineer Zdenek (Zed) Kekula, Principal Civil Engineer Jason Kwak, Building Safety Manager Evelyn LaRocca, Permit Supervisor Kathy Hernandez, Permit Technician Julie Amsden, Permit Technician Ali Pezeshkpour, Planning Manager Jerry Guevara, Senior Planner Alvaro Nunez, PBA Assistant Director and Code Enforcement Manager 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 Planning & Building Agency Building and Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714)-647-5800 www.santa-ana.org GRADING PERMIT REQUIREMENTS FOR DETACHED ADU PROJECTS PCC-15 REV: 09/03/2020 Page 1 of 1 A grading permit is required for all new detached buildings including new detached Accessory Dwelling Unit (ADU) projects. Grading plans prepared and stamped by a registered professional engineer shall be submitted for approval prior to issuance of the building permit, and shall be required to be submitted before or concurrently with the architectural plans submittal to the Building Safety Division. Grading Permit Exemption: Residential detached Accessory Dwelling Unit (ADU) projects that meet all of the following may be exempted from grading permit requirements: 1. The maximum amount of soil being moved is less than 50 cubic yards. The soil quantities shall be calculated by a California registered professional civil engineer 2. A site drainage plan prepared by a California registered professional civil engineer shall be provided with the following minimum information, but not limited to: a. Plan(s) shall be stamped, signed and dated by a California registered civil engineer b. Location of all existing and proposed structures, property lines, right-of-way lines, and easements, including dimensions and setbacks c. Drainage slopes and flow patterns d. Drainage system such as swales, french drains, water collection and disposal system, etc. e. Drainage plan shall indicate how the site grading or drainage system will manage all surface water flows to be diverted away from buildings and adjoining property lines, in accordance with all applicable codes f. The grade shall fall not fewer than 6 inches within the first 10 feet from the foundation wall. Where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, drains, or swales shall be constructed to ensure drainage away from the structure. Impervious surfaces within 10 feet of the building foundation shall be sloped not less than 2 percent away from the building. 3. A final certification letter from the professional engineer of record stating that the grades were constructed per the approved site drainage plan, shall be submitted to the building inspector prior to final inspection 4. The “Detached ADU Grading Permit Exemption Checklist” shall be completed by the California registered professional civil engineer and shall be made a part of the building plans. 5. The site drainage plan and the completed checklist shall be required at the time of architectural plans submittal as part of the building plans package. The building official reserves the right to require a grading plan based on site conditions. This grading permit exemption does not apply to projects in the FEMA Flood Zone. 3205 S Deegan Dr #23/10/2025 Planning & Building Agency Building and Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714)-647-5800 www.santa-ana.org DETACHED ADU - GRADING PERMIT EXEMPTION CHECKLIST PCC-16 REV: 11/10/2020 Page 1 of 1 THIS FORM SHALL BE COMPLETED BY A CALIFORNIA REGISTERED CIVIL ENGINEER. Instructions: In order to qualify for the grading permit exemption for detached Accessory Dwelling Unit (ADU) projects per handout PCC-15, the registered civil engineer of record shall complete all sections, check all boxes and sign the certification section below. A copy of this checklist shall be attached to each of TWO sets of plans. If answering NO to any of the questions, a grading plan and permit shall be required. Project Address: Yes No 1. ☐ ☐ I have verified that the project address is NOT located on a FEMA designated flood zone (Zone A or AE). 2. ☐ ☐ I have provided two sets of site drainage plans that is stamped, signed and dated by a California professional civil engineer, to be submitted with the building submittal package. 3. ☐ ☐ I have calculated the total amount of soil being cut or filled on this project is less than 50 cubic yards. 4. ☐ ☐ The site drainage plans include the following, but not limited to, location of all existing and proposed structures, property lines, right-of-way lines, and easements, including dimensions and setbacks; drainage slopes and flow patterns, drainage systems such as swales, french drains, water collection and disposal systems, etc. 5. ☐ ☐ I have designed drainage such that surface water flows away from buildings and adjoining property lines, in accordance with all applicable codes. 6. ☐ ☐ I have designed grading such that it will not adversely affect the adjoining properties. 7. ☐ ☐ I have designed the grade to fall not fewer than 6 inches within the first 10 feet from the foundation walls except where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, I have designed drains or swales to ensure drainage away from the buildings. Any impervious surfaces within 10 feet of the building foundation are sloped not less than 2 percent away from the building. 8. ☐ ☐ I will provide a final certification letter stating that the grades were constructed per the approved site drainage plan, and will submit this certification letter to the building inspector prior to final inspection. I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Licensed Number: Date: Phone Number: Email Address: 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025 3205 S Deegan Dr #23/10/2025