HomeMy WebLinkAbout330 W Carriage Dr Unit #D - PlanCOVER PAGE
33
0
C
A
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REV DATE DESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
9
3
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-0
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE: 8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
SCOPE OF WORK (3.520 kW DC, 2.320 kW AC)
PV-0 COVER PAGE
PV-1 SITE PLAN WITH ROOF PLAN
PV-2 ROOF PLAN WITH MODULES
PV-3 ATTACHMENT DETAIL
PV-4 ELECTRICAL LINE ELECTRICAL
PV-5 EQUIPMENT ELEVATION
PV-6 WIRING CALCULATION
PV-7,7.1 WARNING LABELS & PLACARDS
PV-8+ EQUIPMENT SPECIFICATION
AHJ: SANTA ANA (CITY OF), CALIFORNIA
UTILITY: SCE
HOUSE PHOTO
SCALE: NTS
VICINITY MAP
GENERAL NOTES: SHEET INDEX
COVER PAGE
GOVERNING CODES
● 2022 CALIFORNIA FIRE CODE
● 2022 CALIFORNIA BUILDING CODE
● 2022 CALIFORNIA RESIDENTIAL CODE
● 2022 CALIFORNIA ELECTRICAL CODE
· 2020 NATIONAL ELECTRICAL CODE
· ATTACHMENT - PEGASUS COMP MOUNT
SCALE: NTS
· RAIL- PEGASUS RAIL
● MSP UPGRADE: NO
● MAIN BREAKER DERATE: NO
● (8) - APTOS SOLAR DNA-120-MF10-440W (440W) SOLAR MODULES
● (8)- ENPHASE ENERGY INC. IQ8PLUS-72-M-US [240V] MICROINVERTERS
● (1) - ENPHASE IQ COMBINER 5/5C (X-IQ-AM1-240-5/5C)
● (1) - ENPHASE IQ SYSTEM CONTROLLER 3/3G
● (1) - ENPHASE ENERGY INC. IQBATTERY-5P-1P-NA
● (1) - 30A NON FUSED AC DISCONNECT SQUARE D DU221RB
● (2) - 60A NON FUSED AC DISCONNECT (SQUARE D DU222RB)
● (1) - 125A BACKUP LOAD PANEL
● 1X BRANCH OF 8 CONNECTED IN PARALLEL
1) ALL PANELS, SWITCHES, ETC. SHALL HAVE SUFFICIENT GUTTER SPACE AND
LUGS IN COMPLIANCE WITH UL REQUIREMENTS TO ACCOMMODATE
CONDUCTORS SHOWN.
2) THIS SYSTEM WILL NOT BE INTERCONNECTED UNTIL APPROVAL FROM THE
LOCAL JURISDICTION AND UTILITY IS OBTAINED.
3) ALL EXTERIOR ELECTRICAL DEVICES AND EQUIPMENT INCLUDING THOSE
THAT ARE EXPOSED TO OUTSIDE ENVIRONMENT SHALL BE
WEATHERPROOF AND SHALL BE LISTED BY 'UL' FOR THE TYPE OF
APPLICATION AND 'UL' LABEL SHALL APPEAR ON ALL ELECTRICAL
EQUIPMENT.
4) AN OSHA APPROVED LADDER PROVIDING ACCESS TO ALL PORTIONS OF
THE ARRAY SHALL BE SECURED IN PRIOR TO REQUESTING INSPECTION.
5) IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL A SUPPLEMENTAL
GROUNDING ELECTRODE CONDUCTOR IF NECESSARY.
6) ENPHASE DEVICES ARE WITHIN MANUFACTURER'S REQUIRED GUIDELINE,
PV ARRAY DOES NOT EXCEED MAX DISTANCE OF 150'.
7) ALL ENSEMBLE EQUIPMENT MUST BE WITHIN 50' OF EACH OTHER.
8) IF THERE ARE COMMUNICATION ISSUES WITH GATEWAY, UB EXTENDER CAN
BE USED TO RELOCATE COMMS KIT NEAR IQ SYSTEM CONTROLLER &
BATTERY.
9) IQ BATTERY UNITS SHOULD NOT BE INSTALLED IN DIRECT SUNLIGHT.
LE
G
E
N
D
NEW PV MODULE
FIRE SETBACK
MICRO-INVERTER
ROOF ATTACHMENT
DIMENSIONS
PROPERTY LINE
RAFTER/TRUSS
RAIL
FENCE
GATE
JB JUNCTION BOX
(NEW)
CP COMBINER PANEL
(NEW)
ACD AC DISCONNECT UNFUSED
(NEW)
M METER MAIN COMBO
(EXISTING)
CONDUIT
BACKUP LOAD PANEL
(NEW) BLP
IQ SYSTEM CONTROLLER
3/3G(NEW)SC
BATT BATTERY
(NEW)
STC DC:(8) 440W = 3.520 kW
STC AC:(8) 290W = 2.320 kW
STORAGE :(1) 5.0kWh = 5.00kWh
CEC AC:3.198 kW
DIG ALERT (811) IS TO BE CONTACTED AND COMPLIANCE WITH
EXCAVATION SAFETY IN ACCORDING WITH GOVERNMENT CODE 4216
WILL BE FOLLOWED, PRIOR TO ANY EXCAVATION TAKING PLACE.
OCCUPANCY CLASS: R3
CONSTRUCTION TYPE:VB
CBC/CRC EDITION:2022
330 CARRIAGE DR, #D SANTA ANA, CA 92707, USA (33.706730, -117.871880)
8 MODULES- SYSTEM SIZE STC - (3.520 kW DC, 2.320 kW AC)
PHOTOVOLTAIC ROOF MOUNT SYSTEM WITH ESS
ARRAY LOCATION(S)
PROJECT SITE
TRENCHING
Bldg #101122352 & Elect #20185015
APPROVALS:
ELECT - M. Smith
330 W Carriage Dr Unit
#D3/21/2025
20
'
-
9
"
89'-6"
89'-6"
20
'
-
9
"
18
"
F
I
R
E
S
E
T
B
A
C
K
36" FIRE SETBACK
JB
M
AC
D
SC
CP
AC
D
BA
T
T
4'-5"
14'-10"
8"
6"
10"
12'-7"
3'-3"
3'
15
'
-
1
"
1'
-
6
"
BL
P
AC
D
SS
P
SITE PLAN
SCALE: 1/8" = 1'-0"
SITE PLAN WITH
ROOF PLAN
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-1
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
(N) 3/4" OR GREATER FMC CONDUIT RUN
THROUGH ATTIC
(N) JUNCTION BOX
ARRAY AREA & ROOF AREA CALC'S
AREA OF ARRAY
(Sq. Ft.)
AREA OF
ROOF(PLAN VIEW)
(Sq. Ft.)
TOTAL ROOF AREA
COVERED BY ARRAY
%
186.08 1360.93 13.67
13.67 ROOF AREA (ARRAY <33% OF ROOF AREA)
DIG ALERT (811) IS TO BE CONTACTED AND COMPLIANCE WITH
EXCAVATION SAFETY IN ACCORDING WITH GOVERNMENT CODE 4216
WILL BE FOLLOWED, PRIOR TO ANY EXCAVATION TAKING PLACE.
(N) COMBINER PANEL
(N) BACKUP LOAD PANEL
(N) VISIBLE LOCKABLE
LABELED AC DISCONNECT 2
(N) SYSTEM CONTROLLER 3/3G
(N) PV ARRAY
SC
E
P
T
O
R
P
L
(N) VISIBLE LOCKABLE
LABELED AC DISCONNECT 3
(N) BATTERY
ENERGY STORAGE SYSTEMS (ESS) SHALL
NOT BE LOCATED LESS THAN 3 FEET FROM
DOORS AND WINDOWS DIRECTLY ENTERING
THE DWELLING UNIT PER 2022 CALIFORNIA
RESIDENTIAL CODE R328.4
ROOF ACCESS POINT
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
ROOF 1
(N) METER MAIN COMBO
ROOF ACCESS POINT
WA
L
K
W
A
Y
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY LINE PROPERTY LINE
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
SOVEREIGN WY
LE
G
E
N
D
NEW PV MODULE
FIRE SETBACK
MICRO-INVERTER
ROOF ATTACHMENT
DIMENSIONS
PROPERTY LINE
RAFTER/TRUSS
RAIL
FENCE
GATE
JB JUNCTION BOX
(NEW)
CP COMBINER PANEL
(NEW)
ACD AC DISCONNECT UNFUSED
(NEW)
M METER MAIN COMBO
(EXISTING)
CONDUIT
BACKUP LOAD PANEL
(NEW)BLP
IQ SYSTEM CONTROLLER
3/3G(NEW)SC
BATT BATTERY
(NEW)
TRENCHING
(N) TRENCHING ~16
(N) VISIBLE LOCKABLE
LABELED AC DISCONNECT 1
(E) SUB SERVICE PANEL
SSP SUB SERVICE PANEL
(EXISTING)
330 W Carriage Dr Unit
#D3/21/2025
18
"
F
I
R
E
S
E
T
B
A
C
K
36" FIRE SETBACK
JB
M
AC
D
SC
CP
AC
D
BA
T
T
BL
P
AC
D
SS
P
ROOF PLAN
WITH MODULES
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-2
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
PV PANELS (COUNT, AREA, WEIGHT):
●(8X) APTOS SOLAR DNA-120-MF10-440W (440W) SOLAR MODULES (75.1" X 44.6", 52.9 LB)
MICRO-INVERTERS (COUNT, WEIGHT):
● (8X) ENPHASE ENERGY INC. IQ8PLUS-72-M-US [240V] MCROINVERTERS (2.43 LBS)
MODULE AREA & WEIGHT CALCULATIONS
ROOF PLANES:
● ATTACHMENT COUNT: 16
● MOUNTING SYSTEM WEIGHT / MODULE: 1.5 LB
● MOUNTING SYSTEM WEIGHT: (8) 1.5 LB = 12.00 LB
●SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF
GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND
LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION IN LOCATIONS
WHERETHE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD
OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS.
ROOF ACCESS POINT
DESIGN CRITERIA
● EXPOSURE CATEGORY = B
● WIND SPEED = 95 MPH
● SNOW LOAD = 0 PSF
ROOF TYPE- COMP SHINGLE
ROOF VENTS, SKYLIGHTS,
WILL NOT BE COVERED
UPON PV INSTALLATIONATTACHMENT SHEET
FR
O
N
T
O
F
H
O
U
S
E
SCALE: 1/8" = 1'-0"
(N) PV ARRAY
ROOF DESCRIPTION TABLE
ROOF
PLANE
ROOF
TILT
ROOF
AZIMUTH
RAFTERS
SIZE
RAFTERS
SPACING
ATTACHMENT
SPACING ROOF MATERIAL
#1 18°72" O.C.2"X10"24" O.C.COMP SHINGLE270°
MODULES
8
BILL OF MATERIALS
SOLAR PV MODULES
MICRO INVERTERS
ATTACHMENTS PEGASUS COMP MOUNT
RAIL PEGASUS RAIL
RAIL SPLICES RAIL SPLICES (FOR ABOVE)0
MID CLAMPS MID CLAMPS12
END CLAMPS END CLAMPS
GROUNDING LUG GROUNDING LUG
8
2
APTOS SOLAR DNA-120-MF10-440W (440W) SOLAR MODULES
ENPHASE ENERGY INC. IQ8PLUS-72-M-US [240V] MICROINVERTERS
8
8
16
4
BATTERIES 1 ENPHASE ENERGY INC. IQBATTERY-5P-1P-NA
ENPHASE IQ SYSTEM CONTROLLER 3/3GSMART SWITCH 1
ENPHASE IQ COMBINER 5/5C (X-IQ-AM1-240-5/5C) BOXCOMBINER1
AC DISCONNECT PV VISIBLE LOCKABLE LABELED DISCONNECT
(30A UNFUSED 1PH 240VAC)1
NEW PANELS
PANEL AREA
PANEL WEIGHT
MICRO-INVERTER WEIGHT
TOTAL SYSTEM WEIGHT
WEIGHT PER CONNECTION
DISTRIBUTED LOAD
ROOF AREA COVERAGE
(8) 2.43 = 19.44 LB
423.2 + 19.44 + 12.00 = 454.64 LB
454.64 LB / 16 = 28.42 LB
454.64 LB / 186.08 SF = 2.44 PSF
186.08 SF / 1360.93 SF = 13.67%
(8) 75.1" x 44.6" = 186.08 SF
(8) 52.9 = 423.20 LB
2AC DISCONNECT PV VISIBLE LOCKABLE LABELED DISCONNECT
(60A UNFUSED 1PH 240VAC)
LE
G
E
N
D
NEW PV MODULE
FIRE SETBACK
MICRO-INVERTER
ROOF ATTACHMENT
DIMENSIONS
PROPERTY LINE
RAFTER/TRUSS
RAIL
FENCE
GATE
JB JUNCTION BOX
(NEW)
CP COMBINER PANEL
(NEW)
ACD AC DISCONNECT UNFUSED
(NEW)
M METER MAIN COMBO
(EXISTING)
CONDUIT
BACKUP LOAD PANEL
(NEW)BLP
IQ SYSTEM CONTROLLER
3/3G(NEW)SC
BATT BATTERY
(NEW)
TRENCHING
SSP SUB SERVICE PANEL
(EXISTING)
330 W Carriage Dr Unit
#D3/21/2025
PEGASUS RAIL
PEGASUS (L-FOOT)
SOLAR MODULE
PEGASUS
SHINGLE FLASHING
RAFTERS
WOOD SHEATHING
5/16"x4 1/2" STAINLESS
STEEL LAG SCREW
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-3
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
ATTACHMENT
DETAILS
ATTACHMENT DETAIL (ENLARGED SECTION VIEW)
SCALE: NTS
ATTACHMENT DETAIL
SCALE: NTS
REFER TO ROOF DESCRIPTION TABLE IN PV-2
FOR MOUNTING PLANE DETAILS
SOLAR MODULE
RAFTER
COMP SHINGLE ROOF
WOOD SHEATHING
PEGASUS RAIL
PEGASUS COMP MOUNT
(STAND POST)
5/16"x4 1/2" STAINLESS
STEEL LAG SCREW
PEGASUS (L-FOOT)
330 W Carriage Dr Unit
#D3/21/2025
G N
(N) 20A/2P
(N) 20A/2P
NO
2
NO
1
ESS HOLD DOWN KIT
EATON SKU
BRHDK125 PER NEC 710.15
ENCHARGE BREAKER
G
NC
2
NC
1
WIRED
COMMS
NC
3
(N) IQ SYSTEM
CONTROLLER 3/3G
SC200D111C24OUS01
DPST
ENPHASE SYSTEM
SHUTDOWN SWITCH
(N) 100A/2P
40A/2P
AC COMBINER
BREAKER
ENCHARGE
BREAKER 3A
(N) AC DISCONNECT 2:
VISIBLE,LOCKABLE AND
LABELED SQUARE D
DTU223RB 100A NON-FUSIBLE
240VAC NEMA-3R, UL LISTED
OR EQUIVALENT
L1
L2
N
G
L1
L2
N
G
GG
IQBATTERY-5P-1P-NA
(6)IQ8D-BAT
L1
L2
4
N
G
(N) BACKUP LOAD PANEL
125A RATED,240V
3
NOTE:
ESSENTIAL LOADS OF
EXISTING SERVICE PANEL
& THEIR RESPECTIVE
BREAKERS
NEEDS TO BE MOVED TO
BACKUP ELECTRICAL
PANEL BEFORE PV
INSTALLATION.
N
GEC
M
(N) 175A/2P
EXISTING GROUNDING
ELECTRODE SYSTEM
TO EARTH
REF.NEC 250.52,
250.53(A)
(N) MAIN BREAKER TO
HOUSE 240 V, 175A/2P
G
2
5
(N) DEDICATED PHOTOVOLTAIC
SYSTEM ENPHASE IQ COMBINER 5/5C
X-IQ-AM1-240-5/5C NEMA 3R, UL
LISTED,125A RATED
TO UTILITY GRID
(E) BI-DIRECTIONAL UTILITY
METER 1-PHASE, 3-W,
120V/240V
L2
L1
N
ENVOY BREAKER
20A/2P
AUTO
TRANSFORMER
(N) METER MAIN COMBO
225A RATED, 240V
G
N
G
ENVOY IQ
(REVENUE GRADE METER)
1
(N) JUNCTION BOX
ROOFTOP
600 V, NEMA 3-R
UL LISTED
L1
L2
G
(N) AC DISCONNECT 3:
VISIBLE,LOCKABLE AND
LABELED SQUARE D
DU221RB 30A NON-FUSIBLE
240VAC NEMA-3R, UL LISTED
OR EQUIVALENT
4
L2
L1
L2
20A/2P
8 MICROINVERTERS IN BRANCH CIRCUIT 1
(8) -APTOS SOLAR DNA-120-MF10-440W (440W) SOLAR MODULES
8 - ENPHASE ENERGY INC. IQ8PLUS-72-M-US [240V]
MICROINVERTERS (240V) - MOUNTED UNDER
EACH PANEL (690.14(D))
INTEGRATED GROUNDING WIRE
A
3
(N) AC DISCONNECT 1:
VISIBLE,LOCKABLE AND
LABELED SQUARE D
DTU223RB 100A NON-FUSIBLE
240VAC NEMA-3R, UL LISTED
OR EQUIVALENT
L1
L2
N
G
L1
L2
N
G
(N)PV
100A/2P
3
(N) TRENCHING ~16
N
G
(E) 90A/2P
(E) SUB SERVICE PANEL
100A RATED,240V
EXISTING WIRES
SPD SURGE PROTECTING
DEVICE TYPE 1
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-4
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
ELECTRICAL LINE
CALCS.
ELECTRICAL THREE LINE DIAGRAM
SCALE: NTS
CALCS.
ENERGY STORAGE SYSTEMS (ESS) SHALL NOT
BELOCATED LESS THAN 3 FEET FROM DOORS AND
WINDOWSDIRECTLY ENTERING THE DWELLING UNIT
PER 2022CALIFORNIA RESIDENTIAL CODE R328.4
EXTREME CASE MODULE OUTPUT
(APTOS SOLAR DNA-120-MF10-440W (440W) SOLAR MODULES)
Isc(25°C) = 13.73A, Tisc = 0.054%/°C
Isc(T) = Isc(25°C) x [1 + (0.054/100) x (T-25°C)]
Isc(-2°C) = 13.53A, Isc(31°C) = 13.77A
Voc(25°C) = 41.02V, Tvoc = -0.27%/°C
Voc(T) = Voc(25°C) x [1 + (-0.27/100) x (T-25°C)]
Voc(-2°C) = 44.01V, Voc(31°C) = 40.36V
SYSTEM SUMMARY STC (3.520 kW DC / 2.320 kW AC)
STC DC:(8) 440W = 3.520 kW
STC AC:(8) 290W = 2.320 kW
STORAGE :(1) 5.0kWh = 5.00kWh
● (8) - APTOS SOLAR DNA-120-MF10-440W (440W) SOLAR MODULES
● (8)- ENPHASE ENERGY INC. IQ8PLUS-72-M-US [240V] MICROINVERTERS
● (1) - ENPHASE ENERGY INC. IQBATTERY-5P-1P-NA
ELECTRICAL NOTES
1) ALL GROUNDING TO COMPLY WITH CEC 690.47.
2) ALL TERMINALS SHALL BE MIN. 75°C RATED.
3) IQ GATEWAY BREAKER DETERMINED AT FACTORY BY MANUFACTURER (10A or 15A).
4) FOR IQ GATEWAY: USE SINGLE CT FOR PV PRODUCTION (L1 FROM ALL PV BRANCH CIRCUITS). USE SINGLE CT FOR
BATTERIES (L2 FROM ALL BATTERY BRANCHES LANDING IN SYSTEM CONTROLLER). USE DOUBLE CTs FOR CONSUMPTION
(L1 AND L2 FEEDING MSP MAIN BREAKER, SERVICE SIDE).
5) IQ COMBINER 5/5C REQUIRES ENPHASE HOLD DOWN KIT X-IQ-NA-HD-125A.
6) WHEN IQ SYSTEM CONTROLLER 3 NOT AT SERVICE ENTRANCE, REMOVE N-G JUMPER WIRE FROM CONTROLLER.
7) SINGLE LARGEST BREAKER, BASELINE LOAD, AND LRA OF LARGEST LOAD IN BACKUP LOAD PANEL CANNOT EXCEED
STORAGE (ESS) OUTPUT CAPACITY, PER CEC 710.15.
8) IQ SYSTEM CONTROLLER 3 MAIN INPUT & OUTPUT LUGS RATED FOR #6-300 KCMIL, FOR WIRES SMALLER THAN #6 REMOVE
LUG AND USE AN APPROVED UL RING TERMINAL.
9) IQ SYSTEM CONTROLLER 3 COMES WITH FACTORY-INSTALLED HOLD DOWN KIT ARM, ADDITIONAL KIT NOT REQUIRED.
DIG ALERT (811) IS TO BE CONTACTED AND COMPLIANCE WITH
EXCAVATION SAFETY IN ACCORDING WITH GOVERNMENT CODE 4216
WILL BE FOLLOWED, PRIOR TO ANY EXCAVATION TAKING PLACE.
NOTE: SPLICING OF THE WIRE-TYPE GROUNDING ELECTRODE SHALL BE
PERMITTED ONLY BY IRREVERSIBLE COMPRESSION-TYPE CONNECTORS LISTED
AS GROUNDING AND BONDING EQUIPMENT OR BY THE EXOTHERMIC WELDING
METAL WATER PIPING SYSTEM INSTALLED IN OR ATTACHED TO A BUILDING OR
STRUCTURE SHALL BE BONDED PER NEC TABLE 250.66 AND 250.104(A)(1).
•NEW ELECTRICAL SHALL BE LOCATED AT LEAST THREE (3) FEET FROM
GAS METER OR GAS SHUT- OFF VALVES. UPC1208.7.1; NEC 110.26.”
•GROUNDING ELECTRODE CONDUCTOR SHALL BE SIZED PER NEC 250.66.
AC wire details
Tag Line Neutral Ground Min EMT/PVC
1
12 AWG (Q-Cable)06 AWG BARE
(NOT IN CONDUIT)
2
10 AWG THWN-2
10 AWG THWN-2
(2) 10 AWG THWN-2
(2) 10 AWG THWN-2
-
-
-A
3/4 in EMT
3/4 in EMT
10 AWG THWN-2
3 8 AWG THWN-2(2) 3 AWG THWN-2 3 AWG THWN-2
4
1-1/4 in EMT
(2) 10 AWG THWN-2 3/4 in EMT-
INTERCONNECTION
120% RULE - NEC 705.12(B)(3)(2)
UTILITY FEED + SOLAR BACKFEED
175A + 90A = 265A
BUSS RATING x 120%
225A x 120% = 270A
●1X BRANCH OF 8 CONNECTED IN PARALLEL
10 AWG THWN-2
3A 1-1/4 IN SCH 40
PVC8 AWG THWN-2(2) 3 AWG THWN-2 3 AWG THWN-2
(2) 10 AWG THWN-2 3/4 in EMT10 AWG THWN-25 -
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-5
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EAST FACING ELEVATION
EQUIPMENT ELEVATION
EQUIPMENT
ELEVATION
SCALE: NTS
FENCE
ENPHASE
(N) ENPHASE IQ BATTERY 5P
(N) AC DISCONNECT 2
(N) IQ SYSTEM
CONTROLLER 3/3G
(E) SUB SERVICE PANEL
(N) AC DISCONNECT-3
ENPHASE
(E) METER MAIN COMBO
(E) WINDOW
NEW ELECTRICAL GUTTER
(N) BACKUP LOAD PANEL
NEW ELECTRICAL GUTTER
(N) IQ COMBINER 5/5C
FROM
ROOF
TOP
ENPHASE
(E) DOOR
INSIDE HOUSEOUTSIDE HOUSE OUTSIDE GARAGE
NEW ELECTRICAL GUTTER NEW ELECTRICAL GUTTER
(N) AC DISCONNECT-1
~16
TRENCHING
330 W Carriage Dr Unit
#D3/21/2025
33
0
C
A
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
C
A
9
2
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
9
3
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-6
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE: 8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
WIRING
CALCULATION
WIRING CALCULATIONS
SCALE: NTS
SOLAR MODULE SPECIFICATIONS
MANUFACTURER / MODEL APTOS SOLAR DNA-120-MF10-440W
(440W) SOLAR MODULES
VMP 33.72V
IMP 13.05A
VOC 41.02V
ISC 13.73A
TEMP. COEFF. VOC -0.27%/°C
MODULE DIMENSION 75.1(L) x 44.6(W)
PANEL WATTAGE 440W
Inverter Ratings
Inverter Make/Model
ENPHASE
ENERGY INC.
IQ8PLUS-72-M-US
[240V]
Max DC Volt Rating 60V
Max con output Power 290W
Max Nominal Voltage 240V
Max AC Current 1.21A
Max OCPD Rating 20V
EXTREME CASE MODULE OUTPUT
(APTOS SOLAR DNA-120-MF10-440W (440W) SOLAR MODULES)
Isc(25°C) = 13.73A, Tisc = 0.054%/°C
Isc(T) = Isc(25°C) x [1 + (0.054/100) x (T-25°C)]
Isc(-2°C) = 13.53A, Isc(31°C) = 13.77A
Voc(25°C) = 41.02V, Tvoc = -0.27%/°C
Voc(T) = Voc(25°C) x [1 + (-0.27/100) x (T-25°C)]
Voc(-2°C) = 44.01V, Voc(31°C) = 40.36V
● 1X BRANCH OF 8 CONNECTED IN PARALLEL
SYSTEM SUMMARY STC (3.520 kW DC / 2.320 kW AC)
STC DC:(8) 440W = 3.520 kW
STC AC:(8) 290W = 2.320 kW
STORAGE :(1) 5.0kWh = 5.00kWh
● (8) - APTOS SOLAR DNA-120-MF10-440W (440W) SOLAR MODULES
● (8)- ENPHASE ENERGY INC. IQ8PLUS-72-M-US [240V] MICROINVERTERS
● (1) - ENPHASE ENERGY INC. IQBATTERY-5P-1P-NA
ELECTRICAL NOTES
1) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION.
2) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600V AND 90°C WET ENVIRONMENT.
3) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26.
4) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS,
SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CODES AND STANDARDS.
5) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM
ACCORDINGLY.
6) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE.
7) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP
MANUFACTURER'S INSTRUCTION.
8) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C.VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG.
9) PV EQUIPMENT SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH NEC 690.
10) EXACT LOCATION OF AUXILIARY GROUNDING TO BE DETERMINED AT TIME OF INSTALL.
11) EXISTING WIRES MUST BE REPLACED IF SMALLER THAN LISTED MINIMUM SIZES PER NEC 310.15(B)(16).
12) IQ GATEWAY BREAKER DETERMINED AT FACTORY BY MANUFACTURER (10A or 15A).
13) FOR IQ GATEWAY: USE SINGLE CT FOR PV PRODUCTION (L1 FROM ALL PV BRANCH CIRCUITS). USE SINGLE CT FOR BATTERIES (L2
FROM ALL BATTERY BRANCHES LANDING IN SYSTEM CONTROLLER). USE DOUBLE CTs FOR CONSUMPTION (L1 AND L2 FEEDING MSP MAIN
BREAKER,
SERVICE SIDE).
14) IQ COMBINER 5/5C REQUIRES ENPHASE HOLD DOWN KIT X-IQ-NA-HD-125A.
15) WHEN IQ SYSTEM CONTROLLER 3 NOT AT SERVICE ENTRANCE, REMOVE N-G JUMPER WIRE FROM CONTROLLER.
16) SINGLE LARGEST BREAKER, BASELINE LOAD, AND LRA OF LARGEST LOAD IN BACKUP LOAD PANEL CANNOT EXCEED STORAGE (ESS)
OUTPUT CAPACITY, PER NEC 710.15.
17) IQ SYSTEM CONTROLLER 3 MAIN OUTPUT LUGS RATED FOR #6-300 KCMIL, FOR WIRES SMALLER THAN #6 REMOVE LUG AND USE AN
APPROVED UL RING TERMINAL.
18) IQ SYSTEM CONTROLLER 3 COMES WITH FACTORY-INSTALLED HOLD DOWN KIT ARM, ADDITIONAL KIT NOT REQUIRED.
AC wire details
Tag Nominal
Voltage
Expected
max temp
Adjusted ampacity (ampacity x temp
derate x conduit fill derate)
Conductor &
neutral size
A 30 x 0.96 x 1 = 28.80 A 12 AWG (Q-Cable)
10 AWG THWN-2
#Modules
8
81 240 V
240 V
Backfeed *1.25
/cond.set
12.10 A
Min
OCPD
12.10 A
20 A
20 A
Conductor
sets
1
1
ccConductors
/conduit
-
2
31
Conductor
metal
Cu
Cu
Max
length
30 ft
15 ft
V drop Min EMT/PVC
size
0.47
0.15
EGC size
(Cu)
06 AWG BARE
(NOT IN CONDUIT)
10 AWG THWN-2
-
3/4 in EMT31
10 AWG THWN-282240 V 12.10 A 20 A 1 2 Cu 15 ft 0.1510 AWG THWN-2 3/4 in EMT
3
4
5
-240 V 32.1 A 40 A 1 2 8 AWG THWN-2 4 AWG THWN-2 Cu 15 ft 0.25 3/4 in EMT
-240 V 100 A 100A 1 2 Cu 0.31 1 in EMT
31
31
31
35 x 0.96 x 1 = 33.60 A
35 x 0.96 x 1 = 33.60 A
50 x 0.96 x 1 = 48.00 A
100 x 0.96 x 1 = 96.00 A
-240 V 20 A 20 A 1 2 10 AWG THWN-2 10 AWG THWN-2 Cu 15 ft 3/4 in EMT3135 x 0.96 x 1 = 33.60 A 0.25
3 AWG THWN-2 8 AWG THWN-2
6 -240 V 20 A 20 A 1 2 10 AWG THWN-2 -Cu 15 ft 3/4 in EMT3135 x 0.96 x 1 = 33.60 A 0.31
-
15 ft
330 W Carriage Dr Unit
#D3/21/2025
JB
ACD
SC
CPACDBATT
BLP
20'-9"
89
'
-
6
"
89
'
-
6
"
20'-9"
ACD M
WARNING LABELS
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-7
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
& PLACARD
CAUTION:
MULTIPLE SOURCES OF POWER
ELECTRICAL SHOCK HAZARD
WARNING!
TERMINALS ON LINE AND LOAD
SIDES MAY BE ENERGIZED IN
THE OPEN POSITION
LABEL LOCATION: INVERTERS, AC DISCONNECTS, AC
COMBINER BOXES
CODE REF: CEC 2022 - 690.13(B)
WARNING
SOLAR SYSTEM CONNECTED AND
ENERGISED
LABEL LOCATION: UTILITY METER
CODE REF: CEC 2022 - 690.13(B)
MAIN PHOTOVOLTAIC
SYSTEM DISCONNECT
LABEL LOCATION: AC DISCONNECTS FOR
UTILITY ACCESS
CODE REF: CEC 2022 - 690.13(B)
RAPID SHUTDOWN SWITCH
FOR SOLAR PV SYSTEM
LABEL LOCATION: UTILITY SERVICE ENTRANCE (MSP OR
AC DISCONNECT IF LINE SIDE TAP), AND WHEREVER
REQUIRED BY AHJ (INVERTERS, DC DISCONNECTS,
OTHER)
CODE REF: CEC 2022 - 690.56(C)(2)
POWER SOURCE OUTPUT CONNECTION
WARNING!
DO NOT RELOCATE THIS
OVERCURRENT DEVICE
LABEL LOCATION: FIRST BACKFEED BREAKER
(MSP/SUBPANEL) IF NO LINE SIDE TAP
CODE REF: CEC 2022 - 705.12(B)(3)(2),
MAXIMUM AC OPERATING CURRENT:
NOMINAL OPERATING AC VOLTAGE:
9.68 AMPS
240.0 VAC
PV SYSTEM DISCONNECT
LABEL LOCATION: INTERCONNECTION Placard (MSP
BACKFEED BREAKER OR TAP BOX IF LINE SIDE TAP), AC
DISCONNECTS
CODE REF: CEC 2022 - 690.54
PHOTOVOLTAIC
AC DISCONNECT
LABEL LOCATION: INTERCONNECTION Placard (MSP
BACKFEED BREAKER OR TAP BOX IF LINE SIDE TAP), AC
DISCONNECTS
CODE REF: CEC 2022 - 690.13(B)
WARNING!
TURN OFF PHOTOVOLTAIC AC
DISCONNECT PRIOR TO WORKING
INSIDE PANEL
LABEL LOCATION: MSP
CODE REF: CEC 2022 - 110.27(C)
CAUTION: MULTIPLE
POWER SOURCES
LABEL LOCATION: MSP
CODE REF: CEC 2022 - 690.56(B), CEC 2022 - 705.10
NOTICE
PV SYSTEM COMBINER PANEL
DO NOT ADD LOADS TO THIS
PANEL
LABEL LOCATION:
LOAD CENTER
[Only use when applicable for PV load center]
!
Follow all safety procedures and
wear proper PPE in accordance
to NFPA 70E, Failure to comply
can result in serious injury or
death.
Arc Flash and Shock Hazard
Appropriate PPE Required
WARNING
SOLAR ELECTRIC
PV PANELS
TURN RAPID SHUTDOWN
SWITCH TO THE "OFF"
POSITION TO SHUT DOWN
PV SYSTEM AND REDUCE
SHOCK HAZARD IN THE
ARRAY.
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
LABEL LOCATION: INTERCONNECTION POINT (MSP OR AC
DISCONNECT IF LINE SIDE TAP)
CODE REF: CEC 2022 - 690.56(C)
NOTES AND SPECIFICATIONS
1) SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF CEC 110.21(B), UNLESS
SPECIFIC INSTRUCTIONS ARE REQUIRED BY
SECTION 690, OR IF REQUESTED BY THE LOCAL AHJ.
2) SIGNS AND LABELS SHALL ADEQUATELY WARN OF
HAZARDS USING EFFECTIVE WORDS, COLORS AND SYMBOLS.
3) LABELS SHALL BE PERMANENTLY
AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HAND WRITTEN.
4) LABEL SHALL BE OF SUFFICIENT
DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED.
5) SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4
- 2011, PRODUCT SAFETY SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED.
6) DO NOT COVER EXISTING MANUFACTURER LABELS.
LOCATION : OUTDOOR EQUIPMENT (BATTERY AND METER MAIN COMBO LOCATION)
330 CARRIAGE DR, #D SANTA ANA, CA 92707, USA
CAUTION
TRI POWER SOURCES
SECOND SOURCE IS PV SYSTEM
THIRD SOURCE IS AC BATTERY
!
LABEL LOCATION : BATTERY
BATTERY
1 OF 1
(N) AC DISCONNECT 3
(N) SYSTEM
CONTROLLER 3/3G
(N) COMBINER PANEL
(N) BATTERY
(N) AC DISCONNECT 2
(N) BACKUP LOAD PANEL
SCEPTOR PL
(N) AC
DISCONNECT 1
(N) METER MAIN
COMBO
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-10
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EQUIPMENT
SPECIFICATION
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-11
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EQUIPMENT
SPECIFICATION
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-12
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EQUIPMENT
SPECIFICATION
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-13
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EQUIPMENT
SPECIFICATION
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
2158
ww
w
.
L
o
y
d
W
M
a
r
t
i
n
.
c
o
m
So
l
a
r
S
t
r
u
c
t
u
r
e
s
E
n
g
i
n
e
e
r
i
n
g
#2
0
2
5
-
0
2
5
1
S
t
r
u
c
t
u
r
a
l
O
n
l
y
Ja
n
u
a
r
y
2
9
,
2
0
2
5
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-14
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EQUIPMENT
SPECIFICATION
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
2158
ww
w
.
L
o
y
d
W
M
a
r
t
i
n
.
c
o
m
So
l
a
r
S
t
r
u
c
t
u
r
e
s
E
n
g
i
n
e
e
r
i
n
g
#2
0
2
5
-
0
2
5
1
S
t
r
u
c
t
u
r
a
l
O
n
l
y
Ja
n
u
a
r
y
2
9
,
2
0
2
5
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-15
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EQUIPMENT
SPECIFICATION
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-8
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EQUIPMENT
SPECIFICATION
330 W Carriage Dr Unit
#D3/21/2025
33
0
CA
R
R
I
A
G
E
D
R
,
#D
S
A
N
T
A
A
N
A
,
CA
92
7
0
7
,
U
S
A
AN
K
I
T
M
A
H
A
J
A
N
REVDATEDESCRIPTION
REVISIONS
HOMEOWNER INFO
AP
N
:
93
3
1
7
0
1
5
SHEET NAME
SHEET SIZE
SHEET NUMBER
ANSI B
11" X 17"
PV-9
SIGNATURE & SEAL
CONTRACTOR: MY SMART HOUSE
ADDRESS: 39809 AVENIDA ACACIAS, UNIT D
MURRIETA, CA 92563
PHONE:8884453020
LICENSE #: C-10 1095569
JOSE EMILIO BAHENA
EQUIPMENT
SPECIFICATION
330 W Carriage Dr Unit
#D3/21/2025
2A
REFRIGERATOR
LIVING ROOM
LIVING ROOM
20A
20A
20A
20A
20A
30A
30A
2
2
KITCHEN PLUGS
KITCHEN PLUGS
LIGHTS AND PLUGS
LIGHTS AND PLUGS
20A
20A
20A BEDROOM 2
125A
BEDROOM 3
20AREFRIDGERATOR
20AREFRIDGERATOR
MASTER BEDROOM
MASTER BEDROOM
20A
20A
INSPECTOR NOTE:
Verify circuit ampacities.
Some may be 15A as is
typical of when built.
MSmith(19) COSA
330 W Carriage Dr Unit
#D3/21/2025
Sht # 0.1 of 3
Note to Plan Checker:
This calculations package shows the structural calculations of the existing 2x4
stud to support the proposed residential battery/ies (Encharge 5P) that are
fixed with 5/16" lag screws, as shown on sheet PV 3 of the System Design
Drawings.
2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-1967 Magic Solar Scott Berger Residence Date: June 15, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
20232613 Solar Deployed Lorne Leech Residence20231967 Magic Solar Scott Berger Residence Date: July 4, 202320233935 Berger Solar Nathan Heit Battery Date: July 4, 202320233834 Solar Renewable Energy Amador Medina Battery Date: July 12, 202320234478 Solar Deployed David Herrera Battery Date: August 10, 2023LWM SSE 20235382 Solar Deployed Maria Viridiana Battery Date: November 4, 202320240203 Solar Depoyed Donald Trapp Battery Date: January 22, 202420240331 ESP Blanca Ambriz Battery Date: February 6, 202420240386 ESP Gustavo Silva Residence Date: February 09, 202420240394 Solar Deployed Arlene Twine Residence Date: February 09, 202420240396 Smart House Peggy Garcia Date: February 9, 202420240466 Solar Deployed Anthony Britt Date: February 20, 202420240527 Solar Deployed Bridget Zuniga Date: February 26, 202420240428 Papke Designs Carlos Gonzalez Date: February 26, 202420240528 Solar Deployed Ricky Desingano Date: February 26, 202420240529 Solar Deployed George Quevedo Date: February 26, 202420240802 Solar Deployed Alex Usher Date: March 22, 202420240866 ESP Margie Collins Battery Date: March 29, 202420240867 ESP Mark Lane Battery Date: March 29, 202320240877 ESP Phillip Clanton Battery Date: March 29, 202320240879 Solar Deployed James Leu Battery Date: March 29, 202320240983 ESP Larry Serota Battery Date: April 06, 202420240991 Velasco's Electrical Juan Ochoa Battery Date: April 09, 202320241018 Velasco's Electrical Kara Herron Battery Date: April 10, 202320241009 ESP Kendra Flores Battery Date: April 10, 202420241010 ESP Belia Flores Battery Date: April 10, 202420241022 Velasco's Electrical Bia Moua Battery Date: April 11, 202320241026 ESP John Schulte Battery Date: April 11, 202420241034 ESP David Morehead Battery Date: April 11, 202420241050 ESP Oscar Gama Battery Date: April 14, 202420241118 ESP Fernando Mercado Battery Date: April 22, 202420241143 Solar Deployed Mirna Gicel Garcia Battery Date: April 23, 20242020241150 Solar Deployed Andrea Davis Battery Date: April 23, 202420241157 ESP Yajaira Yanez Battery Date: April 24, 202420241166 ESP Grant Youn Battery Date: April 25, 202420241168 Solar Deployed Maria Abundes Residence Date: April 25, 202420241180 ESP Teruko Ogawa Residence Date: April 26, 202420241177 ESP Saul Diaz Battery Date: April 26, 202420241173 ESP Ruben Gonzalez Battery Date: April 26, 202420241184 Solar Deployed Mario Chavez Battery Date: April 26, 2024 20241193 Solar Deployed Carolyn Gatlin Residence Date: April 29, 2024 20241225 Velasco's Electrical Luis Anzueto Residence Date: May 01, 202420241262 ESP Jose Perez Battery Date: May 04, 202420241263 Velasco's Electrical Maria Bermudez Battery Date: May 06, 202420241264 ESP Palmira Tirado Battery Date: May 06, 202420241284 ESP Noel Guerra Battery Date: May 08, 202420241289 ESP Mary Margarette Agoncillo Battery Date: May 08, 202420241315 ESP Elias Salmeron Battery Date: May 10, 202420241316 ESP Tull Merrily Battery Date: May 10, 202420241334 ESP Henry Berreondo Battery Date: May 12, 202420241324 Solar Deployed Adam Zamora Battery Date: May 12, 202420241383 Solar Deployed Enrique Soto Battery Date: May 16, 2024 20241398 ESP Javier Portillo Battery Date: May 17, 202420241413 ESP Antonio Picazo Battery Date: May 19, 202420241415 ESP Eduardo Aguirre Battery Date: June 14, 2024
fixed with 5/16" lag screws, as shown on sheet PV 5 of the System Design
Date: June 17, 2024 Date: June 20, 2024 Date: June 25, 2024 Date: June 26, 2024 Date: June 28, 2024 Date: July 22, 2024 Date: July 23, 2024 Date: July 24, 2024 Date: July 26, 2024 Date: July 31, 2024 Date: August 1, 2024 Date: August 2, 2024 Date: August 5, 2024 Date: August 6, 2024 Date: August 7, 2024 Date: August 8, 2024 Date: August 12, 2024 Date: September 24, 2024 Date: September 25, 2024 Date: September 26, 2024 Date: September 27, 2024 Date: September 30, 2024 Date: October 1, 2024 Date: October 2, 2024 Date: October 3, 2024 Date: October 4, 2024 Date: October 7, 2024 Date: October 8, 2024 Date: October 9, 2024 Date: October 10, 2024 Date: October 11, 2024 Date: October 14, 2024 Date: October 15, 2024 Date: October 18, 2024 Date: October 21, 2024 Date: October 22, 2024 Date: October 23, 2024 Date: October 24, 2024 Date: October 25, 2024 Date: October 28, 2024 Date: October 29, 2024 Date: October 30, 2024 Date: October 31, 2024 Date: November 1, 2024 Date: November 4, 2024 Date: November 6, 2024 Date: November 7, 2024 Date: November 8, 2024 Date: November 11, 2024 Date: November 12, 2024 Date: November 13, 2024 Date: November 14, 2024Date: January 17, 2025Date: January 20, 2025Date: January 22, 2025Date: January 23, 2025Date: January 29, 202520250251 Smart House Ankit Mahajan
330 W Carriage Dr Unit
#D3/21/2025
Structural Calculations for a Residential
Battery with Optional Export System for:
Applicable Codes:
2022 California Building Code, 2022 California Electric Code,
2022 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 716 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Constructione, and all other codes which are adopted by
reference or enacted by law.
Sht # 1 of 3
2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 2020
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 20222022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 2023
Scott Berger Residence
5 Ponte Bianco,
Lake Elsinore, CA 92532
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
Ankit Mahajan
330 Carriage Dr Unit D
Santa Ana, CA 92707
20241226 ESP Juan Castillo Residence Date: May 01, 202420241304 ESP Martin Vega Battery Date: May 09, 202420241415 ESP Eduardo Aguirre Battery Date: May 20, 202420250251 Smart House Ankit Mahajan Date: June 13, 2024 Date: July 2, 2024 Date: July 3, 2024 Date: July 5, 2024 Date: July 10, 2024 Date: July 16, 2024 Date: July 17, 2024 Date: July 19, 2024 Date: August 5, 2024 Date: August 6, 2024 Date: August 7, 2024 Date: August 8, 2024 Date: August 12, 2024 Date: August 15, 2024 Date: August 19, 2024 Date: August 20, 2024 Date: August 21, 2024 Date: August 22, 2024 Date: August 23, 2024 Date: August 27, 2024 Date: August 28, 2024 Date: August 29, 2024 Date: September 2, 2024 Date: September 4, 2024 Date: September 6, 2024 Date: September 11, 2024 Date: September 12, 2024 Date: September 13, 2024 Date: September 17, 2024 Date: September 20, 2024 Date: September 23, 2024 Date: September 24, 2024 Date: September 25, 2024 Date: September 26, 2024 Date: September 27, 2024 Date: September 30, 2024 Date: October 1, 2024 Date: October 2, 2024 Date: October 3, 2024 Date: October 4, 2024 Date: October 7, 2024 Date: October 8, 2024 Date: October 9, 2024 Date: October 10, 2024 Date: October 11, 2024 Date: October 14, 2024 Date: October 15, 2024 Date: October 16, 2024 Date: October 17, 2024 Date: October 18, 2024 Date: October 21, 2024 Date: October 22, 2024 Date: October 23, 2024 Date: October 24, 2024 Date: October 25, 2024 Date: October 28, 2024 Date: October 29, 2024 Date: October 30, 2024 Date: October 31, 2024 Date: November 1, 2024 Date: November 4, 2024 Date: November 6, 2024 Date: November 7, 2024 Date: November 8, 2024 Date: November 11, 2024 Date: November 12, 2024 Date: November 13, 2024 Date: November 14, 2024 Date: November 15, 2024 Date: November 18, 2024 Date: November 20, 2024 Date: November 21, 2024 Date: November 22, 2024 Date: November 25, 2024 Date: November 26, 2024 Date: November 27, 2024 Date: December 2, 2024 Date: December 3, 2024 Date: December 4, 2024 Date: December 5, 2024 Date: December 6, 2024Date: December 9, 2024Date: December 10, 2024Date: December 11, 2024Date: December 13, 2024Date: December 17, 2024Date: December 18, 2024Date: December 19, 2024Date: December 20, 2024Date: December 23, 2024Date: January 2, 2025Date: January 3, 2025Date: January 6, 2025Date: January 7, 2025Date: January 8, 2025Date: January 9, 2025Date: January 13, 2025Date: January 14, 2025Date: January 15, 2025Date: January 16, 2025Date: January 17, 2025Date: January 20, 2025Date: January 22, 2025Date: January 23, 2025Date: January 24, 2025Date: January 27, 2025Date: January 28, 2025Date: January 29, 2025
330 W Carriage Dr Unit
#D3/21/2025
Loading Diagram
Sht # 2 of 3
Determine Applied Loads
F y = Weight of Equipment = 174 lbs
2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 20202020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 2020
Check attachment of Support to (E) 2x4 Stud for Seismic Load
F x =F p
F p =0.4 ap SDS Wp
Rp / Ip [1 + 2(z/h)]x
ap
SDS
=1.0
=(2/3) SMS ; SMS = Fa Ssx ; Fa =1.0 ; Ss =1.25
SMS = 1.25
SDS =(2/3) 1.25 =0.83
Wp =174 lbs
Rp =2.5 [Table 13.61 ASCE 716]
[Table 13.61 ASCE 716]
; Ip =1.0 ; z / h =1.0
Total Fy
Total Fx
R1x
R2x
3.75"
16.75"
2020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 2022
16.75"
2022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 202320231967 Magic Solar Scott Berger Residence Date: March 28, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2023-1967 Magic Solar Scott Berger Residence Date: June 15, 202320232613 Solar Deployed Lorne Leech Residence20231967 Magic Solar Scott Berger Residence Date: July 4, 202320233935 Berger Solar Nathan Heit Battery Date: July 4, 202320233834 Solar Renewable Energy Amador Medina Battery Date: July 12, 202320234478 Solar Deployed David Herrera Battery Date: August 10, 202320235069 Devil Dog Energy Ralph Gillespie Battery Date: October 07, 2023LWM SSE 20235382 Solar Deployed Maria Viridiana Battery Date: November 4, 202320240203 Solar Depoyed Donald Trapp Battery Date: January 22, 202420240331 ESP Blanca Ambriz Battery Date: February 6, 202420240386 ESP Gustavo Silva Residence Date: February 09, 202420240394 Solar Deployed Arlene Twine Residence Date: February 09, 202420240396 Smart House Peggy Garcia Date: February 9, 202420240466 Solar Deployed Anthony Britt Date: February 20, 202420240527 Solar Deployed Bridget Zuniga Date: February 26, 202420240428 Papke Designs Carlos Gonzalez Date: February 26, 202420240528 Solar Deployed Ricky Desingano Date: February 26, 202420240529 Solar Deployed George Quevedo Date: February 26, 202420240802 Solar Deployed Alex Usher Date: March 22, 202420240866 ESP Margie Collins Battery Date: March 29, 202420240867 ESP Mark Lane Battery Date: March 29, 202320240877 ESP Phillip Clanton Battery Date: March 29, 202320240879 Solar Deployed James Leu Battery Date: March 29, 202320240983 ESP Larry Serota Battery Date: April 06, 202420240991 Velasco's Electrical Juan Ochoa Battery Date: April 09, 202320241018 Velasco's Electrical Kara Herron Battery Date: April 10, 202320241009 ESP Kendra Flores Battery Date: April 10, 202420241010 ESP Belia Flores Battery Date: April 10, 202420241022 Velasco's Electrical Bia Moua Battery Date: April 11, 202320241026 ESP John Schulte Battery Date: April 11, 202420241034 ESP David Morehead Battery Date: April 11, 202420241050 ESP Oscar Gama Battery Date: April 14, 202420241118 ESP Fernando Mercado Battery Date: April 22, 202420241143 Solar Deployed Mirna Gicel Garcia Battery Date: April 23, 20242020241150 Solar Deployed Andrea Davis Battery Date: April 23, 202420241157 ESP Yajaira Yanez Battery Date: April 24, 202420241166 ESP Grant Youn Battery Date: April 25, 202420241168 Solar Deployed Maria Abundes Residence Date: April 25, 202420241180 ESP Teruko Ogawa Residence Date: April 26, 202420241177 ESP Saul Diaz Battery Date: April 26, 202420241173 ESP Ruben Gonzalez Battery Date: April 26, 202420241184 Solar Deployed Mario Chavez Battery Date: April 26, 2024 20241193 Solar Deployed Carolyn Gatlin Residence Date: April 29, 2024 20241226 ESP Juan Castillo Residence Date: May 01, 202420241225 Velasco's Electrical Luis Anzueto Residence Date: May 01, 202420241262 ESP Jose Perez Battery Date: May 04, 202420241263 Velasco's Electrical Maria Bermudez Battery Date: May 06, 202420241264 ESP Palmira Tirado Battery Date: May 06, 202420241284 ESP Noel Guerra Battery Date: May 08, 202420241289 ESP Mary Margarette Agoncillo Battery Date: May 08, 202420241304 ESP Martin Vega Battery Date: May 09, 202420241315 ESP Elias Salmeron Battery Date: May 10, 202420241316 ESP Tull Merrily Battery Date: May 10, 202420241334 ESP Henry Berreondo Battery Date: May 12, 202420241324 Solar Deployed Adam Zamora Battery Date: May 12, 202420241383 Solar Deployed Enrique Soto Battery Date: May 16, 2024 20241398 ESP Javier Portillo Battery Date: May 17, 202420241413 ESP Antonio Picazo Battery Date: May 19, 202420241415 ESP Eduardo Aguirre Battery Date: May 20, 202420241415 ESP Eduardo Aguirre Battery Date: June 7, 2024 Date: June 14, 2024 Date: June 17, 2024 Date: June 20, 2024 Date: June 25, 2024 Date: June 26, 2024 Date: June 28, 2024 Date: July 2, 2024 Date: July 3, 2024 Date: July 5, 2024 Date: July 10, 2024 Date: July 16, 2024 Date: July 17, 2024 Date: July 19, 2024 Date: July 22, 2024 Date: July 23, 2024 Date: July 24, 2024 Date: July 26, 2024 Date: July 31, 2024 Date: August 1, 2024 Date: August 2, 2024 Date: August 5, 2024 Date: August 6, 2024 Date: August 7, 2024 Date: August 8, 2024 Date: August 12, 2024 Date: August 15, 2024 Date: August 19, 2024 Date: August 20, 2024 Date: August 21, 2024 Date: August 22, 2024 Date: August 23, 2024 Date: August 27, 2024 Date: August 28, 2024 Date: August 29, 2024 Date: September 2, 2024 Date: September 4, 2024 Date: September 6, 2024 Date: September 11, 2024 Date: September 12, 2024 Date: September 13, 2024 Date: September 17, 2024 Date: September 20, 2024 Date: September 23, 2024 Date: September 24, 2024 Date: September 25, 2024 Date: September 26, 2024 Date: September 27, 2024 Date: September 30, 2024 Date: October 1, 2024 Date: October 16, 2024 Date: October 17, 2024 Date: October 21, 2024 Date: October 22, 2024 Date: October 23, 2024 Date: October 24, 2024 Date: October 25, 2024 Date: October 28, 2024 Date: October 29, 2024 Date: October 30, 2024 Date: October 31, 2024 Date: November 1, 2024 Date: November 4, 2024 Date: November 6, 2024 Date: November 7, 2024 Date: November 8, 2024 Date: November 11, 2024 Date: November 12, 2024 Date: November 13, 2024 Date: November 14, 2024 Date: November 15, 2024 Date: November 18, 2024 Date: November 20, 2024 Date: November 21, 2024 Date: November 22, 2024 Date: November 25, 2024 Date: November 26, 2024 Date: November 27, 2024 Date: December 2, 2024 Date: December 3, 2024 Date: December 4, 2024 Date: December 5, 2024 Date: December 6, 2024Date: December 9, 2024Date: December 10, 2024Date: December 11, 2024Date: December 13, 2024Date: December 17, 2024Date: December 18, 2024Date: December 19, 2024Date: December 20, 2024Date: December 23, 2024Date: January 2, 2025Date: January 3, 2025Date: January 6, 2025Date: January 7, 2025Date: January 8, 2025Date: January 9, 2025Date: January 13, 2025Date: January 14, 2025Date: January 15, 2025Date: January 16, 2025Date: January 20, 2025Date: January 22, 2025Date: January 23, 2025Date: January 24, 2025Date: January 27, 2025Date: January 28, 2025Date: January 29, 202520250251 Smart House Ankit Mahajan
330 W Carriage Dr Unit
#D3/21/2025
Sht # 3 of 3
2019-1529 Solar Journey David Lewis - Battery Backup Date: June 4, 2019
9924 Universal Boulevard #224406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Loyd W. Martin Professional Engineer, Inc.
2020-1158 Solar Journey Craig Larsen - Battery Backup Date: June 4, 20202020-1527 Solar Journey Johnathan Valdivia - Battery Backup Date: June 14, 20202020-1697 Sasha Intl Jill Black Zalben - Battery Backup Date: August 3, 20202020-2940 Axis Solar Shook - Battery Backup Date: October 30, 2020
Load per bolt per strut
P = Rx / 2
P = 54.6 lbs / 2 = 27.3 lbs
Determine Applied Loads (cont...)
Fpmax =1.6 SDS Ip Wp =231 lbs
Fpmin =0.3 SDS Ip Wp =43 lbs
Fpmin <Fp <Fpmax OK
F p =0.4 (1.0) (0.83) (174 lbs)
(2.5 / 1)
[1 + 2(1)]x
F p =70 lbs
R1x (33.5") F y (3.75") Fp (16.75") = 0
Check Moment at R2:
R1x = (Fp x 16.75" + Fy x 3.75") / 33.5"
R1x = (1,172.5 lbf-in + 656 lbf-in) / 33.5 in
R1x = 54.6 lbs
Determine allowable load per 5/16" lag screw w/ 3" min. embedment into 2x4 stud per
2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where:
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 10.3.4 of 2018 NDS
W ' = 266 lbs/ in. x 3 in. x 1.6 x 1.0 = 1,277 lbs > 27.3 lbs OK
Check for withdrawal of each bolt:
2020-2940 Axis Solar Shook - Battery Backup Date: December 5, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 10, 20202020-2940 Axis Solar Shook - Battery Backup Date: December 14, 20202021-005 A1 Sun Inc Bissell & Hall - Battery Backup Date: January 05, 20212021-1084 A1 Sun Inc Christoph Dankert - Battery Backup Date: April 01, 20212021-1420 Altadena Solar Gregg & Deborah Vane - Battery Date: May 11, 20212021-2209 Axis Solar Dave Sabey - Battery Date: June 15, 20212021-2256 Solar Journey Ciro Mejia - Battery Date: June 17, 20212021-2339 Infinity Solar Jason Stokes - Battery Date: June 22, 20212021-1010 Skytech Solar Claudia Schweikert - Battery Backup Date: July 12, 20212022-1140 Future Energy Mary Black - Battery Backup Date: March 15, 20222022-1135 Ameco Solar Sherry Dibble - Battery Backup Date: March 15, 20222022-1417 Skytech Solar Richard Elder - Battery Backup Date: March 28, 20222022-2462 Nexa Solar Eric Kahn - Battery Backup Date: June 10, 2022 2022-2739 Sungreen Systems Johnny Lay - Battery Backup Date: July 1, 2022 2022-2829 Plug It In Solar Maria Cousineau - Battery Backup Date: July 11, 2022 2022-3074 Next Solar Leah Bernthal - Battery Backup Date: July 28, 2022 2022-3192 Next Solar Gaylord Naraja - Battery Backup Date: August 6, 2022 2022-3628 Power Town Solar Skylar Brown - Battery Backup Date: September 07, 20222022-3687 Plug It In Solar Corey Udkoff - Battery Backup Date: September 12, 20222022-3873 Magic Solar Harpeet Ghattaura - Battery Backup Date: September 26, 20222022-4146 Belmont Energy Collin Vath - Battery Backup Date: October 11, 2022 2022-5205 Magic Solar Miguel Rivera - Battery Backup Date: December 15, 20222022-5296 Future Energy Today Tyler Masters - Battery Backup Date: December 21, 20222023-198 Magic Solar Nikolai Green - Battery Backup Date: January 15, 20232023-565 AV Solar Alma Ventura - Battery Backup Date: February 6, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 20232023-709 Power Town Solar Joan Baquero - Battery Backup Date: February 13, 202320231967 Magic Solar Scott Berger Residence Date: March 28, 2023
AG
Exp. 3-31-19
No. C58724 NITRAMW.DYO
REGISTEREDPROFESSIONALENGINEER
C
V
L
FOETATS
ALIFORNIAICIL
215
2023-1967 Magic Solar Scott Berger Residence Date: June 15, 202320232613 Solar Deployed Lorne Leech Residence20231967 Magic Solar Scott Berger Residence Date: July 4, 202320233935 Berger Solar Nathan Heit Battery Date: July 4, 202320233834 Solar Renewable Energy Amador Medina Battery Date: July 12, 202320234478 Solar Deployed David Herrera Battery Date: August 10, 202320235069 Devil Dog Energy Ralph Gillespie Battery Date: October 07, 2023LWM SSE 20235382 Solar Deployed Maria Viridiana Battery Date: November 4, 202320240203 Solar Depoyed Donald Trapp Battery Date: January 22, 202420240331 ESP Blanca Ambriz Battery Date: February 6, 202420240386 ESP Gustavo Silva Residence Date: February 09, 202420240394 Solar Deployed Arlene Twine Residence Date: February 09, 202420240396 Smart House Peggy Garcia Date: February 9, 202420240466 Solar Deployed Anthony Britt Date: February 20, 202420240527 Solar Deployed Bridget Zuniga Date: February 26, 202420240428 Papke Designs Carlos Gonzalez Date: February 26, 202420240528 Solar Deployed Ricky Desingano Date: February 26, 202420240529 Solar Deployed George Quevedo Date: February 26, 202420240802 Solar Deployed Alex Usher Date: March 22, 202420240866 ESP Margie Collins Battery Date: March 29, 202420240867 ESP Mark Lane Battery Date: March 29, 202320240877 ESP Phillip Clanton Battery Date: March 29, 202320240879 Solar Deployed James Leu Battery Date: March 29, 202320240983 ESP Larry Serota Battery Date: April 06, 202420240991 Velasco's Electrical Juan Ochoa Battery Date: April 09, 202320241018 Velasco's Electrical Kara Herron Battery Date: April 10, 202320241009 ESP Kendra Flores Battery Date: April 10, 202420241010 ESP Belia Flores Battery Date: April 10, 202420241022 Velasco's Electrical Bia Moua Battery Date: April 11, 202320241026 ESP John Schulte Battery Date: April 11, 202420241034 ESP David Morehead Battery Date: April 11, 202420241050 ESP Oscar Gama Battery Date: April 14, 202420241118 ESP Fernando Mercado Battery Date: April 22, 202420241143 Solar Deployed Mirna Gicel Garcia Battery Date: April 23, 20242020241150 Solar Deployed Andrea Davis Battery Date: April 23, 202420241157 ESP Yajaira Yanez Battery Date: April 24, 202420241166 ESP Grant Youn Battery Date: April 25, 202420241168 Solar Deployed Maria Abundes Residence Date: April 25, 202420241180 ESP Teruko Ogawa Residence Date: April 26, 202420241177 ESP Saul Diaz Battery Date: April 26, 202420241173 ESP Ruben Gonzalez Battery Date: April 26, 202420241184 Solar Deployed Mario Chavez Battery Date: April 26, 2024 20241193 Solar Deployed Carolyn Gatlin Residence Date: April 29, 2024 20241226 ESP Juan Castillo Residence Date: May 01, 202420241225 Velasco's Electrical Luis Anzueto Residence Date: May 01, 202420241262 ESP Jose Perez Battery Date: May 04, 202420241263 Velasco's Electrical Maria Bermudez Battery Date: May 06, 202420241264 ESP Palmira Tirado Battery Date: May 06, 202420241284 ESP Noel Guerra Battery Date: May 08, 202420241289 ESP Mary Margarette Agoncillo Battery Date: May 08, 202420241304 ESP Martin Vega Battery Date: May 09, 202420241315 ESP Elias Salmeron Battery Date: May 10, 202420241316 ESP Tull Merrily Battery Date: May 10, 202420241334 ESP Henry Berreondo Battery Date: May 12, 202420241324 Solar Deployed Adam Zamora Battery Date: May 12, 202420241383 Solar Deployed Enrique Soto Battery Date: May 16, 2024 20241398 ESP Javier Portillo Battery Date: May 17, 202420241413 ESP Antonio Picazo Battery Date: May 19, 202420241415 ESP Eduardo Aguirre Battery Date: May 20, 202420241415 ESP Eduardo Aguirre Battery Date: June 7, 2024 Date: June 14, 2024 Date: June 17, 2024 Date: June 20, 2024 Date: June 25, 2024 Date: June 26, 2024 Date: June 28, 2024 Date: July 2, 2024 Date: July 3, 2024 Date: July 5, 2024 Date: July 10, 2024 Date: July 16, 2024 Date: July 17, 2024 Date: July 19, 2024 Date: July 22, 2024 Date: July 23, 2024 Date: July 24, 2024 Date: July 26, 2024 Date: July 31, 2024 Date: August 1, 2024 Date: August 2, 2024 Date: August 15, 2024 Date: August 19, 2024 Date: August 20, 2024 Date: August 21, 2024 Date: August 22, 2024 Date: August 23, 2024 Date: August 27, 2024 Date: August 28, 2024 Date: August 29, 2024 Date: September 2, 2024 Date: September 4, 2024 Date: September 6, 2024 Date: September 11, 2024 Date: September 12, 2024 Date: September 13, 2024 Date: September 17, 2024 Date: September 20, 2024 Date: September 23, 2024 Date: October 2, 2024 Date: October 3, 2024 Date: October 4, 2024 Date: October 7, 2024 Date: October 8, 2024 Date: October 9, 2024 Date: October 10, 2024 Date: October 11, 2024 Date: October 14, 2024 Date: October 15, 2024 Date: October 16, 2024 Date: October 17, 2024 Date: October 18, 2024 Date: November 15, 2024 Date: November 18, 2024 Date: November 20, 2024 Date: November 21, 2024 Date: November 22, 2024 Date: November 25, 2024 Date: November 26, 2024 Date: November 27, 2024 Date: December 2, 2024 Date: December 3, 2024 Date: December 4, 2024 Date: December 5, 2024 Date: December 6, 2024Date: December 9, 2024Date: December 10, 2024Date: December 11, 2024Date: December 13, 2024Date: December 17, 2024Date: December 18, 2024Date: December 19, 2024Date: December 20, 2024Date: December 23, 2024Date: January 2, 2025Date: January 3, 2025Date: January 6, 2025Date: January 7, 2025Date: January 8, 2025Date: January 9, 2025Date: January 13, 2025Date: January 14, 2025Date: January 15, 2025Date: January 16, 2025Date: January 17, 2025Date: January 24, 2025Date: January 27, 2025Date: January 28, 2025Date: January 29, 202520250251 Smart House Ankit Mahajan
330 W Carriage Dr Unit
#D3/21/2025
Structural Calculations for a Roof Mounted Solar Photovoltaic System for:
Ankit Mahajan
330 Carriage Dr Unit D
Santa Ana, CA 92707
Applicable Codes:
2022 California Building Code, 2022 California Electric Code,
2022 California Mechanical Code, American Society of Civil Engineers
Standard ASCE 7-16 Minimum Design Loads for Buildings and Other
Structures, American Wood Council 2018 National Design Specification
for Wood Construction, Local Municipal Code, and all other codes which
are adopted by reference or enacted by law.
Assumed Design Parameters:
The existing structure has been built under a building permit and is in its
original condition. The existing roof structure is capable of its code
required live load and the ability of the roof structure to support live loads
has not been substantially reduced by the age of the structure, termites or
mold, or unauthorized modifications to the existing structure. Solar Energy
Contractor shall make an inspection of the existing roof framing system
prior to installation of the roof mounted solar energy system to verify that
the existing roof is capable of supporting minimum roof live loads.
Assumed Design Parameters:
All 2x members are grade Douglas Fir #2 or better
All 4X members are grade Douglas Fir #1 or better
All Roof Connectors are Simpson Strong-Tie or Equal
All Concrete Foundations are f'c = 2500 psi or stronger
Sht # 1 of 7
2025-0251 Smart House Ankit Mahajan January 29, 2025
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Original Structure was built to the Type-V Wood Framed Standards of the
Applicable Building Code at the time of Construction.
330 W Carriage Dr Unit
#D3/21/2025
Note to Building Official:
Based upon a review of the proposed plans I am confident that the
existing roof framing system is capable of safely supporting the additional
loads caused by the new solar photovoltaic energy system. The contractor
shall field verify that the existing roof structure is in its original permited
condition and verify that it can support the normal code required roof live
loads. Attached in this package are several calculations showing that the
roof members can support the additional weight of the solar array.
Furthermore, an analysis of the solar array's support for wind forces and a
seismic analysis of the existing structure are also included.
Check Existing 2X10 Roof Rafters @ 24" O.C.:
w =30 psf x 2 ft. = 60 plf
Total load on rafters = 60 plf x 14 ft. = 840 lbs
Sht # 2 of 7
2025-0251 Smart House Ankit Mahajan January 29, 2025
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
14'
330 W Carriage Dr Unit
#D3/21/2025
Check Existing 2X10 Roof Rafters @ 24" O.C.:
Snow Load =0 psf
Dead Load =14 psf
Live Load =16 psf
WDL + LL =30 psf x 2 ft. = 60 plf
WDL =14 psf x 2 ft. = 28 plf
w =30 psf x 2 ft. = 60 plf
Total load on rafters =( 60 plf x 3 ft ) + ( 28 plf x 11 ft ) + ( 6' x 2.75' x 3 psf x 4 )
=686 lbs < 840 lbs OK
OK. Per 2022 California Existing Building Code Section 503.3 Alterations
Check attachment of Support to Existing Structure for Wind Uplift
CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING
APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK
ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2.
NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA:
FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS
EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING
CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT
BE LESS THAN ONE-THIRD ITS LENGTH.
EFFECTIVE AREA = 15 SQ FT
Sht # 3 of 7
2025-0251 Smart House Ankit Mahajan January 29, 2025
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
% CHANGE =686 lbs - 840 lbs x 100 =-18.3% < 5% OK840 lbs
330 W Carriage Dr Unit
#D3/21/2025
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Tributary Area to Each Solar Mount = 6 ft. x 2.75 ft. = 16.5 sq. ft. ( Max )
Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C):
p = q h (GC p )(γ E )(γ a )Eq'n 29.4-7 ASCE 7-16
q h = 0.00256 K z K zt K d K e V 2 Eq'n 26.10-1 ASCE 7-16
Note:
K z =velocity pressure coefficient Section 29.10.1 ASCE 7-16
K z =0.9 (Exposure C, Height = 20 ft or less)
K zt =Topographical Factor = 1.0
K d =Wind Directionality Factor = 0.85
K e =Ground Elevation Factor = 1.0
V =130 mph
q h =0.00256 (0.9) (1.0) (0.85) (1.0) (130)²
q h =33.1 psf
GC p =-2.0 (Zone 2 ; Effective Area = 15 sq. ft. )
γ E =Exposure Factor = 1.5
γ a =Solar Array Pressure Equalization Factor = 0.7 Fig. 29.4-8 ASCE 7-16
p = q h (GC p )(γ E )(γ a )
p = 33.1 psf (-2.0) (1.5) (0.7) = 69.5 psf
Sht # 4 of 7
2025-0251 Smart House Ankit Mahajan January 29, 2025
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
330 W Carriage Dr Unit
#D3/21/2025
Check attachment of Support to Existing Structure for Wind Uplift - Cont'd
Nominal (Unfactored) Uplift at each support = 69.5 psf x 16.5 sq. ft. = 1146.75 lbs
Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress
Design. Note: Applicable Load Combination #5 (D + 0.6W)
Design (Factored) Uplift at each support = 0.6 x 1146.75 lbs = 688 lbs
Load per lag screw = 688 lbs / 1 = 688 lbs
Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below
according to the 2018 NDS.
W ' = W x Cd x Ct Table 10.3.1 2018 NDS
where
W = 266 lbs / in. of embedment per Table 12.2a
Cd = 1.6 per Table 2.3.2 of 2018 NDS
Ct = 1.0 per Table 2.3.3 of 2018 NDS
W' = 266 lbs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 lbs > 688 lbs OK
Sht # 5 of 7
2025-0251 Smart House Ankit Mahajan January 29, 2025
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Use Support connected to 2x Min. Roof Member w/
(1) 5/16" x 4.5" lag screws per connection minimum.
330 W Carriage Dr Unit
#D3/21/2025
Check Seismic load due to added dead load of photovoltaic system.
Determine Seismic Weight of Existing Building:
Effective Existing Seismic Weight
Area of (E) Building =Approximately 300 Sq. ft
Approximate
Effective =300 sq. ft. x 30 psf ave. = 9,000 LBS
Seismic Weight
DETERMINE BASE SHEAR
V = Cs W EQ'N 12.8-1 ASCE 7-16
EQ'N 12.8-2 ASCE 7-16
R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1
R =6.5 WOOD SHEAR WALLS
Ie = 1.0 IMPORTANCE FACTOR
SDS = 2/3 x SMS
SMS = FA x SS
SMS = 1.2 x 1.5 = 1.8
SDS = 2/3 x 1.8 = 1.2
Cs ==0.185 EQ'N 12.8-2 ASCE 7-16
Sht # 6 of 7
2025-0251 Smart House Ankit Mahajan January 29, 2025
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
Email: loydwmartin@gmail.com www.loydwmartin.com
Cs =SDS
R
Ie
SDS
R
Ie
330 W Carriage Dr Unit
#D3/21/2025
EXISTING BASE SHEAR
V = 0.185 x 9,000 LBS = 1,665 LBS
DETERMINE NEW BASE SHEAR
Determine Seismic Weight of Building with Solar Array:
EXISTING
SEISMIC =9,000 LBS
WEIGHT
NEW SOLAR
ARRAY =3 PSF x 8 PANELS x 5.5' x 3.3' = 436 LBS
NEW
SEISMIC =9,000 LBS + 436 LBS = 9,436 LBS
WEIGHT
THEREFORE NEW BASE SHEAR:
V = 0.185 x 9,436 = 1,746 LBS EQ'N 12.8-1 ASCE 7-16
OK. PER ASCE 7-16 SECTION 11B.4 ALTERATIONS
EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT
FROM ANALYSIS SINCE NEW SEISMIC FORCE IS
LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE
Sht # 7 of 7
2025-0251 Smart House Ankit Mahajan January 29, 2025
Loyd W. Martin Professional Engineer, Inc.
9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804
"Alterations may be made to any structure without requiring the existing structure to comply
with this standard, provided that the alterations comply with the requirements for a new
structure. Alterations that increase the seismic force in any existing structural element by
more than 10% or decrease the design strength of any existing structural element to resist
seismic forces by more than 10% shall not be permitted unless the entire seismic force-
resisting system is determined to comply with this standard for a new structure."
End of Calculations
Email: loydwmartin@gmail.com www.loydwmartin.com
% CHANGE =1,746 LBS - 1,665 LBS x 100 = 4.9 % < 10 % OK1,665 LBS
330 W Carriage Dr Unit
#D3/21/2025
I, ______________________________________, grant permission to My Smart House
LLC to make adjustments to my name and address in the Home Improvement Contract
between myself and My Smart House LLC, and all accompanying documents (including
utility and permit forms), so that such information may align with relevant databases used
for funding partners, utility companies, or any other parties necessary to carry out the
actions and obligations contemplated by, and pursuant to, the Home Improvement
Contact, and complete, sign and submit any homeowners association, utility
interconnection, and jurisdictional required documents on my behalf.
Sincerely,
Name: _________________________________________
Signature: ______________________________________
Date: __________________________________________
MY SMART HOUSE LLC
AUTHORIZATION FORM
Docusign Envelope ID: 21288A69-3F15-47B9-8431-2D8E36F58B3C
Ankit Mahajan
1/24/2025
Ankit Mahajan
330 W Carriage Dr Unit
#D3/21/2025
Certificate Of Completion
Envelope Id: 21288A69-3F15-47B9-8431-2D8E36F58B3C Status: Completed
Subject: Complete with DocuSign: April 2023 SCE less than 10 KW NEM.pdf, April 2023 SCE over 10 KW NEM.p...
Source Envelope:
Document Pages: 22 Signatures: 5 Envelope Originator:
Certificate Pages: 5 Initials: 22 My Smart House LLC
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
39809 Avendia Acacias
Ste D
Murrieta, CA 92563
ops@my-smarthouse.com
IP Address: 68.7.47.115
Record Tracking
Status: Original
1/24/2025 4:52:37 PM
Holder: My Smart House LLC
ops@my-smarthouse.com
Location: DocuSign
Signer Events Signature Timestamp
MY SMART HOUSE
TAYLOR@MY-SMARTHOUSE.COM
VIP
My Smart House
Security Level: Email, Account Authentication
(None)
Completed
Using IP Address: 68.7.47.115
Sent: 1/24/2025 5:37:31 PM
Viewed: 1/24/2025 5:37:49 PM
Signed: 1/24/2025 5:38:09 PM
Electronic Record and Signature Disclosure:
Accepted: 7/22/2020 12:55:24 PM
ID: ced1bb67-f7e7-4577-8424-42fbcef5bcee
Ankit Mahajan
MAHAJANANKIT10@GMAIL.COM
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 76.32.193.163
Signed using mobile
Sent: 1/24/2025 5:38:13 PM
Viewed: 1/24/2025 5:54:14 PM
Signed: 1/24/2025 5:58:05 PM
Electronic Record and Signature Disclosure:
Accepted: 1/24/2025 5:54:14 PM
ID: 76f4d4f8-df22-4c41-a9b1-bd03f2204eb3
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 1/24/2025 5:37:31 PM
Certified Delivered Security Checked 1/24/2025 5:54:14 PM
330 W Carriage Dr Unit
#D3/21/2025
Envelope Summary Events Status Timestamps
Signing Complete Security Checked 1/24/2025 5:58:05 PM
Completed Security Checked 1/24/2025 5:58:05 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
330 W Carriage Dr Unit
#D3/21/2025
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, MSH (we, us or Company) may be required by law to provide to you certain
written notices or disclosures. Described below are the terms and conditions for providing to you
such notices and disclosures electronically through the DocuSign system. Please read the
information below carefully and thoroughly, and if you can access this information electronically
to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please
confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and
signatures’ before clicking ‘CONTINUE’ within the DocuSign system.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after the signing session and, if you
elect to create a DocuSign account, you may access the documents for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to
receive required notices and consents electronically from us or to sign electronically documents
from us.
All notices and disclosures will be sent to you electronically
Electronic Record and Signature Disclosure created on: 2/6/2020 1:48:36 PM
Parties agreed to: MY SMART HOUSE, Ankit Mahajan 330 W Carriage Dr Unit
#D3/21/2025
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
How to contact MSH:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: britney@my-smarthouse.com
To advise MSH of your new email address
To let us know of a change in your email address where we should send notices and disclosures
electronically to you, you must send an email message to us at britney@my-smarthouse.com and
in the body of such request you must state: your previous email address, your new email
address. We do not require any other information from you to change your email address.
If you created a DocuSign account, you may update it with your new email address through your
account preferences.
To request paper copies from MSH
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an email to britney@my-smarthouse.com and in
the body of such request you must state your email address, full name, mailing address, and
telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with MSH
To inform us that you no longer wish to receive future notices and disclosures in electronic
format you may:
330 W Carriage Dr Unit
#D3/21/2025
i. decline to sign a document from within your signing session, and on the subsequent page,
select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an email to britney@my-smarthouse.com and in the body of such request you must
state your email, full name, mailing address, and telephone number. We do not need any other
information from you to withdraw consent.. The consequences of your withdrawing consent for
online documents will be that transactions may take a longer time to process..
Required hardware and software
The minimum system requirements for using the DocuSign system may change over time. The
current system requirements are found here: https://support.docusign.com/guides/signer-guide-
signing-system-requirements.
Acknowledging your access and consent to receive and sign documents electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please confirm that you have
read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for
your future reference and access; or (ii) that you are able to email this ERSD to an email address
where you will be able to print on paper or save it for your future reference and access. Further,
if you consent to receiving notices and disclosures exclusively in electronic format as described
herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before
clicking ‘CONTINUE’ within the DocuSign system.
By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm
that:
You can access and read this Electronic Record and Signature Disclosure; and
You can print on paper this Electronic Record and Signature Disclosure, or save or send
this Electronic Record and Disclosure to a location where you can print it, for future
reference and access; and
Until or unless you notify MSH as described above, you consent to receive exclusively
through electronic means all notices, disclosures, authorizations, acknowledgements, and
other documents that are required to be provided or made available to you by MSH
during the course of your relationship with MSH.
330 W Carriage Dr Unit
#D3/21/2025
200A
MASTER BEDROOM
GARAGE
GARAGE
KITCHEN
REFRIGERATOR
KITCHEN
REFRIGERATOR
LIVING ROOM
LIVING ROOM
20A
20A
20A
20A
20A
20A
MASTER BEDROOM 20A
20A
OVEN 50A
OVEN 50A
WASHER/DRYER
WASHER DRYER
30A
30A
WATER HEATER 20A
20AWATER HEATER
BEDROOM 2 15A
BEDROOM 3 15A
NEW BACKUP LOAD PANEL
DISPLAYING ALL LOADS FROM MAIN SERVICE PANEL
330 W Carriage Dr Unit
#D3/21/2025
Rev: 7/15/2021
RESIDENTIAL
PHOTOVOLTAIC
SOL-01 CBC 2019
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required.
Project Address:
Contractor Company Name:
Contractor License Number:
YES NO Are the following applicable to the proposed project?
1. Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
2. Will the PV system be installed on a roof having only one roofing layer with no
overlays?
3. Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
4. Will the PV system weigh maximum 4 pounds per square feet or less?
5. Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
6. Will the PV system be installed with a space of 2” minimum to 10” maximum between
the underside of modules and the surface of the roof?
7. Will the PV system be installed without using any ballast system or counter-weight
system?
8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
10. Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer’s PV support information.)
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name: Signature:
Phone Number: Date:
Email Address:
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
applications@my-smarthouse.com
951-462-5890
Jose Bahena
My Smart House
1095569
1/29/2025
330 CARRIAGE DR, #D SANTA ANA, CA 92707
330 W Carriage Dr Unit
#D3/21/2025