GENERAL GRADING NOTES <br />1. ALL GRADING SHALL COMPLY WITH THE LATEST CBC CHAPTERS 18 AND 33, AND APPENDIX J AND THE SANTA ANA MUNICIPAL CODE. A CITY GRADING PERMIT IS REQUIRED FOR <br />GRADING. <br />2. GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY GRADING INSPECTOR. A PRE-GRADING MEETING ON THE SITE IS REQUIRED BEFORE STARTING OF <br />GRADING WITH THE FOLLOWING PEOPLE PRESENT: GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, GEOTECHNICAL ENGINEER, GRADING INSPECTOR AND WHEN REQUIRED, <br />THE ARCHAEOLOGIST AND PALEONTOLOGIST. THE REQUIRED INSPECTIONS FOR GRADING WILL BE EXPLAINED AT THIS MEETING. <br />3. AN APPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. <br />4. THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO VERIFY COMPLIANCE WITH THE PLANS, SPECIFICATIONS, CODE AND ANY SPECIAL CONDITIONS OF <br />THE PERMIT WITHIN HIS PURVIEW. <br />5. THE GEOTECHNICAL ENGINEER SHALL PERFORM PERIODIC INSPECTIONS AND SUBMIT A COMPLETE REPORT AND MAP UPON COMPLETION OF THE ROUGH GRADING. THE <br />COMPACTION REPORT AND APPROVAL FROM THE GEOTECHNICAL ENGINEER SHALL INDICATE THE TYPE OF FIELD TESTING PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH <br />THE METHOD OF OBTAINING THE IN-PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING, AND SHALL BE SO NOTED FOR EACH TEST. SUFFICIENT MAXIMUM DENSITY <br />DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF THE MAXIMUM DENSITY CURVES BY THE FIELD TECHNICIAN. <br />6. CUT AND FILL SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1) EXCEPT WHERE SPECIFICALLY APPROVED OTHERWISE. <br />7. FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90% RELATIVE DENSITY. AGGREGATE BASE FOR ASPHALTIC AREAS SHALL BE COMPACTED TO MINIMUM OF 95% <br />RELATIVE DENSITY. MAXIMUM DENSITY SHALL BE DETERMINED BY UNIFORM BUILDING CODE STANDARD NO. 70-1 OR APPROVED EQUIVALENT, AND FIELD DENSITY BY UNIFORM <br />CODE STANDARD NO. 70-2 OR APPROVED EQUIVALENT. <br />8. THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET OR MORE WITHOUT THE NECESSARY PERMIT FROM THE STATE OF CALIFORNIA DIVISION OF <br />INDUSTRIAL SAFETY. <br />9. ALL CUT SLOPES SHALL BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE GEOTECHNICAL ENGINEER TO DETERMINE IF ANY SLOPE STABILITY PROBLEM EXISTS. <br />SHOULD EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE GEOTECHNICAL ENGINEER SHALL SUBMIT A RECOMMENDED TREATMENT <br />TO THE CITY ENGINEER FOR APPROVAL. <br />10. THE PERMITTEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER ACTIVE SITES AT LEAST TWICE DAILY. <br />11. THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE RESPONSIBILITY OF THE PERMITTEE. <br />12. GRADING OPERATIONS, INCLUDING MAINTENANCE OF EQUIPMENT, WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE OF HUMAN OCCUPANCY SHALL NOT BE CONDUCTED <br />BETWEEN THE HOURS OF 8:00 P.M. AND 7:00 A.M. ON WEEKDAYS, INCLUDING SATURDAY, OR ANY TIME ON SUNDAY OR A FEDERAL HOLIDAY. (CITY OF SANTA ANA MUNICIPAL CODE <br />SECTION 18-314) <br />13. THE PERMITTEE SHALL GIVE REASONABLE NOTICE TO THE OWNER OF ADJOINING LANDS AND BUILDINGS PRIOR TO BEGINNING EXCAVATIONS, WHICH MAY AFFECT THE <br />LATERAL AND SUBJACENT SUPPORT OF THE ADJOINING PROPERTY. THE NOTICE SHALL STATE THE INTENDED DEPTH OF EXCAVATION AND WHEN EXCAVATION COMMENCES. THE <br />ADJOINING OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS ON THE PERMITTED PROPERTY TO PROTECT HIS STRUCTURE, IF HE SO DESIRES, UNLESS <br />OTHERWISE PROTECTED BY LAW. <br />14. ALL EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN OPEN TO HANDLE THE STORM WATER; HOWEVER, IN ANY CASE, THE PERMITTEE SHALL BE HELD LIABLE <br />FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. <br />15. APPROVED EROSION PROTECTION DEVICES SHALL BE PROVIDED AND MAINTAINED DURING THE RAINY SEASON AND SHALL BE IN PLACE AT THE END OF EACH DAY’S WORK. <br />PROPER EROSION CONTROL MEASURES MUST BE SHOWN ON THE PLANS. <br />16. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITES. DISCHARGES <br />OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO <br />NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A <br />HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR 117 AND 302. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR <br />LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT <br />FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLES/EQUIPMENT WASH WATER AND CONCRETE <br />WASH WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING; AND <br />SUPERCHLORINATED POTABLE WATER LINE FLUSHINGS. DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED TEMPORARY <br />AREA ON-SITE, PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL <br />REQUIREMENTS. <br />17. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF NON-CONTAMINATED <br />GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL <br />BOARD. <br />18. ALL DIRT, SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC STREETS DURING ANY GRADING, HAULING, OR EXPORT OPERATIONS SHALL BE IMMEDIATELY CLEANED <br />UP BY THE DEVELOPER, HIS CONTRACTOR, SUBCONTRACTORS, OR AGENTS TO THE SATISFACTION OF THE CITY ENGINEER. FAILURE TO DO SO WILL BE CAUSE FOR STOPPING ALL <br />SUCH GRADING, HAULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS THE STREETS ARE CLEANED. <br />19. ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED OR SHOULD MAINTAIN A LEAST TWO FEET OF FREEBOARD IN ACCORDANCE WITH <br />THE REQUIREMENTS OF CVC SECTION 23114. <br />20. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES TO PUBLIC PROPERTIES THAT ARE CAUSED BY THE WORK ON-SITE. REPAIR MUST BE COMPLETED TO THE <br />SATISFACTION OF THE CITY ENGINEER. <br />21. MINIMUM ASPHALT PAVEMENT SECTIONS SHALL BE: <br />•3”AC/6”AB - PARKING AISLES <br />•4”AC/8”AB - DRIVES [COMMERCIAL] <br />•4”AC/12”AB - DRIVES [INDUSTRIAL] <br />•3” A.C. OVER 4” A.B. - PARKING STALLS [MULTI-FAMILY] <br />•3” A.C. OVER 8” A.B. - DRIVE AISLES [MULTI-FAMILY] <br />22. EARTHWORK VOLUMES: <br />•CUT: 8 CUBIC YARDS <br />•FILL: 15 CUBIC YARDS <br />•NET: 7 CUBIC YARDS <br />23. IF THE NET VOLUMES EXCEED 500 CUBIC YARDS, THE CONTRACTOR MUST SUBMIT A HAUL TRUCK ROUTE TO THE CITY FOR APPROVAL. HAUL ROUTE SHALL INCLUDE THE <br />LOCATION OF BORROW AND/OR DISPERSAL SITE, ALL STREETS INCLUDED IN THE ROUTE, THE PROPOSED STAGING AREA AND THE MAXIMUM GROSS WEIGHT OF THE TRUCKS <br />WHEN LOADED. <br />24. SUBMIT AN 8 ½” X 11” HAUL ROUTE MAP OF APPROPRIATE SCALE WHICH INDICATES THE LOCATION OF THE PROJECT SITE, SHOWING STREETS AND DIRECTION OF HAULING UP <br />TO AND INCLUDING THE END OF THE ROUTE. <br />25. PURSUANT TO ASSEMBLY BILL 3019, NO EXCAVATION PERMIT IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS AN INQUIRY I.D. NUMBER FROM “UNDERGROUND <br />SERVICE ALERT” (1-800-422-4133) AT LEAST TWO WORKING DAYS PRIOR TO COMMENCING EXCAVATION. <br />26. SEPARATE PERMITS MUST BE OBTAINED FROM THE CITY BUILDING AND SAFETY DIVISION FOR THE CONSTRUCTION OF RETAINING WALLS, LIGHT POLES, TRASH ENCLOSURES, <br />ON-SITE PLUMBING AND ALL BUILDING STRUCTURES. <br />EROSION AND SEDIMENT CONTROL GENERAL NOTES <br />1. ALL WORK SHALL BE IN ACCORDANCE WITH THE EROSION CONTROL PLANS, THE PROJECT’S STORM WATER POLLUTION PREVENTION PLAN (SWPPP), AND THE <br />RECOMMENDATIONS OF SOILS REPORT. <br />2. EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHENEVER THE DAILY RAINFALL PROBABILITY EXCEEDS 40%. <br />3. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE AVAILABLE ON <br />SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL DEVICES AT ALL TIME. <br />4. CONTROLS SHALL BE SET UP AND MAINTAINED AS CONSTRUCTION PROCEEDS. ADJUSTMENTS TO THE EROSION CONTROL PLANS ARE ALLOWABLE AS REQUIRED AND <br />APPROVED BY CITY. <br />5. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL IMPLEMENT STRUCTURAL AND NONSTRUCTURAL BEST MANAGEMENT PRACTICES (BMPS) IN CONFORMANCE WITH <br />THE GUIDELINES OF THE CALIFORNIA STORM WATER BMP HANDBOOKS. <br />6. AFTER A RAINSTORM, ALL SEDIMENT AND DEBRIS SHALL BE REMOVED FROM STREETS, BERMS AND DESILTING BASINS. ANY GRADED SLOPE SURFACE PROTECTION MEASURES <br />DAMAGED DURING A RAINSTORM SHALL BE IMMEDIATELY REPAIRED. <br />7. THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT TRESPASS ONTO AREAS WHERE IMPOUNDED WATER <br />CREATED A HAZARDOUS CONDITION. <br />BENCHMARK LEGAL DESCRIPTION <br />AND BASIS OF BEARINGS <br />REVISIONS <br />REV. # DATE BY DESCRIPTION <br />CUONG NGUYEN <br />TEL.: (714) 204 5308 <br />3925 W HAZARD AVE <br />SANTA ANA, CA 92703 <br />NOTE <br />PRIOR TO FINAL INSPECTION OF THE STRUCTURE, THE <br />ELEVATION OF THE LOWEST FLOOR SHALL BE CERTIFIED <br />BY A LICENSED ENGINEER OR SURVEYOR, AND VERIFIED <br />BY THE CITY INSPECTOR TO BE PROPERLY ELEVATED. <br />GRADING PLAN <br />PROPOSED NEW ADU <br />3925 W HAZARD AVE <br />SANTA ANA, CA 92703 <br />SA-226-70: 74.189 (NAVD88) YEAR LEVELED: 2005 <br />FOUND 3-3/4" OCS ALUMINUM BENCHMARK DISK, SET <br />IN THE NORTHEAST CORNER OF A 3.5' BY 8' <br />CONCRETE CATCH BASIN. MONUMENT IS LOCATED IN <br />THE SOUTHWEST CORNER OF THE INTERSECTION OF <br />NEWHOPE ST. AND HAZARD AVE., 32' SOUTHERLY OF <br />THE CENTERLINE OF HAZARD AVE. AND 4' WESTERLY <br />OF THE WEST SOUTHWEST CURB RETURN. <br />MONUMENT IS SET LEVEL WITH THE SIDEWALK. <br />APN: 198-021-33 <br />LOT 22, TRACT #1830 <br />THE CENTERLINE OF S FLINTRIDGE DR <br />BEING N 89°23'45" E WAS USED AS THE <br />BASIS OF BEARINGS OF THIS PARCEL. <br />VICINITY MAP <br />N.T.S. <br />ESTIMATE OF EARTHWORK QUANTITIES <br />CUT = 8 C.Y. <br />FILL = 15 C.Y. <br />OVEREXCAVATION = 88 C.Y. <br />IMPORT = 11 C.Y. <br />EXPORT = 4 C.Y. <br />SITE DATA <br />SITE ACREAGE: 0.190 ACRE (8,260 SF) <br />UNDISTURBED AREA: 5,694 SF (68.9%) <br />DISTURBED AREA: 2,476 SF (31.1%) <br />TOTAL LANDSCAPED AREA: 990 SF (12.0%) <br />DRAWING INDEX <br />SHEET 1 TITLE SHEET <br />SHEET 2 DETAILS - (E) SITE PLAN - GRADING PLAN <br />SHEET 3 SECTIONS <br />EROSION AND HORIZONTAL CONTROL PLAN <br />APPROVAL <br />SHEET <br />1 <br />OF <br />3 <br />CIVIL ENGINEER <br />TITLE SHEET <br />FOR PUBLIC SEWER AND WATER <br />FACILITIES ONLY <br />APPROVED BY: <br />CESAR E. BARRERA, P.E.DATE <br />DEPUTY PUBLIC WORKS DIRECTOR/ <br />WATER RESOURCES MANAGER <br />TMC ENGINEERS INC. <br />TIEN CHU <br />CE 72324, EXP. 6/30/2024 <br />9542 PACIFIC AVE <br />ANAHEIM, CA 92804 <br />TEL.: (714) 829 5053 <br />TIENCHU.PE@GMAIL.COM <br />SOILS ENGINEER <br />GENERAL NOTES FOR PUBLIC WORKS PERMITTED WORK ON WATER DISTRIBUTION SYSTEM <br />1. CONSTRUCTION AND INSTALLATION OF ALL WATER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH THE CITY OF SANTA ANA STANDARD PLANS AND <br />SPECIFICATIONS. WHERE THE STANDARD PLANS ARE SILENT, CONSTRUCTION AND INSTALLATION OF WATER MAINS AND APPURTENANCES SHALL CONFORM TO THE AMERICAN <br />WATER WORKS ASSOCIATION (AWWA) SPECIFICATIONS AND THE STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION, 2018 EDITION. <br />2. CONSTRUCTION OF WATER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED CONTRACTORS WITH A VALID CALIFORNIA CONTRACTOR A OR C34 <br />LICENSE. <br />3. NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA AS A WATER DISTRIBUTION OPERATOR, SHALL BE <br />ALLOWED TO OPERATE THE CITY'S WATER SYSTEM VALVES. <br />4. NO PERSON, OTHER THAN CITY OF SANTA ANA WATER RESOURCES DIVISION STAFF CERTIFIED BY THE STATE OF CALIFORNIA AS A WATER DISTRIBUTION OPERATOR, SHALL <br />SHUT WATER SERVICE OFF TO ANY CUSTOMERS. <br />5. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT TO THE CITY FOR REVIEW AND APPROVAL "DISINFECTION AND FLUSHING PLAN" PER THE CITY OF <br />SANTA ANA DESIGN GUIDELINES AND STANDARD DRAWINGS. <br />6. ALL NEWLY CONSTRUCTED WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND TESTED IN ACCORDANCE WITH THE AMERICAN WATER WORKS ASSOCIATION <br />(AWWA) STANDARD C600'S, PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM.DISINFECTION TESTING RESULTS SHALL BE SUBMITTED TO THE WATER <br />RESOURCES DIVISION FOR REVIEW AND APPROVAL PRIOR TO CONNECTING TO THE CITY'S WATER DISTRIBUTION SYSTEM. <br />7. WATER MAINS WILL BE HYDROSTATIC TESTED AT 200 PSI FOR 2 HOURS. NEW WATER MAINS CANNOT BE TESTED AGAINST AN EXISTING VALVE BUT CAN BE TESTED USING A <br />TEST PLATE. <br />8. REQUESTS TO SHUT DOWN THE WATER DISTRIBUTION SYSTEM FOR TIE-INS OR OTHER PURPOSES SHALL BE COORDINATED WITH THE WATER RESOURCES DIVISION STAFF AT <br />LEAST 2 WEEKS IN ADVANCE THROUGH THE CITY INSPECTOR. ALL CUSTOMERS AFFECTED BY THE PROPOSED SHUT DOWN SHALL BE NOTICED IN WRITING 48 HOURS IN ADVANCE <br />BY THE CONTRACTOR. <br />9. THE CITY OF SANTA ANA WATER RESOURCES DIVISION CANNOT GUARANTEE A COMPLETE SHUTDOWN OF EXISTING MAINS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />DEWATERING AND ISOLATION OF CONSTRUCTION FOR TESTING OR ANY OTHER PURPOSES. <br />10. ALL FIRE HYDRANTS WHICH ARE OUT OF SERVICE OR NEW FIRE HYDRANTS WHICH HAVE NOT BEEN ACCEPTED FOR SERVICE SHALL BE COVERED WITH A SACK INDICATING <br />THAT THE HYDRANTS ARE NOT IN SERVICE. <br />11. MAINTAINING WATER SERVICE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR ANY SHUTDOWN LASTING LONGER THAN FOUR (4) HOURS. METHOD OF PROVIDING <br />TEMPORARY SERVICE MUST BE APPROVED BY THE WATER RESOURCES DIVISION. THE WATER SHALL BE SAFE FOR DRINKING IN ACCORDANCE WITH STATE OF CALIFORNIA WATER <br />RESOURCES CONTROL BOARD (SWRCB) DRINKING WATER PROGRAM (DWP). <br />12. WATER METER WILL NOT BE INSTALLED NOR WATER TURNED ON UNTIL THE BACKFLOW DEVICES REQUIRED FOR THE BUILDING AND IRRIGATION SYSTEMS HAVE BEEN <br />INSTALLED, TESTED, CERTIFIED, APPROVED; AND APPROVED AND SIGNED OFF BY THE CITY. CONTACT WATER RESOURCES DIVISION AT (714) 647-3320. <br />13. ALL WATER MAINS SHALL BE AWWA C-900, DR 14 PVC PIPE OR AWWA C-151 DUCTILE IRON PIPE. ALL OTHER PIPE MATERIALS REQUIRE SPECIAL REVIEW AND APPROVAL FROM <br />THE WATER RESOURCES DIVISION. <br />14. WATER MAINS SHALL HAVE 36-INCHES MINIMUM COVER TO FINISHED GRADE. ANY DEVIATION FROM THIS REQUIREMENT REQUIRES APPROVAL FROM THE WATER RESOURCES <br />DIVISION. <br />15. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES AND POINTS OF CONNECTION PRIOR TO TRENCHING. <br />16. PRIVATE WATER APPURTENANCES SUCH AS BACKFLOW PREVENTERS, FIRE HYDRANTS AND STANDPIPES, AND VALVES SHALL BE PAINTED AS FOLLOWS: <br />A) DOMESTIC WATER BLUE <br />B) POTABLE IRRIGATION GREEN <br />C) RECYCLED IRRIGATION PURPLE <br />D) FIRE PROTECTION OSHA SAFETY RED <br />17. DO NOT CUT OR SNAP CUT OR MILL ASBESTOS CEMENT PIPE. WHERE JOINING EXISTING ASBESTOS CEMENT PIPE, EXPOSE SIX FEET IN EACH DIRECTION, LOOKING FOR THE <br />NEAREST JOINT AND JOIN TO NEW PIPE WITH A PROPERLY DIMENSIONED ADAPTER PER STANDARD PLAN NUMBER 1443. <br />18. DO NOT TAP EXISTING WATER MAINS WITHOUT THE PRESENCE OF A CERTIFIED PUBLIC WORKS INSPECTOR. PRESSURE TEST TAPPING SLEEVE IN THE PRESENCE OF A <br />CERTIFIED PUBLIC WORKS INSPECTOR BEFORE TAPPING EXISTING MAIN. <br />19. FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FILE ARE DELIVERED TO AND ACCEPTED BY THE CITY'S INSPECTOR. SHOW <br />ALL FIELD CHANGES ON RECORD DRAWINGS. <br />20. TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT AND SHALL BE NON-SKID. <br />21. WHEN PUBLIC WATER FACILITIES ARE LOCATED ON PRIVATE PROPERTY, EASEMENT DOCUMENTS ARE TO BE SUBMITTED TO THE CITY FOR APPROVAL PRIOR TO A PERMIT <br />BEING ISSUED. <br />22. ALL RECYCLED WATER PROJECTS REQUIRE REVIEW AND APPROVAL BY THE WATER RESOURCES DIVISION. <br />23. REMOVE FROM THE FIELD UPPER AND LOWER FIRE HYDRANT DRY BARREL AND 24''X36'' IRON VAULT LID COVERS AND DELIVER UNDAMAGED TO THE CITY WATER RESOURCE <br />DIVISION YARD LOCATED AT 215 S. CENTER STREET. PRIOR NOTIFICATION OF THE DELIVERY IS REQUIRED AT (714) 647-3320. <br />24.WATER MAIN FITTINGS SHALL BE FLANGE OR MECHANICAL JOINTS ONLY, NO PUSH-ON JOINT FITTINGS ALLOWED. <br />25. CONTRACTOR SHALL NOT REMOVE OR DISPOSE EXISTING WATER METERS. CONTRACTOR SHALL APPLY FOR AN ABANDON WATER METER APPLICATION. CONTRACTOR SHALL <br />CONTACT WATER RESOURCES DIVISION AT (714) 647-3320 FOR EXISTING METER REMOVALS. <br />26. INSTALLATION OF NEW WATER METER SERVICE CURB STOP SHALL BE DONE AFTER INSTALLATION OF NEW CURB AND GUTTER OR AFTER CONTRACTOR HAS ESTABLISHED THE <br />PROPOSED CURB GRADE BY STAKING OF THE PROPOSED CURB. <br />GENERAL NOTES FOR PUBLIC WORKS PERMITTED WORK ON SEWER COLLECTION SYSTEM <br />1. CONSTRUCTION AND INSTALLATION OF ALL SEWER MAINS AND APPURTENANCES SHALL BE IN ACCORDANCE WITH THE CITY OF SANTA ANA STANDARD PLANS AND <br />SPECIFICATIONS. WHERE THE STANDARD PLANS ARE SILENT, CONSTRUCTION AND INSTALLATION OF SEWER MAINS AND APPURTENANCES SHALL CONFORM TO THE STANDARD <br />SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTIONS, 2012 EDITION. <br />2. CONSTRUCTION OF SEWER MAINS AND APPURTENANCES SHALL ONLY BE PERFORMED BY QUALIFIED CONTRACTORS WITH A VALID CALIFORNIA CONTRACTOR A OR C34 <br />LICENSE. <br />3. ALL NEWLY CONSTRUCTED SEWER MAINS AND APPURTENANCES SHALL BE TESTED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS <br />CONSTRUCTION. ALL NEWLY CONSTRUCTED SEWER MAINS, LATERALS AND MANHOLES MUST BE INSPECTED VIA CLOSED CIRCUIT TELEVISION CAMERA BY A NATIONAL <br />ASSOCIATION OF SEWER SERVICES COMPANIES (NASSCO) CERTIFIED TECHNICIAN AND VIDEO SUBMITTED IN A DIGITAL FORMAT TO THE WATER RESOURCES DIVISION FOR <br />REVIEW AND FINAL ACCEPTANCE OF WORK. <br />4. ALL SEWER MAINS SHALL BE VITRIFIED CLAY PIPE (VCP) OR PVC SDR-26 PIPE. ALL OTHER PIPE MATERIALS REQUIRE SPECIAL REVIEW AND APPROVAL FROM THE WATER <br />RESOURCES DIVISION. <br />5. TRENCH PLATES SHALL BE FLUSH WITH PAVEMENT AND SHALL BE NON-SKID. <br />6. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF ALL UTILITIES AND POINTS OF CONNECTION PRIOR TO TRENCHING. <br />7. WHEN PUBLIC SEWER FACILITIES ARE LOCATED ON PRIVATE PROPERTY, EASEMENT DOCUMENTS ARE TO BE SUBMITTED TO CITY FOR APPROVAL PRIOR TO A PERMIT BEING <br />ISSUED. <br />8. FINAL ACCEPTANCE WILL NOT OCCUR UNTIL ORIGINAL RECORD DRAWINGS ON MYLAR AND DIGITAL FORMAT ARE DELIVERED TO AND ACCEPTED BY THE CITY'S INSPECTOR. <br />SHOW ALL FIELD CHANGES ON RECORD DRAWINGS. <br />9. ALL SEWER REPAIRS SHALL BE ACCOMPLISHED USING STAINLESS STEEL DOUBLE BANDED COUPLINGS. <br />BRANDON TRAN, P.E. <br />RCE# 58283 <br />EXP. 6/30/2024 <br />16792 BRIDGEPORT ST <br />FOUNTAIN VALLEY, CA 92708 <br />TEL.: (714) 414 5701 <br />BRANDONHTRAN@YAHOO.COM <br />DRAWN BY: ALBERT LUU <br />CHECKED BY: BRANDON TRAN <br />PREPARED UNDER SUPERVISION OF: <br />BRANDON TRAN <br />RCE NO. 58283, EXP. 6/30/2024 <br />OWNER/DEVELOPER <br />for 4/28/25 <br />Behrooz Sarlak 5/5/2025