Loading...
HomeMy WebLinkAbout5111 3%4 W Edinger Ave #WCC01 - Plan5111 3/4 W Edinger Ave #WCC01 - Cell Site Address Bldg #101123027 APPROVALS: PLNG - C. Santana BLDG - J. Lo PUBLIC WORKS - Y. Soto 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 5111 3%4 W Edinger Ave #WCC014/30/2025 1 Revision for Code Updated 11 10 B. Y. D. D.12/06/2023 0 Issued for Submittals 11 10 B. Y. D. D. 6/22/2022 No.Reason for Revision Total # of Last sheet By Check Approved Date sheets # Record or Revisions Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 STRUCTURAL CALCULATION for AT&T 5111 WEST EDINGER AVE., SANTA ANA, CA 92704 SITE NAME : MCFADDEN AVE. / EUCLID AVE. SITE NUMBER: CLU3406 / CLL03406 5111 3%4 W Edinger Ave #WCC014/30/2025 P1 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject: Discipline: Equipment anchorage support analysis Arch./Civil/Structural Design Criteria P2 Seismic Map P3 Equipment Lateral Force Analysis P4 Antenna Support and Connection Design Analysis P5~P7 Equipment P15 Lateral Force Analysis P8 Cabinet Anchorage Check P9~P10 Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 TABLE OF CONTENTS 5111 3%4 W Edinger Ave #WCC014/30/2025 P2 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject: Discipline: Equipment anchorage support analysis Arch./Civil/Structural Design Criteria Scope of Design:  Antenna and RRU Support and Anchroage Check  Cabinet Anchorage Check Design Code: 2022 CBC, ASCE 7-16 Design Reference: 1 • Lag Screw (wood)NDS 2018 2 • Steel Structure AISC 360 3 • Concrete f'c= 2,500 psi 4 • As Built by Infinigy Engineering Job # 496-008 Dated 08-20-18 Existing Materials: 1 • Steel pipe AISC 360 2 • M bolt A307 3 • Anchorage (wood)NDS 2018 4 • Anchor Bolt (Concrete)Hilti KB-TZ2, ICC-ESR-4266 5 • As built by DCI Pacific, Inc.Dated 09/30/2021 6 • Hilti KB-TZ Bolt ICC-ESR 1917 Design Loads: Seismic Load for Mechanical and Electrical Component (ASCE 13.6) Design Seismic Load for Communication Equipment ap (amplification factor)= 1 Rp (modification factor)= 2.5 Wind Load per Method 2 - Analysis Procedure (ASCE 30.11) Design Wind Load for Rooftop Antenna & Equipment (ASCE 29.5.1) Wind speed= 95 mph Risk Category II Exposure category= C Equipment Weight Weight Projected Area Tangential Area (N) Antenna, 1 total 75 lb. max. 8 ft2 3.2 ft2 (N) Antenna, 3 total 75 lb. max. 8 ft2 3.2 ft2 (N) Antenna, 2 total 84 lb. max. 3 ft2 1.9 ft2 (E) Antenna, 2 total 85 lb. 8.2 ft2 2.8 ft2 (E) Rack w/ new batteries, 1 total 2800 lb 12.5 ft2 10 ft2 (E) DC-2, 6 total 25 lb. 1.0 ft2 0.6 ft2 Conclusion: 1. Existing antena support and anchorage are sufficient. 2. Existing RRU support and anchorage are sufficient. 3. The existing cabinet base anchorage is sufficient. Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 Design Criteria 5111 3%4 W Edinger Ave #WCC014/30/2025 P3 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject: Discipline: Equipment anchorage support analysis Arch./Civil/Structural Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 Seismic Parameter 5111 3%4 W Edinger Ave #WCC014/30/2025 P4 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject: Discipline: Equipment anchorage support analysis Arch./Civil/Structural Design for :Roof Level Equipment Seismic Load per: Mechanical and Electrical Component (ASCE 13.6) Ip (important factor) = 1 MCE short period SS=1.333 MCE 1 sec. period S1=0.476 Site Class= D SDS= 1.066 ap (amplification factor)= 1 (ASCE Table 13.6-1) Rp (modification factor)= 2.5 (ASCE Table 13.6-1) Building height (H)= 32 ft Equipment anchor elev.(Z)= 29 ft Fp= 0.4x ap x SDS x (1+2x(Z/H)) / (Rp / Ip) x Wp (ASCE Eq. 13.3-1) = 0.48 Wp Fp,max.= 1.6 x SDS x Ip x Wp= 1.71 Wp (ASCE Eq. 13.3-2) Fp,min.= 0.3 x SDS x Ip x Wp= 0.32 Wp (ASCE Eq. 13.3-3) Using Lateral Force Eh = 0.48 Wp Wind Load per Method 2 - Analysis Procedure Design Wind Load for Rooftop equipment Wind speed= 95 mph Risk Catagoly II Exposure category= C Topographic factor KZt = 1.00 I= 1 qh (velocity pressure)= 0.00256 Kz Kzt Kd V² I= 19.15 psf (ASCE Eq. 29.3-1) Kz= 0.98 (ASCE Table 29.3-1) Kd= 0.85 (ASCE Table 26.6-1) P= qz G Cf (ASCE Eq. 29.4-1) G = 0.85 (ASCE 26.5.8) Cf = 1.6 (ASCE Fig. 29.4-1) P= qz G Cf= 26.05 psf Fh= 26.05 x Awind Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 Lateral Force Analysis 5111 3%4 W Edinger Ave #WCC014/30/2025 P5 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject:Discipline: Equipment anchorage support analysis Arch./Civil/Structural Antenna pipe mounted on existing wall (worst case): Existing 2 std pipe For pipe 2 std Fy= 35 ksi S= 0.53 r= 0.791 K= 1 L= 6 ft Z= 0.713 D= 84 lb E= 40 lb W = 209 lb Governs (equipment projected to wind? Yes ) Use ASD Load condition D+0.6W Kl/r= 91 P/W =25.3 kips M/W =3.83 k-ft 8/9 x (P/ (Pn) + M/(Mn) )= 0.066 <1 (OK) Pmax.= 84 lb M1= 0.6W / 2 x 6'/2 + Pe = 272 lb-ft e = 12 in (antenna offset from support) Use ASD Load condition D+0.6W Antenna to pipe connection: Use 1/2 " Ø A307 bolt min. (1) at top & (1) at bottom Required Pullout tension = 63 lb Required Shear = 42 lb Fnt= 45 ksi (AISC Table J3.2) Fnv= 27 ksi (AISC Table J3.2) frv=0.13 ksi <Fnv/Ω = =13.5 ,where Ω =2 (OK) F'nt= 1.3 Fnt - Ω/Fnv X frv = 58.1 > Fnt using 45 ksi (AISC J3-3b) frt=0.39 ksi <F'nt/Ω =22.5 ksi (OK) Existing antenna pipe support and anchorage is sufficient. See next page for pipe to wall connection with (2) 1/2" diameter lag screws with 3" embedment at top and bottom. Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 Antenna Support Check 5111 3%4 W Edinger Ave #WCC014/30/2025 P6 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject: Discipline: Equipment anchorage support analysis Arch./Civil/Structural Lag Screw Connection Design (ASD) Design Tension T=62.8 lb Design Shear V=42.0 lb Using 1/2 " Lag Scerw w/3 " embedment Per 2018 NDS Table 12J or 12K, Z= 320 lb Per 2018 NDS Eq. 12.2-1, W= 378 lb (Eq. 12.2-1) Per 2018 NDS Table 11.3.1 Z'=Z x CD x CM x Ct x Cg x CD x Ceg x Cdi x Ctm where CD 1.6 (NDS 11.3.2) CM 1 (<19%) (NDS 11.3.3) Ct 1 (T°F)(NDS 11.3.4) Cg 0.99 (Table 11.3.6) CD 0.88 (edge distance = 1.75 ") (NDS 12.5.1) Ceg 0.75 (NDS 12.5.2) Cdi = 1 (NDS 12.5.3) Ctn = 1 (NDS 12.5.4) Z'= 333 lb W'= Wx CM² x Ct x Ceg x Ctn W'= 393.4 lb For Combinated Lateral and Withdrawal loads Per 2018 NDS eq. 12.4-1 a=56 deg Za'= 659.9 >F= (T²+V²)^½ =75.5 (OK) Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 Seismic Parameter 5111 3%4 W Edinger Ave #WCC014/30/2025 P7 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject: Discipline: Equipment anchorage support analysis Arch./Civil/Structural RRU mounted to existing support frame: Seismic Load = 35 lb Wind Load = 69 lb Governs (exposed to wind = Yes ) Weight = 72 lb RRU to Unistrut anchorage with 3/8"Ø Unistrut bolt: Allowable pull out = 1000 lb > 21 lb OK (Per ASD 1.0D+0.6W) Allowable shear = 800 lb > 36 lb OK (Per ASD 1.0D+0.6W) 3 ft Unistrut beam check: R1x = 34 lb R2x = 34 lb (due to lateral) R1y = 17 lb R2y = 36 lb (due to gravity) Max. moment at beam = 52 lb-ft (due to lateral) Max. moment at beam = 26 lb-ft (due to gravity) Per load combination D+0.6W My (at major axial) = 36 lb-ft= 433.0 lb-in Mx (at minor axial) = 26 lb-ft= 310.8 lb-in My allow = 5070 x 1 = 5070 lb-in Mx allow= 5070 x 0.85 x 0.69 = 2981 lb-in (S1 = 0.2 ,S2= 0.292 ,S1/S2= 0.6918 ) (My / My allow + Mx / Mx allow) = 0.19 < 1 OK Existing Unistut support beams at RRU are OK. Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 RRU Anchorage Check 5111 3%4 W Edinger Ave #WCC014/30/2025 P8 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject: Discipline: Equipment anchorage support analysis Arch./Civil/Structural Design for :Roof Level Equipment Seismic Load per: Mechanical and Electrical Component (ASCE 13.6) Ip (important factor) = 1 MCE short period SS=1.333 MCE 1 sec. period S1=0.476 Site Class= D SDS= 1.066 ap (amplification factor)= 1 (ASCE Table 13.6-1) Rp (modification factor)= 2.5 (ASCE Table 13.6-1) Building height (H)= 32 ft Equipment anchor elev.(Z)= 0 ft Fp= 0.4x ap x SDS x (1+2x(Z/H)) / (Rp / Ip) x Wp (ASCE Eq. 13.3-1) = 0.17 Wp Fp,max.= 1.6 x SDS x Ip x Wp= 1.71 Wp (ASCE Eq. 13.3-2) Fp,min.= 0.3 x SDS x Ip x Wp= 0.32 Wp (ASCE Eq. 13.3-3) Using Lateral Force Eh = 0.32 Wp Wind Load per Method 2 - Analysis Procedure Design Wind Load for Rooftop equipment Wind speed= 95 mph Risk Catagoly II Exposure category= C Topographic factor KZt = 1.00 I= 1 qh (velocity pressure)= 0.00256 Kz Kzt Kd V² I= 16.67 psf (ASCE Eq. 29.3-1) Kz= 0.85 (ASCE Table 29.3-1) Kd= 0.85 (ASCE Table 26.6-1) P= qz G Cf (ASCE Eq. 29.4-1) G = 0.85 (ASCE 26.5.8) Cf = 1.6 (ASCE Fig. 29.4-1) P= qz G Cf= 22.67 psf Fh= 22.67 x Awind Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 Lateral Force Analysis 5111 3%4 W Edinger Ave #WCC014/30/2025 P9 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject: Discipline: Equipment anchorage support analysis Arch./Civil/Structural Equipment: Cabinet Equipment weight= 2800 lb Lateral Loads Seismic load: Eh= 0.32 Wp= 895 lb 1 Wind load: Wind project area = 12.5 ft² Wind load= 0.0 psf (equipment projected to wind? No ) W= 0 lb W < E (seismic control) Fp= 895 lb Load Condition : 0.9D+ 1.0E Gravity center to base h= 2.9 ft Bolt row = 2 total bolt number = 4 bolt space (S)=1.3 ft Overturn moment=Fp x h x Ω =5223 lb-ft Ω =2 Resistant moment = Weight x S/2= 1680 lb-ft Uplift force at ea. bolt= 886 lb Shear force at ea. bolt= 224 lb Use min. (4) 1/2"Ø Hilti KB-TZ2 bolt with 3" embed. N allow = 2069 lb >N req. = 886 lb OK V allow = 2440 lb >V req. = 224 lb OK (N req. / N allow + V req. / V allow ) = 0.52 < 1.2 OK The existing cabinet base anchorage is sufficient. Proposed anchorage of base per detail is sufficient. The proposed cabinet is minor, and thus no retrofit is required for the existing impacted structure. Requried Pullout Tension = 0 lb. Required Shear = 627 lb. Fnt = 45 ksi (AISC Table J3.2) Fnv = 27 ksi (AISC Table J3.2) frv = #DIV/0! ksi ####Fnv/W = =13.5 ,where W =2 #### F'nt = 1.3 Fnt - W/Fnv X frv = #########Fnt using ####ksi (AISC J3-3b) frt = #DIV/0! ksi ####F'nt/W =#####ksi #### Proposed L4x4x1/4 beam under cabinet with 1/2" Ø A307 at both ends are sufficient. Architecture - Engineering - Consulting 26 Executive Park Suite 170, Irvine, CA 92614 (T) 949-475-1000 Equipment Anchorage 5111 3%4 W Edinger Ave #WCC014/30/2025 P10 Project:Job No.:Calc. No.: Rev: MCFADDEN AVE. / EUCLID AVE.CLU3406 / CLL03406 DCI- 1 Subject:Discipline: Equipment anchorage support analysis Arch./Civil/Structural Anchorage Design Design: Hilti KB-TZ2 1/2" w/3.25 "embedmentpost installed number of bolt= 1 bolt diameter 0.5 in Bolt space= 32 " Ca= 8 " CHECK ANCHOR TENSILE STRENGTH ACI318, 17.4.1.2 Φ Ns= Φ Ase futa =8465 lb Φ =0.75 ACI318, 17.3.4 Ase =0.099 in² ICC-ESR-4266 futa =114000 psi ICC-ESR-4266 CHECK CONCRETE BREAKOUT STRENGTH IN TENSION ACI318, 17.4.2.1 Φ Ncb= Φ (ANC/ANCO) x Ψed,N x Ψc,N x Ψcp,N x Nb=3237 lb ACI318, Eq. 17.4.2.1a Ψed,N= 1.00 (Ca min > Cac = 6.75") ACI318, Eq. 17-11 ΨC,N= 1.00 ACI318, 17.4.2.6 Ψcp,N= 1.00 (Ca,min >= Ca) ACI318, 17.4.2.6 Φ =0.65 ACI 318, 17.3.4 ANCO=95.06 (9 hef^2) ACI318. Eq. 17.4.2.1c ANC=95.06 Nb= 4980 (Kc= 17 f'c= 2500 ) ACI318, Eq. 17.4.2.2b Nb= Kc x (f'c)^.5 (hef)^1.5 CHECK PULLOUT STRENGTH IN TENSION ACI318, 17.4.3.1 Φ NPN= Φ Ψc,p x Np=2759 ACI318, Eq. 17.4.3.1 Np= 4245 ICC-ESR-4266 Φ =0.65 ACI318, 17.3.4 Ψc,p= 1.00 ICC-ESR-1917 CHECK SIDE-FACE BLOWOUT STRENGTH ACI318, 17.4.4.1 Cmin > 0.4 hef [Satisfactory] Ф N allow = 2069 lb where Ф =0.75 CHECK ANCHOR SHEAR STRENGTH ACI318, 17.5.1.2 Φ Vs =5424 lb Φ =0.65 ACI318, 17.3.5 Vs=8345 (using Vsa per ICC-ESR-4266) ACI318, Eq. 17.5.1.2 CHECK CONCRETE BREAKOUT STRENGTH IN SHEAR ACI318, 17.5.2.1 Φ Vcb= Φ (AVC/AVCO) x Ψed,V x Ψc,V x Vb=3254 lb ACI318, Eq. 17.5.2.1a Ψed,V= 1.00 (Ca,min > 1.5hef= 4 7/8 ) ACI318, Eq. 17.4.2.5a ΨC,V= 1.20 ACI318, 17.5.2.7 Φ =0.70 ACI318, 17.3.4 AVCO=96.00 (Ca x 2 x t) t= 6 " ACI318, Eq. 17.5.2.1c AVC=96.00 Vb= 3873 (for d0=0.500 , le= 3 1/4 ACI318, Eq. 17.5.2.2a f'c= 2500 ) CHECK PRYOUT STRENGTH IN SHEAR ACI318, 17.5.3.1 Φ VCP= Φ kcp x Ncb=4208 lb ACI318, Eq. 17.5.3.1a kcp= 2.00 Φ =0.65 Ф V allow =2440 lb where Ф =0.75 Anchor Bolt Strength 5111 3%4 W Edinger Ave #WCC014/30/2025 YES NO INSTRUCTIONS: ORAN GE COUNTY FI RE AUTHORI TY Plan Submittal Criteria COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects and RESIDENTIAL TRACT developments · Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place. · Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section. · If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA. · In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations. · Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602. Address Suite City Project Scope/Business Description 1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways, curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within 300 feet of an active or proposed oil well? Fire Master Plan (PR145) 2. Property is adjacent to a wildland area or non-irrigated native vegetation? Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124) 3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170) 4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475) 5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000 sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285) 6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card, button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520) 7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations? Special Equipment Plan (PR315, PR340-PR382) 8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240) 9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330) 10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335) Initial each of the following two items indicating that you have read and understand the statement: 11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications. 12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327— Initials the building department will determine specific requirements. I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name Signature Phone Number ( ) Date / / Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the appropriate plans and fees for OCFA review. 10-08-14 EE COM 5111 3%4 W Edinger Ave #WCC014/30/2025 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City / County Official Requesting Review: City / County Reference #: Date: __________________________________ City / County: _____________________________________ E-Mail: __________________________________ Contact Name: _____________________________________ Phone #: _________________________________ Title: _____________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County : OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ OCFA Authorization Updated: 06/02/2020 rs 5111 3%4 W Edinger Ave #WCC014/30/2025