Loading...
HomeMy WebLinkAbout3340 S Crawford Glen - PlanPAGE REV: C 4/8/2025 ANGELA SAMPSON 3340 S CRAWFORD GLEN, SANTA ANA, CA, 92704 PROJECT NUMBER: 109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 (415) 580-6920 ex3 Template_version_v5_2024 02 28 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603 FAX 949.215.7778 CA CL #750184 GILBERT CORREIA, C10, C46 COVER SHEET SCOPE OF WORK GENERAL NOTES PV-1.0 VICINITY MAPABBREVIATIONS A AMPERE AC ALTERNATING CURRENT AFC ARC FAULT CIRCUIT INTERUPTER AZIM AZIMUTH COMP COMPOSITION DC DIRECT CURRENT (E)EXISTING ESS ENERGY STORAGE SYSTEM MSP MAIN SERVICE PANEL (N) NEW PRE-FAB PRE-FABRICATED PSF POUNDS PER SQUARE FOOT PV PHOTOVOLTAIC RSD RAPID SHUTDOWN DEVICE TL TRANSFORMERLESS V VOLTS W WATTS SHEET INDEX PAGE # DESCRIPTION PV-1.0 COVER SHEET PV-2.0 SITE PLAN PV-3.0 LAYOUT PV-3.1 MOUNTING DETAIL PV-4.0 ELECTRICAL PV-4.1 ELECTRICAL CONTI PV-4.2 ELECTRICAL CALCS PV-4.3 BACKUPLOAD PANEL PV-4.4 PANEL SCHEDULE PV-5.0 SIGNAGE 1 PV-5.1 SIGNAGE 2 MUNICIPAL CODE, AND ALL MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. SOLIDLY GROUNDED IN THE INVERTER. SYSTEM COMPLIES WITH 690.41(A). MODULES, ARE CLASS A FIRE RATED. CONDUCTORS OUTSIDE OF THE ARRAY ARE LIMITED TO LESS THAN 30V IN 30 SECONDS AND CEC 2022 690.12(B)(2)(2) WHERE CONDUCTORS INSIDE THE ARRAY BOUNDARY IS LIMITED TO LESS THAN 80V IN 30 SECONDS ROUTINE MAINTENANCE. SYSTEM VOLTAGE IN ACCORDANCE WITH CEC 706.20 AND EXCEPTION 1 CEC 706.20 (B). CIRCUITS FROM THESE TERMINALS PASS THROUGH A WALL OR PARTITION PER 706.15(D). CIRCUIT WIRING IS EXTENDED MORE THAN 6FT AND DOES NOT INCLUDE ANY ADDITIONAL OUTLETS OR DEVICES PER CEC 210.12(D). GREATER THAN THE LOAD POSED BY THE SINGLE LARGEST UTILIZATION EQUIPMENT CONNECTED TO THE SYSTEM PER CEC ARTICLE 710.15(A) LTD: LR5-54HABB-400M (1) TESLA: POWERWALL 3 1707000-XX-Y DRAWING SNR-DC-00437 (MCI) ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE NOTE: CEC 2022: 705.12(B)(3)(3): THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR. 1707000-XX-Y, (1) EXPANSION 1807000-XX-Y BACKUP GATEWAY: (1) 200A TESLA POWERWALL CONTROL PANEL C Bldg #101123008 Elect #20185449 APPROVALS: ELECT - M. Smith ***The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown.*** 3340 S Crawford Glen4/28/2025 /ce/ PAGE REV: C 4/8/2025 ANGELA SAMPSON 3340 S CRAWFORD GLEN,  SANTA ANA, CA, 92704 PROJECT NUMBER:   109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 (415) 580-6920 ex3 Template_version_v5_2024 02 28 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603   FAX 949.215.7778 CA CL #750184 GILBERT CORREIA, C10, C46 PL PL PL PL PL PL PL PL PL PL PL PL SITE PLAN PV-2.0 BP NOTES:  RESIDENCE DOES NOT CONTAIN ACTIVE FIRE  SPRINKLERS. ARRAY DETAILS:  TOTAL ROOF SURFACE AREA: 3448 SQFT.  TOTAL PV ARRAY AREA: 504.5 SQ FT.  PERCENTAGE PV COVERAGE: (TOTAL PV ARRAY AREA/TOTAL ROOF SURFACE  AREA) * 100 = 14.6% ESS SHALL BE INSTALLED 3FT FROM DOORS AND WINDOWS  IN ACCORDANCE WITH R328.4. ESS UNITS SHALL BE  SEPARATED FROM EACH OTHER BY NOT LESS THAN 3 FEET  EXCEPT WHERE SMALLER SEPARATION DISTANCES ARE  DOCUMENTED TO BE ADEQUATE BASED ON LARGE/SCALE  FIRE TESTING. SITE PLAN - SCALE = 3/64" = 1'-0" (E) RESIDENCE (N) ARRAY AR-01 (N) ARRAY AR-02 FIRE SETBACKS (18" TYP) ROOF PATHWAYS (3' TYP) SE MP S CRAWFORD GLEN (E) FENCE (E) PATIO INV INV ACAC MD RSD POWERWALL ENERGY  STORAGE SYSTEM (ESS) INTERIOR EQUIPMENT  SHOWN AS DASHED COMMUNICATION  WIRES GROUNDING  ELECTRODE SP MP MAIN PANEL LC SERVICE ENTRANCE SE ACREL METER IQ COMBINER BOXSEMCB INVERTER(S)SUB-PANEL SOLAREDGE METER AMINV PV LOAD CENTER BACKUP INTERFACE BACKUP LOADS PANEL BI BP  1  SM SCALE: NTS NOTE: NOT ALL ITEMS IN LEGEND  WILL APPEAR IN SITE PLAN PM LEGEND  ENERGY STORAGE  SYSTEM ELECTRIC VEHICLE  SUPPLY EQUPMENT ACSUNRUN METER DEDICATED PV METER AC DISCONNECT(S) DC DC DISCONNECT(S) EV MA MD METER ADAPTER MICROGRID  INTERCONNECT DEVICE RSD EXTERNAL RAPID SHUTDOWN SWITCH GP GENERATION PANEL BG BACKUP GATEWAY RAIL STANDOFFS &  FOOTINGS SOLAR  MODULES NOTE: ROOFTOP MODULE LEVEL RAPID SHUTDOWN DEVICE  INSTALLED PER CEC 690.12 ROOF PATHWAYS (3' TYP) B B B B B B B B B A A A A A A A A C C C C C C C (E) GATE (TYP) ARRAY  PITCH PV AREA  (SQFT) AR-01 41°315.3 AR-02 41°189.289° TRUE  AZIM MAG  AZIM 167°179° 77° EQUIPMENT ELEVATION VIEW - SCALE = NTS Gas 3' min 3' minimum clearance around gas meter 3' min NORTH EXTERIOR WALL NORTH EXTERIOR WALL (N) BACKUP  LOADS PANEL MAIN SERVICE  PANEL (N) GATEWAY  PANEL (N) RAPID  SHUTDOWN  SWITCH SP C (N) AC DISCONNECT CONDUIT CONDUIT (N) AC  DISCONNECT TESLA  POWERWALL  3 ESS+PV TESLA  POWERWALL  3 ESS+PV TESLA  POWERWALL  3 EXPANSION  PACK CONDUIT CONDUIT 3' MIN 3' MIN C Exp. 12/31/2026Digitally Signed On: 04/09/25 3340 S Crawford Glen4/28/2025 /ce/ PAGE REV: B 3/20/2025 ANGELA SAMPSON 3340 S CRAWFORD GLEN,  SANTA ANA, CA, 92704 PROJECT NUMBER:   109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 (415) 580-6920 ex3 Template_version_v5_2024 02 28 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603   FAX 949.215.7778 CA CL #750184 GILBERT CORREIA, C10, C46 #SSTAMP DESIGN CRITERIA MAX DISTRIBUTED LOAD: 3 PSF SNOW LOAD: 0 PSF WIND SPEED:  96 MPH 3-SEC GUST. FASTENERS: (2) 5/16" DIA S.S. LAG SCREW: 2.5"  MIN EMBEDMENT INTO FRAMING PV-3.0 LAYOUT SOLAR MODULE SNAPNRACK RACKING  AND  TILE ROOF HOOK MODULE ELEVATION DETAIL - SCALE: NTS 3" INSTALLERS SHALL NOTIFY ENGINEER OF ANY  POTENTIAL STRUCTURAL ISSUES OBSERVED  PRIOR TO PROCEEDING W/ INSTALLATION. 26'-6"6'-6" ROOF INFO ATTACHMENT INFORMATION Name Type Height Detail Max Landscape  OC Spacing Max Landscape  Overhang Max Portrait  OC Spacing Max Portrait  Overhang Configuration AR-01 CONCRETE TILE [FLAT] - TILE HOOK -  UR 2-Story ADJUSTABLE TILE HOOK TO FRAMING, SEE DRAWING SNR-DC-00437 6'-0"2'-4"6'-0"2'-4" STAGGERED AR-02 CONCRETE TILE [FLAT] - TILE HOOK -  UR 2-Story ADJUSTABLE TILE HOOK TO FRAMING, SEE DRAWING SNR-DC-00437 6'-0"2'-4"6'-0"2'-4" STAGGERED 4'-11"16'-8"6'-7" 7'-2" 17'-3" 7" EXISTING STRUCTURE IS ASSUMED TO BE A LIGHT-FRAME WOOD ROOF  AND FREE FROM DAMAGE, DETERIORATION, OR MODIFICATION THAT  WOULD COMPROMISE ITS ORIGINAL DESIGN INTEGRITY. CONTACT  ENGINEER OF RECORD IF FOLLOWING MINIMUM REQUIREMENTS ARE NOT  SATISFIED IN COMPLIANCE WITH THE STATED RACKING DESIGN: * IF ARRAY (EXCLUDING SKIRT) IS WITHIN 12" BOUNDARY  REGION OF ANY ROOF PLANE EDGES (EXCEPT VALLEYS),  THEN ATTACHMENTS NEED TO BE ADDED AND OVERHANG  REDUCED WITHIN THE 12" BOUNDARY REGION ONLY AS  FOLLOWS: ** ALLOWABLE ATTACHMENT SPACING INDICATED ON  PLANS TO BE REDUCED BY 50%. ** ALLOWABLE OVERHANG INDICATED ON PLANS TO BE  1/5TH OF ALLOWABLE ATTACHMENT SPACING INDICATED  ON PLANS. D1 - AR-01 - SCALE:1/8" = 1'-0" AZIM: 179° PITCH: 41° D2 - AR-02 - SCALE:1/8" = 1'-0" AZIM:89° PITCH: 41° 18'-7" 1'-11" 17'-1"17'-7" Exp. 12/31/2026Digitally Signed On: 03/20/25 3340 S Crawford Glen4/28/2025 /ce/ PAGE REV: B 3/20/2025 ANGELA SAMPSON 3340 S CRAWFORD GLEN,  SANTA ANA, CA, 92704 PROJECT NUMBER:   109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 (415) 580-6920 ex3 Template_version_v5_2024 02 28 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603   FAX 949.215.7778 CA CL #750184 GILBERT CORREIA, C10, C46 #SSTAMP #SSTAMP Sunrun South LLC 595 MARKET STREET, 29TH FLOOR  SAN FRANCISCO, CA 94105 USA PHONE (415) 580-6900  FAX (415) 580-6902 Solar Mounting Solutions THE INFORMATION IN THIS DRAWING IS CONFIDENTIAL AND PROPRIETARY. ANY REPRODUCTION, DISCLOSURE, OR USE THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SUNRUN SOUTH LLC. DESIGNER: APPROVED BY: D.RYAN SCALE: DATE: DRAWING NUMBER: DESCRIPTION:REV: A REVISION: DRA     2/6/2020    NEW DETAIL DNS DRAFTER:      D.RYAN W.ARBUCKLE 2/6/2020 SNR-DC-00437 ULTRA RAIL, ATTACHMENT DETAIL, ULTRA RAIL  ADJUSTABLE TILE HOOK TO RAFTER BIN: 1SNAPNRACK ADJUSTABLE TILE HOOK FOR USE WITH SNAPNRACK ULTRA RAIL TILE ROOF MOUNT ASSEMBLY MAY BE USED FOR S, W, AND FLAT TILE PROFILE ROOFS REFER TO SNAPNRACK ENGINEERING CHARTS FOR APPLICABLE RAIL SPANS. "BIN" NUMBER ON CHART SHOULD MATCH "BIN" NUMBER ON THIS DRAWING 5/16"Ø S.S. LAG SCREWS MUST EMBED A MIN. OF 2-1/2" INTO STRUCTURAL MEMBER REFER TO SNAPNRACK INSTALLATION MANUAL FOR 5/16" Ø HARDWARE TORQUE SPECIFICATIONS UNLESS STATED OTHERWISE RAIL MUST MOUNT TO THE UPSLOPE SIDE OF THE TILE HOOK RAILS CAN BE LEVELED UP TO 1-1/4" USING THE SLOT IN THE TILE HOOK TILE HOOK ARM CAN BE LEVELED 7/16" RELATIVE TO THE BASE ENSURE 2-1/2 MINIMUM Ø 5/16" STAINLESS CARRIAGE BOLT WITH FLANGE NUT RAFTER OR OTHER STRUCTURAL ROOF MEMBER, TYP. SNAPNRACK  UR-60 RAIL Ø 5/16" STAINLESS LAG SCREWS WITH 5/16" STAINLESS FLAT WASHERS ROOF SEALANT SNAPNRACK ADJUSTABLE TILE HOOK ARM MAY BE RELOCATED ON BASE WHERE REQUIRED SNAPNRACK ADJUSTABLE TILE HOOK BASE 11/2" STEP 2: DRILL 2 QTY. 3/16" Ø PILOT HOLES INTO  2-1/4" UR-40 RAIL | UR-60 RAIL FOR USE WITH SNAPNRACK ULTRA SERIES RAILS RAFTER. SEAL ROOF PENETRATIONS WITH APPROPRIATE SEALANT. FASTEN BASE TO ROOF WITH 2 QTY. INSTALLED ASSEMBLY STEP 1: REMOVE TILES TO EXPOSE ROOF DECKING S-TILES, TYP. PENETRATION DETAIL TILE BATTEN, TYP.ROOF SHEATHING, TYP.EMBEDMENT INTO RAFTER, TYP. UR-60 RAIL (UR-40 RAIL SIMILAR) S-TILE, TYP. MODULE HEIGHT OFF ROOF: UR-40: 7-1/4" - 8-15/16" UR-60: 7-7/8" - 9-9/16" SNAPNRACK ULTRA RAIL ADJUSTABLE TIE HOOK ASSEMBLY ROOF SHEATHING, TYP. HOOK ARM CAN BE OFFSET FROM RAFTER UP TO 6" IN EITHER DIRECTION TO LINE UP WITH LOW POINT IN S-TILES STRUCTURAL MEMBER (RAFTER SHOWN) 5/16"Ø LAG SCREWS WITH FLAT WASHERS OFFSET DETAIL 11/2" 15/8" PV-3.1 MOUNTING DETAIL Exp. 12/31/2026Digitally Signed On: 03/20/25 3340 S Crawford Glen4/28/2025 EXISTING 225A MAIN BREAKER END FED EXISTING 225A MAIN PANEL 225A  BUS M NEW 200A BACKUP GATEWAY 3 1841000-X1-Y WITH 200A  MAIN BREAKER 4 (N) IMO PE69-3020,  DISCONNECT  SWITCH, 3P, 16A RSD TESLA POWERWALL 3 1707000-XX-Y TESLA: POWERWALL 3 1707000-XX-Y 11500 WATT INVERTER LOAD RATED DC DISCONNECT WITH AFCI RAPID SHUTDOWN COMPLIANT 3 J-BOX LONGI GREEN ENERGY TECHNOLOGY CO LTD LR5-54HABB-400M STRING 1 OF 9 MODULES 3  MODULE LEVEL RAPID SHUTDOWN DEVICES 12b RSD TESLA POWERWALL 3 1707000-XX-Y TESLA: POWERWALL 3 1707000-XX-Y 11500 WATT INVERTER LOAD RATED DC DISCONNECT WITH AFCI RAPID SHUTDOWN COMPLIANT 3 J-BOX LONGI GREEN ENERGY TECHNOLOGY CO LTD LR5-54HABB-400M STRING 1 OF 8 MODULES 3  MODULE LEVEL RAPID SHUTDOWN DEVICES 12a 1 POINT OF INTERCONNECTION:CEC 2022: 705.12(B)(3)(3) GATEWAY   AT OPPOSITE END OF BUSBAR METER NUMBER: 222013-138480 EQUIPMENT CHARACTERISTICS INCLUDED IN SPEC SHEETS NOTE: TOTAL PV BACKFEED = 120A USED FOR INTERCONNECTION CALCULATIONS (N) LOCKABLE BLADE TYPE AC DISCONNECT SQUARE D DU222RB 3R, 60A , 2P 120/240VAC 3 (N) LOCKABLE BLADE TYPE AC DISCONNECT SQUARE D DU222RB 3R, 60A , 2P 120/240VAC 3 FED  THROUGH  LUGKIT A A NEW 225A  BACK UP LOADS PANEL  WITH 200A MAIN BREAKER  RELOCATED (E) LOADS 4 FACILITY  GROUND (1 ) TESLA POWERWALL 3 EXPANSION 1807000-XX-Y UL 9540 FACTORY WIRING ASSEMBLY LONGI GREEN  ENERGY TECHNOLOGY CO LTD  LR5-54HABB-400M STRING 2 OF 7 MODULES 3 MODULE LEVEL RAPID SHUTDOWN DEVICES (N) (2) 60A (PV+ESS)  BREAKER AT  OPPOSITE END OF BUS  FROM MAIN BREAKER 5 PAGE REV: C 4/8/2025 ANGELA SAMPSON 3340 S CRAWFORD GLEN,  SANTA ANA, CA, 92704 PROJECT NUMBER:   109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 (415) 580-6920 ex3 Template_version_v5_2024 02 28 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603   FAX 949.215.7778 CA CL #750184 GILBERT CORREIA, C10, C46 PV-4.0 ELECTRICAL C 3340 S Crawford Glen4/28/2025 CONDUIT SCHEDULE TAG CIRCUIT DESCRIPTION CONDUCTOR NEUTRAL GROUND CONDUIT 1 Inverter Input (2) 10 AWG  (PV WIRE)N/A 6 AWG (BARE) Open Air 2a Inverter Input (2) 10 AWG THHN/THWN-2 N/A 8 AWG THHN/THWN-2 3/4" EMT 2b Inverter Input (4) 10 AWG THHN/THWN-2 N/A 8 AWG THHN/THWN-2 3/4" EMT 3 Inverter Output (2) 6 AWG THHN/THWN-2 (1) 6 AWG THHN/THWN-2 8 AWG THHN/THWN-2 3/4" EMT 4 Gateway Output (2) 3/0 AWG THHN/THWN-2 (1) 3/0 AWG THHN/THWN-2 4 AWG THHN/THWN-2 2 EMT 5 Backup Loads (19) 12 AWG THHN/THWN-2 (19) 12 AWG THHN/THWN-2 8 AWG THHN/THWN-2 2 EMT (2) 10 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 8 AWG THHN/THWN-2 (8) 8 AWG THHN/THWN-2 (4) 8 AWG THHN/THWN-2 8 AWG THHN/THWN-2 (2) 4 AWG THHN/THWN-2 (1) 4 AWG THHN/THWN-2 8 AWG THHN/THWN-2 PAGE REV: C 4/8/2025 ANGELA SAMPSON 3340 S CRAWFORD GLEN,  SANTA ANA, CA, 92704 PROJECT NUMBER:   109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 (415) 580-6920 ex3 Template_version_v5_2024 02 28 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603   FAX 949.215.7778 CA CL #750184 GILBERT CORREIA, C10, C46 CONDITIONS ON SITE MAY DICTATE INSTALLATION LOCATION OF RELOCATED  BACKUP LOADS. PLEASE NOTE THAT IF LOADS ARE RELOCATED MORE THAN  24", THE CONDUIT SIZES WILL BE ADJUSTED TO COMPLY WITH CEC  310.15(C)(1) INSTALLER MUST CHECK THE CONDITION, INSTALLABILITY AND CODE  COMPLIANCE OF EXISTING EQUIPMENT. PV-4.1 ELECTRICAL  CONTI. GENERAL NOTES: COLD WATER GAS BOND INSTALL THE BACKED UP LOAD  CONDUCTORS AND THE GATEWAY  BREAKER CONDUCTORS IN TWO  SEPARATE CONDUITS C C 3340 S Crawford Glen4/28/2025 PAGE REV: C 4/8/2025 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603   FAX 949.215.7778 ANGELA SAMPSON 3340 S CRAWFORD GLEN,  SANTA ANA, CA, 92704 PROJECT NUMBER:   109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 PV-4.2 ELECTRICAL CALCS SYSTEM INFORMATION 9.6 KW DC PHOTOVOLTAIC SYSTEM      (8) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR5-54HABB-400M, TESLA:  POWERWALL 3 1707000-XX-Y      (16) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR5-54HABB-400M, TESLA:  POWERWALL 3 1707000-XX-Y SYSTEM OCPD SIZE (COMBINED MAX CURRENT) X (CONTINUOUS LOAD) =  144 A X 1.25 =180 A → 200 A OVERCURRENT PROTECTION GATEWAY SYSTEM AC WIRE SIZING MAX AC OUTPUT CURRENT = 200 A ADJUSTED CONDUCTOR AMPACITY = (HIGH TEMP)[TABLE 310.15(B)(1)(1)] X (CONDUIT  FILL) [TABLE 310.15(C)(1)] X (CONDUCTOR AMPACITY) [TABLE 310.16] =  0.91 X 1 X 225A = 204.75A TERMINAL RATING[110.14(C)] = 3/0 AWG, 75°C RATED = 200A 200A < 204.75A   TERMINAL RATING GOVERNS CONDUCTOR SIZING 200A ≤ 200A   3/0 AWG AMPACITY OK THEREFORE 3/0 AWG IS SUFFICIENT. ALLOWABLE BACKFEED ALLOWABLE BACKFEED = MAIN PANEL RATING = 225A LOADS IN MAIN PANEL:0A LOADS + 200A GATEWAY BREAKER = 200A ≤ 225A INTERCONNECTION MEETS CEC 705.12(B)(3)(3) REQUIREMENTS. INVERTER INFORMATION 3200 W DC PHOTOVOLTAIC SYSTEM      (8) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR5-54HABB-400M, TESLA:  POWERWALL 3 1707000-XX-Y INVERTER OVERCURRENT PROTECTION (INVERTER MAX CURRENT) X (CONTINUOUS LOAD) =  48 A X 1.25 = 60 A → 60 A OVERCURRENT PROTECTION PER MANUFACTURER DC WIRE SIZING MAX CIRCUIT CURRENT = (MODULE ISC) X (HIGH IRRADIANCE)[690.8(A)(1)] X  (CONTINUOUS LOAD)[690.8(B)(1)]=  14.88A X 1.25 X 1.25 = 23.25A ADJUSTED CONDUCTOR AMPACITY = (HIGH TEMP)[TABLE 310.15(B)(1)] X (CONDUIT FILL)  [TABLE 310.15(C)(1)] X (CONDUCTOR AMPACITY)[TABLE 310.16] =  0.91 X 1 X 40A = 36.4A TERMINAL RATING[110.14(C)] = 10 AWG, 75°C RATED = 35A 35A < 36.4A →  TERMINAL RATING GOVERNS CONDUCTOR SIZING. 23.25A < 35A → 10 AWG AMPACITY OK THEREFORE 10 AWG IS SUFFICIENT. AC WIRE SIZING MAX AC OUTPUT CURRENT = (MAX INVERTER OUTPUT) X (CONTINUOUS LOAD)  [210.19(A)(1)] = 48 A X 1.25 = 60 A ADJUSTED CONDUCTOR AMPACITY = (HIGH TEMP)[TABLE 310.15(B)(1)] X (CONDUIT FILL)  [TABLE 310.15(C)(1)] X (CONDUCTOR AMPACITY)[TABLE 310.16] =  0.91 X 1 X 75A = 68.25A TERMINAL RATING[110.14(C)] = 6 AWG,  75°C RATED = 65A 65A < 68.25A →  TERMINAL RATING GOVERNS CONDUCTOR SIZING. 60A < 65A → 6 AWG AMPACITY OK THEREFORE 6 AWG IS SUFFICIENT. SYSTEM CHARACTERISTICS MAX OPEN CIRCUIT VOLTAGE   = {[((TEMP COEF VOC) X (VOC)) / 100] X [LOW TEMP - STC  TEMP] + VOC} X (# MODULES / STRING) = {[(-0.26 %/°C X 37.05 V) / 100] X [-2 °C - 25 °C] + 37.05 V} X 9 = 356.85 V SHORT CIRCUIT CURRENT = 1.25 X (MODULE ISC) X (# STRINGS) 1.25 X 14.88 A X 1 = 18.6A INVERTER INFORMATION 6400 W DC PHOTOVOLTAIC SYSTEM      (16) LONGI GREEN ENERGY TECHNOLOGY CO LTD: LR5-54HABB-400M, TESLA:  POWERWALL 3 1707000-XX-Y INVERTER OVERCURRENT PROTECTION (INVERTER MAX CURRENT) X (CONTINUOUS LOAD) =  48 A X 1.25 = 60 A → 60 A OVERCURRENT PROTECTION PER MANUFACTURER DC WIRE SIZING MAX CIRCUIT CURRENT = (MODULE ISC) X (HIGH IRRADIANCE)[690.8(A)(1)] X (CONTINUOUS  LOAD)[690.8(B)(1)]=  14.88A X 1.25 X 1.25 = 23.25A ADJUSTED CONDUCTOR AMPACITY = (HIGH TEMP)[TABLE 310.15(B)(1)] X (CONDUIT FILL)  [TABLE 310.15(C)(1)] X (CONDUCTOR AMPACITY)[TABLE 310.16] =  0.91 X 1 X 40A = 36.4A TERMINAL RATING[110.14(C)] = 10 AWG, 75°C RATED = 35A 35A < 36.4A →  TERMINAL RATING GOVERNS CONDUCTOR SIZING. 23.25A < 35A → 10 AWG AMPACITY OK THEREFORE 10 AWG IS SUFFICIENT. AC WIRE SIZING MAX AC OUTPUT CURRENT = (MAX INVERTER OUTPUT) X (CONTINUOUS LOAD)  [210.19(A)(1)] =48 A X 1.25 = 60 A ADJUSTED CONDUCTOR AMPACITY = (HIGH TEMP)[TABLE 310.15(B)(1)] X (CONDUIT FILL)  [TABLE 310.15(C)(1)] X (CONDUCTOR AMPACITY)[TABLE 310.16] =  0.91 X 1 X 75A = 68.25A TERMINAL RATING[110.14(C)] = 6 AWG,  75°C RATED = 65A 65A < 68.25A →  TERMINAL RATING GOVERNS CONDUCTOR SIZING. 60A < 65A → 6 AWG AMPACITY OK THEREFORE 6 AWG IS SUFFICIENT. SYSTEM CHARACTERISTICS MAX OPEN CIRCUIT VOLTAGE   = {[((TEMP COEF VOC) X (VOC)) / 100] X [LOW TEMP - STC  TEMP] + VOC} X (# MODULES / STRING) = {[(-0.26 %/°C X 37.05 V) / 100] X [-2 °C - 25 °C] + 37.05 V} X 8 = 317.20 V SHORT CIRCUIT CURRENT = 1.25 X (MODULE ISC) X (# STRINGS) 1.25 X 14.88 A X 2 = 37.2A C 3340 S Crawford Glen4/28/2025 BACKUP LOADS LOAD BREAKER RATING  (AMPS)LABEL DEMAND  LOAD 1 15A-1P BATHROOM LIGHTS 1500 W 2 20A-1P FAU 1 1500 W 3 20A-1P FAU 2 1500 W 4 20A-1P BATHROOM GFI 1500 W 5 20A-1P FRIDGE 1500 W 6 20A-1P MICROWAVE 1500 W 7 20A-1P DISPOSAL 1500 W 8 20A-1P DISHWASHER 1500 W 9 20A-1P KITCHEN LIGHTS 1500 W 10 20A-1P KITCHEN OUTLETS 1500 W 11 20A-1P DRYER 1500 W 12 20A-1P LIVING ROOM OUTLETS 1500 W 13 20A-1P LIVING ROOM LIGHTS 1500 W 14 20A-1P GFI OUTLETS 1500 W 15 20A-1P GFI OUTLETS 1500 W 16 20A-1P BEDROOM LIGHTS 1 1500 W 17 20A-1P BEDROOM LIGHTS 2 1500 W 18 20A-1P BEDROOM OUTLETS 1 1500 W 19 20A-1P BEDROOM OUTLETS 2 1500 W 20 50A-2P AC UNIT 1 6288 21 50A-2P AC UNIT 2 6384 22 50A-2P OVEN 9600 23 50A-2P TESLA EV 9600 24 30A-2P SPA 5760 25 70A-2P SUB PANEL 13440 SUB PANEL LOADS 26 15A-1P GARAGE 1500 W 27 15A-1P GARAGE FRIDGE 1500 W 28 15A-1P OFFICE LIGHTS 1500 W 29 15A-1P OFFICE OUTLETS 1500 W 30 15A-1P BATHROOM 2 LIGHTS 1500 W 31 15A-1P BATHROOM 2 OUTLETS 1500 W 32 15A-1P HALF BATH LIGHTS 1500 W 33 15A-1P LIVING ROOM LIGHTS 1500 W 34 15A-1P LIVING ROOM OUTLETS 1500 W 35 15A-1P HALF BATH GFI 1500 W 36 15A-1P BEDROOM LIGHTS 3 1500 W 37 15A-1P BEDROOM LIGHTS 4 1500 W 38 15A-1P BEDROOM OUTLETS 3 1500 W 39 15A-1P BEDROOM OUTLETS 4 1500 W 40 15A-1P OUTDOOR LIGHTS 1500 W PAGE REV: C 4/8/2025 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603   FAX 949.215.7778 ANGELA SAMPSON 3340 S CRAWFORD GLEN,  SANTA ANA, CA, 92704 PROJECT NUMBER:   109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 BACKUP LOAD CALCS ALL BACKED UP LOADS ABOVE IN THE BACKED UP LOADS PANEL ARE RELOCATED FROM THE MAIN SERVICE  PANEL. BACKED UP LOADS CALCULATION: ( 13440VA)/ 240V = 56 A PER CEC 2022 ARTICLE 690.10 OR NEC 2020 ARTICLE 710.15. THE MAXIMUM CURRENT FOR ALL LARGE APPLIANCES LOADS IS 56A. (MAX LOADS OUTPUT) X (CONTINUOUS LOADS) =  56 A X 1.25 = 70A BACKED UP LOADS PANEL BREAKER = 200A 70 A < 200A. THEREFORE, THE AMPERAGE OF THE BACKED UP LOADS IS LESS THAN THAT OF THE OCPD. AC WIRE SIZING FOR BACKUP LOADS PANEL MAX AC OUTPUT CURRENT = (MAX LOADS OUTPUT) X (CONTINUOUS LOAD)[210.19(A)(1)] = 56 A X 1.25 = 70A ADJUSTED CONDUCTOR AMPACITY = (HIGH TEMP)[TABLE 310.15(B)(1)] X (CONDUIT FILL)[TABLE 310.15(C)(1)] X  (CONDUCTOR AMPACITY)[TABLE 310.16] = 0.91 X 1 X 95A = 86.45A TERMINAL RATING[110.14(C)] = 4 AWG, 75°C RATED = 85A 85A < 86.45A    TERMINAL RATING GOVERNS CONDUCTOR SIZING. 70A≤ 85A   4 AWG AMPACITY OK THEREFORE 4 AWG IS SUFFICIENT.      PV-4.3 BACKUP LOAD  CALCS C C 3340 S Crawford Glen4/28/2025 PAGE REV: C 4/8/2025 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603   FAX 949.215.7778 ANGELA SAMPSON 3340 S CRAWFORD GLEN,  SANTA ANA, CA, 92704 PROJECT NUMBER:   109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 GILBERT CORREIA, C10, C46 CA CL #750184 (415) 580-6920 ex3 (N) LUGKIT MAIN BREAKER 225A  (N) 225A BACKUP  LOADS PANEL FUTURE  225/225A  MAIN  PANEL PANEL SCHEDULE PANEL SCHEDULE PV-4.4 50 30 15 20 20 20 20 20 20 20 20 20 20 20 20 20 5 0 20 20 5 0 20 20 5 0 200A 20 70  EXISTING 225A MAIN  SERVICE PANEL OVEN FAU 1 BATHROOM GFI TESLA EV SPA BATHROOM LIGHTS KITCHEN LIGHTS LIVING ROOM OUT MICROWAVE AC UNIT 1 DISPOSAL 50 30 15 20 20 20 20 20 20 20 20 20 20 20 20 20 5 0 20 20 5 0 20 20 5 0 KITCHEN OUTLETS DRYER LIVING ROOM LIGHT GFI OUTLETS BEDROOM LIGHTS 1 FAU 2 AC UNIT 2 FRIDGE 225A MAIN BREAKER 20 70 SUB PANEL DISHWASHER GFI OUTLETS BEDROOM LIGHTS 2 BEDROOM OUTLETS 1 BEDROOM OUTLETS 2 NEW PV+ESS  BREAKER 60  (N) 200A BACKUP GATEWAY 60 NEW PV+ESS  BREAKER 200A MAIN BREAKER MAIN BREAKER OVEN SUB PANEL FAU 1 FAU 2 AC UNIT 2 BATHROOM GFI FRIDGE MICROWAVE AC UNIT 1 DISPOSAL LIVING ROOM LIGHT GFI OUTLETS GFI OUTLETS BEDROOM LIGHTS 1 BEDROOM LIGHTS 2 BEDROOM OUTLETS 2 BEDROOM OUTLETS 1 TESLA EV BATHROOM LIGHTS DISHWASHER KITCHEN LIGHTS KITCHEN OUTLETS DRYER LIVING ROOM OUT SPA  EXISTING 200A SUB PANEL 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 BEDROOM LIGHTS 3 BEDROOM LIGHTS 4 BEDROOM OUTLETS 4 BEDROOM OUTLETS 3 OUTDOOR  LIGHTS HALF  BATH GFI GARAGE  FRIDGE OFFICE  LIGHTS OFFICE  OUTLETS LIVING OUTLETS  LIVING LIGHTS HALF BATH LIGHTS BATH LIGHTS 2 BATH OUTLETS 2 GARAGE C 3340 S Crawford Glen4/28/2025 PAGE REV: B 3/20/2025 ANGELA SAMPSON 3340 S CRAWFORD GLEN, SANTA ANA, CA, 92704 PROJECT NUMBER: 109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 (415) 580-6920 ex3 Template_version_v5_2024 02 28 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603 FAX 949.215.7778 CA CL #750184 GILBERT CORREIA, C10, C46 SIGNAGE PV-5.0 NOMINAL ESS VOLTAGE VAC LABEL LOCATION: ENERGY STORAGE SYSTEM PER CODE(S): NEC 706.15(C), CEC 706.15(C) 120/240 520 VDC MAXIMUM ESS DC VOLTAGE:60 ENERGY STORAGE SYSTEM DISCONNECT WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE POWER SOURCE OUTPUT CONNECTION LABEL LOCATION: ADJACENT TO PV BREAKER AND ESS OCPD (IF APPLICABLE). PER CODE(S): NEC 2020: 705.12(B)(3)(2), CEC 2022: 705.12(B)(3)(2) NOTES AND SPECIFICATIONS: SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE CEC 2022 ARTICLE 110.21(B), UNLESS SPECIFIC INSTRUCTIONS ARE REQUIRED BY SECTION 690, OR IF REQUESTED BY THE LOCAL AHJ. SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE WORDS, COLORS AND SYMBOLS. LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HAND WRITTEN. LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS, UNLESS OTHERWISE SPECIFIED. DO NOT COVER EXISTING MANUFACTURER LABELS. SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. LABEL LOCATION: ON OR NO MORE THAT 1 M (3 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. PER CODE(S): NEC 2020: 690.56(C), CEC 2022: 690.56(C) 4" 3" ELECTRICAL SHOCK HAZARD WARNING TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION LABEL LOCATION: INVERTER(S), AC/DC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): NEC 2020: 690.13(B), CEC 2022: 690.13(B) ! INVERTER 1 PHOTOVOLTAIC DC DISCONNECT MAXIMUM SYSTEM VOLTAGE:VDC550 LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): NEC 2020: 690.53, CEC 2022: 690.53 WARNING: PHOTOVOLTAIC POWER SOURCE WARNING: PHOTOVOLTAIC POWER SOURCE LABEL LOCATION: INTERIOR AND EXTERIOR DC CONDUIT EVERY 10 FT, AT EACH TURN, ABOVE AND BELOW PENETRATIONS, ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. PER CODE(S): NEC 2020: 690.31(D)(2), CEC 2022: 690.31(D)(2) LABEL LOCATION: INSTALLED WITHIN 3' OF RAPID SHUT DOWN SWITCH PER CODE(S): NEC 2020: 690.56(C)(2), CEC 2022: 690.56(C)(2), IFC 2018: 1204.5.3 RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM WARNING! SOURCES: UTILITY GRID, BATTERY AND PV SOLAR ELECTRIC SYSTEM THREE POWER SUPPLY LABEL LOCATION: UTILITY SERVICE METER AND MAIN SERVICE PANEL. PER CODE(S): NEC 2020: 705.12(C), CEC 2022: 705.12(C) THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE SHALL NOT EXCEED AMPACITY OF BUSBAR WARNING! LABEL LOCATION: PV LOAD CENTER (IF APPLICABLE) AND ANY PANEL THAT UTILIZES "THE SUM OF BREAKERS RULE". PER CODE(S): NEC 2020: 705.12 (B)(3)(3), CEC 2022: 705.12 (B)(3)(3) CAUTION 3340 S CRAWFORD GLEN, SANTA ANA, CA, 92704 PER CODE(S): NEC 2020 : 705.10, 710.10, CEC 2022: 705.10, 710.10 MULTIPLE SOURCES OF POWER AC DISCONNECT BACKUP GATEWAY WITH PV + ESS BREAKER SOLAR PANELS ON ROOF INVERTER AND ENERGY STORAGE 2 (EXT) SERVICE ENTRANCE AND LUGKIT BACKUP LOADS PANEL RAPID SHUTDOWN SWITCH (EXT)MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 48 AMPS 240 VAC LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): NEC 2020: 690.54, CEC 2022: 690.54 PV SYSTEM DISCONNECT ENERGY STORAGE SYSTEM PREMISES WIRING MAY REMAIN ENERGIZED AFTER LOSS OF UTILITY POWER CAUTION! LABEL LOCATION: INVERTER(S), AC/DC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2022: 706.15(C), NEC 2020: 706.15(C) INVERTER AND ENERGY STORAGE 1 (EXT) EXPANSION ENERGY STORAGE (EXT) AC DISCONNECT 3340 S Crawford Glen4/28/2025 PAGE REV: B 3/20/2025 ANGELA SAMPSON 3340 S CRAWFORD GLEN, SANTA ANA, CA, 92704 PROJECT NUMBER: 109R-340SAMP SHEET DESIGNER: VISHNUMAYA KP CUSTOMER RESIDENCE: TEL. (714) 642-8754 APN: 412-521-03 (415) 580-6920 ex3 Template_version_v5_2024 02 28 2500 WHITE RD. SUITE A, IRVINE CA 92614 PHONE 805.540.7603 FAX 949.215.7778 CA CL #750184 GILBERT CORREIA, C10, C46 SIGNAGE PV-5.1 MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 48 AMPS 240 VAC LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): NEC 2020: 690.54, CEC 2022: 690.54 PV SYSTEM DISCONNECT INVERTER 2 PHOTOVOLTAIC DC DISCONNECT MAXIMUM SYSTEM VOLTAGE:VDC55 LABEL LOCATION: INVERTER(S), DC DISCONNECT(S). PER CODE(S): NEC 2020: 690.53, CEC 2022: 690.53 LABEL LOCATION: BACKUP LOAD PANEL NO ADDITIONAL LOADS TO BE ADDED 3340 S Crawford Glen4/28/2025 This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 1 of 8 GFT-OP-11a (22-August-2019) Test Verification of Conformity Verification Number: 104514208CRT-001VOC Applicant Name & Address: Tesla Inc. 3500 Deer Creek Road, Palo Alto, CA 94304 Product Description: Energy Storage System Grid Support Utility Interactive & Standalone Inverter Ratings & Principle Characteristics: See Appendix 2 Models/Type References: 1707000- followed by two numbers; followed by -; followed by one letter. Brand Names: Tesla Relevant Standard(s) / Specification(s): See Appendix 1 Verification Issuing Office Name & Address: Intertek Testing Services NA, Inc. 3933 US Route 11, Cortland, NY 13045 USA Date of Tests: 9/15/2022 to 4/23/2024 Test Report Number(s): 104514208CRT-001, 104514208CRT-001RRF, 104514208CRT-001TRS, 104514208CRT-010, 104514208CRT-012 Additional information in Appendix. Signature Name: Mukund Rana Position: Sr. Staff Engineer Date: 10th May 2024 On the basis of the tests undertaken, the samples of the below product have been found to comply with the requirements of the referenced standards at the time the tests were carried out. This verification is part of the full test report and should be read in conjunction with it. This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 2 of 8 GFT-OP-11a (22-August-2019) Appendix 1: Relevant Standard(s)/Specification(s) Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources [UL 1741:2021 Ed.3] Grid Support Utility Interactive Equipment - Supplement SA to UL 1741:2021 Ed.3 - Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources [UL 1741:2021 Ed.3 (Supplement SA)] Grid Support Utility Interactive Inverters and Converters Based Upon IEEE 1547:2018 & IEEE 1547.1:2020 - Supplement SB to UL 1741:2021 Ed.3 - Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources [UL 1741:2021 Ed.3 (Supplement SB)] Energy Storage Systems and Equipment [ANSI/UL 9540:2020 Ed.2+R:09Apr2021] Photovoltaic (PV) DC Arc-Fault Circuit Protection [UL 1699B:2018 Ed.1+R:18May2021] Software in Programmable Components [UL 1998:2013 Ed.3+R:24Sep2018] Tests For Safety-related Controls Employing Solid-state Devices [UL 991:2004 Ed.3+R:09Jun2010] Batteries for Use in Stationary, Vehicle Auxiliary Power and Light Electric Rail (LER) Applications [ANSI/UL 1973:2018 Ed.2] IEEE 1547:2018 - IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces IEEE 1547a:2020 - IEEE Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces Amendment 1: To Provide More Flexibility for Adoption of Abnormal Operating Performance Category III IEEE 1547.1:2020 - IEEE Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces Source requirements document UL 1741 (SRD) v2.0 – HECO Electric Rule No.21-2020 Generating Facility Interconnections Default New England Bulk System Area Settings Requirement PRC-024-3 Frequency and Voltage Protection Settings for Generating Resources GOVERNMENT OF PUERTO RICO PUBLIC SERVICE REGULATORY BOARD PUERTO RICO ENERGY BUREAU, Generating Facility and Microgrid Interconnection Regulation (“Regulation”), July 2021 Power Conversion Equipment [CSA C22.2#107.1:2016 Ed.4+U1] Interconnection of Distributed Energy Resources and Electricity Supply Systems [CSA C22.3#9:2020 Ed.2] Photovoltaic Rapid Shutdown Systems [CSA C22.2#330:2023 Ed.2] Safety Functions Incorporating Electronic Technology [CSA C22.2#0.8:2019 Ed.4] 3340 S Crawford Glen4/28/2025 This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 3 of 8 GFT-OP-11a (22-August-2019) Appendix 2: Ratings & Principle Characteristics: ➢ Ratings: Models 1707000-xx-y Rated AC Output Power (W) 11500, 10000, 7680, 5750 Rated AC Input Power (W) Charging 5000 Max. Cont. Output Power (W) 11500, 10000, 7680, 5750 Max. Continuous Output PV to AC Power Off-Grid (W) 15400 Max. Cont. Input Power (W) Charging 5000 AC Input / Output Voltage (VL-L) 240 AC Output Frequency (Hz) 60 Max. Cont. Output Current (A) 48, 4 1.6, 32, 24 Max. Cont. Input Current (A) Charging 20.83 Apparent Power rating (VA) 11500, 10000, 7680, 5750 Apparent Power rating (VA) Charging 5000 Normal Category A, B Abnormal Category II, III ➢ Communication Protocol: IEEE 2030.5 protocol ➢ PCH board MD5 Firmware checksum: c5773b136a9ef9be9057302a67258482 ➢ TACO board MD5 Firmware checksum: dcq8OiBXbQWYnK9UhCAjvl02/py2MZymmwAQYOn8jSc= ➢ Grid Support Function Parameters: Tesla used the parameters in the Result reporting form “104514208CRT-001RRF” during the testing of the grid support functions according to UL1741 SB. The parameters that have “blank” as their value are not applicable. ➢ UL 1998 and CSA C22.2#0.8 Evaluation: ECU / Board Rev Software version Checksum UL1998, CSA C22.2#0.8 Compliant* Date of evaluation HVP / -E V2 51705DB5 Yes Apr-19-2024 PWS / -3F V2 34204954 Yes Apr-19-2024 PWS / -1F V2 B3C1375B Yes Apr-19-2024 PWS / -D V2 43FEF523 Yes Apr-19-2024 *Note: Below safety functions were evaluated during the UL1998 and UL 991 evaluation. • List of all UL1998 and UL 991 functions are as follow: o Overcharge o Over-discharge o Over Temperature o Over current o Relay weld, Isolation Monitoring Interruption, PV RSD (UL 1741) o AFCI (UL 1699B) This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 4 of 8 GFT-OP-11a (22-August-2019) 3340 S Crawford Glen4/28/2025                      !  "  # $ $% &   !  " '() *$ ' *  " +  '  ,(-./)0    1'      * #1  $       1'  #    2 $" +)   $" +  %   #$% &  ! 1' )+  !  %     #    ' )      #2* $" +1   *   $" +      3 # 43  5 )6 57...*  57...&*  5#+# &8 ! 9 7 '" *      "   1  " "  %    5  # !     )+  9  *    7 ' :$" -  # ;.<2=><2? 0      (  1                           "    +             "     +           #    "    '        "   '   +          +       +               ,22  E  F  '"  "G         H *8 '  "   +    . Sep 16, 2020  5 .>-2=&>2? 0  .&2=2? %!  "   1    +    &2@9=2@? 2@9=2@?    +  /%-;  #  #   #'A3B1$% & 0  )  0%& 71C$><;;>>&< $".+ *#.  * # 8 # =" ?&.-2"=/)?=&.;2*#?   " 'D  '+#/)  *#/  * #  # .2=.>2?  * # 8 .>2=&;.<><2?  * #  # &.<2=<.>>2? ++ )  " ' )  " ++   7   %   # %  0    %  + +)3D %/)0  !   %/)0    1: !' + D  '+ D ) :  + D   ) #   )      !   )   = +  ) #   ? %!  0    %!  +  3340 S Crawford Glen4/28/2025 This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 5 of 8 GFT-OP-11a (22-August-2019) Appendix 3: List of Tested Grid protection / Support Function: Table 3A: Test List -1 Grid protection / Support Function Tested Test Standards Sections and Source Requirement Documents IEEE 1547- 2018 IEEE 1547.1- 2020 UL 1741SB - 2021 CA Rule 21:2020 UL 1741 SRD V2.0 (HECO):2020 OPERATIONAL TEMPERATURE -- 5.3.3.1 SB4.3.5.3 -- Same as 1547- 2018 PROTECTION FROM ELECTROMAGNETIC INTERFERENCE (EMI) TEST 4.11.1 5.8.1 SB4.3.5.8.1 -- Same as 1547- 2018 SURGE WITHSTAND PERFORMANCE TEST 4.11.2 5.8.2 SB4.3.5.8.2 -- Same as 1547- 2018 PARALLELING DEVICE 4.11.3 5.8.3 -- -- Same as 1547- 2018 OVERVOLTAGE TRIP 6.4.1 5.4.2 SB4.3.5.4.2 Electric Rule No. 21 Table Hh.1 Same as 1547- 2018 UNDERVOLTAGE TRIP 6.4.1 5.4.3 SB4.3.5.4.3 Electric Rule No. 21 Table Hh.1 Same as 1547- 2018 OVERFREQUENCY TRIP 6.5.1 5.5.1 & 5.5.2 SB4.3.5.5.1 & SB4.3.5.5.2 Electric Rule No. 21 Table Hh.2 Same as 1547- 2018 UNDERFREQUENCY TRIP 6.5.1 5.5.1 & 5.5.2 SB4.3.5.5.1 & SB4.3.5.5.2 Electric Rule No. 21 Table Hh.2 Same as 1547- 2018 LOW VOLTAGE RIDE-THROUGH 6.4.2.3 & 6.4.2.5 5.4.4 SB4.3.5.4.4 Electric Rule No. 21 Table Hh.1 Same as 1547- 2018 HIGH VOLTAGE RIDE-THROUGH 6.4.2.4 5.4.7 SB4.3.5.4.7 Electric Rule No. 21 Table Hh.1 Same as 1547- 2018 LOW FREQUENCY RIDE-THROUGH 6.5.2.3 5.5.3 SB4.3.5.5.3 Electric Rule No. 21 Table Hh.2 SRD-UL-1741-SA- V2.0 (HECO) Part II B HIGH FREQUENCY RIDE- THROUGH 6.5.2.4 5.5.4 SB4.3.5.5.4 Electric Rule No. 21 Table Hh.2 SRD-UL-1741-SA- V2.0 (HECO) Part II B RATE OF CHANGE OF FREQUENCY 6.5.2.5 5.5.5 -- -- Same as 1547- 2018 ANTI-ISLANDING PROTECTION - WITH GRID SUPPORT FUNCTIONS ENABLED 8.1 5.10.2 SB4.3.5.10.2 Electric Rule No. 21 Hh.1a According to UL 1741 SA-V2.0 (HECO) TEST FOR VOLTAGE PHASE-ANGLE CHANGE RIDE-THOUGH (VARIATION 1) 6.5.2.6 5.5.6.1 SB4.3.5.5.6 -- Same as 1547- 2018 ENTER SERVICE 4.10 5.6 -- -- Same as 1547- 2018 SYNCHRONIZATION CONTROL FUNCTION TEST FOR EQUIPMENT WITH NO SYNCHRONIZING DISABLE CAPABILITY (VARIATION 3) 6.3 5.7.4 -- -- Same as 1547- 2018 LIMITATION OF DC INJECTION FOR INVERTERS 7.1 5.9 -- Electric Rule No. 21 Hh.2h Same as 1547- 2018 OPEN PHASE 6.2.2 5.11 -- -- Same as 1547- 2018 CURRENT DISTORTION 7.3 5.12 -- Electric Rule No. Same as 1547- This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 6 of 8 GFT-OP-11a (22-August-2019) Grid protection / Support Function Tested Test Standards Sections and Source Requirement Documents IEEE 1547- 2018 IEEE 1547.1- 2020 UL 1741SB - 2021 CA Rule 21:2020 UL 1741 SRD V2.0 (HECO):2020 21 Hh.2g 2018 LIMIT ACTIVE POWER 4.6.2 5.13 -- Electric Rule No. 21 Hh.8 Same as 1547- 2018 CONSTANT POWER FACTOR 5.3.2 5.14.3 SB4.3.5.14.3 Electric Rule No. 21 Hh.2i Same as 1547- 2018 VOLTAGE-REACTIVE POWER (VOLT-VAR) MODE FIXED VREF 5.3.3 5.14.4 SB4.3.5.14.4 Electric Rule No. 21 Hh.2J Same as 1547- 2018 VOLTAGE-REACTIVE POWER (VOLT-VAR) MODE (VREF TEST) 5.3.3 5.14.5 SB4.3.5.14.5 -- Same as 1547- 2018 ACTIVE POWER-REACTIVE POWER MODE (WATT-VAR) 5.3.4 5.14.7 SB4.3.5.14.7 -- Same as 1547- 2018 CONSTANT REACTIVE POWER (VAR) MODE 5.3.5 5.14.8 SB4.3.5.14.8 -- Same as 1547- 2018 VOLTAGE-ACTIVE POWER (VOLT- WATT) MODE 5.4 5.14.9 SB4.3.5.14.9 Electric Rule No. 21 Hh.2.m Same as 1547- 2018 TEST FOR FREQUENCY -DROOP (FREQUENCY-POWER OR FREQUENCY-WATT) CAPABILITY — ABOVE NOMINAL FREQUENCY 6.5.2.7 5.15.2 SB4.3.5.15.2 Electric Rule No. 21 Hh.2.l SRD-UL-1741-SA- V2.0 (HECO) Part II C TEST FOR FREQUENCY -DROOP (FREQUENCY-POWER OR FREQUENCY-WATT) CAPABILITY — BELOW NOMINAL FREQUENCY 6.5.2.7 5.15.3 SB4.3.5.15.3 Electric Rule No. 21 Hh.2.l SRD-UL-1741-SA- V2.0 (HECO) Part II C PRIORITIZATION OF DER RESPONSES 4.7 5.16 SB4.3.5.16 -- Same as 1547- 2018 LOAD REJECTION OVERVOLTAGE (LROV) 7.4 5.17.2 SB4.3.5.17.2 -- Same as 1547- 2018 FAULT CURRENT TESTS FOR INVERTERS 6.2.1 5.18.1 -- -- Same as 1547- 2018 PERSISTENCE OF DER PARAMETER SETTINGS -- 5.19 -- -- Same as 1547- 2018 NORMAL RAMP RATE -- -- -- Electric Rule No. 21 Hh.2k -- NAMEPLATE DATA TEST 10.3 6.4 -- -- Same as 1547- 2018 MONITORING INFORMATION TEST 10.5 6.6 SB4.3.6.6 -- Same as 1547- 2018 MANAGEMENT INFORMATION TEST 10.6 6.7 SB4.3.6.7 -- Same as 1547- 2018 3340 S Crawford Glen4/28/2025 3340 S Crawford Glen4/28/2025 Powerwall 3 Power Everything 2024 — Powerwall 3 is a fully integrated solar and battery system, designed to accelerate the transition to sustainable energy. Customers can receive whole home backup, cost savings, and energy independence by producing and consuming their own energy while participating in grid services. Once installed, customers can manage their system using the Tesla App to customize system behavior to meet their energy goals. Powerwall 3 achieves this by supporting up to 20 kW DC of solar and providing 11.5 kW AC of continuous power per unit. It has the ability to start heavy loads up to 185 A LRA, meaning a single unit can support the power needs of most homes. Powerwall 3 is designed for mass production,fast and ef𿿿cient installations,easy system expansion,and simple connection to any electrical service. 22024Powerwall 3 Datasheet Solar Technical Speci￿cations Maximum Solar STC Input 20 kW Withstand Voltage 600 V DC PV DC Input Voltage Range 60 — 550 V DC PV DC MPPT Voltage Range 60 — 480 V DC MPPTs 6 Maximum Current per MPPT (Imp)13 A 5 Maximum Short Circuit Current per MPPT (Isc)15 A 5 Powerwall 3 Technical Specifications 1 Typical solar shifting use case. 2 Values provided for 25°C (77°F), at beginning of life. 3.3 kW charge/discharge power. 3 Tested using CEC weighted ef𿿿ciency methodology. 4 The customer is expected to provide internet connectivity for Powerwall 3;cellular should not be used as the primary mode of connectivity. Cellular connectivity subject to network operator service coverage and signal strength. 5 Where the DC input current exceeds the MPPT rating,a jumper can be used to combine two MPPTs into a single input to intake DC current up to 26 A IMP / 30 A ISC. Battery Technical Speci￿cations Nominal Battery Energy 13.5 kWh AC 2 Maximum Continuous Discharge Power 11.5 kW AC Maximum Continuous Charge Power 5 kW AC Output Power Factor Rating 0 -1 (Grid Code con𿿿gurable) Maximum Continuous Current 48 A Maximum Output Fault Current 10 kA Load Start Capability (1 s)185 A LRA Power Scalability Up to 4 Powerwall 3 units supported System Technical Speci￿cations Model Number 1707000-xx-y Nominal Grid Voltage (Input &Output)120/240 VAC Grid Type Split phase Frequency 60 Hz Overcurrent Protection Device 60 A Solar to Battery to Home/Grid Ef￿ciency 89% 1,2 Solar to Home/Grid Ef￿ciency 97.5% 3 Supported Islanding Devices Gateway 3, Backup Switch, Backup Gateway 2 Connectivity Wi-Fi (2.4 and 5 GHz), Dual-port switched Ethernet, Cellular (LTE/4G 4) Hardware Interface Dry contact relay,Rapid Shutdown (RSD)certi𿿿ed switch and 2-pin connector, RS-485 for meters AC Metering Revenue Grade (+/- 0.5%) Protections Integrated arc fault circuit interrupter (AFCI), Isolation Monitor Interrupter (IMI),PV Rapid Shutdown (RSD)using Tesla Mid-Circuit Interrupters Customer Interface Tesla Mobile App Warranty 10 years 3340 S Crawford Glen4/28/2025 3340 S Crawford Glen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eb 3, 2020 : !!761;!: ;: ;:  , 3 4 3 <) =2::5,3< 2#15()<==  . )( *C . */3.%D //  . )( *  . )( //    . --8  (/. 88  .#1 $+  8  . E8 *  - ( .(.3+  .( -8. 4   ,.4.   / (/.     .3 .A 8 '  -2- ./- .3 44428#14 ..3 2 23' $  3( .$  (  . $ / /"C   ' -8( .  (  . E '*- (/ C % */ C  E -8 ../- .C  .  3( . .  (  .   '  .  (  .< / . ( 3 ( 8 = .'.- . ( (   .'.- . (/( (  */( . / 8 / *(.38  . .    (4  . *   . *:6-.  3340 S Crawford Glen4/28/2025 32024Powerwall 3 Datasheet Mechanical Speci￿cations Dimensions 1099 x 609 x 193 mm (43.25 x 24 x 7.6 in) Weight 130 kg (287 lb) Mounting Options Floor or wall mount Powerwall 3 Technical Specifications Environmental Speci￿cations Operating Temperature –20°C to 50°C (–4°F to 122°F) 6 Operating Humidity (RH)Up to 100%, condensing Storage Temperature –20°C to 30°C (–4°F to 86°F), up to 95% RH, non- condensing, State of Energy (SOE): 25% initial Maximum Elevation 3000 m (9843 ft) Environment Indoor and outdoor rated Enclosure Rating NEMA 3R Ingress Rating IP67 (Battery & Power Electronics) IP45 (Wiring Compartment) Pollution Rating PD3 Operating Noise @ 1 m < 50 db(A) typical <62 db(A)maximum Compliance Information Certi￿cations UL 1642, UL 1699B, UL 1741, UL 1741 SA, UL 1741 SB, UL 1741 PCS, UL 3741, UL 1973, UL 1998, UL 9540, IEEE 1547- 2018, IEEE 1547.1, UN 38.3 Grid Connection United States Emissions FCC Part 15 Class B Environmental RoHS Directive 2011/65/EU Seismic AC156, IEEE 693-2005 (high) Fire Testing Meets the unit level performance criteria of UL 9540A 6 Performance may be de-rated at operating temperatures above 40°C (104°F). 609 mm 193 mm 1099 mm 42024Powerwall 3 Datasheet Electrical Speci￿cations Model MCI-1 MCI-2 Nominal Input DC Current Rating (IMP)13 A 13 A Maximum Input Short Circuit Current (ISC)19 A 17 A Maximum System Voltage (PVHCS)600 V DC 1000 V DC 7 Solar Shutdown Device Technical Specifications Environmental Speci￿cations Operating Temperature -40°C to 50°C (-40°F to 122°F) -45°C to 70°C (-49°F to 158°F) Storage Temperature –30°C to 70°C (–22°F to 158°F) –30°C to 70°C (–22°F to 158°F) Enclosure Rating NEMA 4X /IP65 NEMA 4X /IP65 RSD Module Performance Maximum Number of Devices per String 5 5 Control Power Line Excitation Power Line Excitation Passive State Normally Open Normally Open Maximum Power Consumption 7 W 7 W Warranty 25 years 25 years — The Solar Shutdown Device is a Mid-Circuit Interrupter (MCI)and is part of the PV system rapid shutdown (RSD)function in accordance with Article 690 of the applicable NEC. When paired with Powerwall 3, solar array shutdown is initiated by any loss of AC power. Mechanical Speci￿cations Electrical Connections MC4 Connector MC4 Connector Housing Plastic Plastic Dimensions 125 x 150 x 22 mm (5 x 6 x 1 in) 173 x 45 x 22 mm (6.8 x 1.8 x 1 in) Weight 350 g (0.77 lb) 120 g (0.26 lb) Mounting Options ZEP Home Run Clip M4 Screw (#10) M8 Bolt (5/16") Nail / Wood screw Wire Clip Compliance Information Certi￿cations UL 1741 PVRSE, UL 3741, PVRSA (Photovoltaic Rapid Shutdown Array) RSD Initiation Method External System Shutdown Switch or Powerwall 3 Enable Switch 7 Maximum System Voltage is limited by Powerwall to 600 V DC. UL 3741 PV Hazard Control (and PVRSA)Compatibility See Powerwall 3 Installation Manual 3340 S Crawford Glen4/28/2025 52024Powerwall 3 Datasheet Gateway 3 8 Only Eaton CSR or BWH main breakers are 25 kA rated. Performance Speci￿cations Model Number 1841000-01-y Nominal Grid Voltage 120/240 V AC Grid Con￿guration Split phase Grid Frequency 60 Hz Continuous Current Rating 200 A Maximum Supply Short Circuit Current 22 kA with Square D or Eaton main breaker 25 kA with Eaton main breaker 8 IEC Protective Class Class I Overvoltage Category Category IV Mechanical Speci￿cations Dimensions 660 x 411 x 149 mm (26 x 16 x 6 in) Weight 16.3 kg (36 lb) Mounting options Wall mount Environmental Speci￿cations Operating Temperature –20°C to 50°C (–4°F to 122°F) Operating Humidity (RH)Up to 100%, condensing Maximum Elevation 3000 m (9843 ft) Environment Indoor and outdoor rated Enclosure Type NEMA 3R Compliance Information Certi￿cations UL 67, UL 869A, UL 916, UL 1741 PCS, CSA 22.2 107.1, CSA 22.2 29 Emissions FCC Part 15, ICES 003 — Tesla Gateway 3 controls connection to the grid in a Powerwall system, automatically detecting outages and providing seamless transition to backup power. It provides energy monitoring that is used by Powerwall for solar self-consumption, time-based control, and backup operation. 411 mm 660 mm 149 mm AC Meter Revenue accurate (+/- 0.5%) Communication CAN User Interface Tesla App Backup Transition Automatic disconnect for seamless backup Overcurrent Protection Device 100–200 A Service entrance rated Eaton CSR, BWH, or BW, or Square D QOM breakers Internal Panelboard 200 A 8-space/16 circuit breakers Eaton BR, Siemens QP, or Square D HOM breakers rated to 10–125A Warranty 10 years 62024Powerwall 3 Datasheet Backup Switch 9 Breaker maximum supply short circuit current rating must be equal to or greater than the available fault current. Performance Speci￿cations Model Number 1624171-xx-y Continuous Load Rating 200 A, 120/240 V split phase Maximum Supply Short Circuit Current 22 kA with breaker 9 Communication CAN AC Meter Revenue accurate (+/- 0.5%) Expected Service Life 21 years Warranty 10 years Mechanical Speci￿cations Dimensions 176 x 205 x 74 mm (6.9 x 8.1 x 2.9 in) Weight 2.8 lb Meter and Socket Compatibility ANSI Type 2S, ringless or ring type External Service Interface Contactor manual override 10 Reset button Conduit Compatibility 1/2-inch NPT Environmental Speci￿cations Operating Temperature –40°C to 50°C (–40°F to 122°F) Storage Temperature –40°C to 85°C (–40°F to 185°F) Enclosure Rating NEMA 3R Pollution Rating PD3 Compliance Information Safety Standards USA: UL 414, UL 414 SB, UL 2735, UL 916, CA Prop 65 Emissions FCC, ICES 10 Manually overrides the contactor position during a service event. — The Tesla Backup Switch controls connection to the grid in a Powerwall system, and can be easily installed behind the utility meter or in a standalone meter panel downstream of the utility meter. The Backup Switch automatically detects grid outages, providing a seamless transition to backup power. It communicates directly with Powerwall, allowing home energy usage monitoring from any mobile device with the Tesla app. 204.86 74 176 mm 205 mm 74 mm 3340 S Crawford Glen4/28/2025 72024Powerwall 3 Datasheet Backup Gateway 2 Performance Speci￿cations Model Number 1232100-xx-y AC Voltage (Nominal)120/240 V Feed-in Type Split phase Grid Frequency 60 Hz Current Rating 200 A Maximum Supply Short Circuit Current 10 kA 11 Overcurrent Protection Device 100 - 200 A, Service entrance rated 9 Overvoltage Category Category IV Internal Primary AC Meter Revenue accurate (+/- 0.2%) Internal Auxiliary AC Meter Revenue accurate (+/- 2%) Primary Connectivity Ethernet, Wi-Fi Secondary Connectivity Cellular (3G, LTE/4G) 12 Mechanical Speci￿cations Dimensions 660 x 411 x 149 mm (26 x 16 x 6 in) Weight 20.4 kg (45 lb) Mounting options Wall mount, Semi-Bush mount Environmental Speci￿cations Operating Temperature –20°C to 50°C (–4°F to 122°F) Operating Humidity (RH)Up to 100%, condensing Maximum Elevation 3000 m (9843 ft) Environment Indoor and outdoor rated Enclosure Type NEMA 3R Compliance Information Certi￿cations UL 67, UL 869A, UL 916, UL 1741 PCS, CSA 22.2 0.19, CSA 22.2 205 Emissions FCC Part 15, ICES 003 411 mm 660 mm 149 mm 11 When protected by Class J fuses, Backup Gateway 2 is suitable for use in circuits capable of delivering not more than 22kA symmetrical amperes. 12 Cellular connectivity subject to network operator service coverage and signal strength. — Backup Gateway 2 controls connection to the grid when paired with Powerwall 3, automatically detecting outages and providing seamless transition to backup power. Backup Gateway 2 also provides energy metering for solar self-consumption, time-based control, and backup operation. In this system con𿿿guration,Powerwall 3 acts as the Site Controller,with the Backup Gateway 2 Site Controller disabled. User Interface Tesla App Operating Modes Support for solar self- consumption, time-based control, and backup Backup Transition Automatic disconnect for seamless backup Modularity Supports up to 10 AC- coupled Powerwalls Optional Internal Panelboard 200 A 6-space / 12 circuit breakers Siemens QP or Square D HOM breakers rated 10 - 80A or Eaton BR breakers rated 10 - 125A Warranty 10 years 82024Powerwall 3 Datasheet Powerwall 3 Example System Configurations Powerwall 3 with Backup Switch Whole Home Backup Powerwall 3 with Gateway 3 Whole Home Backup Powerwall 3 with Backup Gateway 2 Partial Home Backup 3340 S Crawford Glen4/28/2025 This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 7 of 8 GFT-OP-11a (22-August-2019) Table 3B: Test List -2 Test Description CSA C22.2#107.1:2016 Ed. 4 CSA C22.3#9:2020 Ed 2 Screw Tightening Torque Test 3.6.3 -- Impedance Test 105.1/10.5.2 -- Continuity Test 4.1 -- Output Power Factor 4.2 -- Voltage Harmonics for stand alone 15.3.2.1 -- Frequency 10.5.4 -- Stand-alone inverter dc output short-circuits current contribution 10.5.5 -- Normal ramp rate -- 7.2.3.4.2 / 8.3.12.2.3 Flicker -- 7.2.2 / 8.3.13 Test for constant reactive power (var) mode 7.2.3.3.3 / 8.3.12.2.2 This Verification is for the exclusive use of Intertek's client and is provided pursuant to the agreement between Intertek and its Client. Intertek's responsibility and liability are limited to the terms and conditions of the agreement. Intertek assumes no liability to any party, other than to the Client in accordance with the agreement, for any loss, expense or damage occasioned by the use of this Verification. Only the Client is authorized to permit copying or distribution of this Verification. Any use of the Intertek name or one of its marks for the sale or advertisement of the tested material, product or service must first be approved in writing by Intertek. The observations and test/inspection results referenced in this Verification are relevant only to the sample tested/inspected. This Verification by itself does not imply that the material, product, or service is or has ever been under an Intertek certification program. Intertek Page 8 of 8 GFT-OP-11a (22-August-2019) Appendix 4: Revision Summary Date / Project Engineer Comments 15-Feb-2023 Dipesh Patel Original issue date 8-Mar-2023 / G104200718 Dipesh Patel Added UL 1699B, UL 1998 and UL 991 standards 24-Mar-2023/ G104200718 Dipesh Patel Added UL 1973 standard. Added normal and abnormal category in ratings table. 18-Apr-2023 / G104200718 Dipesh Patel Added additional factory settable nameplate ratings rated output active power (W): 9600, 7680, 5750; Max. Continuous output power (W): 9600, 7680, 5750; Max. Cont. Output Current (A): 40, 32, 24; Apparent Power rating (VA): 9600, 7680, 5750 Added Puerto Rico Interconnection regulation as it refers to UL 1741 and IEEE 1547-2018. 1-May-2024 / G104514208 Mukund Rana A) Added standards. Power Conversion Equipment [CSA C22.2#107.1:2016 Ed.4+U1] Interconnection of Distributed Energy Resources and Electricity Supply Systems [CSA C22.3#9:2020 Ed.2] Photovoltaic Rapid Shutdown Systems [CSA C22.2#330:2023 Ed.2] Interconnection of Distributed Energy Resources and Electricity Supply Systems [CSA C22.3#9:2020 Ed.2] B) Update CSA C22.2#0.8 standard C) added Table 3B: Test List -2 3340 S Crawford Glen4/28/2025 Service Voltage 240 Section 220.83 Existing Dwelling Unit Part #1 - Section 220.83 (B)(1) General Lighting/Receptacles @ 3 VA per sq ft: Amps Box A (VA) 55.73 13374 Part #2 - Section 220.83(B)(2), (3)a, b, c, d - Appliances and Dedicated Circuits: Size in VA Size in VA 1500 1500 1500 1000 600 1000 1600 9600 9600 5760 Amps Box B (VA) 140.25 33660 Total VA from Parts #1 and #2 combined:Box A + Box B =47034 Total VA 47034 First 8000 VA @ 100%8000 Remaining VA @ 40% Remaining VA =39034 39034 x 40% =15613.6 VA Adding First 8000 VA, if possible 8000 VA Total VA for Gen. Lights/Recep, Appliances & Dedicated circuits:23613.6 VA Total AMP for Gen. Lights/Recep, Appliances & Dedicated circuits:98.39 Amps Part #3 - Section 220.83(B) Heating and A/C loads: *Combine the larger loads of either the Heating or the A/C loads togther 100% of all the Heating or A/C loads in VA:13,872 VA 100% of all the Heating or A/C loads in Amps:57.80 A VA Volts Amps Parts #1 & #2 23613.6 240 98.39 Part #3 13,872 240 57.80 Total VA for all Parts:37,486 Totals Service/Feeder Load 156.19 Dedicated circuit Dedicated circuit Article 220 - Dedicated Backup Panel Calculation Job Code 3340 S Crawford Gln, Santa Ana, CA 92704 109R-340SAMP Building Square Footage VA (watts)Amps House 4458.00 13374 55.73 Total for Part #1: Laundry Appliance Circuit - 1 Appliance Circuit - 2 Dishwasher Disposal Refrigerator Microwave Oven EV Charger Spa/Hot Tub Totals for Part #2: Totals from all Parts 3340 S Crawford Glen4/28/2025 Section 220.83 Existing Dwelling Unit Part #1 - Section 220.83 (B)(1) General Lighting/Receptacles @ 3 VA per sq ft: Amps Box A (VA) 55.73 13374 Part #2 - Section 220.83 (B)(2),(3)a, b, c, d - Appliances and Dedicated Circuits: Size in VA Size in VA 1500 9600 3000 5760 1000 N/A 600 N/A 1000 N/A 1600 N/A N/A N/A N/A N/A 9600 N/A N/A Amps Box B (VA) N/A 140.25 33660 Total VA from Parts #1 and #2 combined:Box A + Box B = 47034 Total VA 47034 First 8,000 VA @ 100% 8000 Remaining VA @ 40% Remaining VA = 39034 39034 x 40% = 15613.6 VA Adding First 8000 VA 8000 VA Total VA for Gen. Lights/Recep, Appliances & Dedicated circuits: 23613.6 VA Total AMP for Gen. Lights/Recep, Appliances & Dedicated circuits: 98.39 Amps Part #3 - Section 220.83 (B) Heating and A/C loads: *Combine the larger loads of either the Heating or the A/C loads togther 100% of all the Heating or A/C loads in VA:13,872 VA 100% of all the Heating or A/C loads in Amps:57.80 A VA Volts Amps Parts #1 & #2 23613.6 240 98.39 Part #3 13,872 240 57.80 Total VA for all Parts: 37,486 Totals Service/Feeder Load 156.19 #ESTAMP Laundry Appliance Circuit(s) Dishwasher(s) Disposal(s) Dedicated circuit House Square Footage 4458 Article 220 - Service/Feeder calculation for (address): 3340 S Crawford Gln, Santa Ana, CA 92704 Building VA (watts) 13374 Amps 55.725 Job Code 109R-340SAMP Totals from all Parts Dedicated circuit Total for Part #1: Spa/Hot Tub EV Charger Refrigerator(s) Microwave(s) Totals for Part #2:Pool Equipment MISC Range Oven Cooktop 3340 S Crawford Glen4/28/2025 Bus Rating: 225 Main Rating: 225 0%0% Not Fed by other panels 0.00 0.00 Bus Rating: 225 Main Rating: 225 100%100% Itemized House and 240V Loads for Panel: (VA) 1500 1500 1500 1000 600 1000 1600 9600 9600 5760 6288 6384 600 600 Not Fed by other panels 156.19 156.19 Panel 1 of 2 Panel % of Sq.Ft:Panel % of 100% VA: Total Load Calc: Load Calc: (This Panel) Appliance Circuit - 2 Dishwasher Panel 2 of 2 Panel % of Sq.Ft: Panel % of 100% VA: Laundry Appliance Circuit - 1 Disposal Refrigerator Microwave Oven EV Charger Spa/Hot Tub A/C Unit - 240V A/C Unit - 240V Air Handler/FAU - 120V Air Handler/FAU - 120V Load Calc: (This Panel) Total Load Calc: 3340 S Crawford Glen4/28/2025 717 17th Street,Ste.200 |Denver,CO 80202 Angela Sampson 340 s crawford glen Docusign Envelope ID:F03401AA-64AB-4AB3-886A-53C066A40634 11/22/2024 3340 S Crawford Glen4/28/2025 Certificate Of Completion Envelope Id: F03401AA64AB4AB3886A53C066A40634 Status: Completed Subject: Complete with Docusign: uploaded-2024_11_21T21_06_49Z-340samp auth.pdf Source Envelope: Document Pages: 1 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 0 Jamie Elgin AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 225 Bush Street, Suite 1400 San Francisco, CA 94104 jamie.elgin@sunrun.com IP Address: 75.140.107.2 Record Tracking Status: Original 11/21/2024 1:13:20 PM Holder: Jamie Elgin jamie.elgin@sunrun.com Location: DocuSign Signer Events Signature Timestamp Angela Sampson jsamp31@yahoo.com Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 76.170.8.225 Signed using mobile Sent: 11/21/2024 1:13:55 PM Viewed: 11/22/2024 11:00:11 AM Signed: 11/22/2024 11:00:34 AM Electronic Record and Signature Disclosure: Accepted: 11/22/2024 11:00:11 AM ID: eb4b26f5-4fea-4694-a598-cce7dab33bc6 In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 11/21/2024 1:13:55 PM Certified Delivered Security Checked 11/22/2024 11:00:11 AM Signing Complete Security Checked 11/22/2024 11:00:34 AM Completed Security Checked 11/22/2024 11:00:34 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure 3340 S Crawford Glen4/28/2025 CONSUMER DISCLOSURE From time to time, Sunrun Inc. (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign, Inc. (DocuSign) electronic signing system. PLEASE READ THE INFORMATION BELOW CAREFULLY AND THOROUGHLY, AND IF YOU CAN ACCESS THIS INFORMATION ELECTRONICALLY TO YOUR SATISFACTION AND AGREE TO THESE TERMS AND CONDITIONS, PLEASE CONFIRM YOUR AGREEMENT BY CLICKING THE 'I AGREE' BUTTON AT THE BOTTOM OF THIS DOCUMENT. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after signing session and, if you elect to create a DocuSign signer account, you may access them for thirty (30) days after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, please request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 8/7/2013 10:17:58 AM Parties agreed to: Angela Sampson 3340 S Crawford Glen4/28/2025 How to contact Sunrun Inc.: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: customercare@sunrun.com You may also contact us in writing at 45 Fremont Street, 32nd Floor, San Francisco, CA 94105 or by phone at 1-855-478-6786. To advise Sunrun Inc. of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at customercare@sunrun.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address. In addition, you must notify DocuSign, Inc. at 1-866-219-4318 to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in the DocuSign system. To request paper copies from Sunrun Inc. To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must contact us by (a) sending us an e-mail to customercare@sunrun.com, (b) writing to us at Sunrun Inc, 45 Fremont Street, 32nd Floor, San Francisco, CA 94105, or (c) calling us at 1-855-478-6786, and in connection with your request you must state your e-mail address, full name, US Postal address, and telephone number. To withdraw your consent with Sunrun Inc. To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. contact us by (a) sending us an email to customercare@sunrun.com, (b) writing to us at Sunrun Inc., 45 Fremont Street, 32nd Floor, San Francisco, CA 94105, or (c) calling us at 1-855-478-6786, and in connection with your request you must state your e-mail, full name, US Postal Address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows® 2000, Windows® XP, Windows Vista®; Mac OS® X 3340 S Crawford Glen4/28/2025 Browsers: Final release versions of Internet Explorer® 6.0 or above (Windows only); Mozilla Firefox 2.0 or above (Windows and Mac); Safari™ 3.0 or above (Mac only) PDF Reader: Acrobat® or similar software may be required to view and print PDF files Screen Resolution: 800 x 600 minimum Enabled Security Settings: Allow per session cookies ** These minimum requirements are subject to change. If these requirements change, you will be asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and browsers are not supported. Notices Any notice or other communication to be made hereunder, even if otherwise required to be in writing under other provisions of this Consent or any other documents or agreements that have been provided to you in connection with this Consent, may alternatively be made in an electronic record transmitted electronically to the electronic addresses provided by you. Any notice or other communication made in electronic form will have the same legal effect and enforceability as if made in non-electronic form. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ‘I agree’ button below. By checking the ‘I agree’ box, I confirm that:  I can access and read and have accessed, read and understood the terms of this ELECTRONIC CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and  I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and  Until or unless I notify Sunrun Inc. as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Sunrun Inc. during the course of my relationship with you. Entire Agreement Provision This agreement and the consumer disclosure statement executed by the customer in conjunction with and simultaneously with its review and acceptance of the terms set forth herein constitute 3340 S Crawford Glen4/28/2025 the entire agreement between the parties with respect to the subject matter hereof and supersede any prior understandings, agreements, or representations by or between the parties, written or oral, to the extent they relate in any way to the subject matter hereof. 3340 S Crawford Glen4/28/2025 Rev: 8/29/19 SOL-01 CBC 2016 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Phone Number: Signature: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST Caitlyn hernandez 385-400-5019 oc_permits@subrun.com 2-4-253-19-25 3340 S Crawford Glen4/28/2025 /ce/ Astra v.2.050 11/20/2024 12:18 PM CAT 1, EOSS #AStamp Subject : Structural Certification for Proposed Residential Solar Installation. Job Number: 109R-340SAMP; Rev A Client: Angela Sampson Address: 3340 S Crawford Glen, Santa Ana, CA 92704 Attn: To Whom It May Concern Signed on: 11/20/2024 The existing structure is assumed to be a light-frame wood roof and free from damage, deterioration, or modification that would compromise its structural integrity. Preliminary site information was obtained by a representative of Sunrun. Prior to installation of the solar PV system, a site observation shall be conducted by a representative of Sunrun to confirm the above-noted assumptions. Structural evaluation of the loading is based on the assumptions above and the applicable design criteria listed below. Design Criteria: • 2022 CBC/CEBC, 7-16 ASCE & 2018 NDS • Basic (Category II) Wind Speed V=96 mph, Exposure B • Ground Snow Load = 0 psf Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the requirements of the applicable existing building code provisions adopted/referenced above. Additionally, the PV module assembly and hardware supporting it have been designed according to manufacturer's specifications per the loading criteria referenced above. Installer shall inspect the existing roof framing to verify it is in suitable condition and does not exhibit any signs of damage which may diminish the capacity of its members or connections prior to commencement of PV installation. If actual framing differs from the assumed condition, the installer shall notify the engineer of record prior to proceeding with installation. Results Summary (Hardware Check Includes Uplift Check on Attachments/Fastener, Structure Check Considers Main Structure) AR-01 Orientation Attachment Spacing/Cantilever Configuration Max DCR Result Landscape 72 / 28 Staggered 34%Pass Portrait 72 / 28 Staggered 39%Pass Roofing Material Pitch Structure Check Tile 41°Pass AR-02 Orientation Attachment Spacing/Cantilever Configuration Max DCR Result Landscape 72 / 28 Staggered 34%Pass Portrait 72 / 28 Staggered 39%Pass Roofing Material Pitch Structure Check Tile 41°Pass 225 Bush St. Suite 1400 San Francisco, CA 94104 Exp. 12/31/2024 Digitally Signed On: 11/20/24 3340 S Crawford Glen4/28/2025 Seismic Considerations: 10% Lateral Loading Increase Check Seismic Design Criteria (per USGS) Latitude Longitude Soil Site Class Ss S1 SDC 33.640302 -117.769442 D 1.237 0.443 D Site Conditions Module Type:LONGi Green Energy Technology Co Ltd: LR5-54HABB-400MTotal Mods:24 Sum of Roof Areas w/ PV:3484 Load Information Area Dead Load Total Weight Existing Roof 3484 sq ft 14 psf 48776 lb Ceiling 3484 sq ft 5 psf 17420 lb Interior Walls (Top Half)944 sq ft 5 psf 4722 lb Exterior Walls (Top Half)944 sq ft 9 psf 8027 lb System Weight PV 432 sq ft 3 psf 1296 lb Lateral Loading 10% Check (2018 IEBC Section 503.4) Net Weight of PV System Net Weight of Roof % Increase of LFRS Final Result 1296 lb 78946 lb 1.64%Pass 3340 S Crawford Glen4/28/2025 AR-01 Roofing Material Roof Pitch Hardware Results Structural Results Tile 41°Pass Pass Hardware Calculations Attachment Information Attachment:Adjustable Tile Hook Uplift Force: 0.6(p - (3psf x cos(pitch))) x trib area =321 lb Uplift Capacity: 829 lb a = 5.2 ft Wind Design Criteria (Partially/Fully Enclosed Method, ASCE 7-16) Basic Wind Speed V 96 mph Wind Speed - Category II Wind Pressure Exposure Kz 0.67 Table 26.10-1 Topographic Factor Kzt 1.0 Figure 26.8-1 Wind Directionality Factor Kd 0.85 Table 26.6-1 Ground Elevation Factor Ke 1.0 Section 26.9 Velocity Pressure qh = 0.00256 x Kz x Kzt x Kd x Ke x V²11.60 psf Equation 26.10-1 Solar Adjustment Factors γe (Port/Land) =(1.15,1.22)γa =0.535 Figure 29.4-8 Zone 1 (up)Zone 2 (up)Zone 3 (up)Zone 1 (down) Ext Pressure Coefficient GCp -1.48 -1.99 -2.17 0.77 Figures 30.3-2(A-H) Ultimate Design Wind Pressure p = qh x GCp x γe x γa -16 psf -16 psf -16 psf 16 psf Equation 29.4-7 Mod Orientation X-Spacing Cantilever Trib Area Demand DCR Final Result Landscape 72''28''11.2 ft²11.4 psf 34%Pass Portrait 72''28''17 ft²11.4 psf 39%Pass Structural Calculations Gravity Loading Summary Load Definitions Initial Pre-PV Load Code Factors Post-PV LoadPg =0 psf | Pf =0.7 x Ce x Ct x Pg Ps = Cs x Pf Roof Dead Load (D)DL 14.0 psf 14.0 psf 14.0 psf PV Dead Load (D)PV DL 3.0 psf 0.0 psf 3.0 psf Roof Live Load (Lr)RLL 20.0 psf 13.6 psf 0.68 0.0 psf Sloped Snow Load (Pf --> Ps)LL/SL 0.0 psf 0.0 psf 0.89 0.48 0.0 psf Total Design Load 27.6 psf 17.0 psf Cd Factor of Governing LC 1.25 (D+Lr)0.9 (D) Total Design Load (Normalized)22.1 psf 18.9 psf IEBC 5% Check Net Design Gravity Loading Change (Normalized w/ Cd Factor)-3.2 psf DCR: 86%Pass AR-02 Roofing Material Roof Pitch Hardware Results Structural Results Tile 41°Pass Pass Hardware Calculations Attachment Information Attachment:Adjustable Tile Hook Uplift Force: 0.6(p - (3psf x cos(pitch))) x trib area =321 lb Uplift Capacity: 829 lb a = 5.2 ft Wind Design Criteria (Partially/Fully Enclosed Method, ASCE 7-16) Basic Wind Speed V 96 mph Wind Speed - Category II Wind Pressure Exposure Kz 0.67 Table 26.10-1 Topographic Factor Kzt 1.0 Figure 26.8-1 Wind DIrectionality Factor Kd 0.85 Table 26.6-1 Ground Elevation Factor Ke 1.0 Section 26.9 Velocity Pressure qh = 0.00256 x Kz x Kzt x Kd x Ke x V²11.60 psf Equation 26.10-1 Solar Adjustment Factors γe (Port/Land) =(1.15,1.22)γa =0.535 Figure 29.4-8 Zone 1 (up)Zone 2 (up)Zone 3 (up)Zone 1 (down) Ext Pressure Coefficient GCp -1.48 -1.99 -2.17 0.77 Figures 30.3-2(A-H) Ultimate Design Wind Pressure p = qh x GCp x γe x γa -16 psf -16 psf -16 psf 16 psf Equation 29.4-7 Mod Orientation X-Spacing Cantilever Trib Area Demand DCR Final Result Landscape 72''28''11.2 ft²11.4 psf 34%Pass Portrait 72''28''17 ft²11.4 psf 39%Pass Structural Calculations Gravity Loading Summary Load Definitions Initial Pre-PV Load Code Factors Post-PV LoadPg =0 psf | Pf =0.7 x Ce x Ct x Pg Ps = Cs x Pf Roof Dead Load (D)DL 14 psf 14.0 psf 14.0 psf PV Dead Load (D)PV DL 3 psf 0.0 psf 3.0 psf Roof Live Load (Lr)RLL 20 psf 13.6 psf 0.68 0.0 psf Sloped Snow Load (Pf --> Ps)LL/SL 0 psf 0.0 psf 0.89 0.48 0.0 psf Total Design Load 27.6 psf 17.0 psf Cd Factor of Governing LC 1.25 (D+Lr)0.9 (D) Total Design Load (Normalized)22.1 psf 18.9 psf IEBC 5% Check Net Design Gravity Loading Change (Normalized w/ Cd Factor)-3.2 psf DCR: 86%Pass 3340 S Crawford Glen4/28/2025