Laserfiche WebLink
DISCLAIMER: UNAUTHORIZED USE OF THIS DRAWING SET <br />WITHOUT WRITTEN PERMISSION FROM INFINITY SOLAR, INC. IS IN <br />VIOLATION OF U.S. COPYRIGHT LAWS AND WILL BE SUBJECT TO <br />CIVIL DAMAGES AND PROSECUTIONS. <br />INFINITY SOLAR, INC. <br />749 N MAIN ST. <br />ORANGE, CA 92868 <br />PHONE: (714) 880-8089 <br />LIC NO.: C10 #824287 <br />NATIONAL POLLUTANT DISCHARGE <br />ELIMINATION SYSTEM (NPDES) NOTES <br />1. IN THE CASE OF EMERGENCY, CALL ___________________AT WORK PHONE <br />#___________________OR HOME PHONE #___________________. <br />2. SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON <br />SITE USING STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE. <br />3. STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT <br />TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES OR ADJACENT <br />PROPERTIES VIA RUNOFF, VEHICLE TACKING, OR WIND. <br />4. APPROPRIATE BMP'S FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS <br />SHALL BE IMPLEMENTED TO MINIMIZE TRANSPORT FROM THE SITE TO STREETS, <br />DRAINAGE FACILITIES, OR ADJOINING PROPERTIES BY WIND OR RUNOFF. <br />5. RUNOFF FROM EQUIPMENT AND VEHICLE WASHING SHALL BE CONTAINED AT <br />CONSTRUCTION SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND <br />OTHER POLLUTANTS. <br />6. ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PERSONNEL ARE TO BE <br />MADE AWARE OR THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD <br />HOUSEKEEPING MEASURES FOR THE PROJECT SITE AND ANY ASSOCIATED <br />CONSTRUCTION STAGING AREAS. <br />7. AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION <br />DEBRIS AND WASTE MATERIALS SHALL BE COLLECTED AND PROPERLY DISPOSED IN <br />TRASH OR RECYCLE BINS. <br />8. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN <br />ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE. <br />DISCHARGES OF MATERIAL OTHER THAN STORMWATER ONLY WHEN NECESSARY <br />FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE <br />THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY <br />STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR <br />NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE <br />UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302. <br />9. POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID <br />CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, <br />PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS <br />FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND <br />HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLE/EQUIPMENT <br />WASH WATER AND CONCRETE WASH WATER; CONCRETE, DETERGENT OR <br />FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR <br />CHEMICAL DEGREASING AND SUPER-CHLORINATED POTABLE WATER LINE FLUSHING. <br />DURING CONSTRUCTION, PERMITTEE SHALL DISPOSE OF SUCH MATERIALS IN A <br />SPECIFIED AND CONTROLLED TEMPORARY AREA ON-SITE, PHYSICALLY SEPARATED <br />FROM POTENTIAL STORMWATER RUNOFF, WITH ULTIMATE DISPOSAL IN <br />ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. <br />10. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING <br />CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING OF <br />NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT <br />DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE STATE REGIONAL <br />WATER QUALITY CONTROL BOARD. <br />11. GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM <br />THE FACE OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY. DRAINAGE IS TO <br />BE DIRECTED TOWARD DESILTING FACILITIES. <br />12. THE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE <br />NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE <br />IMPOUNDED WATER CREATES A HAZARDOUS CONDITION. <br />13. THE PERMITTEE AND CONTRACTOR SHALL INSPECT THE EROSION CONTROL <br />WORK AND INSURE THAT THE WORK IS IN ACCORDANCE WITH THE APPROVED PLANS. <br />14. THE PERMITTEE SHALL NOTIFY ALL GENERAL CONTRACTORS, SUBCONTRACTORS, <br />MATERIAL SUPPLIERS, LESSEES, AND PROPERTY OWNERS: THAT DUMPING OF <br />CHEMICALS INTO THE STORM DRAIN SYSTEM OR THE WATERSHED IS PROHIBITED. <br />15. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE <br />AT ALL TIMES DURING THE RAINY SEASON. NECESSARY MATERIALS SHALL BE <br />AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE <br />RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT. <br />16. ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END <br />OF EACH WORKING DAY WHEN THE 5-DAY RAIN PROBABILITY FORECAST EXCEEDS <br />40%. <br />17. SEDIMENTS FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON <br />SITE USING AN EFFECTIVE COMBINATION OF EROSION AND SEDIMENT CONTROLS TO <br />THE MAXIMUM EXTENT PRACTICABLE, AND STOCKPILES OF SOIL SHALL BE <br />PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE SITE TO <br />STREETS, DRAINAGE FACILITIES OF ADJACENT PROPERTIES VIA RUNOFF, VEHICLE <br />TRACKING, OR WIND. <br />18. APPROPRIATE BMPS FOR CONSTRUCTION-RELATED MATERIALS, WASTES, SPILLS <br />OR RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON SITE TO MINIMIZE <br />TRANSPORT FROM THE SITE TO STREETS, DRAINAGE FACILITIES, OR ADJOINING <br />PROPERTY BY WIND OR RUNOFF. <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA RESIDENTIAL CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA GREEN CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA ENERGY CODE <br />ANY OTHER LOCAL AND MUNICIPAL CODES <br />GENERAL NOTES <br />AUTHORITIES HAVING JURISDICTION <br />BUILDING: SANTA ANA <br />ZONING: SANTA ANA <br />UTILITY: SCE <br />DESIGN SPECIFICATIONS <br />OCCUPANCY: R-3/U <br />CONSTRUCTION: V-B <br />ZONING: RESIDENTIAL <br />SNOW LOAD: 0 <br />WIND EXPOSURE: C <br />WIND SPEED: 95 MPH <br />ROOF SURFACE: 1253 <br />PV COVERAGE: 158.53 <br />NO. OF STORIES: ONE <br />FIRE SPRINKLERS: NO <br />LOT INFORMATION <br />APN: 10022215 <br />LOT AREA: 8276 SQFT <br />LIVING AREA: 1291 SQFT <br />C.B. <br />PAPER SIZE: 11" X 17" (ANSI B) <br />DRAWING TITLE: <br />DRAWN BY: <br />DATE: <br />DRAWING NO: <br />10/18/2023 <br />ENGINEER OF RECORD <br />K.T. <br />NEW PV SYSTEM: 3.040 kWp <br />ANDY <br /> LAM <br />1005 EVONDA ST UNIT 2, <br />SANTA ANA, CA 92703 <br />APN: 10022215 <br />DESIGN LEAD: T.M. <br />DESIGNED BY <br />SOLAR DEPLOYED, LLC <br />931 10TH STREET #114 <br />MODESTO, CA 95354 <br />(209) 671-2001 <br />SIGNATURE: <br />CHECKED BY: <br />PV.01 <br />INSTALLER NOTES <br />COVER SHEET <br />N <br />E <br />S <br />W <br />PV.01 <br />01 AERIAL PHOTO <br />NTS <br />PROJECT INFORMATION <br />APPLICABLE CODES <br />NEW PV SYSTEM FOR <br />LAM RESIDENCE <br />1005 EVONDA ST UNIT 2, SANTA ANA, CA 92703 <br />APN: 10022215 <br />SYSTEM SIZE: 3.040 kWp <br />CEC POWER OUTPUT: 2.815 kWp <br />ALL WORK SHALL COMPLY WITH APPLICABLE, LOCAL, MUNICIPAL <br />CODES, AND TO MANUFACTURERS' LISTINGS AND INSTALLATION <br />INSTRUCTIONS. <br />THE PV SOLAR SYSTEM WILL BE INTERCONNECTED AND <br />OPERATED IN PARALLEL WITH THE UTILITY ELECTRICAL GRID PER <br />THE REQUIREMENTS OF THE UTILITY AND APPLICABLE CODES. <br />THE PV SOLAR SYSTEM IS DESIGNED IN COMPLIANCE WITH CEC <br />690.12. (RAPID SHUTDOWN). <br />SCOPE OF WORK <br />DC SYSTEM SIZE: 3.040 kW AC SYSTEM SIZE: 2.792 kW <br />MODULE: (8) MEYER BURGER MEYER BURGER BLACK 380W <br />MICROINVERTER:(8) ENPHASE IQ8A-72-2-US [240V] <br />MOUNT: (16) EVERFLASH ECOMP KIT <br />RAILING: EVEREST RACKING-48-X RAILS <br />MSP UPGRADE: NO <br />SHEET LIST TABLE <br />SHEET NUMBER SHEET TITLE <br />PV.01 COVER SHEET <br />PV.02 SITE PLAN <br />PV.03 ROOF PLAN <br />PV.04 ATTACHMENT PLAN <br />PV.05 ASSEMBLY DETAILS <br />PV.06 LINE DIAGRAM <br />PV.07 DESIGN TABLES <br />PV.08 PLACARDS <br />PV.09 PLACARD MAP <br />PV.10 MICROINVERTER MAP <br />SS.00 SPECIFICATION SHEETSBldg# 101117174 <br />Elec# 20181292 <br />Issued 10/24/23 <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to <br />compliance with all applicable city and state codes and <br />regulations regarding construction. The approval of the <br />plans does not constitute any certification of the accuracy, <br />completeness, or building permit status of the existing <br />buildings and structures as shown. <br />1005 N Evonda St <br />#211/7/2023