HomeMy WebLinkAbout10196548 - Permitq
Proiect Address: 505 N Sunset St
Assessor's Parcel OO7 -312-12 Lot: 12
Bldg: Address Range:Suite Range:
Zoning: C2Block NA Tract: '1341 Historic: No
City of Santa Ana 20 civic Center Plaza (M-19)' Santa Ana, cAg27Q2 Building
Permit Counter: (714\ 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714]'647-5853
Permit #: 10195548
Pin #: 92557
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Usel
Single Family Dwelling
Solar
Solar
SFD Watt garage
R.3, U
VB
cBc 2016
x-0602320257 J
1st FL Area:
2nd FL Area:
Other Areas:
Garage Area:
Total:
Patio:
T.l.Area:
Yards Req'd:
Valuation: $1'1,000.00
Occupancy:
Constr Type
Code:
Flood Zone:
# of Stories:
Description of Work: lnstall solar panels
Planning Conditions:
gsLch+:45
0ff i.e3 (:lnonsi il.l
htet i
Owner:
Address
Marco Soto
505 N Sunset St
Santa Ana, CA 92703
(7',t41 726-2905
Contractor: SolarCityCorporation
Address: 183'l Ritchey St
Santa Ana, CA 92705
Phone: (702) 785-2998
State Lic #r 888104
Lic Typer B, A, C-10, C-20, C46
Bus. Lic #: 324801
Workers' Compensation lnsurance:Carrier: Zurich
Policy #: WC0182018
Expires: 1Ol31l2O1A
Address
Rcpt+ r u2?
TrBnsoct i
S0l ctr{: it.!
utl0lrl9
i,t rt:,r -t
taIr
'I6Llltllll,i(evo1v in
i161 ?Il:ltl
:r***i *9
Phone.
License #
Architecl /
Desiqner:
Address.
P hone.
License #:
I.l
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp. Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
Hernandez, Kathy
Date:
Date:
Datei 05/2512018
Subject to Field:
$450.00
$1 .00
$0.00
01776002 51501 Permit Fee
01776002 57672 Bldg. Stds. Revolving
07776002 57600 General Plan Update
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#
Flood Zone Cert. Req'd: No O116002 S1601
01 1 16002 51612
$450 00
$1 00
Every perfiit issued shall become invalid unless the work on the site authoized by
such permit is comfienced within 180 days aftet its issuance or if the wotk outhotized
on the site by such pemit is suspended or abandoned lot a period of 180 days after
the time lhe work is cofifienced
lnspector ltAlD#: 2018-142142
Fee Total:
Paid to Date:
Balance Due
Unit:
\li(
lr
Engineer:
Phone:
Tenant:
ArJtL + i ll
lvlisc. Receipt:
lvlisc. Receipt:
Misc. Receipt:\0(
Total
$451 00
$0.00
945't.00
SITE-WORK DATE ID/SIG.COMMENTS OWNER AUILDER DELCARATION
I hcEhy nlftm unds t'ctr{lly ol Dcrjury rhar I rm.rcnpr fftnn rhc Contruc(B l-i.cnsc l-trN for rhc follo*ing rcannr (Scc?0115
Bxli'lcs rd Prorcsion Cqte) Any Ciry o! Counry which rcautcs . tlnlil t. .onnrucr, a,ts. inprovc. &nnlnh or Epln rny
nrudurc. Plnlh irs *surn.c,0ho rcqu,rcs rh. lppltnnr f{r slch Fnnir ro lilc a riSncd nalcmor rh hco! shc n licc!\cd pususnt
lo rhc p.ovisions.rth. conracd s Li.dh*d ll, (Cluplcr 9, Connncn.i.rs wilh Scclnnr ?0r0 ol Divnnrn I ofthc Businc$ rtrd
Proacsst'nsCodc)orlhnllrcorshchcxcmplrhcrcft.m ndrhc hlis turrlr rllcscd cxcnrtrion AtryvidarioiofScibnTO.ll5btxny
rpplicrnr ntr a pc.nril subjccrs rhc ap!licrnr Io o civil !cn.llyorDor nrrc th,n fivc htrndrcd doll s ($500)
L ns owhcr.lrh.ItuI,jny. oi my.hpkrycrs wilh s ses !s thct solc conrp.nsllion. silld.ltE work ffd thc \trururc n nol
inrcndcd or ofcrcd lor ulc (SL!.7t)1-1, Busirc$ rn{l Piofcssn,ns Cdlc Thc G)ntrt,\ l-iccnr uw do.s nor apply b 3no*Nr oi
rh.F,pcny wh' builds or inUoE\ rh.E$n. orx! who dN\ ruch sod( h,nNclfor hcr!.lror rhnrulh his or hr o*tr cmpl.tces.
t]n)v'dcdrhdtsu.h i'nptvc $i*,r. dor i cndcil oror]trql lbr \nlc lr: k)scrr. rh. ht tlir or irn NuEnr i\ sld wilhii, c)rJt
olcompleli,,n.lhc osncr lJuiHcr *illhalc rhc hofllctr.itn'rnB rhr' h. or \hc did tror htrikl or i'npmw rh. lmFry ror rlE rurthr or
l. r\ustr.rofrhcIroF-ny. amcr.lu\iv.lyconrrcri'rg *nh liccnscd conrrrckn\ kr con$rucr rh.IrcFr (Scc ?0i14. gusm$
r thncs{iotr Corlc l hc Conlr&ktr's Lrcns. Lrw dods ndr rtply n) nn owNr or l)ft,pcdy who hrilds .r imlrovN rhcicon,
rnd sho dnnrr.r\ tur \!ch ptr,j.cr\ sirh r Cotrrmcr{n(\) li.cnscd,rtrNua hrhcConrracroisLiccn{ctjw).
l,n'.r.n,l)rldcr Sdcrnnr_. B. & P.C.lbrrhis rci{nr
Drle: Ovner
lVOR(ERy C(|luPFN.SATTCN
aEllA84ull
I hcrcby rliinn undcr t^..n,lry oi trljury onc orrhc rolk,wiis dcclar n,i\:
Ihdvcn' s ill trx,i'nrin ! Ccn ilicarc or Con{ni n, Sclll trff. ior *orkc^ $mNnsrrioo. r\ pnviJcd fitr hy Scuriotr .l?(U of rlr
ffi";
Itr lhc lE 'oirruncc ol lhc work l'or whi.h rh. pcnnh i! i\\ucd
sh'.h(h,s tu ir ,\ LUCJ Mt co'nr.nsrrion iNuEncc .rdcr dxl rolicy nu Dhcr rc:
:o t(or", ".,*, U1,/ L0 i
l.cnifyrh.t inrhr If,rfo.nriccofrhcwork ntrwhich rhi\ pcrnrir i\ isrudd.I\hnllior dirPlot any p.^on inant mncr
$ rsrobtcorx sut'jsr lolhc sorkcF c.mpens0lion lowsolCtrlifonrin. ind ryrcclhot i,l sh.uld tEconrc subtcd rorhc
*orr.n compcns!ionpmvtions otsccrn.:l7lx)olrhc L'try Gdc.l \h!ll. forrhlirh comrly wilhrtos lrovisions
WARNIN(;: t,Ilurc to scurc solkcr coDpcns iotr corc&Ac is utrhwtul. nM shlll sublccr otr cnrtlo)cr ro sm n0llcn0ltas ind
civil 6ncs up ro onc hundrcd thausnd ilollm ($l0l).tro0). in rddilidr ro rh. con ol co.rtcns.rnnr. d{ru8cs.r prnridcn io!
'hc
;::ryliryi$
I hccby.mrfl ud$ p.Mlly of pcrjuy th,r I an L.cnwl xndcr pblnii)n orchlprd 9 t.onmn.ing wilh Soliln 7tD0] ol Division l
or rhc Busirc$und Pmacssi.n\ Gdc.!ftjmr liccnE h in lulllorcc uftl elitcr.
v,I c
tr)2El I I
!!)l-lt!](l.rlN-Lr!!!tl1ji!
I hctoby nllnh undrr rculirofFrjtry rhr rhcrc is r cotr{ru.riotr lcnJing rgcnct for rhc pcrrornuncc orrhc work lor which rhi! Fnnn ir
R{rc.lrs.c :1017 ('iv C)
l,cndcrs Addrc$
AITLrIANLDECIABTI]ON
I rrrby allinn tr n,l.r pcmlry ol ll{rjuryoN ottu hllowif8 ncchrrrion\:
Dcnnhion ttrmih'Ash(nos Notification ltderalRcEulirions ( rirk 40. Prn6)
-Rcquircn
br'crol Noriicarbn
il,rnilj rl- rt. fc,lc'Jl rEulJri,n. rpJdilp B.h.r{,.nnrJlJrc n,{ 'mli.:l"lc rn rFn pmr.r
fh,#+n,,n.,,*'.*u,'n^JnnlE.ntrinlndqnrcrhrirItribroinLnndiotrN.oncdIasrero.ompl,wirhallciryrndcounryordr{rlc.rnd Sr,t Li*. Rl,inE rnburld[s (otr{dcrn,n. dt hcrubylurh.rizcrcprcscnl ilcsoflhisCnr.ndCounlylocnlqul)onrtr
rir,r. n.fl r, r t'r'trdt ntr
\(qtr\x ^'.,X|L5LY
Set Backs
Erection Pads
UFER Ground
SLAB Floor
Subf loor/VenUlnsulation
Rool Sheathinq
Shear Wall
framing
lnsulation/Energy
Drywall
lVlason rY
Pool Fence
T-Bar
Handi cap Beq
De puty Final Report
Engineer Final Report
FINAL U\1,t\\9
^rxrl(\)\Certilicate of Occu pancy
Notes, Remarks, Etc
BUILDING. INSPECTOR RECORD
Forms/Sleel/Holdowns
Ext./lnt. Lath
Brown Coat
Flood Zone Cefiif .
t---+--
Plannlng & Building Agency
Bulldlng Safety Dlvision
20 CMc Center Plaza
P.o. Box 1988 (Itl-l9)
Santa Ana, CA 92702
(7r4) 647{800
www.aanla-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL-01 cBc 2013
Solar Photovoltalc (PV) Checkllst for Detached SINGLE FA ILY RESIDENCES Only
lnstructlons: The licensed contraclor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11' x 17" Eize. lf answerlns NO to anv ol the ques0ons. plan check thall be reoulred.
Project Address:GOs N Sunset St, Santa ana, CA 92703, US
TESLA
YES NO Are the following applicablo to the proposed project?
Will the PV system layout provide the required thre+'foot wide clear access pathways
per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan?
Vvill the PV system be installed on a roof having only one roofing layer with no
overlays?
\Mll the PV anay be flush mounted to the existing roof so that the plane of th€
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
\Mll the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum 1o 10'maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Wll the anchorc be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Willthe minimum 5/16" lag screws be installed with a minimum of 2'112lnch
embedment into roof rafters (with pre{rilled holes) and is this minimum embedment
shown on the plans?
Are ALL the slructural pages of the plans WET stamped and signed by a Califomia
licensed professional engineer? (including pro,ect sp€cific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
1 EI tr
2 trtr
ao
Eltr
Eltr
tro
atr
c
4
5
6
7
S. Etr
s Elo
10 tra
I certlfy unde
Print Name:
r penalty of periury u nder the laws of the State ol
Signatu
Phone Number:.2Aq
Email Address:
R6v: 8Yr72015
tnt0x Ktav v\\f^r0
Date:6
ia that tho is truo:
-,-SANTA
ANArr[]*
Contractor Company Name:
Gontractor Llcense Numbet:888 104
-'-SANTA
ANAqil$
Plannlng & Building Agency
Bulldlng Safety Dlvision
20 Clvic Center Plaza
P.O. Aox 1988 (M-19)
Santa Ana, C492702
(714) 647-5800
www.santa{na.org
RESIDENTIAL
PHOTOVOLTA!C
CHECKLIST
sol{1 cBc 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer lhe ten questions and
sig n the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size.f answerin NO to of he u n check shall be re
Project Address:
Contractor Company Name:
Contractor License Number:
TESLA
BBB 104
YES NO Are the following applicable to the proposed proiect?
Will the PV system layout provide the required three'foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted lo the existing roof so that the plane of tho
modules (panels) are parallel to lhe plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and haps)?
Will the PV system be installed with a space of 2'minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter'weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch
embedment into roof rafters (with predrilled holes) and is lhis minimum embedment
shown on the plans?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including proiecl specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
,|trtr
2 trtr
trtr
trDatr
trtr
tro
4
5
6
7
I Eltr
a @tr
'10.trtr
I certity under pe nalty o, pariury under the laws of the State of C
Print Name:Signatu
Phone Numb6r
Email Address:
2Aq Date:5
R€v: 8/1712015
tnftx^t axv\\{at1@fl(r,(
rnia that tho a is truo:
G05 N Sunset St, Santa ana, CA 92703, US