Loading...
HomeMy WebLinkAbout1508 E Washington Ave- need V1 & V2 - 101113268 & 20178303 - Plan76 North Meadowbrook Drive Scott E. Wyssling, PE Alpine, UT 84004 Jon P. Ward, SE, PE office (201) 874-3483 Gregory T. Elvestad, PE swyssling@wysslingconsulting.com August 22, 2022 Green World Renewable Energy 4408 Ritchie Highway Baltimore, MD 21225 Re: Engineering Services Guillen Residence 1508 East Washington Avenue, Santa Ana, CA 6.370 kW System To Whom It May Concern: We have received information regarding solar panel installation on the roof of the above referenced structure. Our evaluation of the structure is to verify the existing capacity of the roof system and its ability to support the additional loads imposed by the proposed solar system. A. Site Assessment Information 1. Site visit documentation identifying attic information including size and spacing of framing for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information will be utilized for approval and construction of the proposed system. B. Description of Structure: Roof Framing: Assumed prefabricated wood trusses at 24” on center. All truss m embers are constructed of 2x4 dimensional lumber. Roof Material: Composite Asphalt Shingles Roof Slopes: 20 degrees Attic Access: Inaccessible Foundation: Permanent C. Loading Criteria Used x Dead Load o Existing Roofing and framing = 7 psf o New Solar Panels and Racking = 3 psf o TOTAL = 10 PSF x Live Load = 20 psf (reducible) – 0 psf at locations of solar panels x Ground Snow Load = 0 psf x Wind Load based on ASCE 7-16 o Ultimate Wind Speed = 95 mph (based on Risk Category II) o Exposure Category C Analysis performed of the existing roof structure utilizing the above loading criteria is in accordance with the 2019 California Residential Code, including provisions allowing existing structures to not require strengthening if the new loads do not exceed existing design loads by 105% for gravity elements and 110% for seismic elements. This analysis indicates that the existing framing will support the additional panel loading without damage, if installed correctly. 1508 E Washington Ave - 2017830312/30/22 Page 2 of 2 D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent Everest Solar Systems installation manual. If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. The maximum allowable withdrawal force for a 5/16” lag screw is 235 lbs per inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications. Based on a minimum penetration depth of 2½”, the allowable capacity per connection is greater than the design withdrawal force (demand). Considering the variable factors for the existing roof framing and installation tolerances, the connection using two 5/16” diameter lag screw with a minimum of 2½” embedment will be adequate and will include a sufficient factor of safety. 3. Considering the wind speed, roof slopes, size and spacing of framing members, and condition of the roof, the panel supports shall be placed no greater than 72” on center. 4. Panel supports connections shall be staggered to distribute load to adjacent framing members. Based on the above evaluation, this office certifies that with the racking and mounting specified, the existing roof system will adequately support the additional loading imposed by the solar system. This evaluation is in conformance with the 2019 CRC, current industry standards and practice, and is based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. Very truly yours, Scott E. Wyssling, PE California License No. 83664 Signed 8/22/2022 1508 E Washington Ave - 2017830312/30/22 Wyssling Consulting 76 N. Meadowbrook Drive Alpine, UT 84004 (201) 874-3483 swyssling@wysslingconsulting.com Existing Guillen Residence Roof Dead Load 1508 East Washington Avenue 2 psf Composite Shingle Santa Ana, CA 1 psf 7/16" Plywood Sheathing 4 psf 2x4 Trusses @ 24 in. o.c. 0 psf Ceiling, Mechanical, Electrical 0 psf Miscellaneous 7 psf TOTAL Second Floor Dead Load 0 psf Floor Finishes 0 psf 1 1/8" Subfloor Sheathing 0 psf Joists @ 16' o.c. 0 psf Partitions 0 psf Ceiling, Mechanical, Electrical 0 psf Miscellaneous 0 psf TOTAL Roof Live Load Floor Live Load 20 psf 0 psf Roof Snow Load Ground SnowLoad= 0 psf(to be divided by cosine of roof angle for horizontal projection ASCE 7 Sec. 7.4) pf = 0.7 Ce Ct I pg = 0 psf Ce = 1, Ct = 1.1 Flat Roof Snow Load (ASCE 7-16 Eq. 7.3-1) Cs = 0.91 ASCE 7-16 Figure 7.4-1 Additional Roof Dead Load - New Solar Panels 3 psf Roof Live Load at Solar Panels 0 psf Roof Snow Load at Solar Panels 0 psf Sloped Roof Snow Load (ASCE 7-16 Eq. 7.4-1) Total Total Existing Roof Load = (DLROOF + Max(LLROOF or S)) AreaROOF 69678 lbs Total New Roof Load = (DLROOF + DLADD + Max(LLROOF or S)) AreaROOF 63952 lbs Change in Demand = (Total New Roof Load - Existing Roof Load) / Existing Roof Load -8.22% 2018 IEBC Section 807.4 states: "Existing structural elements supporting any additional gravity loads as a result of the alterations, including the effects of snow drift , shall comply with the International Building Code. EXCEPTION: 1. Structural elements whose stress is not increased by more than 5%." Gravity Loads Total New Gravity Loads are less than Existing Loads. OK 508 East Washington Avenue Santa Ana, CA 8/22/2022 1508 E Washington Ave - 2017830312/30/22 Wyssling Consulting 76 N. Meadowbrook Drive Alpine, UT 84004 (201) 874-3483 swyssling@wysslingconsulting.com V = 95 Basic Wind Speed Guillen Residence Exposure C ASCE 7-16, Section 26.7 1508 East Washington Avenue Kz = 0.85 Velocity Pressure Coefficient, ASCE 7-16, Figure 26.10-1 Santa Ana, CA Kzt = 1 Topographic Factor, ASCE 7-16, Section 26.8.2 Kd = 0.85 Directionality Factor, ASCE 7-16, Section 26.6 Ke = 0.994 Ground Elevation Factor, ASCE 7-16, Section 26.9 qh = 16.6 psf qh = 0.00256KzKztKdKeV2 (ASCE 7-16 Eq. 26.10-1) Roof Angle = 20 deg Roof Type Gable sanchor = 72 in Horizontal spacing of roof anchors Atrib = 20.61 sf Panel Area tributary to each roof anchor GCp External Pressure Coefficient, ASCE 7-16, Figure 30.3-2 Roof Zone Zone 1 2e 2n 2r 3e 3r -1.99 -1.99 -2.91 -2.91 -2.91 -3.39 ga = 0.75 Pressure Equalization Factor, ASCE 7-16 Figure 29.4.-8 gE = 1.00 Edge Array Factor, ASCE 29.4.4 edges < 0.5*building height, and panel spacing < 4ft. pnet = qhGCpgEga =Design Wind Pressure, ASCE 7-16, Equation 29.4-7 Roof Zone 1 2e 2n 2r 3e 3r -25 psf -25 psf -36 psf -36 psf -36 psf -42 psf Min Pressure = -16 psf Use 25 psf Use 25 psf Use 36 psf Use 36 psf Use 36 psf Use 42 psf ULTIMATE x 0.6 = 16 psf 16 psf 22 psf 22 psf 22 psf 25 psf ALLOWABLE Connection to Existing Roof Framing F.S. = 1 Additional Factor of Safety applied to withdrawl force, if desired Atrib = 20.6 ft2 DLpanel = 3 psf Roof Zone 1 2e 2n 2r 3e 3r Wuplift = 25 psf 25 psf 36 psf 36 psf 36 psf 42 psf Plag = F.S. x Atrib x (0.6D - 0.6W) =Withdrawl force for each roof anchor Roof Zone 1 2e 2n 2r 3e 3r -276.2 lbs -276.2 lbs -418.8 lbs -418.8 lbs -418.8 lbs -492.3 lbs Connection Capacity db = 5/16 in Lag Screw diameter Dpen = 2 1/2 in Lag Screw penetration into existing framing member No. of Screws 2 Screws per Connection Species of wood framing C D = 1.6 Load Duration Factor for Wind Loading, NDS Table 2.3.2 Ct = 0.7 Temperature Factor, NDS Table 10.3.4 W = 266 lb/in Withdrawl Capacity, NDS Equation 11.2-1 W' = C D x Ct x W = 298 lb/in Adjusted withdrawl value Pallow = Dpen x W' = 1490 lbs (Using (2) screws per connection) Roof Zone 1 2e 2n 2r 3e 3r DEMAND = 276 lbs 276 lbs 419 lbs 419 lbs 419 lbs 492 lbs CAPACITY = 1490 lbs 1490 lbs 1490 lbs 1490 lbs 1490 lbs 1490 lbs up to72in okup to72in okup to72in okup to72in okup to72in okup to72in ok This analysis calculates the capacity of the lag screws only. For capacity of the complete mounting system, please see manufacturer's recommendations. Douglas Fir-Larch Wind Uplift Rooftop Solar Panels Parallel to Roof Surface ASCE 7-16, Section 29.4.4 508 East Washington Avenue Santa Ana, CA 8/22/2022 1508 E Washington Ave - 2017830312/30/22 ROOFTOPGROUND LEVEL -HOUSE EXTERIOR20A 20A N 2 (N) JUNCTION BOX WITH IRREVERSIBLE GROUND SPLICE NOTE: IN BETWEEN EACH ARRAY THE EMT IS USED AS THE GROUNDING / BONDING, GROUND CLAMPS ARE AT EACH END OF THE EMT CONDUIT WITH THE WIRE THEN FREE AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL (N) 100A PV LOAD CENTER 12 3 4 1 PV CIRCUIT 1: 8 MODULES/PARALLEL [ (4) AP SYSTEM DS3-L 2 IN 1 ] (N) 14 SOLAREVER SE-166*83-455M-144 (455W) MODULES WITH (7) AP SYSTEM DS3-L MICRO-INVERTERS ATTACHED TO THE BACK OF MODULES.M POINT OF DELIVERY AND INTERCONNECTION 30A 200A N (E) GROUNDING ELECTRODE OR (UFER) BACKFEED BREAKER EXISTING 240V/200A MAIN SERVICE PANEL SINGLE PHASE 3 5 6 7 8 12 1 PV CIRCUIT 2: 6 MODULES/PARALLEL [ (3) AP SYSTEM DS3-L 2 IN 1 ] 3 4 5 6 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. Conduit and Conductor Schedule Tag Description Wire Gauge # of Conductors Conduit Type Conduit Size 1 PV WIRES 10 AWG 2 N/A - Free Air N/A - Free Air 1 Bare Copper Ground (EGC/GEC) 6 AWG 1 N/A - Free Air N/A - Free Air 2 THWN-2 10 AWG 4 EMT 3/4" 2 THWN-2 - Ground 8 AWG 1 EMT 3/4"METER # 222013428012 Inverter Ratings Inverter Make/Model AP SYSTEM DS3-L MICROINVERTER Max DC Volt Rating 60V Peak Output Power 768W Max Nominal Voltage 240V Max AC Current 3.20A Max OCPD Rating 20A DESIGN TEMPERATURES ASHRAE EXTREME LOW 2°C ASHRAE 2% HIGH 31 °C PV Module Ratings @ STC Module Make/Model SOLAREVER SE-166*83-455M-144 (455W) MODULE Max Power-Point Current (Imp)10.96A Max Power-Point Voltage (Vmp)41.51 V Open-Circuit Voltage (Voc)49.35V Short-Circuit Current (Isc)11.44A Max Series Fuse (OCPD)20A Nominal Maximum Power at STC (Pmax)455W Maximum System Voltage 1500V Voc Temperature Coefficient -0.29%/°C 3 THWN-2 10 AWG 3 EMT 3/4" 3 THWN-2 - Ground 8 AWG 1 EMT 3/4" SYSTEM SUMMARY BRANCH #1 INVERTERS PER BRANCH 4 MAX AC CURRENT 12.8A MAX AC OUTPUT POWER 3072W ARRAY STC POWER 6370W ARRAY PTC POWER 5946W MAX AC CURRENT 22.40A MAX AC POWER 5376W DERATED (CEC) AC POWER 5737.70W BRANCH #2 3 9.6A 2304W MAIN SERVICE PANEL 240/120V 1Ø, 3W MAIN BUSS: 200A MAX BREAKER SIZE: (200A X 1.2) - 200A = 40.0A E-1 1508 E Washington Ave - 2017830312/30/22 N1. NOT ALL PLACARDS SHOWN MAY BE REQUIRED BY LOCAL AHJ. CONTRACTOR TO VERIFY PLACARD REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION. 2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALIFORNIA ELECTRICAL CODE 3. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTCHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. 4. DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8" LETTER HIEGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. PERMANENT SIGNAGE NOTES: WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE POWER SOURCE OUTPUT CONNECTION LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(b) ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(c), SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. LABEL LOCATION: ON OR NO MORE THAT 3 M (10 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. ELECTRICAL SHOCK HAZARD WARNING! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2019: 690.13(B) TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION 5$3,' 6+87'2:1 6: ,7&+ )25 62/$5 39 6<67(0 LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): CEC 2019: 690.56(C)(3), CFC 2019: 1204.5.3 32:(5727+,6%8,/',1*,6 $/626833/,(')5207+( )2//2:,1*6285&(6:,7+ ',6&211(&76$66+2:1 &$8 7,21 (N) SOLAR PANELS AND MICRO-INVERTERS ON ROOF MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 22.4 AMPS 240.0 VAC PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2019: 690.54 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. E-21508 E WASHINGTON AVEWARNING! THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. PV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO & PV LOAD CENTER. 1508 E Washington Ave - 2017830312/30/22 N1. NOT ALL PLACARDS SHOWN MAY BE REQUIRED BY LOCAL AHJ. CONTRACTOR TO VERIFY PLACARD REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION. 2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALIFORNIA ELECTRICAL CODE 3. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTCHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. 4. DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8" LETTER HIEGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. PERMANENT SIGNAGE NOTES: WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE POWER SOURCE OUTPUT CONNECTION LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(b) ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(c), SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. LABEL LOCATION: ON OR NO MORE THAT 3 M (10 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. ELECTRICAL SHOCK HAZARD WARNING! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2019: 690.13(B) TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): CEC 2019: 690.56(C)(3), CFC 2019: 1204.5.3 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN CAUTION: (N) SOLAR PANELS AND MICRO-INVERTERS ON ROOF MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 25.6 AMPS 240.0 VAC PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2019: 690.54 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. E-21508 E WASHINGTON AVEWARNING! THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. PV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO, AC DISCONNECT & PV LOAD CENTER. 1508 E Washington Ave - 20178303-2017855 2 03/09/23 To whom it may concern, This letter serves to confirm I have chosen to have my system installed by Solgen Construction LLC. You have my express permission to move forward with the solar permit applied for by Solgen Construction LLC for my property at 1508 E Washington Ave, Santa Ana, CA 92701 Thank you, Elizabeth Guillen DocuSign Envelope ID: 159A20A5-AB5E-4F2C-955D-93DEBFB040C7 1508 E Washington Ave - 2017830312/30/22 DocuSign Envelope ID: 159A20A5-AB5E-4F2C-955D-93DEBFB040C7 1508 E Washington Ave - 2017830312/30/22 Certificate Of Completion Envelope Id: E254CBEFA38C4F48AFBB8725A91E3E56 Status: Completed Subject: Please DocuSign: Elizabeth Guillen Letter of Authorization.pdf Source Envelope: Document Pages: 2 Signatures: 1 Envelope Originator: Certificate Pages: 5 Initials: 0 Core Energy Group AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 727 Eagle Pass North Salt Lake, UT 84054 proposals@coreenergygroup.com IP Address: 50.230.190.63 Record Tracking Status: Original 9/21/2022 8:52:58 AM Holder: Core Energy Group proposals@coreenergygroup.com Location: DocuSign Signer Events Signature Timestamp Elizabeth Guillen navarroguillen@aol.com Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 166.205.107.24 Signed using mobile Sent: 9/21/2022 8:56:41 AM Viewed: 9/22/2022 10:07:00 AM Signed: 9/22/2022 10:10:23 AM Electronic Record and Signature Disclosure: Accepted: 9/22/2022 10:07:00 AM ID: bdb5adb2-c366-4b7e-8c88-acba9c28e63e In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Customer Service cs@coreenergygroup.com Security Level: Email, Account Authentication (None) Sent: 9/21/2022 8:56:41 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Permits permits@coreenergygroup.com Security Level: Email, Account Authentication (None) Sent: 9/21/2022 8:56:41 AM Viewed: 9/21/2022 9:05:31 AM Electronic Record and Signature Disclosure: Accepted: 9/2/2022 12:54:06 PM ID: cd3255b6-1dde-4915-88e9-db9665de6fa9 Witness Events Signature Timestamp Notary Events Signature Timestamp 1508 E Washington Ave - 2017830312/30/22 Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/21/2022 8:56:42 AM Certified Delivered Security Checked 9/22/2022 10:07:00 AM Signing Complete Security Checked 9/22/2022 10:10:23 AM Completed Security Checked 9/22/2022 10:10:23 AM Payment Events Status Timestamps Electronic Record and Signature Disclosure 1508 E Washington Ave - 2017830312/30/22 ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, Solgen Construction LLC (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign s ystem to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 5/17/2019 7:32:49 AM Parties agreed to: Elizabeth Guillen, Permits 1508 E Washington Ave - 2017830312/30/22 Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact Solgen Construction LLC: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: proposals@solgen.co To advise Solgen Construction LLC of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at proposals@solgen.co and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from Solgen Construction LLC To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to proposals@solgen.co and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with Solgen Construction LLC To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: 1508 E Washington Ave - 2017830312/30/22 i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to proposals@solgen.co and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that: You can access and read this Electronic Record and Signature Disclosure; and You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and  Until or unless you notify Solgen Construction LLC as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by Solgen Construction LLC during the course of your relationship with Solgen Construction LLC. 1508 E Washington Ave - 2017830312/30/22 NOT FOR PERMITTING USE. FOR INSTALLATION USE ONLY 2 1 4 3 6 5 8 7 10 9 12 11 14 13 16 15 18 17 20 19 22 21 24 23 26 25 28 27 30 29 32 31 34 33 36 35 38 37 40 39 42 41 44 43 7473 7271 7069 6867 6665 6463 6261 6059 5857 5655 5453 5251 5049 4847 4645 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. INSTALL 1508 E Washington Ave - 2017830312/30/22 N 1'-6" 3' 3' SCALE: 3/32" = 1'-0" PV SYSTEM SITE PLAN PV SYSTEM SIZE: 6.37 kW DC LEGEND M METER MAIN COMBO CONSTRUCTION NOTES MPV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO & PV LOAD CENTER MOUNTED ON EXTERIOR WALL OF A SINGLE FAMILY RESIDENCE. DRIVEWAY (14) SOLAREVER SE-166*83-455M-144 (455W) WITH (7) AP SYSTEM DS3-L MICRO-INVERTERS MOUNTED TO THE BACK OF MODULE MOUNTED ON COMP SHINGLE ROOF 1508 E WASHINGTON AVE ROOF OBSTRUCTIONS SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. PV-1LCCAL-FIRE ROOF LADDER ACCESS POINT 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC WIND SPEED OF 95 MPH (3 SECOND GUST), WIND EXPOSURE B. 3. THE ROOF MEMBERS ARE 2 "X 4" TRUSSES AT 24" ON CENTER. CONNECTION TO STRUCTURE SHALL NOT BE WITHIN 11" OF NAILING PLATES. 4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 5. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). 6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE FOLLOWING (CRC R324.7.1, CBC 3111.2.1) 6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS. 6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS: TREES, WIRES, OR SIGNS. 7. SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES IN COMPLIANCE WITH 2019 CFC/2018 IFC 1204.2.1.2 TOTAL PLAN VIEW AREA = 2543.19 SQFT TOTAL PV AREA = 14(82.44 IN)(40.86 IN)/(144 IN^2) = 327.49 SQFT (327.49 SQFT/ 2543.19 SQFT)100 = 12.88% TOTAL PV AREA POPULATES 12.88% OF TOTAL PLAN VIEW AREA AND IS WITHIN THE 33% REQUIREMENT. PROPERTY LINE LOCATION OF "RAPID SHUTDOWN" DISCONNECT NEC 690.12 (E) SERVICE DROP NEW SOLAR PANEL LC PV LOAD CENTER (E) SWIMMING POOL PROPERTY LINERoof Azimuth: 180° Roof Tilt: 20° Roof Section 1 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINE8/22/2022 The scope of the plans is for the installation of the solar photovoltaic system only and the approval is subject to compliance with all applicable city and state codes and regulations regarding construction. The approval of the plans does not constitute any certification of the accuracy, completeness, or building permit status of the existing buildings and structures as shown. Bldg# 101113268 Elec# 20178303 Issued 12/29/22 1508 E Washington Ave - 2017830312/30/22 6' 6'6' N SCALE: 3/16" = 1'-0" PV SYSTEM MOUNTING DETAILS EXISTING COMP SHINGLE ROOF EVEREST SPLICE FOOT XL FOR COMP SHINGLE @ 72" O.C. MAX PROPOSED EVEREST CROSSRAIL RACKING PROPOSED SOLAREVER SE-166*83-455M-144 (455W) PV SOLAR MODULES EXISTING 2 "X 4" ROOF TRUSSES @ 24"O.C. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. PV-2 (E) SERVICE DROP Roof Azimuth: 180° Roof Tilt: 20° Roof Section 1 8/22/2022 1508 E Washington Ave - 2017830312/30/22 ROOF SLOPE910 10 6 21 7 S-5 D5 20 11 1214 13 15 18 22 END CLAMP S-5 D4 3 1 5 4 25 24 23 8 26 2 ''(7$ ,/  75$169(56( 127 72 6&$/( ''(7$ ,/  /21*,78',1$/ 127 72 6&$/( '5$&. ,1* '(7$ ,/  75$169(56( 127 72 6&$/( '5$&. ,1* '(7$ ,/  723 127 72 6&$/( '5$&. ,1* '(7$ ,/  /21*,78',1$/ 127 72 6&$/( SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. ROOF MATERIAL: COMP SHINGLE ROOF STRUCTURE: TRUSSES ATTACHMENT TYPE: EVEREST SPLICE FOOT XL MODULE MANUFACTURER: SOLAREVER MODULE MODEL: SE-166*83-455M-144 (455W) MODULE LENGTH: 82.44'' MODULE WIDTH: 40.86" MODULE WEIGHT: 51.8 LBS. SEE SHEET S-1 FOR DIMENSION(S) MIN. FIRE OFFSET: 18" TRUSSES SPACING: 24" O.C. TRUSSES SIZE: 2 "X 4" NOMINAL LAG BOLT DIAMETER: 5/16 IN. LAG BOLT EMBEDMENT: 2.5 IN. TOTAL # OF ATTACHMENTS: 23 TOTAL AREA: 327.49 SQ. FT. TOTAL WEIGHT: 725.20 LBS. WEIGHT PER ATTACHMENT: LBS. DISTRIBUTED LOAD: 2.21 PSF MAX. HORIZONTAL STANDOFF: 72 IN. MAX. VERTICAL STANDOFF: LANDSCAPE: 26 IN., PORTRAIT: 39 IN. STANDOFF STAGGERING: YES RAIL MANUFACTURER AND MODEL (OR EQUIV.):EVEREST CROSSRAIL RAIL WEIGHT: 0.436 PLF. MAX. TRUSSES SPAN: 12 FT. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. PV-3 8/22/2022 1508 E Washington Ave - 2017830312/30/22 ROOF SLOPE910 10 6 21 7 S-5 D5 20 11 1214 13 15 18 22 END CLAMP S-5 D4 3 1 5 4 25 24 23 8 26 2 D4 DETAIL (TRANSVERSE) NOT TO SCALE D5 DETAIL (LONGITUDINAL) NOT TO SCALE D1 RACKING DETAIL (TRANSVERSE) NOT TO SCALE D3 RACKING DETAIL (TOP) NOT TO SCALE D2 RACKING DETAIL (LONGITUDINAL) NOT TO SCALE SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. 1. ROOF MATERIAL: COMP SHINGLE 2. ROOF STRUCTURE: TRUSSES 3. ATTACHMENT TYPE: EVEREST SPLICE FOOT XL 4. MODULE MANUFACTURER: SOLAREVER 5. MODULE MODEL: SE-166*83-455M-144 (455W) 6. MODULE LENGTH: 82.44'' 7. MODULE WIDTH: 40.86" 8. MODULE WEIGHT: 51.8 LBS. 9. SEE SHEET S-1 FOR DIMENSION(S) 10. MIN. FIRE OFFSET: 18" 11. TRUSSES SPACING: 24" O.C. 12. TRUSSES SIZE: 2 "X 4" NOMINAL 13. LAG BOLT DIAMETER: 5/16 IN. 14. LAG BOLT EMBEDMENT: 2.5 IN. 15. TOTAL # OF ATTACHMENTS: 20 16. TOTAL AREA: 327.49 SQ. FT. 17. TOTAL WEIGHT: 725.20 LBS. 18. WEIGHT PER ATTACHMENT: 36.26 LBS. 19. DISTRIBUTED LOAD: 2.21 PSF 20. MAX. HORIZONTAL STANDOFF: 72 IN. 21. MAX. VERTICAL STANDOFF: LANDSCAPE: 26 IN., PORTRAIT: 39 IN. 22. STANDOFF STAGGERING: YES 23. RAIL MANUFACTURER AND MODEL (OR EQUIV.):EVEREST CROSSRAIL 24. RAIL WEIGHT: 0.436 PLF. 25. MAX. TRUSSES SPAN: 12 FT. 26. MODULE CLEARANCE: 3 IN. MIN., 6 IN. MAX. PV-3 Signed 8/22/2022 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-1 1508 E Washington Ave - 2017830312/30/22 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-1 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-2 1508 E Washington Ave - 2017830312/30/22 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-2 1508 E Washington Ave - 2017830312/30/22 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-4 1508 E Washington Ave - 2017830312/30/22 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-2 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-2 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-4 1508 E Washington Ave - 20178303-2017855 2 03/09/23 Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC CHECKLIST SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1.   Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2.   Will the PV system be installed on a roof having only one roofing layer with no overlays? 3.   Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4.   Will the PV system weigh maximum 4 pounds per square feet or less? 5.   Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6.   Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7.   Will the PV system be installed without using any ballast system or counter-weight system? 8.   Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9.   Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10.   Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1053344 Solgen Construction, LLC Cole Farmer Permits@CoreEnergyGroup.com 559-462-6009 1508 E Washington Ave, Santa Ana, CA 92701 9/23/2022 1508 E Washington Ave - 2017830312/30/22 SHEET # T-1 T-2 PV-1 PV-2 PV-3 E-1 E-2 S-1 S-2 S-3 S-4 SHEET NAME COVER SHEET PLAN NOTES SITE PLAN LAYOUT ATTACHMENT DETAILS MOUNTING DETAILS ELECTRICAL DIAGRAM WARNING LABELS SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET PROJECT INFORMATION PROPERTY OWNER NAME:ELIZABETH GUILLEN PHONE:- CONTRACTOR NAME:SOLGEN CONSTRUCTION PHONE:(559) 442-9887 DESIGN SPECIFICATIONS OCCUPANCY: R-3 CONSTRUCTION TYPE: SINGLE FAMILY RESIDENCE ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: C WIND SPEED: 95 MPH APPLICABLE CODES & STANDARDS 2019 CALIFORNIA RESIDENTIAL CODE (CRC) 2019 CALIFORNIA BUILDING CODE (CBC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA ELECTRICAL CODE (CEC) 2019 CALIFORNIA PLUMBING CODE (CPC) 2019 CALIFORNIA ENERGY CODE (ENERGY) 2019 CALIFORNIA GREEN BUILDING CODE (CALGREEN) 2017 NATIONAL ELECTRIC CODE (NEC) 2019 CALIFORNIA FIRE CODE (CFC) COORDINATES: 33.756338, -117.848222 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. T-1 AERIAL VIEW TYPE OF INTERCONNECTION: BACKFEED BREAKER IN THE MSP SCOPE OF WORK SYSTEM SIZE: STC: 14 X 455W = 6.370kW PTC: 14 X 424.7W = 5.946kW (14) SOLAREVER SE-166*83-455M-144 (455W) MODULES (7) AP SYSTEM DS3-L MICROINVERTERS (1) 100A PV LOAD CENTER MSP UPGRADE: NO MAIN BREAKER DERATE: NO RACKING & MOUNTING PV ATTACHMENT TYPE: EVEREST SPLICE FOOT XL FOR COMP SHINGLE RACKING TYPE: EVEREST CROSSRAIL- ROOF MOUNT RACKING HARDWARE GUILLEN RESIDENCE NEW PHOTOVOLTAIC SYSTEM PROJECT - 6.370 kW DC / 5.376 kW AC 8/22/2022 1508 E Washington Ave - 2017830312/30/22 SHEET # T-1 T-2 PV-1 PV-2 PV-3 E-1 E-2 S-1 S-2 S-3 S-4 SHEET NAME COVER SHEET PLAN NOTES SITE PLAN LAYOUT ATTACHMENT DETAILS MOUNTING DETAILS ELECTRICAL DIAGRAM WARNING LABELS SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET PROJECT INFORMATION PROPERTY OWNER NAME:ELIZABETH GUILLEN PHONE:- CONTRACTOR NAME:SOLGEN CONSTRUCTION PHONE:(559)442-9887 DESIGN SPECIFICATIONS OCCUPANCY: R-3 CONSTRUCTION TYPE: SINGLE FAMILY RESIDENCE ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: B WIND SPEED: 95 MPH APPLICABLE CODES & STANDARDS 2019 CALIFORNIA RESIDENTIAL CODE (CRC) 2019 CALIFORNIA BUILDING CODE (CBC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA ELECTRICAL CODE (CEC) 2019 CALIFORNIA PLUMBING CODE (CPC) 2019 CALIFORNIA ENERGY CODE (ENERGY) 2019 CALIFORNIA GREEN BUILDING CODE (CALGREEN) 2017 NATIONAL ELECTRIC CODE (NEC) 2019 CALIFORNIA FIRE CODE (CFC) COORDINATES: 33.756338, -117.848222 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. T-1 AERIAL VIEW TYPE OF INTERCONNECTION: BACKFEED BREAKER IN THE MSP SCOPE OF WORK SYSTEM SIZE: STC: 14 X 455W = 6.370kW PTC: 14 X 424.7W = 5.946kW (14)SOLAREVER SE-166*83-455M-144 (455W) MODULES (8)AP SYSTEM DS3-L MICROINVERTERS (1)100A PV LOAD CENTER (1)30A KNIFE AC DISCONNECT MSP UPGRADE: NO MAIN BREAKER DERATE: NO RACKING & MOUNTING PV ATTACHMENT TYPE: EVEREST SPLICE FOOT XL FOR COMP SHINGLE RACKING TYPE: EVEREST CROSSRAIL- ROOF MOUNT RACKING HARDWARE GUILLEN RESIDENCE NEW PHOTOVOLTAIC SYSTEM PROJECT - 6.370 kW DC / 6.144 kW AC Signed 8/22/2022 Revision to 20178303 issued on 12/29/22 Approved by M. Smith on 2/2/23 1508 E Washington Ave - 20178303-2017855203/09/23 1.1. PROJECT NOTES: 1.2. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.3. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.4. GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC 690.5(A) 1.5. ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4 & NEC 690.60: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.6. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO NEC 690.7. 1.7. ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [NEC 110.3]. 1.8. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC AND AHJ. 1.9. SCOPE OF WORK: 1.10. PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.11. WORK INCLUDES: 1.12. PV ROOF ATTACHMENTS - EVEREST SPLICE FOOT XL FOR COMP SHINGLE . 1.13. PV RACKING SYSTEM INSTALLATION - EVEREST CROSSRAIL ROOF MOUNT RACKING HARDWARE 1.14. PV MODULE AND INVERTER INSTALLATION - SOLAREVER SE-166*83-455M-144 (455W) MODULES / AP SYSTEM DS3-L MICROINVERTERS 1.15. PV EQUIPMENT GROUNDING 1.16. PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.17. PV LOAD CENTERS (IF INCLUDED) 1.18. PV METERING/MONITORING (IF INCLUDED) 1.19. PV DISCONNECTS 1.20. PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.21. PV FINAL COMMISSIONING 1.22. (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.23. SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE 1.24. SITE NOTES: 1.25. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 1.26. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 1.27. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 1.28. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 1.29. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 1.30. EQUIPMENT LOCATIONS: 1.31. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 1.32. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C) 1.33. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 1.34. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 1.35. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 1.36. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 1.37. STRUCTURAL NOTES: 1.38. RACKING SYSTEM 1.39. PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND 1.40. A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 1.41. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED PER LOCAL REQUIREMENTS. 1.42. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 1.43. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 1.44. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 1.45. WIRING & CONDUIT NOTES: 1.46. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 1.47. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 1.48. VOLTAGE DROP LIMITED TO 1.5%. 1.49. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 1.50. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15 1.51. GROUNDING NOTES: 1.52. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 1.53. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 1.54. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 1.55. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICROINVERTER MANUFACTORERS’ INSTRUCTIONS. 1.56. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 1.57. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 1.58. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 1.59. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 1.60. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.5 IN GENERAL AND NEC 690.5 (A)(1) SPECIFICALLY. 1.61. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1.62. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 1.63. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 1.64. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [NEC 690.12]. LOCATION OF LABEL ACCORDING TO AHJ 1.65. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 1.66. MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 1.67. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. 1.68. INTERCONNECTION NOTES: 1.69. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 690.64 (B)] 1.70. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)]. 1.71. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(D)(2)(3)]. 1.72. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (D)(2)(3)(C). 1.73. FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (D)(2)(1) 1.74. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 1.75. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (D)(5)]. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. T-2 Signed 8/22/2022 1508 E Washington Ave - 20178303-2017855 2 03/09/23 1.1. PROJECT NOTES: 1.2. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.3. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.4. GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC 690.5(A) 1.5. ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4 & NEC 690.60: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.6. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO NEC 690.7. 1.7. ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [NEC 110.3]. 1.8. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC AND AHJ. 1.9. SCOPE OF WORK: 1.10. PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.11. WORK INCLUDES: 1.12. PV ROOF ATTACHMENTS - EVEREST SPLICE FOOT XL FOR COMP SHINGLE . 1.13. PV RACKING SYSTEM INSTALLATION - EVEREST CROSSRAIL ROOF MOUNT RACKING HARDWARE 1.14. PV MODULE AND INVERTER INSTALLATION - SOLAREVER SE-166*83-455M-144 (455W) MODULES / AP SYSTEM DS3-L MICROINVERTERS 1.15. PV EQUIPMENT GROUNDING 1.16. PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.17. PV LOAD CENTERS (IF INCLUDED) 1.18. PV METERING/MONITORING (IF INCLUDED) 1.19. PV DISCONNECTS 1.20. PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.21. PV FINAL COMMISSIONING 1.22. (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.23. SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE 1.24. SITE NOTES: 1.25. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 1.26. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 1.27. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 1.28. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 1.29. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 1.30. EQUIPMENT LOCATIONS: 1.31. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 1.32. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C) 1.33. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 1.34. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 1.35. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 1.36. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 1.37. STRUCTURAL NOTES: 1.38. RACKING SYSTEM 1.39. PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND 1.40. A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 1.41. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED PER LOCAL REQUIREMENTS. 1.42. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 1.43. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 1.44. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 1.45. WIRING & CONDUIT NOTES: 1.46. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 1.47. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 1.48. VOLTAGE DROP LIMITED TO 1.5%. 1.49. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 1.50. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15 1.51. GROUNDING NOTES: 1.52. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 1.53. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 1.54. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 1.55. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICROINVERTER MANUFACTORERS’ INSTRUCTIONS. 1.56. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 1.57. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 1.58. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 1.59. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 1.60. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.5 IN GENERAL AND NEC 690.5 (A)(1) SPECIFICALLY. 1.61. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1.62. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 1.63. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 1.64. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [NEC 690.12]. LOCATION OF LABEL ACCORDING TO AHJ 1.65. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 1.66. MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 1.67. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. 1.68. INTERCONNECTION NOTES: 1.69. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 690.64 (B)] 1.70. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)]. 1.71. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(D)(2)(3)]. 1.72. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (D)(2)(3)(C). 1.73. FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (D)(2)(1) 1.74. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 1.75. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (D)(5)]. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:8/22/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. T-2 8/22/2022 1508 E Washington Ave - 2017830312/30/22 ROOFTOPGROUND LEVEL -HOUSE EXTERIOR 20A 20A N 2 (N) JUNCTION BOX WITH IRREVERSIBLE GROUND SPLICE NOTE: IN BETWEEN EACH ARRAY THE EMT IS USED AS THE GROUNDING / BONDING, GROUND CLAMPS ARE AT EACH END OF THE EMT CONDUIT WITH THE WIRE THEN FREE AIR'D TO THE GROUND CLAMP ON THE RACKING RAIL (N) 100A PV LOAD CENTER 12 3 4 1 PV CIRCUIT 1: 7 MODULES/PARALLEL [ (4) AP SYSTEM DS3-L 2 IN 1 ] 5 6 7 12 1 PV CIRCUIT 2: 7 MODULES/PARALLEL [ (3) AP SYSTEM DS3-L 2 IN 1 ] 3 4 5 6 M POINT OF DELIVERY AND INTERCONNECTION 30A 200A N 3 (E) GROUNDING ELECTRODE OR (UFER) BACKFEED BREAKER (N) VISIBLE LOCKABLE 2 POLE 30A 'KNIFE' AC DISCONNECT 3 AC DISCONNECT TO BE LOCATED WITHIN 10' OF METER EXISTING 240V/200A MAIN SERVICE PANEL SINGLE PHASE 7 (N) 14 SOLAREVER SE-166*83-455M-144 (455W) MODULES WITH AN AP SYSTEM DS3-L MICRO-INVERTER ATTACHED TO THE BACK OF EVERY MODULE. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. Conduit and Conductor Schedule Tag Description Wire Gauge # of Conductors Conduit Type Conduit Size 1 PV WIRES 10 AWG 2 N/A - Free Air N/A - Free Air 1 Bare Copper Ground (EGC/GEC) 6 AWG 1 N/A - Free Air N/A - Free Air 2 THWN-2 10 AWG 4 EMT 3/4" 2 THWN-2 - Ground 8 AWG 1 EMT 3/4" METER # 222013428012 Inverter Ratings Inverter Make/Model AP SYSTEM DS3-L MICROINVERTER Max DC Volt Rating 60V Peak Output Power 768W Max Nominal Voltage 240V Max AC Current 3.20A Max OCPD Rating 20A DESIGN TEMPERATURES ASHRAE EXTREME LOW 2°C ASHRAE 2% HIGH 31°C PV Module Ratings @ STC Module Make/Model SOLAREVER SE-166*83-455M-144 (455W) MODULE Max Power-Point Current (Imp)10.96A Max Power-Point Voltage (Vmp)41.51V Open-Circuit Voltage (Voc)49.35V Short-Circuit Current (Isc)11.44A Max Series Fuse (OCPD)20A Nominal Maximum Power at STC (Pmax)455W Maximum System Voltage 1500V Voc Temperature Coefficient -0.29%/°C 3 THWN-2 10 AWG 3 EMT 3/4" 3 THWN-2 - Ground 8 AWG 1 EMT 3/4" SYSTEM SUMMARY BRANCH #1 INVERTERS PER BRANCH 4 MAX AC CURRENT 12.8A MAX AC OUTPUT POWER 3072W ARRAY STC POWER 6370W ARRAY PTC POWER 5946W MAX AC CURRENT 25.60A MAX AC POWER 6144W DERATED (CEC) AC POWER 5737.70W BRANCH #2 4 12.8A 3072W MAIN SERVICE PANEL 240/120V 1Ø, 3W MAIN BUSS: 200A MAX BREAKER SIZE: (200A X 1.2) - 200A = 40.0A E-1 1508 E Washington Ave - 20178303-2017855 2 03/09/23 N1. NOT ALL PLACARDS SHOWN MAY BE REQUIRED BY LOCAL AHJ. CONTRACTOR TO VERIFY PLACARD REQUIREMENTS WITH LOCAL AHJ BEFORE INSTALLATION. 2. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF THE CALIFORNIA ELECTRICAL CODE 3. ALTERNATE POWER SOURCE PLACARD SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED LETTERS IN A CONTRASTING COLOR TO THE PLAQUE. THIS PLAQUE WILL BE ATTCHED BY POP RIVETS OR SCREWS OR OTHER APPROVED METHOD. 4. DIRECTORY PLACARD MARKING CONTENT AND FORMAT: RED BACKGROUND, WHITE LETTERING, MINIMUM 3/8" LETTER HIEGHT, ALL CAPITAL LETTERS, ARIAL OR SIMILAR FONT, NON BOLD, REFLECTIVE WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT. PERMANENT SIGNAGE NOTES: WARNING! DO NOT RELOCATE THIS OVERCURRENT DEVICE POWER SOURCE OUTPUT CONNECTION LABEL LOCATION: ADJACENT TO PV BREAKER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(b) ! DO NOT ADD LOADS PHOTOVOLTAIC SYSTEM COMBINER PANEL WARNING LABEL LOCATION: PHOTOVOLTAIC AC COMBINER (IF APPLICABLE). PER CODE(S): CEC 2019: 705.12(B)(2)(3)(c), SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN SOLAR ELECTRIC PV PANELS TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY. LABEL LOCATION: ON OR NO MORE THAT 3 M (10 FT) FROM THE SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED. ELECTRICAL SHOCK HAZARD WARNING! LABEL LOCATION: INVERTER(S), AC DISCONNECT(S), AC COMBINER PANEL (IF APPLICABLE). PER CODE(S): CEC 2019: 690.13(B) TERMINALS ON LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LABEL LOCATION: UTILITY SERVICE ENTRANCE/METER, INVERTER/DC DISCONNECT IF REQUIRED BY LOCAL AHJ, OR OTHER LOCATIONS AS REQUIRED BY LOCAL AHJ. PER CODE(S): CEC 2019: 690.56(C)(3), CFC 2019: 1204.5.3 POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS AS SHOWN CAUTION: (N) SOLAR PANELS AND MICRO-INVERTERS ON ROOF MAXIMUM AC OPERATING CURRENT: NOMINAL OPERATING AC VOLTAGE: 25.6 AMPS 240.0 VAC PHOTOVOLTAIC AC DISCONNECT LABEL LOCATION: AC DISCONNECT(S), PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. PER CODE(S): CEC 2019: 690.54 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. E-21508 E WASHINGTON AVEWARNING! THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR. PV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO, AC DISCONNECT & PV LOAD CENTER. 1508 E Washington Ave - 20178303-2017855 2 03/09/23 N 1'-6" 3' 3' SCALE: 3/32" = 1'-0" PV SYSTEM SITE PLAN PV SYSTEM SIZE: 6.37 kW DC LEGEND M METER MAIN COMBO CONSTRUCTION NOTES MPV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO, AC DISCONNECT & PV LOAD CENTER MOUNTED ON EXTERIOR WALL OF A SINGLE FAMILY RESIDENCE. DRIVEWAY (14) SOLAREVER SE-166*83-455M-144 (455W) WITH (8) AP SYSTEM DS3-L MICRO-INVERTERS MOUNTED TO THE BACK OF MODULE MOUNTED ON COMP SHINGLE ROOF 1508 E WASHINGTON AVE ROOF OBSTRUCTIONS SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. PV-1LCCAL-FIRE ROOF LADDER ACCESS POINT 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC WIND SPEED OF 95 MPH (3 SECOND GUST), WIND EXPOSURE B. 3. THE ROOF MEMBERS ARE 2 "X 4" TRUSSES AT 24" ON CENTER. CONNECTION TO STRUCTURE SHALL NOT BE WITHIN 11" OF NAILING PLATES. 4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 5. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). 6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE FOLLOWING (CRC R324.7.1, CBC 3111.2.1) 6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS. 6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS: TREES, WIRES, OR SIGNS. 7. SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES IN COMPLIANCE WITH 2019 CFC/2018 IFC 1204.2.1.2 TOTAL PLAN VIEW AREA = 2543.19 SQFT TOTAL PV AREA = 14(82.44 IN)(40.86 IN)/(144 IN^2) = 327.49 SQFT (327.49 SQFT/ 2543.19 SQFT)100 = 12.88% TOTAL PV AREA POPULATES 12.88% OF TOTAL PLAN VIEW AREA AND IS WITHIN THE 33% REQUIREMENT. PROPERTY LINE LOCATION OF "RAPID SHUTDOWN" AC DISCONNECT NEC 690.12 (E) SERVICE DROP NEW SOLAR PANEL LC PV LOAD CENTER (E) SWIMMING POOL PROPERTY LINERoof Azimuth: 180° Roof Tilt: 20° Roof Section 1 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINEACD AC DISCONNECT ACDSigned 8/22/2022 1508 E Washington Ave - 20178303-2017855 2 03/09/23 N 1'-6" 3' 3' SCALE: 3/32" = 1'-0" PV SYSTEM SITE PLAN PV SYSTEM SIZE: 6.37 kW DC LEGEND M METER MAIN COMBO CONSTRUCTION NOTES M PV INTERCONNECTION POINT. LOCATION OF METER MAIN COMBO, AC DISCONNECT & PV LOAD CENTER MOUNTED ON EXTERIOR WALL OF A SINGLE FAMILY RESIDENCE. DRIVEWAY (14) SOLAREVER SE-166*83-455M-144 (455W) WITH (8) AP SYSTEM DS3-L MICRO-INVERTERS MOUNTED TO THE BACK OF MODULE MOUNTED ON COMP SHINGLE ROOF 1508 E WASHINGTON AVE ROOF OBSTRUCTIONS SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. PV-1LCCAL-FIRE ROOF LADDER ACCESS POINT 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON RESIDENTIAL STRUCTURE. 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC WIND SPEED OF 95 MPH (3 SECOND GUST), WIND EXPOSURE B. 3. THE ROOF MEMBERS ARE 2 "X 4" TRUSSES AT 24" ON CENTER. CONNECTION TO STRUCTURE SHALL NOT BE WITHIN 11" OF NAILING PLATES. 4. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 5. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF SHALL BE MINIMUM 7/8" ABOVE ROOF SURFACE (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). 6. ROOF ACCESS POINTS SHALL BE PROVIDED PER THE FOLLOWING (CRC R324.7.1, CBC 3111.2.1) 6.1. LOCATED IN AREAS NOT REQUIRING PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS DOORS OR WINDOWS. 6.2. LOCATED AT STRONG POINTS OF CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS: TREES, WIRES, OR SIGNS. 7. SETBACKS AT RIDGES CAN BE REDUCED TO 18 INCHES IN COMPLIANCE WITH 2019 CFC/2018 IFC 1204.2.1.2 TOTAL PLAN VIEW AREA = 2543.19 SQFT TOTAL PV AREA = 14(82.44 IN)(40.86 IN)/(144 IN^2) = 327.49 SQFT (327.49 SQFT/ 2543.19 SQFT)100 = 12.88% TOTAL PV AREA POPULATES 12.88% OF TOTAL PLAN VIEW AREA AND IS WITHIN THE 33% REQUIREMENT. PROPERTY LINE LOCATION OF "RAPID SHUTDOWN" AC DISCONNECT NEC 690.12 (E) SERVICE DROP NEW SOLAR PANEL LC PV LOAD CENTER (E) SWIMMING POOL PROPERTY LINERoof Azimuth: 180° Roof Tilt: 20° Roof Section 1 PROPERTY LINE PROPERTY LINEPROPERTY LINEPROPERTY LINEACD AC DISCONNECT ACD Signed 8/22/2022 1508 E Washington Ave - 20178303-2017855 2 03/09/23 N 6' 6' 6' SCALE: 3/16" = 1'-0" PV SYSTEM MOUNTING DETAILS EXISTING COMP SHINGLE ROOF EVEREST SPLICE FOOT XL FOR COMP SHINGLE @ 72" O.C. MAX PROPOSED EVEREST CROSSRAIL RACKING PROPOSED SOLAREVER SE-166*83-455M-144 (455W) PV SOLAR MODULES EXISTING 2 "X 4" ROOF TRUSSES @ 24"O.C. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. PV-2 (E)SERVICE DROP Roof Azimuth: 180° Roof Tilt: 20° Roof Section 1 Signed 8/22/2022 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-1 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-2 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-2 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. S-4 1508 E Washington Ave - 20178303-2017855 2 03/09/23 SHEET # T-1 T-2 PV-1 PV-2 PV-3 E-1 E-2 S-1 S-2 S-3 S-4 SHEET NAME COVER SHEET PLAN NOTES SITE PLAN LAYOUT ATTACHMENT DETAILS MOUNTING DETAILS ELECTRICAL DIAGRAM WARNING LABELS SPEC SHEET SPEC SHEET SPEC SHEET SPEC SHEET PROJECT INFORMATION PROPERTY OWNER NAME:ELIZABETH GUILLEN PHONE:- CONTRACTOR NAME:SOLGEN CONSTRUCTION PHONE:(559)442-9887 DESIGN SPECIFICATIONS OCCUPANCY: R-3 CONSTRUCTION TYPE: SINGLE FAMILY RESIDENCE ZONING: RESIDENTIAL GROUND SNOW LOAD: 0 PSF WIND EXPOSURE: B WIND SPEED: 95 MPH APPLICABLE CODES & STANDARDS 2019 CALIFORNIA RESIDENTIAL CODE (CRC) 2019 CALIFORNIA BUILDING CODE (CBC) 2019 CALIFORNIA MECHANICAL CODE (CMC) 2019 CALIFORNIA ELECTRICAL CODE (CEC) 2019 CALIFORNIA PLUMBING CODE (CPC) 2019 CALIFORNIA ENERGY CODE (ENERGY) 2019 CALIFORNIA GREEN BUILDING CODE (CALGREEN) 2017 NATIONAL ELECTRIC CODE (NEC) 2019 CALIFORNIA FIRE CODE (CFC) COORDINATES: 33.756338, -117.848222 SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. T-1 AERIAL VIEW TYPE OF INTERCONNECTION: BACKFEED BREAKER IN THE MSP SCOPE OF WORK SYSTEM SIZE: STC: 14 X 455W = 6.370kW PTC: 14 X 424.7W = 5.946kW (14)SOLAREVER SE-166*83-455M-144 (455W) MODULES (8)AP SYSTEM DS3-L MICROINVERTERS (1)100A PV LOAD CENTER (1)30A KNIFE AC DISCONNECT MSP UPGRADE: NO MAIN BREAKER DERATE: NO RACKING & MOUNTING PV ATTACHMENT TYPE: EVEREST SPLICE FOOT XL FOR COMP SHINGLE RACKING TYPE: EVEREST CROSSRAIL- ROOF MOUNT RACKING HARDWARE GUILLEN RESIDENCE NEW PHOTOVOLTAIC SYSTEM PROJECT - 6.370 kW DC / 6.144 kW AC Signed 8/22/2022 1508 E Washington Ave - 20178303-2017855 2 03/09/23 1.1. PROJECT NOTES: 1.2. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE (NEC) ARTICLE 690, ALL MANUFACTURERS’S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) APPLICABLE CODES. 1.3. THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION 1.4. GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC 690.5(A) 1.5. ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4 & NEC 690.60: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY 1.6. MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED ACCORDING TO NEC 690.7. 1.7. ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING [NEC 110.3]. 1.8. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC AND AHJ. 1.9. SCOPE OF WORK: 1.10. PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED IN THIS DOCUMENT. 1.11. WORK INCLUDES: 1.12. PV ROOF ATTACHMENTS - EVEREST SPLICE FOOT XL FOR COMP SHINGLE . 1.13. PV RACKING SYSTEM INSTALLATION - EVEREST CROSSRAIL ROOF MOUNT RACKING HARDWARE 1.14. PV MODULE AND INVERTER INSTALLATION - SOLAREVER SE-166*83-455M-144 (455W) MODULES / AP SYSTEM DS3-L MICROINVERTERS 1.15. PV EQUIPMENT GROUNDING 1.16. PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX 1.17. PV LOAD CENTERS (IF INCLUDED) 1.18. PV METERING/MONITORING (IF INCLUDED) 1.19. PV DISCONNECTS 1.20. PV GROUNDING ELECTRODE & BONDING TO (E) GEC 1.21. PV FINAL COMMISSIONING 1.22. (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV 1.23. SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE 1.24. SITE NOTES: 1.25. A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 1.26. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. 1.27. THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING ROOF VENTS. 1.28. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION NEC 110.26. 1.29. ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. 1.30. EQUIPMENT LOCATIONS: 1.31. ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY NEC 110.26. 1.32. WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),(C) AND NEC TABLES 310.15 (B)(2)(A) AND 310.15 (B)(3)(C) 1.33. JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO NEC 690.34. 1.34. ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. 1.35. ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC APPLICABLE CODES. 1.36. ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. 1.37. STRUCTURAL NOTES: 1.38. RACKING SYSTEM 1.39. PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND 1.40. A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. 1.41. JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED SEALED PER LOCAL REQUIREMENTS. 1.42. ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. 1.43. ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 1.44. WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST THE ROOF FRAMING MEMBERS. 1.45. WIRING & CONDUIT NOTES: 1.46. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. 1.47. CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. 1.48. VOLTAGE DROP LIMITED TO 1.5%. 1.49. DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. 1.50. AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- BLACK PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15 1.51. GROUNDING NOTES: 1.52. GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. 1.53. PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND MINIMUM NEC TABLE 250.122. 1.54. METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). 1.55. EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO NEC 690.45 AND MICROINVERTER MANUFACTORERS’ INSTRUCTIONS. 1.56. EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. 1.57. THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. 1.58. GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] 1.59. THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING TO NEC 250, NEC 690.47 AND AHJ. 1.60. GROUND-FAULT DETECTION SHALL COMPLY WITH NEC 690.5 IN GENERAL AND NEC 690.5 (A)(1) SPECIFICALLY. 1.61. DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: 1.62. DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE SIDE” (TYPICALLY THE UPPER TERMINALS). 1.63. DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH 1.64. RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS ≤30V AND ≤240VA [NEC 690.12]. LOCATION OF LABEL ACCORDING TO AHJ 1.65. ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, 690.9, AND 240. 1.66. MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). 1.67. IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. 1.68. INTERCONNECTION NOTES: 1.69. LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH [NEC 690.64 (B)] 1.70. THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)]. 1.71. WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [NEC 705.12(D)(2)(3)]. 1.72. AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO NEC 705.12 (D)(2)(3)(C). 1.73. FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 (D)(2)(1) 1.74. SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH SERVICE ENTRANCE CONDUCTORS IN ACCORDANCE WITH NEC 230.42 1.75. BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (D)(5)]. SHEET CONTRACTOR SOLGEN CONSTRUCTION LLC. 1508 E WASHINGTON AVE, SANTA ANA, CA 92701 APN:40027206 DATE:9/29/2022 GUILLEN RESIDENCE License#: C-10 1053344 ADDRESS: 2072 N MAIN ST, FL2, LOGAN UT 84341-1993 CSLB#: 1053344 DESIGNER: ODJ CORE ENERGY GROUP. T-2 Signed 8/22/2022 1508 E Washington Ave - 20178303-2017855 2 03/09/23