HomeMy WebLinkAbout10197570 - Permitw
Project Address: 797 N Concord St
Assessor's Parcelr 400-181-29 Lot:
Unit Bldgr Address Range Suite Range;
Zoning: RlBlock: NA Tract; 4159 Hrstoric: No
city of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA,27O2 Building
Permit Counter: (714) 647-5800 lnspection Requests: (714\ 667-2738 lnspector Section: (714) 647-5853
Permit #: 1019757O
Pin #: 47257
Building Usel
Job Type:
Nature of Work:
Existing Bldg. & Use:
Proposed Use:
Single Family Dwelling
Solar
Solar
SFD Watt garage
R-3, U
VB
cBc 2016
x-0602320163J
1st FL Area
2nd FL Area
Other Areas:
Garage Area
Total
Patio:
T.l.Area:
Yards Req'd
Valuation: $16,000.00
Occupancy:
Constr Type:
Code:
Flood Zone:
# of Stories:
Description of Work: lnstall solar panels
Planning Conditions:
Owner:
Address
Phone:
Tenant
Devin Nguyen
797 N Concord St
Santa Ana, CA 92701
Contractor: SunsolarUS
Address: 15755 Von Karman Avenue,
lrvine, CA 92606
Phone: (949) 242-0088
Stale Lic #: 575072
Lic Type: B, C-10
Bus. Lic #: 367937
Workers' Compensalion lnsurance:
Carrier: State Fund
Policy #; 9108804
Expires: 0712612018
Engineer:
Address
EOECI}i: f .16 /i - U,/JU,/?t_llg IDtoff ice: CTYH TrRne+: ?(]Acct+: F:et a: 1r:rFcpt+:B?36F6?6 - g {rir?irI:, t1
Tronso,:t ion ToLol $: :
EAIIi
S
o
nI
R
')
" r:ll.1
Phone:
License #:
:iunSolor US
Buildins
01 1 1 6tltl2- 5 16t_]1 tltttt-
tllds Stds Re"o 1v ins
0111611112- l;161200n-
ICL Check A477
$4lt:r, rt0
t 1 . t:t(r
$6?1 . (rt'
t[,ernandez, Kathy
Date:
Date:
Date: 08/30/2018
Subject to Field:
Misc. Receipt
Misc. Receipt
Misc. Receipt
$450.00
$1 .00
$0.00
01776002 5150f Permit Fee
01776002 57672 Bldg. Stds. Revolving
07776002 51500 ceneral Plan Update
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#
Flood Zone Cert. Req'd: No 011i600251601
01116002 5't612
$450.00
$1.00Every pemit issued shall become invald unlessthe work on tho sile authoized by
such permit is commenced within 180 days aftet its issuance,ot if the wo* authorized
on the site by such permit is suspended or abandoned for a peiod of180 days after
the timo the work is cofifienced
lnspector Ir/lD#.2018-145788
Fee Totat
Paid to Datel
Balance Due:
s451.00
$0 00
$451 .00
Phone:
License #:
Architect /
Designer:
Address:
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd:
Total
BUILDING. INSPECTOR BECOBD
DATE ID/SIG.COMMENTS o\1\t.]t Bl I t)t,]t I)11.{ \ll,\'lI(r\
I hcahy.lfirn undcr n nrlry or lfrjur! Ihal I an crcn!,r il.,n rnc ConrE tn l-iccn€ 1,r* fot rh. r.UosinS.rcrvxr (Sc''1'115
BusiN$ aftl Profi$bn Cdc): Afy Cir, or Counry whrh rcquirc\ a lrnnir r. !_ondtu.r' dlr$ nn|tr'!c. thnmli\[ or EPrt rnv
ndcrur.. filor b irs issuancc. rko rcquircs thc lpplicxnr lbr \dch Pcrnril Io filca rilncd inrcnN lhd hcor shc is lienssl pu$u tri
tr rh. prori\n)n\ nf rlE Contrctn s Li.cn$d Lr* lchrPrcr 9, Comnt{.if3 wirh Sccrn i 70(x) ol Divnn r :l ol lh' Rusl '\\ nl
Prnis\ions Codr) or rhsr h.orshc i\cx.mpr rhcrfronnnd rhcb!si\ ior rtu rllc8cd cienrPrion A yvnn{riorofSstionr0ll5hvanv
uplicnnr tu.apcrrril suhjcch rhc stplicatri h a.i!ilP.n!llyor or nx,clhrtr lirc hun,tr.d oll$(S5U))
L ,s osncr of rhc p&pcny, or my crnPlolccs *il h eas* .s ih.n s[ compen\aitn:. uill do lhc srk trfl1 thc sltrrm i\ nn
idc .n or ollcred fn \nlc lse ,044. Busincs anJ Potc$ions Codcr Thc Conkrttr s Licctr* l-tw docs nor trprly b rn owmr oi
rhc lfrI).rty qli)hiklsor i'npn'tsrh.Nn. o.d sho dms sk-h work hi$s.ll'or hcr*lforrhmu8hhisorhcr.*trcmPloyccs.
F);idcd rhd such inpmvcrns m mr ificMcn ot ofttJ.d l'or $lc. lf. lFwcvc' rh. buitli.S .r impmrdxtrr is sld within nnc Fr
;t conphinn. tu osmr suiHs will haw rh. hndcn oI nmving lh:r h. or \h. dil mr bnild .i nrpmrc lhc Pn'p.nv ror thc Ir!,F)s 'r
-1.
!s o$n.r or rh. t()ncnr am cr.lu\ilcly .onrdins $ilh liccn*d ..ilr.cio6 ro con{d.t rhc Piojer ( Sc. 7t!r4. Bu\ims
int Potusbtr Co{lc ThcCofi,.rols t,iccnse Low doc\ nor rrPlrto itrowncr.r[opcnysho hLildror inuovcsrhcton
aNl who .o.t(N for such Inojech wnh , conrncron, liccn{d N^utrtrr h rhc Conrra.ttr { Lkc$c ljw)
I rn.xc U nDdcr Secrio
t.te: Ouer:
rvoR(Dtls' (:(r\ti'iris,rTlor\i
DF(:I ARATI(IN
I h.tohr,filrn uMcr pcnrllyolpcrjury oic otrhc hll.*in8 d.llrrnrid'sl
l hrvc nM erll nu irlnin r C.d ilicdc .f Consnr k' Sclfl Nrc for qor kcr' coml.rsd i(,n N fiovidcJ fu by S..ri'n .]7(x) of rh'
hbor C{d..lar rhc fnirnnrrre ofuhc*ulk f(} whi.h rhc ponrir i\ i\\ucd
rh.wnrllnr{hichrhi\trnniirsis{tdMyrv.rlcr\'con'$n\nritnirr\trrtr.cc rcr |hlicvruDhcrrt
-lccdifyrhar
inrhcpcrfo Mtr cofrhesork ntr w[ich rhi\ t'clrnil ir i\\ucd.I $rllnol cnfk,y rtry Pc onininydMicr
v, rs b hrco r. subjc.l ro rhc {olk.n .onWrsrlior hws olCtrlir.nrir nnldstc rhrr ir I \hould t'cconE shtd ro lhc
so't..orpctrs.liurprcvisn,n\olSLrliotr:lTIXJoflhcl.rhtrCod..lshill.fonh*irh.ordy*irhrhoe!flrvisi(,r{
WAI(NIN(; trilxr r) {cutc worlcr\ comptns ri,D corurllc i\ unh(tu|. und shtll suhicct nn cmPk,tlr 6 $i'niml Irinhtl ii(l
.ivll fincs uI k, oic hundrcd rhon\aftl tlo lrs (sllxr.(xx)). irr i(ldiri{nr r) rhc.o{ .i..trlPc \al$n, rmrsc! rs tmvidcd Inr lhc
Scdiur.rl)76 ofrhc IrlttrC.dc. irlrcr.n rd rrnncr'! lcc\
b"1", 3' Jd -/ :l
I h.ehy rfinnundcr pc@lry or Pctjury thlr I !m liccnYd nidcr pmvision oaChrlrtr 9lconlmncins wirh
oI rh. Bu\incssrM Pr.ics\ioN Codc. d nryli.ctrsc is ir lull lam ind cilicr
Drl.,i
l-icc \c Ntrnrtur
30'/ (
(]ONSTRUC ION I FNDIN(; AGI'NCY
I hcnhy rffirr undcr l{mllyofNljury rhll rhcrc n ! condtucri,n Ltrdir8 rAcmy for rhc Frlimuncc ofrh. *ork itr whi(
is{rd lS( :lo97.Civ C).
AIILICANfDEIL]ISAIION
Ilmhylilir rundcr rctrrlryof p.rjuryoncof rhcnnl,nvingl..lffarnnts
l)cmolirnrn Pcnnirq Ashciios Norilicrrnnr I'L'd.r.l Rc3trlarior (Tirlc.10, Pm6)
Rcqui'cd Lcrl$ol Ndilicrrotr
l.cnilylhd rnu lid.ful rcguhriotrr rc3r'ding r\h.{o\ rc k,vrlrc Dor,'mli(*lctu thi\ prolccr
_lcrnlty rhrr I h !. r.&lrhis rJ,flicdi(nr ,kl s
o i'rnNcr ri shtc li${rclaritrgt' huiklin3.of
fiirc rnli.n.(lpnlrny tu ir\tf,.l nurFx$
I ll3r.. h..nrfly \nh rllCiryrf(t (in'nrr_
rlhn Cily$d Cortrry to cnrcr upor rlt
Al,plit{nror^rorsl!tu'trre Df
Pcm r.. non,.rnrinr,: Zcz-z
?.lq tl
/,/1,, / a,"4=a
Set Backs
UFER Ground
SLAB Floor
Subf loor/Vent/l nsu lation
Roof Sheathinq
Shear Wall
Framinq
lnsulation/Enerqy
Drywall
Brown Coat
Ir/lason ry
Pool Fence
T-Bar
Handicap Req.
Deputy Final Report
Enoineer Final Report
Flood Zone Certil
FINAL v/,q/r I >r,r^.,4r--/r) -Certif icate ol Occupancy l
Notes, Remarks, Etc.
SITE-WORK
Forms/Steel/Holdowns
Erection Pads
Ext./lnt. Lath
fT
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(7r4) 647-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMTLY RESIDENCES Onty
lnstructions: The censed contractor of record shall fill in the address of the project, contractor's
licensing information and answer questions 1 -10 below. Complete and sign the c;rtification section.**lf answering NO to any of the questions, plan check shall be required,**
Proj
l'- ,1 -ectAddress: r' 7'/o/JanrD -97,Pr:r,T-
Contractor Company Name:
Contractor Licensa Number:
,Cot Sai-/4R U,S 7-//(',i sa r-7
1
YES NO
Hu
EAptr
qtr
Ha
(u
Ws
Are the following applicable to the proposed project?
Will the PV array be flush mounted to the existing roof so that lhe plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 3 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV system layout provide a three-foot wide clear access pathway per the
latest edition ol "Guideline for Fire Safety Elements of Solar photovoltalc Systems"
by OCFA? (Guideline available on the OCFA website: htto://www.ocfa.oro)
Do the plans show a maximum horizontal anchor spacing of 6 feet?
Do the plans show a minimum ol 2-112 inch lag screw embedment into roof raflers?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed professional engineer? (including project specific site plan, pV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
'8tr9 Qtr
IO,Qtr
I certify under penalty of periury under the laws of the State of California th the above
Print name:
s e
-,-SANTA
NAqil*
Rev 2J1712015
4,/
c
sol-01 cBc 2013
Phone Number:
Email Address:
4.
6.
7.
Signature:
Date:7c2.urv-q7:{
.,-SANTA
ANA
PI$$C
ilButDnc
lcil0
Planning & Building Agency
Buildlng Safety Division
20 Civic Genter Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(7t4) 647-5800
www,santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL{1 cBc 2013
Solar Photovoltaic (PV) Checklist for Detachcd SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall fill in the address ofthe proiect, contracto/s
licensing information and answer questions 1 -'10 below. Complete and sign the certification section.**lf answering NO to any of the questions, plan check shall be required,**
Proj
l'1 .-, -ectlddress: i 7'/ COIJCI-tfO S c
Contractor Company Name:
Contractor License Number:
.9rul ,sai.AR L)5 l /t/a
c ,_7 a .-7
1
YES NO
Fn
Euptr
qtr
(n
(a
Wu
Are the following applicable to the proposed project?
Will the PV anay be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the rooff
Will the PV system weigh maximum 3 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV system layout provide a three-foot wide clear access pathway per the
latest edition of "Guideline for Fire Safety Elements ot Solar Photovoltalc Systems"
by OCFA? (Guideline available on the OCFA website: htto://www.ocfa.oro)
Do the plans show a maximum horizontal anchor spacing of 6 feet?
Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters?
Are ALL the structural pages of the plans WET stamped and signed by a Califomia
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
o
2
4
5
6
7
, Etre 0tr
ro Qtr
I certify under penalty of periury under the laws of the State of California th the above s el
Print name Signature
Date:Phone Number:
Email Address:
Rev,2h712015
'i/4,/
4( py h4 nt"a, d: