HomeMy WebLinkAbout10197739 - Permitq
Proiect Address: 1026 S Dennis St
Assessor's Parcel: 108-721-14 Lot: 75
Unit:Bldg: Address Rangel Suite Range:
Zoning: R'lBlockr NA Tract: 8924 Hrstoric; No
city of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CAI27O2 Building
Permit Counter: (714) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853
Permit #: 10197739
Pin #: 5OO25
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use:
Single Family Dwelling
Solar
Solar
SFD Watt garage
Occupancy:
Constr Type:
Code:
Flood Zone:
# of Stories:
R-3, U
VB
cBc 2016
x-0602320256J
1st FL Area
2nd FL Area
Other Areas
Garage Area
Totat
Patiol
T.l.Area:
Yards Req'd
Valuation: S9,000.00
Description of Work: lnstall solar panels
Planning Conditions /qoor - o/talrrtta lrr
Owner:
Address:
Phone:
Tenant
Vicky Nguyen
1026 S Dennis St
Santa Ana, CA 92704
(7141623-0204
Contraclor: South West Sun Solar, lnc.
Address: 13752 Harbor BlYd
Garden Grove, CA 92843
Phone: (714) 582-3909
State Lic #; 1004667
Lic Type: B, C-10, C-38, C-39
Bus. Lic #: 350754
Workers' Compensation lnsurance:
Carrier: State Fund
Policy #: 9232358
Expires: 06/01/2019
Engineer:
Address
off l cer CTYH TPonsi: 68Acct+: Rel+! lU l:
Fcpti:0!386797 - 9 /18/2ttlg 71\\
Tronsoct ion Totol tlrt'
Phone:
License #
Architect /
Desiqner:
Address:
louth lest Sun Solorr Inc.
Buildine
trl116062- 51601@0-
BIde stds Revolv ins
uI116002- 516r?000-
Viso
C(:+ r rrrrrr rirrrr8724 Aut hi
Planning Approval Byi
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp Req'd:
Planning lnsp. Req'd:
Hernandez, Kathy
Date:
Date:
Date: 09/18/2018
Subject to Field:
Misc. Receipt
Misc. Receipt
Misc. Receipt
07776002 51601 Permit Fee
07776002 57672 Bldl. Stds. Revolving
07776002 51500 ceneral Plan Updale
$450.00
$1.00
$0.00w
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Landscaping lnsp. Req'd Flood Zone Cert. Req'd: No 01i160025160i
Every pemit issued shall become invalid unlessthe wo* on the site authorized by
such permit is conmenced within 180 days after its issuance,or il the wotk authotized
on the sile by such pemit is suspended ot abandoned for a period of 180 days aftar
the titne tha wotk is commenced
lnspector MID#: 20'18-'146'188
011'16002 516't2
$450.00
$1 00
Fee Total
Paid to Date:
Balance Due
$451.00
$0.00
$451.00
Phone:
License #:
BUILDING- INSPECTOR RECORD
SITE-WORK DATE ID/SIG.COMMENTS OWNTN BUILDER LIDLCARATION
I hcrchy nl'ftni undcr Fn ! of pcrjury th,r I m.r.mIr fn,n rht conta.ro^ Li..n\. tiw r(r rh. toll.wing kav,! (s..7011 5
Businc$ md Prolession Codc) Any Cny or C.u.ty whi.h rdquircs , Frnn k, .otr{fl.r. alr.r. nnpn,v., dcnrli$ or qun any
docrurc- n,in ro ils issunrcc, ols rcquircsrnc rmli.atrr roi such p.nnn ro,ilc. siSncd ndrcmnt rh0r hcor nr is licctrsd purua
ro lhc Imvtions.flh. Co.knctoCs Lic.trs.d ttr* (Chlpr.r 9. c(,6m.n.ing wirh Scdn,n 7(XXl.r Divhbn I of rh. Bxsincs rnd
Pr,ft$n,.s C.dc) or thrl hcorshc hcicnrl thcrclionr Md thc bisis lor thcalkacdcrcmp'ion Anyviol.rionotScclionri)ll.5hyany
aprli.,nr ror a p.inir subjcch rhc rtplica.r kr !ci!ilpcnlhyolnor mrrcrhan llrc hundrcddollas (5500)
-1.
as oNtrcr ol rhc rollcny. (tr nry c.nployccs wilh waScs ,s rhcn bb drnp.trs^riflr. qrll do tlE sork and lhc iMl@ is nor
inrctrdcJ oroltto{ lor eL (Sd.7044. ausnEss and Profcsi{,ns c(dc:'Ihc Contactr's Liccnsc Liw docs nor.DDly ro on.sncrof
rhc ptuFn! who builds or inrpK,v.s rhcnnr dd sho docs such {ork himrcllor h.rcltor rhrcuEh his or h.r osn c.l|,lo!ec..
,rovidcrl lhrr sucn impmE,mnts N Rn inrcfrhd n oficrcd lor s,h ll hlwcrcr. lh. hoildin8 or i 0nnctrE h $ld *ilfiin nn( rerr
of.onplcridr. rhc Oen( Buiki.r willha* th. bnrd.n ofrovin8 oEr tE or shc nid er tuikl or irll)rolc rhc pmFl, for (lt lnrl$* of
_l.rsoqncrolrhc[,olrny.rrcr.lusivcly.oftrcri'rg*irIlircn\rdrotrrn&r\rr..fnr.rrhcpn,.,cd(SLr.70,]-{.I]u{nc\s
rnd hnfca\imCodc'l'hcContrctr'\l-iccn\c1,,+d{{\no!rpnlybrnosncroinloB-nywhoiuildsorimprcvc\rhcr.oD.
rnd *ho co mcls lar such tnolccrl qirh n cu0kd.rtrl\) liccn\.d pursrr r brhr('.nrafrr'\ Lirctr\c trN)
-l
amcxcmpludcr SNtion-. B &PC f.rrhisE.son
OPner:
]raatrl:all:()ltfrNsAlror
ILCLdAAII(}N
I hcrchyrllirfl undcr!c alryoltcrjuryotrcolrhclollow rf Jc.lmri,n\
-lhovcaiuillnuinrdnaCcnifi.arcofconsrnrt
s.lr lnsurc ror *urkcrs.ontrnrarion,0c providcd lorblScction]T0Ooltlrc
ubor d)dc.Ior rhc,.fonruftc ollh. wolk for whi.h rhc peroir is hrkd
I hrt r8l *illnuinrrin *.rlcri conrpcnsllnnr insurrNc. as Eatltcd byScctior 3?il)ol'lhc LlhorOnlc. fo! rhc pcrtonunccol
M y uorkcn conrp. \.rion iNumNc c.Ficr lnd policy nu mhcr arc
L
q ULr(t 0-( k
I.cnily rhrr in rhc F-rforron.c ofrh. {ork fir *hich rhis p.flnir is issurd. I \hrll tror c Dby rtry pcr$tr ir any mrnncr
$ !s h bccom subi.rl lo rhc *oikcc' co mrcnsir ion lnws ofcahnmii.,nd mEc rhar ifl should hcconE subicct Io rhc
$orhcN co'npe.\arion !rcvisions o, SNtion ST(x)olrhc tjbor Codc. r stull. fonhsirh co'nply with rhoc tmvhions$ARNIN(;: F{ilur. ro sccurc wor*cr omPctrnnn .ov.itrgc is unlruful. rnd sh.ll suhj(r arr rmploy.r to dimird pcrukics.nd
ciril 6nes uD ro onc hundrcd thousand dorla^ (SllD.mo), i. addi'ion ro lhc cosl ofconpcnsnlion. d.m8cs {s nmvilcd lor lhc
s.crion:1076 ofrhc LltnrC.de- inlcre(anda onEy\ lccs
;,:,""4-ik;r- - ;ilv -F--r-LfFrsED coN rR,{cror
IIECI,ABAIION
I h.rchr rrfirm hdcr pcnllryofpc{lrylnd I !n liccnsd undcr pmvnion ol'Chrprcr 9 (qnn'rcrcins *irh sccrion 7txx)) oroivision 3
ol rhc Businc$ and ProfcsionsCodc. onl my liccnsc n in lull rora {d cl'fccr.
C-l o lb oY eo 7
1 irsl 'r
kst.d (Scc 1097. Civ C.).
lxnJ.,'. Namc
-
AfIII!]ANLDECIIBAIA!
I LEr!, idonncrrEnrhyof pcrjuryore ollhc lolloqinsaccl .rnnN:
rJemlibn Permik.Ashcstos NotifEarion lrcdcrnl Rcgnhr,.ns (Tirlc 40. Ptrn6)
-Rcquncd
brlfi oi Nolifmli.n
I c.nilirhrrrtu frJcrxlr.EUhn)n\ rcgtrding rshc{os ,cn)ul rrc mr rt,plicahlc k, rhn pn+.r
-l
cenifyrhtrr I hovercadlhn applicltionnnd {0l hatthcatnr irhrmrion n.oEccr loexerocomplywirhallCirylndCounry
ordidnccs and Sx cLaqschlitrslobuilditrBconnrucrion.udhcrcby,urlnriz.rcprc{trrarivcsoflhiCityandCouDtylocnre.!tx,nlh.
.trrk nrtrriotrcd proFny lnl in\pc.'ion
/\mli..hl or AAdl Slgnaluh
L
qlrrlu
Set Backs
Erection Pads
Subf loor/Vent/l nsulation
Rool Sheathinq
Shear Wall
Framing
lnsulation/Energy
Drywall
Ext./lnt. Lath
Brown Coat
It/ason ry
Pool Fence
T-Bar
Handicap Req.
Leputy Final Report
Engineer Final Report
Flood Zone Cenif .
FINAL
Certilicate of Occu a
Notes Remarks Etc.
Forms/Steel/Holdowns
UFER Ground
SLAB Floor
ailzhtn I
I
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M.19)
Sanla Ana, CA 92702
(714) 647.5800
www.santa-ana.org
RES!DENTIAL
PHOTOVOLTAIC
CHECKLIST
1
sol-01 cBc 2013
Solai Photovoltaic (PV) Checktist for Detached STNGLE FAMILy RESTDENCES Onty
lnslructions: The licensed contractor of record shall com plete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached lo each of TWO sets of plans, of
minimum 11"x 17
Project Address:
" size. lf answerin NO to anv of the oue stions. Dlan check sh all be required
,I026 S. DENNIS ST, SANTA ANA, CA 92704
Contractor Company Name:SOUTHWEST SUN SOLAR, INC
contractoi License Number: 1004667
YES NO Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roollng layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the ptane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Wll the PV system be inslalled with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
sYstem?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-1/2 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
E tr
4
5
2
3
6
7
8tr
EID
tstr
Ettr
ED
trtr
8. trtr
e. trtr
Are ALL the structural pages of the plans WET stamped and signed
licensed professional engineer? (including project specific site plan,
anchorage spacing, anchorage details and manufacture/s pV supp
by
PV
a California
layout,
nformation.)
I certify under penalty of periury under the laws of the Stale of California
Signature
Date:
above is true:
1 t9
p1;611i12rns. TRANG CONG PHAN/
Phone Numbar: 714 582 3909
Emait Address: PERIVIT@SOUTHWESTSUNSOLAR.COIV
Rev: al1'|12015
,**SNTA
NA,Iffi
10. EE
,--SANTA
NAJIiII
Planning & Building Agency
Building Safety Division
20 Civis Center Plaza
P,O. Box 1988 (M-19)
Santa Ana, CA 92702
(7r 4) 647-5800
www.santa-ana.org
sol-01 cac 2013
Project Address:1026 S. DENNIS ST, SANTA ANA, CA 92704
Contractor Gompany Name:SOUTHWEST SUN SOLAR, INC
contractorLicenseNumber: 1004667
YES NO Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofrng layer with no
overlays?
Will the PV anay be flush mounied to the exisling roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch
embedment inlo roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans WET stamped and signed by a Califomia
licensed professional engineer? (including project specific site plan, PV layout,
EI tr
2 Ettr
Ettr
Ettr
Etr
Etr
Etr
4
5
6
7
I Eltr
9 Etr
10 Etr
anchorage spacing, anchorage details and manufacture/s PV suppo information.)
I cerlify under penalty of perjury under the laws of the State of Galifornia above is true:
p1i61 x6ms. TRANG CONG PHAlvl
Phone Number: 714 582 3909
Signature:
Dale:
Reu,811712015
PERIV IT@SOUTHWESTSUNSOLAR.COIV
tg
RESIDENTIAL
PHOTOVOLTAIC
CHEGKLIST
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMTLY RESTDENCES Onty
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification seclion below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11"x'17"size. lf answerino NO toanvof the questions. Dlan check shall be reouired.
Email Address: