HomeMy WebLinkAbout10195865 - PermitCity of Santa Ana 20 civic center Plaza (M-'19), santa Ana, cA s2702 Building
Permit Counter: (714) 647-5800 lnspection Requests: t\714\ 667-2738 lnspector Section: (714) 647-5853
Permit #: {O{95865
Pin #: 52747
T
Project Address: 1117 S Halladay St
Assessor's Parcel 011-225-17 Lot: 3
Unrt BIdg. Address Range.Suite Range:
Zoning: RlBlock NA Iracl 2025 Hislonc: No
Burlding Use:
Job Type:
Nature of Work
Existing Bldg & Use
Proposed Use
Single Family Dwelling
Solar
Solar
SFD w/att garags
Occupancyl
Constr Type
Code:
Flood Zone.
# of Stories
R-3, U
VB
cBc 2016
x-0602320276J
'I st FL Area
2nd FL Area:
Other Areas
Garage Area
Total:
Patio:
T l.Area
Yards Req'd
Valuation:$8,000.00
Description of Work: lnstall solar panels
Planning Conditions:
Engineer
Address
Ir(rnEoLt ion
Owner
Address
Phone
Tenant
Hai Nguyen
1117 S Halladay
Santa Ana, CA 927016142
(714) 719-9168
Contractor: South West Sun Solar, lnc.
Address 13752 Harbor Blvd
Garden Grove, CA 92843
Phone (714) 582-3909
Slate Lic #: 1004667
Lic Type: C-10
Bus. Lic #: 350754
Workers' Compensation lnsurance:
Carrier. COMMERCE & INDUSTRY INSURA
Policy #: 033571266
Expiresr 06/01/2018
Build ins
tll I t6uUr- !l1r ' l r-rlglde Stde PerElri
r-rlI16r'rr:r:- rt I t 2i,'.
V isq(:{}irri}xrr*rri'
f I 'trr
Phonel
License #
Architect /
Desiqner:
Address:
Phone:
License #
Planning Approval By
Plan Checked By
Permil lssued By:
NPDES lnsp. Req'd.
PWA lnsp. Req'd
Planning lnsp. Req'd
Hernandez, Kathy
Date:
Dale.
Date.03/16/2018
Subject to Field.
Misc Receipt
Misc. Receipt
Misc. Receipt
$s00.00
$1 00
$0.00
07776002 51501 Permit Fee
07776002 s7672 Bldg Stds Revolving
01776002 57600 Gene.al Plan Update
N
N
N
o
o
o
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Landscaping lnsp Req'd Flood Zone Cert. Req'dr No oit.16002 5.1601
Every permil6suod shall become nvahd unless the wofu on lhe sle aulhonzod by
such pe@tt is cofimenced et/tthn 180 days aftet s tssuance.or I lhe woi< authonzed
on the sle by such perml ts suspended ot abandoned fot a pefiod o1180 days aftet
the hfie the work iscommenced
$s01.00
$0.00
ss01 .00
lnspector MtD#. 2018-142125
01 1 16002 51612
$500.00
$1.00
Fee Total:
Paid to Oate.
Balance Due:
\0t""
BUILDING. INSPECTOR RECORD
SITE.WORK DATE COMMENTS O!{NT:R AI]II,DER DEI,('ARATIo:\
I hcrcb rtljrnr unjer lEnllr! nr Frjlry rh.t Lm rrchfl (n,m rh. Coni(o^' L{.nr li* (,, rh nnk'*:n3 n{y lSLr 70.11 5
Bu\incs xl l'roral\ion Cdc) Any Cil, or Coun'y *hrh r.qun$ ! NNr k) on{tu'. trlr.r, impr.v.. d.nx'l,rh or topnt y
(ru.ru'.. trin n, ir\ issuancc. rl\o Btuirc\rh( lpFli(inr lnr {uch Fnnrr k' ljlc, \Encd { r.mnr rhrl hror rh. n li..ns.d Dursu,nr
l0 rlE Ii1,vnt)n! !f rlE Conrerr'1 l.iccned ttrw (Ch!!r.i 9. Cummm'nE sirh S..riinr 7(ri, of Dirri)n .l ol th. 8u\incs 3nd
Prul€*i,n\ (ixlo or rhtr,lI..!h. rcrcrpr lhcrclroor.nl thc tB$ nr rlr llkB.dcrcnrnriJn nyr$brhtrofS&1i 7lrJl 5hlinr-
rpllKod ntr.Frnit obFlt rh. lmlrnn or.rilI,(Mhyoltr m,. rll'n li\c hrndr.al d.llaB (lll(rD
l.( o{krorrh.rn,Fdr-or rvcnltk,ye\ sirh*r3.\aslhcir $lccon{Rnelon. silldu
'lrro* on rh. nelE ir rk
inrcndd or.flard ntr eh ( S.! 7(ll,r, Bur.css ahd hnr.siin$ Codc 'l h. ( o rkntr \ l-icn{ I j* rhf,\ nor aplly n, owtrcrol
,hcFmlfnr whot ilth or im[,'h\ illE)n. and wlY' d,r\ !u.hw)* hirscll.r hcrrlrorrhr.uth hir or hq o*ncnlploys.
F,riJcd thnr {'.t in]Ircvcmnr e ftn mrcidal d oltir{ h, aL. ll h,*crar. rlt huiuine or iftF*rmnr is q'U qahin ok )tuoicorqildrrl rh. t)rtur auiut' *ill h.rc rlh hnd.n otFnrinA rh! llc.r {E Jrl nrt hild ar inIfo\r th. FrFny nn iE purFE o,
_l.r\.sD.,,nrlnln'|x J. rnrcrclNrclJ.onrrkr.! r h l'..n{J.odlrrn\r,.otrnnd rlx,t,','r..i {S.c 7(gl lnnno$
n sho o Ln(rrntr\u.httrftrr\snhaconrrr.rnlelirc"{Jnur{'.tr iirhc(itr rrnn\li..n\rl.rs)
I mcr.nrd unkr Sclfn-
nalf,l;&uloutENtAlltl!I)Iiti!$AIIr]!
I klcbyrrlimr'lcrpcnullyoarErturynncoilhc,nllirirr .rld,rhn\
-l
v.,.1qrllrruinrdndCcnrlirr.ofCon{nrk,Scllln\rrcfq{,rl(!d'qxnuhn. In,lrlcdnnbyS$ri'n.17(X)ofrheljhd clrlc. I(r rlr |frfolrrm. ui rli r({i ,ry rhi.h rrE nsmd s nsut
t! h!\c.^l rrllminrarn rorrcF'r, nF.q' n 'n !n\u'rr.. r\ .cqu&{ hr s&r trr .r7{ro or rhc l,tir codr. ,or r hr Frllnnrfrc oa
ria *o* n whrh thF Fm('\ h*l Mv {orkh' lomlr ngrln'n.u,trr..M'.r arn Fh) nun'hl m
h-r-e
0,',)'9- &4 G-( I
l.cn'rtrh,rrrh{ p.raornuE.,n th. *ort i, rhkh,hi{ nlrmir n F\un,.I \hillmr cn$l,y ry liy$n in sny ,unNr
v, 6 ro lBrnr \uhj({! b rh. su*rr' .onqEnqri,n h*r nf Cnl'ft, ir,! l r[N rhf,r ifI sh,ut,lr.om \!hFr htrr
tr.rtcN cotrrtf,trrltion pnJvnirN olS.rli,,n 3700 frh.lrhn C(xlr,I rhall, tudhwilhlinltlly $'rhrhM F)vi\xrn\
W,!RNIN(; I:!ilnr. t, {cm trorl(r rompctr\01i,)n .o\cnsc i\ unhstul. i $!ll suhjd dn .Nph}!r ro snnn,rl ,rulra\ und
(nrl ft(\ ur nr o'r hundRl rhru$rl drllx^ l(lrrrrrr)r
'n
)mp.nurk'.. daro3cs r\ Irril.d fN rhc
;:::'"";'7i;)tv
DIU"SnAIIAN
I hcEhy illlrm utulcr lr.Mlryol tirllry rhd Ln lnrn{il und.r pR,vhi{r rl ( hrtt$ 9 (ron,nf,R.'i',F *ih S(ii,n 7(lX)) ol lrvnk)n 1
oi rhc 8!i,'x$.'nJ Prorc\shni (i(k. a,rl n,r- ltcn{ N r tllllhrcc nl.lt.\r
C.o lLaW,6 )'tltt t ty
rclllf,lj(ra rElil]llic-&{itlilr
I h.^h!".ffirrn u'xlo lxtulryor FrJUry rhi rkr. '\ r.onqmrirn lcd'n8 rg.r\ l,tr rh. Fnorn$E-.. otrh. sort tu xhf,h thtr [rmn n
tr\kd (Scr :rrD7. C^ C )
Lutr .r'\ A,l(lrr\i
AIfIIIAITIIECIjIAIIIIN
I hod'y dfm !.d.r Fnllry of F,ort oE of rh. rdb$inA d..ld k nr
l)..nlirxr. P.rnr.Asb.rtx Mrufrrtrr Fd.nl RcAUbri,nr (Tntq). Ptn6r
-Rcquncd
l,n.r of Norifi .ari,tr
_l cdily rhur rlt fdml Egukrirnr E8adinS arftiri,r Emrval nr br.tDl.ihk ro rhir lniF
Ic.niayrh.!ItrvcEadrhn.pplt.lirrds1i'.lhdrlE.hnrinfordi'nnmlI.3Rhd{mlyunhrllC!r,rj(hur}
rnl'hntuc\ in,l Sr3r.,f,s\ rbrins n' hu'ltnng c.en h.rchv.urhtrtrc r.I'rctrr.ttr!\.t rhh (iry Md Cnunty h.nrs ulr,ntlE
ihrc nEnri(!ri l)nrn ny lr in(F(rk,n
Ap0li.. or AletrlsltNl
lzL
3ta /?
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Roof Sheathinq
Shear Wall
Frami ng
lnsu lation/Energy
Drywall
Ext./lnt. Lath
Brown Coat
N4asonr v
Pool Fence
T-Bar
Handicap Req
De puty Final Report
Engineer Final Report
Flood Zone Certif .
fi
FINAL th4/n -1/W.)
Certilicate of Occu /(/pancy
Notes Flemarks Etc.
ID/SIG.
ar---r.ffi
Subf loor/VenVl nsulation
Plrnning & Bullding Agsncy
Bullding S.fcty Dlvl!lon
20 Clvlc Conter Plaza
P.O. Box 1988 (M.19)
Srnt! Ana, CA 92702
(7r4) 647-5800
www,santa€na.otg
RESIDENTIAL
PHOTOVOLTAIC
CHECKL!ST
-
sol-01 csc 2013
Solar Photovoltalc (PV) Checklist for Dotached STNGLE FAMtLy RESTDENCES Onty
lnstrua{lon3: The licensed contractor of rocord shall complete all sections, answer the ten questions and
sign the certification section below. A copy of thls form shall be attachod to sach of TWO sets of plans, of
minimum 11" x 17'
Prolecl Addrsss:
size. Jf answerin NO to any of lhe ns, Dlan check shall b€required.
,I 117 S. HALLADAY ST, SANTA ANA, CA92701
Contractor Company Name:SOUTHWEST SUN SOLAR, INC
contractorLicenseNumber: 1004667
YES NO Are tho followlng appllcable to lhe proporod projoct?
Will lhe PV system layout provkJe th€ requirsd thres-foot wids clear accass pathways
per Section 605.11 of the Califomia Fire Cods, and is this shown on the roof plan?
Will the PV systsm be installed on a roof having only one rooting layer with no
overlays?
Will the PV anay b€ llush mounted to the exlsting roof so thal the plane of the
modules (panels) are parallel to tha plane of the roon
Will tho PV system weigh maximum 4 pounds per squsre feet or lass?
Will ths PV systam be installsd whero the modulos do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will th6 PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surfac€ of the roof?
Will the PV system be installed without uslng any ballast system or counter-weight
systsm?
Will the Bnchors be instralled with a maximum hodzontal anchor spacing of 6 feet
and ls this maximum horizontal spacing shown on ths plans?
Will lhe minimum 5/16'lag screws be installsd wlth a minlmum ol2-112inch
embsdmsnt into rool rafiers (with prs-drilled holes) and is this minimum embedmenl
shown on the plans?
Are ALL the slruciural pages of the plans WET stamped and signod by a California
licensed pmfesslonal engineer? (includlng proJect specific site plan, pV layout,
a tr
2 atr
atr
Etr
Ettr
trD
trtr
J
4
5
6
7
8 Ertr
s EO
'10 ED
anchorage spacing, anchorage delails and manufacturer's PV support i ation.)
I certffy undor pcnalty of perlury under the laws of the Stata
pd61 113mg. TRANG CONG PHAM g;r..1,
of Califomls thd
rg:
bove iE true:
phona Number: 714 582 3909 Date:
Email Address:
Rov:8/1712015
PERMIT@SOUTHWESTSUNSOLAR.COM
3 tg
I
*,,SANTA
NA
ILT\INC
Itltutic
.{ciln
Planning & Bullding Agency
Building Satoty Divislon
20 Clvic Center Plaza
P.O. Box 1988 (M-'19)
Santa Ana, CA 92702
(714) 647-5800
www.sanla-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
E
sol-01 cBc 2013
Solar Photovoltalc (PV) Checktist for Detached STNGLE FAMtLy RESTDENCES Onty
lnstruclions: The licensed contractor of rscord shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to 6ach oi TWO sets of plans, of
minimum11"x17"size. lf answorino NOtoanvof the ouestions, plancheckshall b6 reouired.
Proje ct Address: 1 I 17 S. HALLADAY ST, SANTA ANA, CA 92701
Conlractor Company Name:
Contracloi License Number:
SOUTHWEST SUN SOLAR, INC
Etr
1004667
YES NO Are the following applicable to the proposed project?
2 Etr
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the Califomia Fire Code, and is this shown on the roof ptan?
Will the PV system be installed on a roof having only one roofng layer with no
ovedays?
Will the PV anay be flush mounled to the existing roof so that the plane of the
modules (panels) are parall6l to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installad where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum b€tween
the underside of modules and the surface of the roof?
Will the PV system bs installed without uslng any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing ol 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16'lag screws be installed with a minimum of 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans WET stamped and signed by a California
licensed pmfessional engineer? (including project specific sile plan, pV layout,
3 8tr
4 Ertr
Etr
6 EEI
7. Eltr
S. Etr
9. Etr
10 EE
anchorage spacing, anchorage delails and manu
I certify under penalty of periury undar the laws of lhe State of
pr1n1 116ms. TRANG CONG PHAM Signatur€:
phone Number: 714 582 3909 Date:
facture/s
California
ation.)
true
Ema it Address: PERMIT@SOUTHWESTSUNSOLAR.COM
Rev:8/1712015
5 tg
l