HomeMy WebLinkAbout10195687 - PermitProject Address: 617 S Huron Dr
Assessor's Parcel 109425-07
Unit Bldg. Address Range Suite Rangel
Zoning: RlBlock NA Tract: 3915 Historic: No
l>
CiW of Santa Ana 20 Civic Center Plaza (M-'19), Santa Ana. CA,27O2 Building
Permit Counler: (714) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714],647-5853
Permit #: {0195687
Pin #: 71701
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use:
Proposed Use:
Single Family Dwelling
Solar
Solar
SFO WATT GARAGE
R-3, U
VB
cBc 2016
x-0602320256J
lst FL Area: 0
2nd FL Area: 0
OtherAreas: 0
Garage Area:
Total: 0
Patio:
T.l.Area:
Yards Req'dl
Valuation: $16,000.00
Description of Vl'ork: lnstall (24) roof mounted solar panels. Per checklist.
Planning Conditions:
Owner:
Address:
Jose Gomez & Maria T#res
617 S Huron Dr
Santa Ana, CA 927041527
(657) 293-s109
Contractor: SolarCityCorporation
Address lS3l Ritchey St
Santa Ana, CA 92705
Phone: (702) 785-2998
State Lic #: 888104
Lic Typer B, A, C-10, C-20, C46
Bus. Lic #: 324801
Workers' Compensation lnsurance:
Carrier; Zurich
Policy #i WC0182018
Expires: 1013112018
Engineer
Address:
SolarCity
James ChildS
3055 Clearview Way
San Mateo, cA 94.402
(6s0) 638-1028
5077 5
Phone:
Tenant
Architect /
Oesiqner.
Address:
Planning Approval By:
Plan Checked By.
Permit lssued By: \ /+
NPDES lnsp. Req'd. ! No
PWA lnsp Req'd: No
Planning lnsp Req'd: No
Landscaping lnsp. Req'd: No
Amsden, Julie
Dale:
Date.
Date:0212712018
Subject to Field:
Misc. Receipl
Misc. Receipt
Misc. Receipt
07776002 51601 Permit Fee
07775002 s1612 gldg Stds. Revolving
07776002 57600 Genetal Plan Update
$s00.00
$1 .00
$0.00
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'd: No 0111600251601
01 1 16002 51612
$500.00
$1.00Every perfiit issuod shall becone nvalid unless the wo* on the site authonzed by
such pemil is cofinenced wilhin 180 days aftet lls issuence.ot if the wo* authonzecl
on the site by such pamlit is suspended ot abandoned lor a potiod of180 days after
the time tho wor* is cofimenced
lnspector MtD# 2018-141702
Fee Total:
Paid lo Date.
Balance Due
$501 00
$0.00
$50 1.00
vY
Lot 15
Occupancy:
Constr Type
Code:
Flood Zone:
# of Stories:
Phone:
License #
Phone:
License #:
COMMENTSSITE-WORK DATE ID/SIG.
Set Backs
Erection Pads
UFER Ground
SLAB Floor
S u bf loor/Ve nVlnsu lat ion
Roof Sheathinq
Shear Wall
Framing
ln s u lation/E nergy
Drywall ll
itttJtwExt./lnt. Lath tt lr tg
Brown Coat
Itrlasonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
Engineer Final Beport
Flood Zone Certil
I
,|FINAL .1 Lto $\Nilh Ir3
Certilicate ol Occupancv
Notes, Bemarks, Etc.
OWNI'R BUII,I'ER I'EI,CARAIION
I tE.b) llfinn uLLr FBlry ol Frjurv lhd I m .xcn{, fri'm rh. c(rrrrhF l-i..n{ tjw r,r rh. nnbwi,rs Nusn (S.( 7o.ll 5
Ilu\inc\\ a Prnti\i(n' C*lc) A.y Ciry or Coudy shich r.nx,.s , Frnri n' on{ruct. .116. rmrorc. J.mr'rh or rcFtr st
nto.irc. Frrt, \ ,$x.n.. !,$ Rtrtr$ rft rtT'larr fitr rui trflu! ro li lc r ii8rri skr.'Enr rh:, lt nr sh. ii lEnql t'Urua.l
ro rlE li.vni,ns ol rh. C.dB.kr\ l-ic.nr.d lf,s rChitrrcr 9. C.'nnkE_in3 sirh Scclion ?Uxr ol l)ivi\ion .l n( rhc Blsitus ind
hora$i,,nr (idr) or rhdr h. or sh. $.x.mfl rh.rcfn'm!frjrlE hd$ lhr rhc sllcScd .r.irpri)n Ant !ii,ldi,norSdnn 7lr:ll.J hy..y
+!ltrnr for ! Frnrn rubFrk rlr {Tlictnl ro r cn il pcMlry of nn dn. rhltr lir. hondRi dolld\ ( llo0 r
_ l. a\ o*Nr ol rrE l,oFnr, rtr my crir'Fy\ sir h sa8c! .\ rtrtr y)k (,n{EEt.n. rrll l1' rlr {rrl ui rlt {dm a nr
idcnl.ri or nflcRat fd qk ISN ,(Itl. Burimrs lnd l\.fc{$N Cdc 'I hr Conkr(r's I -tcnt lrw d,$ nor 0nllv l| !n encroa
rhs nn'pcny *ho huru{ or in{rnw\ rllB)i. nl th, &$ ruh s hinrlf or h.r<lf or rhouBh hF q nq osn .ryt,)tc.,
pr\ ild rhlr rrh rymrtmd\ m ni inrGikrt d olI'cl ft, ql. ll h]uN. rlt h{illi.a d irlmrnEni ir $Ll eirhi. otu ttd
orco.WL{in rlr ()socr Buiuo witlhivu rh. bord.n o, pn'viry ihd h. or \hc did n, ttritl or invotr !h. FDJdy f{r rh. I'o{n{ ol
l. i\ oqnc. ol rhc Fofxny. im .r.lunv.ly (nMsl mS * nh li.cn\d ...nr(r,^ k, .un{tul rlt FolLrr lS( 7l}l.{. 8u\Es
arrl Pr(a\in C,rL l'h.(i,nk&tn \ Li..nr lju d,*\ *n lmlyro !6oqrE ol p.,,F.ry *h' l'uikk or nnpn' \ $ rhcr$n.
i qho (onlruch ny ruci l-rFrc wir h a Conirtr nfi { I li(n\cJ pu^urni t, rh. Contrett-s l.acnc tj$ )
I 3'n.i.m.r unds Sc.ri'n
\lau:&tlJ.rltfBisarui
Dt!IJ"8d-ll()!
I lkrchy!lltrnru .rpctrr!lyol tErjuryoncolrhcnnhqrE,1.(lrrrrrnn
I l r,,rl*illnuinra r (cd'r{rrc otcotr*nrt) S.lr ltr{rc ntr s!rlcr\' .on,r,.rsrri{trr. ar pmv d n, ht SL{tiin 1700olrhc
(iil. ntrrhrE,r,,nrr{..1rh.{dLhtrshkhrh(IxnnI tr\nh,l
rn(l{rlL utr[rnworlt.n.,,n,r.n\rrtrrtrtrur,tr..,n rntut('lh]Sr.rttr.lrrxrorrh.lJlitC'ilt.htrli'rilo' rtk.ri
I [tI ${,16\' (,r{Insii{ 'n$hn..MEr lrt Fni.! numh( o.
l)*,*. lb
[
2-oly
I..di,rrh.r'nrhcnrtunutuc,'frtrqorkfnrqhiuhrhhI'crnrri\is\u.Irhrllnor.nfl,r,!n,Frvrninrtrynunftr
i, !s !' tRnm {hFd n' rh f,rt6'mqrnuri,n I's\ of( u,if,tr !..nJ !8R rhd rrl \i,uU lf{'m \ubjNr b rlE
trrrlda lr)mpcner iiln poi\l,ff oI S.rti,i .t7(D of rhr I jhtr C(xl!. I Jtrll. i'n hwilh comnly e ir h rh,{ nn,irbn\
IYARNIN(; friluE n, {.urc }orkcn' d'nl0<nsri,n .o\crrge rl unk*f l. ul shrll br..r an c.{lh]d t' dimiMl Ffllr.\ arl
.'ril limr $ t, oh hu'rirrl tlkrueod tj.llr.r ltllD.lxtrr. in r.tliliu t' rh. rtrd of ronqxtr"rrnnl d.rMSc( .\ nrovilcd lnr ric
srj , ur. 01 th.l rh, (
IV,,.,",L\tn\
Dl]!L\lltllo\
Ihcrhyrfllrnln'lcr p.nuhyolr.rjurrlhd I rm lntne{l u&ln F)vi\i.Ddf CtrPrd I (.onmhin3 s hS.dDtr70m)orD Fbn l
ol rhc BulRx lnd h.fcl\i'ni (ixic. rrd mr lr..{ F 6 lull f(re r.d c,lcr
..".,. C,t{1, ,
""'' r-lz+Tf L **"*, ?E rtr,
llLUliIf,lJCIl9NIlNDlll,rraDXrI
I hcahy rlftm undd FtulrroI FrJUry rhar rh.c n r G'.iulhn Lding 4cxl lor th. Ffontutrc ol rh. trutk litr *hih rhn Frn,i n
n\u.i rse.. lt 7- ( iv C )
I.nd.is N(m,
-
D,I1jIIU)I:(LIBAIIOII
I lr:1.$!lrnn trn'l.r t!trxlrv ol trrltr'r,tr'. ol rlt nnl,ri'r!,lrrln'nDtr\
l)r i,l tri l,c'n \ A\hn'( Norri.Itr r L,l.rrl k.!Ll.nkn* t I l. Jr,. Iltrr6)
llrqntrr l crtr1!l Nurliilrri(n,
Llln'l\ rh, r^_ rc.kral
l4({,.,*,,*,..,,,
""r,,.*1.,1,.r shrc r""' n br
Jh{. 'El/i,r,r nn'FnJ nf,,
Rsrhti,nr R8.rdin8 {\tE\los rcnx,v ar rcr q'plitebL k' rhn pn,J..t.
nlplla.ri'nrnd rc rlur rhc ltnr infomdi!. ir coml Ir3Blo(xnl,lywith.llCii,r cnu.ry
hns n' huil'jins .on{ocrion, ! h.ahy aurhtri,. EnErnr.r iv.s or rhn Cny !d Counry r. rnrd !F. itr
M \(aA)-.212+J r_(
BUILDING. INSPECTOR RECORD <
Forms/Steel/Holdowns
u A +
I
#,
#
.t
i,
ll
.
,
1,
,
,
i:
.
u
r-
!.
It
l
::
-
u)
tD
-
-:
J
Jc
r
)a
Dr
o
3p
"
So
<-
o
i.
i
"r
(t
,7 t :l
()
(l N\
$':
.
--
t
:l
l
I )
I
ii
r,
'
,l
,,
ri
'l
,
r
)'
-
'
.J
,.
,
()
t,
l
:.
)
.
;
Pt
L
:
l::l
''
.
!r
,
r
,
o)
t-
i
,,
)<)
i:
i i a::l(r
:)
_
(1
1 :.P ,l
..
i
1
i,
i
,
,
,
,)
i):-1.l ],
:.
i
l
,,
]
I I
li
r
i
,'
l
l
"l
:,
:-
I
t
:).'
::,l
,.
)
I I
(,
J :)
():l :r
:l J'
P-
n;](,
J ?:,
,:
;
:)
t)
:-
)
rl
,
v,
\
a :'
J L:E o C)
::)
('
--
1
;u
"
'
d
\)
.!
.
"
-
:I
B
!
Y
,,
'
o
t-
,
'
ii
?
P
xO
o-
.
't
t
^
a5
1q
{q R.
t
s
:-
r
'i
'
i'
1
:l
3s
.
]'
+(,
os'
+
1x
6T
-
I
."
"
5{
^f
J
to
rt
l
h
io
'a
+
tr
;
oq
Qo aa
b'
J*
t
of
It o 39 (L o f o,):r$oa,
o,o-
(l
)Ds€'
0,
,=
!1
,
(u of a:a 9'
l 'o (Doao ?_
wU
l,
Y
l
:
,
;
j'
1"
,
'
;
I
r
l,
'
li
i
l
i
;
i
l(
i
I.
,
l
lY
i
ll
;
l*
l
t
i
N D
li
l
[
I
l"
I'
ll
l
r
ll
r
i
;
].
.
.
]
I I I I
EXPEDITED PERMIT PROCESS FoR PV SysTeruIS
STANDARD STRINC SYSTEM
The Solar America Board for Codes and Standards (Solar ABCS) Expedited Permit Pro-
cess provides a means to differentiate systems that can be permitted quickly and easily
due ro rheir similariry with the majority of small-scale PV systems. Those systems with
unique characteristics may be handled with small additions to this Expedited Permit
Process or may require much more information, depending on the uniqueness of rhe
installation.
The following pages contain forms for the Standard Srring System to use with the Expe-
dited Permit Process. The Micro-lnvertet AC Module. and Supply-Side Connection forms
are also available as interactive PDF files at www.solarabcs.org/perm itt ing ln jurisdic-
tions thar have adopred the Expedited Permit Process for PV Systems, these forms can
be filled out electronically and submiued in either printed form and via email. An elec-
tronic format is used so that the supplied information is standardized and legible for the
local jurisdiction.
R)U5:a4'7
R3 -t- U
\ l ,..)\:i)
.QC\E
x
EXII'I)II II) I't.RMII I'RoCt SS FOR IV SYSTEMS
I
/'
EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS
STANDARD STRING SYSTEM
The information in this guideline is intended ro help local jurisdictions and contractors identify when Pv system installations
are simple. needing only a basic review and when an inshllation is more complex. It is likely that 50%-75% of all residential
systems will comply with these simple criteria. For projects rhat fail ro meet the simple criteria. resolution steps have been
suggested to provide as a path to permit approval.
Required Inlonnation for Pennit:
l. Site plan showing location of major components on the property. This drawing need not be exactly to scale. but it
should represent relative location of components at site (see supplied example sire plan). PV arrays on dwellings
with a 3 perimeter space at ridge and sides may not need separate fire service review.
2 Electrical diagram showing PV array connguration, wiring system, overcurrent protection, invertet disconnects,
required signs, and ac connection to building (see supplied standard electrical diagram).
3. Specifrcation sheets and insrallation manuals (if available) for all manufactured components including. but not
limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system.
Step 1 : Structural Review of PV A,,ay Mounting System
Is the array to be mounted on a defined, permitted roof structur€?ves E no
U No due to non-compliant rooJ or a ground mount, submit completed worksheet Jor the struclure WKSI
Roof Infotmation:
L ls the roohng rype lightweight (Yes = composition. lightweight masonry, metal, etc...)YES
lf No. submit completed. worksheetJor rooj structure WKSI (No = heavy masonry, slate. etc...)
2. Does the roof have a single roof coveringZ EVes ! no
f No, submit completed worksheetlor rool structure WKSI .
3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk)Flashing, geocell sealant
M ount ing Syst em Infonnation :
l. Is the mounting structure an en ineered product designed ro nount PV modules with no more than an 18" gap
benea(h the module Frames?ves E no
IJ No, provide details of structural attachment certiied by a design proJessional.
2. For manufac[ured mounting systems. fill out information on the mounting system below
a. Mounting Sy stem Manufacturer ZeP product Name and 64o6"14 Comp Mount Type C
b. Total Weigh t of PV Modules sn6 P.2115 '1323 bs
c. Total Number of Attachment Points 38
Weight per Attachment Point (b -: c)34.81 lbs (if greater than 45 lbs. see WKS I )
Maximum Spacing Between Attachment Points on a Rail 48 inches (see product manual for
maximum spacing allowed based on maximum design wind speed)
Total Surface Area of PV Modules (square fee$441
d
e
f.fr:'
Disrribured Weighr of PV Module on Roof (b + l)3.0 Ibs/ft'
If distributed weight oI the PV system is grcater than 5 lbs/ft', see WKSr .
Step 2: Electrical Review o[ PV System (Calculations for Electrical Diagram)
ln order for a PV system to be considered for an expedited permit process, the following must apply:
l. PV modules. utility-interactive inverters. and combiner boxes are identifred for use in PV systems.
2. The PV array is composed of 4 series strings or less per inverter.
3. The total inverter capacity has a continuous ac power output 13,44O Watrs or less
4. The ac interconnection point is on the load side of service disconnecting means (690.64(8)).
5. One of the standard electrical diagrams (El.l. El.l a. El.1b. or El.lc) can be used to accurately represent the PV
system. lnteractive PDF diagrams are available at wwwsolarabcs.org/permitting.
Fill out the standard electrical dtagram completely. A guide to the electrical diagram is provided to help the dpplicant
understand each blank to jll in. lf the electrical system is more complex than the standard electical diagram can elfectively
communicate, provide an altemative diagram with appropriqte detail.
2 EXIEDI'TED PERMII' PROCTSS TOR PV SYSI'EMS
ileoslN
e6euoN orcunef!
r!l!e r :azrs cv uals^s
sn'or.8yc.6.Es,oudrnrsl', :ssalppv alls
.$ar uE,,r tur :auJeN alls
suals^s n d aseqd-ol6urs 'alecs-lleLUS ro,
ueld alrs
s01a5 va rwnu.s
rEnSI.'P!U S rEgt
vlsir
I
I
s-l
(
FI
f--------eli-Ji______)
I
Irri;H l. l'!il.-l
\- t3'l'lrlr\l 3! l-\ Tlr/, LlitJ\,J;
l r |l|
nt
I t]lr .rt.. Lrt ]vl"l
: illt llj la 1tli,]
rl..? r7.-.r? lrl'rlE'{l
"-l
rulti ri . l.ll"I "
.-
l;. 'Illt1 : _,r I a'l-. ,'111:..11: ', Tl;
NV'rd rrrs wrrs^S DNrur_s ctvcNVts
x
=o
=i
.--
a
o
-t
=
Itill
One-Line Standard Electrical Diagram for
Small-Scale, Single-Phase PV Systems
Site AddreSS: 6,7sHoMor s:ibN c^e27o. us
System AC Size
Site Name: ios€ M.^'n 6oh6!
0."" 3v Mauricio Noriega
NI5 Date
o EQUIPMENT SCHEDULE
TA
1
2
3
4
5
6
1
8
9
G DESCRTPTTON __
!qL4Etyl!9s!!E _PVARRAY -J-qgxlll rrlEq) _ _
COMBINER (IF USED)
DC DISCONNECT -_DC/AC INVERTER
GEN METER (IF USEDL__
AC DISCONNECT (IF USED)
SERVICE PANEL
PART NUMBER NOTES
Solarcrty Standard 325 24 Modul€s
t SorNra 6.6 TL
UTILITY
SERVICE
# OG224NRK CuUerHamm€r 2004,/35A F!ses 240Vac Fusrble NENIA 3R
=9vnc :oo A MA|N. 2oo- A 8us 15 A tNvEnrEnbcpo
(SEE NOTE 5 FOR INVERTER OCPDS, ALSO SEE GUIDE SECTION 9)
I
a
I
a
a
Disregard if
provided with
inverter
BUILOING
GROUNDING
ELECTRODEFOR UNUSED SERIES STRINGS
PUT "N/A- in ELANK ABOVE
SEE GUIDE APPENOIX C FOR
INFORMATION ON i/ODULE AND
ARRAY GROUNDING
A CONOUIT AND CONDUCTOR SCHEDULE
rAG OESCRIPTION OR CONDUCTOR ]YPE COND,
94V9E
4ry9{9
4'/v9Iq
10
10
10
8
8_
8
NUMBER OF
CONDUCTORS
9
_2
2
1
__3 _
I
c9!9qI
TYPE
!4
N/A
EMT
EMT
cqNs!!r
9r4E!tt
!/A
314',
311',
1 USE-2 E or PV WIRE E
BARE COPPER EO, GRD COND. (EGC)
1
-l
4
5
Tl\ryNl2 E oTXHHW-2 D or RHW-2 0
THWN-2 E orxHHw-2 tr or RHW-2 tr
INSULATED EGC
DC GROUNDING ELECTRODE COND,EMT 3r
6 ttoouues tu
SERtES SOURCE-CtRCUtrl
6 r,rooures n !
se-nressounce-crncurt!
rrfi,l:lnftn
n
INVERIER
AC DISCODC DISCO
6 l,rooures tru i
se-nressounce-ctncutr!
INVERTER
OCPD
)MAIN
OCP
6 MoDULES tN .
senres sounce-ctncutr I
#NIEIIIE
rHwN-2 E ol4!1Hry-lo or 8lwt2 tr
INSULATED EGC EMT 3t4
STANDARD STRING SYSTEM ELECTRICAL DIACRAM
:
F
co
Uodc-
F
2d
1
F
c
X
-t
L
A A A
+
J.8OX
Notes for One-Line Standard Electrical
Diagram for Single-Phase PV Systems
Site Name
System AC Size
Site Address
o6w. By Sean Ferneyhough
NTS Dale
NOTES FOR ALL DRAWINGSI
OCPD = OVERCURRENT PROTECTION DEVICE
NATIONAL ELECTRICAL CODEO REFERENCES
sHowN AS (NEC )O(XXX)
SIGNS_SEE GUIDE SECTION 7
SIGN FOR DC DISCONJ'IECT
PHOTOVOLTAIC POWER SOURCE
PV |\.4ODULE RATINGS @ STC (Guide Section 5)
MOOULE MAKE solapty laldlr9
sc325
MAX POWER.POINT CURRENT (IJ
MAx POWERfOTNT VOLTAGE (V,f)
oPEN-CTRCUtT VOLTAGE (Voc)
sHoRT-CIRCUtT CURRENT (sc)
5.65
MAX SERTES FUSE (OCPD) _
MAXTMUM POWER (PMA) _
MAx voLrr'sllrYlj00Y!!L
VOC TEMP COEFF (mvrcEl or Y./'C fl)
RAIEO I\,1PP CURRENT
MODULE MOOEL
57.6 -V,
-
A
-
RATED MPP VOLTAGE
MAX SYSTEM VOLTAGE
69.6
6.03
INVERTER RATINGS (Guide Sectron 4)
INVERTERI\,,IAKE DELTA
INVERTER MoDEL SOLIVIA 6.6 TL
MAX DC VOLT RATING
6600
WARNING: ELECTRICAL SHOCK
HAZARD_LINE AND LOAD MAY BE
ENERGIZED IN OPEN POSITION
MAX CIRCUIT CURRENT
SIGN FOR INVERTER OCPD AND
AC DISCONNECT (IF USED)
SOLAR FV SYSTEM
AC POINT OF CONNECTION
l
't5
325
600
600 v
-0.258
yA] lolE1q4!.c
lo!!rNA!19v!rrleE
IVAX AC CURRENT
MAX OCPD RATING
240
IF COEFF SUPPLIEO CIRCLE UNITS
NOTES FOR ARRAY CIRCUIT WIRING (Gurde Seclion 6 and I and Appendix D):
2,I2OO5 ASHRAE FUNDEMENTALS 2.lo DESIGN TEMPERATURES DO NOT EXCEED
47'C IN THE UNITED STATES (PALM SPRINGS, CA IS 44,1'C), FOR LESS THAN 9
CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTEO SUNLiT CONDUIT AT
LEAST 0,5'ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF
47OC OR LESS (ALL OF UNITED STATES),
a) 12 Awc, 90oC CONDUCTORS ARE GENERAI-LY ACCEPTABLE FOR MOOULES
WITH lsc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SI\4ALLER
FUSE.
b) 1O AWG, gOOC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULES
WITH lscOF 9.6 AMPS OR LESS WHEN PROTECTEO BYA I'AMP OR SMALLER
FUSE
31.7
AC OUTPUT CURRENT
NOMINAL AC VOLTAGE
35
240
THIS PANEL FED 8Y MULTIPLE
SOURCES (UTILITY ANO SOLAR)
NoTES FOR INVERTER CIRCUITS (Guide Soclon I and 9)
3) SIZE PHOTOVOLTAIC POWER SOL,RCE {DC)CONDUCTORS BASEO ON MAX
CURRENT ON NEC 690 53 SIGN OR OCPD RATING AT OISCONNECT
4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTER
OCPD AMPERE RATING (See Guide Section g)
5) TOTAL OF n INVERTER OCPD(S), ONE FOR EACH INVERTER. OOES TOIAL
SUPPLY SREALERS COMPLY WITH 120% BUSBAR EXCEPTION lN 5S0.64{BX2)(a)?
YES E NOtr
I ) IF UTILITY REOUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THE
REQUIREMENT? YESI NOD N/A tr
2) IF GENERATION METER REOUIREO. DOES THIS METER SOCKET MEET THE
REOUIREMENT? YES tr NO tr N/A N
NOTES FOR STANDARD STRINC SYSTEM ELECTRICAL DIAGRAM
:
F
4o
Uo
F
4.
a-
a
L
1,) LOWEST EXPECT AMAIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEAN
EXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP 2 oC
2 ) HIGHEST CONTINUOUS AI\4BIENT TEMPERATURE BASED ON ASHRAE HIGHEST
MONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE e 'C
*-SANTA
NAJIiH}
Plannlng & Bulldlng Agency
Bulldlng Safety Dlvision
20 Clvic Conter Plaza
P.O. Box 1988 (ll-19)
Santr Ana, CA 92702
(714) 047-5E00
www.aanta-ana.org
soL{l cBc 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructlons: The licensed conlraclor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size. lf answe rinq NO anv of the ouestions. olan check shall be reouired.
ProJect Address:617 S Huron Dr, Santa ana, CA 92704, US
2
Contractor Company Name:Solar City
contractor License Number: 888104
YES NO Are the followlng applicabla to the proPosed proiect?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will th€ PV system be installed with a space of 2' minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast syst€m or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will th€ minimum 5/16" lag screws be installed with a minimum o12-112 inch
emb€dment into roof rafters (with predrilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans WET stamped and signed by a Califomia
licens€d professional engineer? (including proiect specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
Etr
I @tr
trtr
ao
trtrEtr
trtr
ao
4
5
6
7
I EI E]
'10 trtr
Phone Number 702-785-2998
Emait Address: mnoriega@tesla.com
DarF- t/25/2018
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
I cortlfy under penalty of poriury undor the laws of the State oI Callforni. that the above 13 truc:
print Name: MAURICIO NORIEGA Signature: Vaurici. \oriega ll.il'il,i:il',1','l'1",i ,1"'lli'
Rev: 8/1712015