Loading...
HomeMy WebLinkAbout1000 E Santa Ana Blvd Unit# 220 - Misc. Permit (2)-,-SINTA A]iA llr\\l$ t [[tDI\c $t\0 Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 9?7Oz (714) 647-s800 www.santa-ana,org ACC-01 CBC 20'1SA. PURPOSE OF THIS DOCUMENTATION: (check one) d Finding of unreasonable hardship for pro.lects UNDER the valuation threshold' Q Finding of unreasonable hardship for projects OVER the valuation thresholdt O Certification of Full Compliance with the 2019 California Building Code ' Valuation threshold as defined in the 2019 California Building Code, Section 118-202.4 (Exception #8) and Section 202 is $lzLlgqEq (as of January 2020) B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER: hoject Address: 1000 E. Santa Ana Blvd Permit Number: 101103540 Prcject Descriptjon: Se@nd Floor Tennant lmprovement Floor Number: &6iness Name / O,nner: city of Santa Ana Eusiness Phone Numben 714.647.5045 Legal Property Owner Oty of Santa Ana Phone Number 714.647.5045 fotal Construction Cost or Project Valuation 320,000 Cost of Providing Comdete Disabled Access $1s0,000 1. The cost of all construction contemplated in the determination of the valuation of improvement threshold based on the valuation of site and building improvements for the last three-year pedod. Permit No lssuance Date Valuation of lmprovements 101 103540 ln Plan Check $20,000 Total: ?. 20o/o of Tolal Construction Cost or Project Valuation: 3. The actual amount to be spent to provide disabled access $ 4.000 $ 4,000 4. Describe the impact of the proposed improvements on financial feasibility of the project Reu:0210412020 Page 1 ol 2 DISABLED ACCESS COMPLIANCE DOCUMENTATIOI{ FORM 5. Describe the nature of the use of the facility under construction and its availability to persons with disabilities and the nature of accessibility that would be gained or lost: Office Soace - The second floor restrooms are not 100% in comoliance. however thev are Accessible: however in an extreme case the first floor restroom are 100% comoliant. 6. ldentify the accessibility features and equivalent facilities that WILL be brought into compliance with the latest edition of Title 24 as a part of this project and an estimate of thecostof each item: (Documentation may be required) Accessible Features to be Made Accessible Cost of lmprovement a. Entrance E Door ! Landing E Stairway/Steps E Ramp $ D Path of travel from accessible parking to the building entrance and area of remodel ! Path of kavel to sanitary facilities / public phone / drinking fountain $ E Path of kavel from the public way to the building entrance s c Sanitary facilities ( Floor no. 2 |$4,000 d. Public phone(s)$ e. Drinkingfountain(s)$ f. Parking $ g. Signage & Alarms $ i. Other $ $ 7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is granted. Provide an estimated cost of compliance for each ilem: (Documentation may be required) Accessible Features Not to be lmproved Cost of lmprovement a. Sink, Water Closets, Urinals, & Partitions $1s0,000 b $ c $ sTotal: 8. Petitioner must be the legal property owner or his/her legal representative: lcertify that the above noted information is true and correct. ,/! Legal Property Owner @ ArchitecuEngineer E Contractor E Other Print Name: Tyrone Chesanek Phone No. 714.615.0887 Address: 20 Civic M-22, Santa Ana, CA 92702 Si gnature Date: Sept 24,2020 Approved by Reu:0210412020 FOR AGENCY USE ONLY Date Page 2 of 2 I I b. Path of Travel: Total: