ACC-01 CBC 20'1SA. PURPOSE OF THIS DOCUMENTATION: (check one)
d Finding of unreasonable hardship for pro.lects UNDER the valuation threshold'
Q Finding of unreasonable hardship for projects OVER the valuation thresholdt
O Certification of Full Compliance with the 2019 California Building Code
' Valuation threshold as defined in the 2019 California Building Code, Section 118-202.4 (Exception #8) and
Section 202 is $lzLlgqEq (as of January 2020)
B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER:
hoject Address:
1000 E. Santa Ana Blvd
Permit Number:
101103540
Prcject Descriptjon:
Se@nd Floor Tennant lmprovement
Floor Number:
&6iness Name / O,nner:
city of Santa Ana
Eusiness Phone Numben
714.647.5045
Legal Property Owner
Oty of Santa Ana
Phone Number
714.647.5045
fotal Construction Cost or Project Valuation
320,000
Cost of Providing Comdete Disabled Access
$1s0,000
1. The cost of all construction contemplated in the determination of the valuation of improvement threshold
based on the valuation of site and building improvements for the last three-year pedod.
Permit No lssuance Date Valuation of lmprovements
101 103540 ln Plan Check $20,000
Total:
?. 20o/o of Tolal Construction Cost or Project Valuation:
3. The actual amount to be spent to provide disabled access
$ 4.000
$ 4,000
4. Describe the impact of the proposed improvements on financial feasibility of the project
Reu:0210412020 Page 1 ol 2
DISABLED ACCESS COMPLIANCE
DOCUMENTATIOI{ FORM
5. Describe the nature of the use of the facility under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
Office Soace - The second floor restrooms are not 100% in comoliance. however thev are
Accessible: however in an extreme case the first floor restroom are 100% comoliant.
6. ldentify the accessibility features and equivalent facilities that WILL be brought into compliance with the
latest edition of Title 24 as a part of this project and an estimate of thecostof each item: (Documentation
may be required)
Accessible Features to be Made Accessible Cost of lmprovement
a. Entrance
E Door ! Landing E Stairway/Steps E Ramp $
D Path of travel from accessible parking to the building entrance
and area of remodel
! Path of kavel to sanitary facilities / public phone / drinking
fountain $
E Path of kavel from the public way to the building entrance s
c Sanitary facilities ( Floor no. 2 |$4,000
d. Public phone(s)$
e. Drinkingfountain(s)$
f. Parking $
g. Signage & Alarms $
i. Other $
$
7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is
granted. Provide an estimated cost of compliance for each ilem: (Documentation may be required)
Accessible Features Not to be lmproved Cost of lmprovement
a. Sink, Water Closets, Urinals, & Partitions $1s0,000
b $
c $
sTotal:
8. Petitioner must be the legal property owner or his/her legal representative:
lcertify that the above noted information is true and correct.
,/! Legal Property Owner @ ArchitecuEngineer E Contractor E Other
Print Name: Tyrone Chesanek Phone No. 714.615.0887
Address: 20 Civic M-22, Santa Ana, CA 92702
Si gnature Date: Sept 24,2020
Approved by
Reu:0210412020
FOR AGENCY USE ONLY
Date
Page 2 of 2
I
I
b. Path of Travel:
Total: