Loading...
HomeMy WebLinkAbout1226 W Second St - Misc. PermitPlanning & Building Agency Buildin g Safety Divi$j{ni- 20 Civic Center Plazff ''' P.O. Box 1988 (M-19I i Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org p - RESIDENTIAL PHOTOVOLTAIC CHECKLIST soL-o1 cBC 2016 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11" x 17" size. lf answerinq NO to anv of the questions, plan check shall be required. ^c{€rProject Address:t2-L6 ru 2 tstr tstr Etr tstr tstr Etr 2 3 4 5 Contractor Company Name: Contractor License Number YES NO Eltr 8 Ettr I tstr 10 mtr +T4-krl €LZTR- (AL- TEC4+NA L-t'c.y i60 20tL Are the following applicable to the proposed project? Will the PV system layout provide the required threejool wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 4 pounds per square feet or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weight system? Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Will the minimum 5/1 6" lag screws be installed with a minimum ol 2-112 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specrfic site plan, PV layout, anchorage spacing, anchorage details and manufacturer's PV support information.) I certify under penalty of perjury under the laws of the State of Califo Print Name: Mr&ew Tp-y'oJ Signature Phone Number: 1t+ - gr+ - 417 I 6 7 Rev 8/29/19 D t the above is true: Email Address C11I, 1/E JUL 16 RICD 1 Date: