Loading...
HomeMy WebLinkAbout1418 W Elder Ave - Misc. PermitGEOTEGHNICAL I NTERNATIONAL LAN & ASSOCIATES Civil . Structure . Geotechnical . Topographic Sun el l3ll9 Ilarbor Boulcrard. Gardcn Grove. ('n 92813 Tel:(714) 414-9215. Fax: (714) 537 -7974.Email:[-an ham9 a-hotnra il.conr Project no.: SA-0 1 -0 1 -20-03-SW Permir No. I 0l I 02883 lantary 26,2020 Richard Osorio (714) 760 - 8098 Richar_20 I 9@yahoo.com c.o. Wendy (714\747 -7244 Subject Geotechnical Engineer's Certification Of Demolition And Backfilling Of Pre-Exisling Swimming Pool For Abandoning Purpose Located at I 4l 8 W. Elder Avenue. Santa Ana. Calilbmia 92704. Dear Mr. Osorio: In accordance with the requirements ol the City and per your request and authorization, this certification has been prepared for the demolition and backfilling ollhe pre-existing swimming pool located at the subject site. We understand that creation of drainage holes along the bottom of the swimming pool by puncturing/breaking-out the pool shell bottom has been approved by the City inspector prior to backfilling the swimming pool. 2. Removal of the coping. bond beam. and upper portions ol the swimming pool shell side walls has also been performed and approved by the City lnspector. 3. All utility lines serving the swimming pool including electric. gas. and water lines were terminated/disconnected./removed and plugged,/capped in an approved manner. and approved by the City Inspector. 4. Some concrete pieces of demolished pool shell side walls, coping and pond beam were placed along the bottom of the swimming poo[. 5. The regular soil fill materials generally' consisted of mixture of yellowish brown and grey/dark grey silty fine sand and clay. were placed in thin lifts. added water by using a water hose, and compacted by using a Bobcat. Conclusion: The demolition and backfilling of the pre-existing swimming pool is considered geotechnically acceptable and suitable for the intended use for landscaping purposes. Note: Ifa structural object such as a room addition/ADU is to be constructed at or near the su'imming poot backfill area in the future. a quatified geotechnical engineer should be consulted for provision of geotechnical recommendations for foundation design. Very truly yours, r.'- Lan N. Pham. P.E. Chief Geotechnical Engineer RGE 686. exp.03131l21 I ROFT 5 0F CALII If you have any questions or required clarification. please contact this office. This opportunity to be of service is sincerely appreciated. {_