Loading...
HomeMy WebLinkAbout1426 E Eighteenth St - Misc. Permitr Planning & Ruilding.Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1934 (N].19) Santa Ana, CA 92702 (7 14) 647 -sA00 v^l iV. S aO ta.an a. o rg soL-o1 c8c 20r3 minimum 11' \ 17" sizs If answerinq NO to anv Solar Photovoltaic (PV) Checklist for Detached SINcLE FAtlllLy RESIDENCES Only Instructions: The licensed conlractor of record shail complete all sections, ans,r'/er the ten questions and sign the certification section below. A copy of this form shall be attached to each of TV/O sets of plans, of of the u uestions, plan check shall be required Project Addres s I \LILL A. l<lV ,l Co n tracto r Company Nam e: Con tractor Licens e N umber: V;'/;^) 9-lo.( q1)15 L ZB Are the following applicable tc ths proposed project? \r'/ill the PV systenr Iayout provde the required threeJoot v,ride clear access pathways per Section 605.1 1 of the California Fire Code, and is lhis sho,,,rn on the roof plan? \ /ill the PV systsn, be installed on a roof having only one roofing layer,/'iith no VVill the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane oi the roof? U/ili the PV system weigh maximum 4 pou nds per square feet or less? \r'/ill the PV system be installed where the modules do not o,/erhang an.v roof edges (such as ea,res, gabled ends, rrdges and hips)? \r'/ill the PV syslem be installeC !,/ith a space of 2" minimum to I0" maximum betr'/een the underside of modules and the surface of the roof? il/ill the PV syslem be installed without using any ballast systern or counter-weight system? \//ill the anchors be installed with a maximum hor,zontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? \r'/ill the minimum 5/1 6" iag screws be installed lvith a minimum ol 2-l 12 incn embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? Are ALL the structural pages oF the pians stamped and sjgned by a California licensed professional engineer? (ncluding project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer's PV support informatjon.) 2 3 tr tr 7 tr 4 5 I I tr I tr tr10 I certify under penalty of perjury under the laws of the state of california that the above is true Print Name (ha S gn ature Phone Number qqL 'rz't o Emaii Address ar,L Rev 1 l/ 19/201 5 . c!(l;t r/ iuintsJz.(,r-C) Date RESIDENTIAL PHOTOVOLTAIC CHECI(LIST 6