HomeMy WebLinkAbout1435 S Borchard Ave - Misc. PermitPlanning & Euilding Agency
Building Safety Division
20 Civic Cente. Plaza
P.O. Box 1988 (M.19)
Santa Ana, CA92702
(714) 647-s8oo
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMtLy RESIDENCES Onty
lnslructions: The licensed contractor of record shall complete all sections, answer the ten qu€stions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11" x 17" size. lf answerino NO to anv of the ouestlons. olan check shall be reoulred.
soL-01 c8c 2016
Project Address:1435 South Borchard Ave
Contractor Company Name: Vivint Solar
Contractor Licen5s 11um6s1; 973756
YES NOtrtr
trtr
trtr
Are lhe following applicabl6 to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.'11 of the Califomia Fire Code, and is lhis shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the rooP
Will the PV system weigh maximum 4 pounds psr square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to '10" maximum between
the underside of modules and the surface of lhe roof?
Will the PV system be installed without using any ballast system or counter-weaght
system?
Will the anchors be installed wilh a maximum honzontal anchor spacing of 6 feet
and is this maximum horizontal spaclng shown on the plans?
Wilt the minimum 5/16" lag screws be installed wilh a minimum of 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the struclural pages of the plans stamped and signed by a California
licensed professional engineer? (including proiect specific site plan, PV layout,
anchorage spacing, anchorage details and manufacture/s PV support information.)
2
3
6
4
5
7
8
trtrtrtr
trtr
ED
tr
o trtr
10.atr
I cartlfyr under penalty of perjury under tho laws of the State of
print Name: Noemi Brito Signature:
phone Number: 7 1 4-872-U76
Email Address:
Rev: 8/29/19
noemi.brito@vivintsolar.com
g,71s. 4l22l2o
la that the true:
@-,'-^\_
Planning & Building Agency
Building Safety Dlvision
20 Civic Center Plaza
P.o. Box 19EB (M.19)
Santa Ana, CA 92702
(7r4) 647-5E00
wwrY,santa-ana.org
RESIDENTIAL
PHOTOVOLTAIG
CHECKLIST
soL 01 cBc 2016
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TwO sets of plans, of
minimum 1 1" x 17" size. lf answerino NO to anv of ths ouo3tlons. plan check shall be reoulrod.
Proj ect Address: 1435 South Borchard Ave
Contractor Company Name: Vivint Solar
Contractor Licen56 11um5g1; 973756
YES NO
1. BE
2 Elfl
3. Etr
4. gE
s. atr
6. Efl
7. EE
Are the following applicable to the proposed prolect?
Will the PV system layout provide the required three-foot wide clear access palhways
per Section 605.11 of the Califomia Fire Code, and is lhis shown on the roof plan?
Will the PV system be instelled on a roof having only one roofing layer with no
overlays?
Wall the PV anay be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feel or less?
Will the PV system be installed where ths modules do nol overhang any roof edgos
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of lhe roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with e maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed wilh a minimum ol2-112incl,t
embedment into roof raflers (with pre-drilled holes) and is this minimum emb€dment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacture/s PV support information.)
8 tr
o trtr
10.Eltr
I certlfy under ponalty of perjury undsr lhe laws of the State of C
py;n1 116r"- Noemi Brito Signature:
phone Number: 7 1 4-872-347 6
Email Address:
Rev: 8/29/19
noemi. brito@vivintsolar.com
9.s6. 4l22l2O
la that the ls true:
@-^---L