Loading...
HomeMy WebLinkAbout1606 N Huron Dr - Misc. PermitPlanning & Building Agsncy Building Satety Division 20 Glvic Center Plaza P.o. Box 1988 (M-19) Santa Ana, CA 92702 (7r 4) 647-5800 wwwsanta-ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST sol-01 cBc 2013 Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMTLY RESIDENCES Onty lnstructlons: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certiflcation section below. A copy of this form shall be attached to each oi TWO sets of plans, of minimum 11" x 17" size NO estion lan check shall be re Project Address:1606 HURON, SANTA ANA, CA 92706 SOUTHWEST SUN SOLAR, INC contractorLiconseNumber: 1004667 2 3 6 7 YES NO m tr 8 Etr AE Etr Etr tstr Etr Ettr atr I I cerlify under penalty of pe{ury under the laws of the State of California t the aqove is true: print Name: MlMl NGO Signature: phone Number: 714 582 3909 Ema it Address: PERMIT@SOUTHWESTSUNSOLAR.COM /t -)c *-SNTA ANA-"ffi Are the following applicable to the proposed project? Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the plane of lhe modules (panels) are parallel to lhe plane of the roof? Will the PV system weigh maximum 4 pounds per square feel or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weighl system? Will the anchors be installed with a maximum horizonlal anchor spacing of 6 feet and is this maximum horizonlal spacing shown on the plans? Will the minimum 5/16" lag screws bs installed with a minimum 012-112inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? Are ALL the structural pages ofthe plans WET stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacture/s PV support information.) Date: Contractor Company Name: 4. 5. lO.EE Re\:811712015