Loading...
HomeMy WebLinkAbout1617 E Washington Ave - Misc. PermitNorCal Engineering Soils and Geotechnical Consultants 10641 Humbolt Street Los Alamitos, CA90720 (s62)799-9469 Fax (s62) 799-9459 September 27 , 2017 Project Number 19859-17 Kennah Construction 6251 Vatcher Drive Huntington Beach, California 92647 Attn: Mr. Steve Espenschied RE Report of Geotechnical Observation and Testing of Swimming Pool Backfill Operations - Located at 16'17 East Washington Avenue, in the City of Santa Ana, California Dear Mr. Espenschied: Pursuant to your request, this firm has provided this geotechnical report to summarize the observation and testing performed by this firm for the swimming pool backfill operations at the above referenced project, Our geotechnical services pertaining to the bacKill are summarized in the subsequent sections of this report. Backfill O oerations The existing pool shell was completely removed. The exposed bottom was compacted to a minimum of 9oo/o relative compaction prior to the placement of fill soils. The fill area was approximately 16 feet by 34 feet with a maximum depth of 9 feet. The pool was backfilled with approximately 4 feet of Y, inch diameter gravel. The gravel was overlain with filter fabric prior to the placement of fill. Fill material placed was compacted to a minimum of 90% of the laboratory standard in lifts not in excess of eight inches in thickness. A rubber tire loader was utilized for compaction control. A water hose provided moisture control. May 15, 2017 Page 2 Project Number 19578-17 Laboratory /Field Testino The relative compaction was determined by Sand Cone Method (ASTM: D1556-07) and by the Drive Tube Method (ASTM: D2937-10). The maximum density of the fill soils was obtained by the laboratory standard (ASTM: D1557-12) and results are shown on Table l. Tests were performed a mtnimum of every 500 cubic yards placed and every two feet in depth of fill placed. A summary of the compaction tests are included with locations shown on the accompanying plan. Limitations It should be noted that our work does not warrant or guarantee that the contractor responsible for each phase of the project has performed his work in accordance with the project specifications. We appreciate this opportunity to be of service to you. lf you have any further questions, please do not hesitate to contact the undersigned. Respectfully submi NORCAL ENGINE Laoat erp.rZgltre ) :!r Keith D. Tucker *Michael A. Barone Project ManagerProject Engineer )6 1C y"*/, R.G E. 841 cHrr 4:=..t |:r=l-- NorCal Engineering September 27 , 2017 Page 3 Project Number 19859-17 TABLE I MAXIMUM DENSITY TESTS (ASTM: D1557-12) Samole Classificatio n Optimum Moisture Maximum Dry Densitv (lbs./cu.ft. ) 115.0 128 0 Clayey sandy SILT Sandy CLAY 14.0 10.5 Date of TestTest No.Location Deoth Percent Moisture Unit Wt. lbs./cu.ft. Relative ComDaction Soil Tvoe Test S/D 9t7 t17 9t7 t17 9t25t't7 9t251't7 101 101A" 102 IUJ Pool Backfill Pool Backfill Pool Backfill Pool Backfill on_o4 on_o( 5.0-5.5 1.0-1.5 16.5 14.1 11.1 10.6 '101 .3 106.9 117 .0 1 18.1 88 93 91 92 D D D S D D S 9t25117 9126117 9126t17 104 105 106 Pool Backfill Pool Backflll Pool Backflll 3.0-3.5 't.0-1.5 0.0-0.5 1 1.0 10.4 10.6 1 18.0 117 .7 119.3 3Z 92 o,l --Retest of failing tests after area reworked S= Sand Cone Method D= Drive Tube Method NorCal Engineering SUMMARY OF COMPACTION TEST RESULTS APROXIMATE LIMITS OF FILL EXISTING RESIDENCE I 02 I O l I I oE I r oa 'l 05 I - !^-t NorCal Engineering SOILS AND GEOTECI{NIICAL CONSULTANTS LOCATIOI'I oF Cot PACTIG'I TESTS KENNAH PRGTECT I ga59-r 7 OATE SEPTEMBER 20] 7 \,VASHINGTON A\/E-