Loading...
HomeMy WebLinkAbout1739 W McEvoy Ln - Misc. Permit*,SANTA NAJ,ffi Plannlng & Building Agency Building Safety Division 20 Clvic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org RES!DENTIAL PHOTOVOLTAIC CHECKLIST soL-01 cBC 2013 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESTDENCES Onty lnstructions: The licensed contractor of record shall complete all seclions, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11" x 17" size lf answerino NO to anv ofthe ouestions. Dlan check shall be required. Project Address:1739 IVCEVOY LN, SANTA ANA, CA 92706 2 YES NO E tr Etr 9. EE 10 EE 8tr mtr Etr tstr tstr Ettr Are lhe following applicable to the proposed project? Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 4 pounds per square feet or less? Will the PV system be inslalled where the modules do nol overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weight system? Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Will the minimum 5/16" lag screws be installed with a minimum o'f 2-112 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? Are ALL the structural pages of the plans WET stamped and signed by a California licensed professional engineer? (including pro.iect specific site plan, PV layout, anchorage spacing, anchorage details and manufacture/s PV support information.) 4. 5. 6. 7 I certify under penalty of perjury under the laws of the State of California prjnt Name: MlMl NGO Signature Date:phone Number: 714 582 3909 Email Addres Rev:811712015 S' PERMIT@SOUTHWESTSUNSOLAR.COM at bove is 3 Jo contractor company Hame: SOUTHWEST SUN SOLAR' INC contractorLicenseNumber' 1004667