Loading...
HomeMy WebLinkAbout1906 S Halladay St - Misc. Permit (2)Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box '1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org RES!DENT!AL PHOTOVOLTAIC CHECKLIST sol 01 cBC 2016 Solar Photovoltaic (PV) Ghecklist for Detached SINGLE FAMILY RESIDENCES Only lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11" x 17" size. If answerinq NO to anv of theques tions. olan check shall be reouired. Project Address:larth rlrr \\ cr 1 Contractor Company r'rame' €R.lb AlrJr-IZt\J IUE s contractor License Number, 8(r15 i3 1 YES/ NO6o da da dada Are the following applicable to the proposed project? Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 4 pounds per square feet or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weight system? Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Will the minimum 5/16" lag screws be installed with a minimum of 2-112 tnch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? Are ALL the structural pages ofthe plans stamped and signed by a California licensed professional engineer? (including project speciflc site plan, PV layout, anchorage spacing, anchorage details and manufacturer's PV support information.) 2 3 4 5 6 7 8 9 da da da da {a10 I certify under penalty of perjury under the laws of th Print Name: l-[ tK{ FLO g(S California-lDat the above is true: ( e State of Signature Phone Number:502- +tS - 30 ts D Emair Address: \t-cr 0 rnnE qv v\cr\L a, v rnc,loA.o(q Rev: 8/29l19