HomeMy WebLinkAbout1995 S Standard Ave - Misc. Permit (2)Phnnlng f Bdldhg Ae.rcy
&ldhe S.lbty Dfi,lh.r
l0 Clv{c CrtE PlEr
P.O. Aor lt.t (*rtltrt Arlr CA t2702
oral aa7{r00
tww.ta rallror!
DI.9ABLED ACCESS CO IPTIA}ICE
DOCUT,ENf AION FORM
ACC{1 C8C 20tS
A PURPOSE OF THIS DOCU TCffiATIOI{: (check one)
! Findlng of unreasonable hardship for prciects UNOER t'€ valuation Ureshold'
ffi Rnding of unreasonable hardship br projects OVER th. valuation hr€shold'
E Certifrcetion of Full Co.npllance wfi the 2019 C€lifo.nia Bullding Code
' Vakralion threshold as defined in he 2019 California Building Codc, Section 11&202.4 (Aception *.8) end
S€c,rion 202 is allllll&oo (as of January 2020)
B. PROJECT INFORflATION TO BE COTPLETED BY PETITONER:
Proiccl Addlllr:
1995 S Standard Avc, Santa Ana Ca
P.lmit NrrnD.n
PC# l0 t I04396
Ptubd O.sidort
Remoddl Existing Office lnterior Improvement
Fl@. NunbGe
Ground
BuslrEss Namr / O1^rlor
Behr Processing Corp
Eusi Es! PlEna Nrrnbar
7 t4-545-7 t0l
Lagal Pro9arfy Ornar
Prologis USLV NITWCA 4 t.t.C
ToLal Cooaln dion Colt or Plojarat Valustbns 305,000.00
Colt o{ Prc\,idln9s 2 u,751.0
Corndat OlarbLd A(..ri:
0
1. The cost of all construction contemplatsd in the determination of the valuation of improvement threshold
based on the valuatjon of site and building improvements for th6 last thrge-year period.
Pgrmit No lssuance Date Valuation of lm nts
Total
2. 20016 of Total Cmstruction Cost or Proiect Valuaton:
3. Th6 actual amount to be spent to provid€ disabled acoass:
$ s 6r,000.00
t $ srs,685.00
4. Describ6 the impact of the proposed improv€ments on financial feasibility of the project
no impact
5. Ooscrib. the naturo of the usa of lh€ facility und€r constuclion end its availability to p€rsons with
disabililios and the nature of accessibility that would bc gainod or lost:
This Facility is a wholesale Paint Distribution Center and is not open to the Public. The Project
wi[[ provide accessibility to Restrooms and Employee Break Area.
$305,000.00PCf l0l 104396 08t21t2020
$30s,000.00
R.v 0204,2020 Pa8o 1 ol2
,**SNTA
NAJ}il$
6. ld€ntify the accessibility features and equivalenl facilities that IILL be brought into compliance with the
latest edition of Title 24 as a parl of this project and an estimate of the costof each ilem: (Docunenlalbn
may b Bqutied)
Acc-.lbb F..tur- to b. tl.d. Accslbl.Cat of lmprcvaor.nt
tr ooo. 6 Landing E Stairway/Steps E Ramp 550.00
b. Path of Travel
f] Path of travel from accessible parking to the building entranc€
and area of remodel $
E Path of tmvel to sanitary facilitiss / puUiiC ptrone I Orinfing
foJntain $
El Path oftravel from the public way to the building anfanc€s 1s,135.00
c Sanitary facilities ( Floor no Ground )$
d. Public phone(s)$
e. Drinkingfountain(s)I9
f. Parking s
g. Signage & Alarms $
l. Other: Break Room $
$ $15,68s.00Totrl:
7. ldentify tho sccessibility features that Wll'I ilOT comply if a request for unreasonable hardship is
granted. Provide an estimatsd cost of compliance for each ilem: (Documental/bn may be nqut;@d)
AccolbL F..turr llot to b. lmprcy.d Cct of lmprovomont
a s
b $
$
Totrl;
t. Pddonar muat b. th. l.grl proprty omrar or hh,h.r Lgrl ltpr!.ntatlva:
I cerl,fy that the above noted information is bue and correct.
! Legal Property Ov*rer ! 4r"61,**nginoer B Contractor E Otlrer:
print Name: Kristy Collins Phone No. 714-279-8091
g66.""". 830 W. Fletcher Ave, Orange, CA 92865
Signature o<A'fu;921s. 0210112021
Approvod by:\
Rov 0204/2020
FOR AGENCY UsE OIILY
Oate ) -q-2,
Page 2 ot 2
a. Entrance:
s
c.