Loading...
HomeMy WebLinkAbout2112 N Flower St - Misc. PermitPlannlng & Bulldlng Agency Buildlng Safety Dlvtsion 20 Clvic Centar Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 6/t7-5800 www.santa-ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST sol-01 cBC 2016 solar Photovoltaic (PV) checktist for Detached stNGLE FAMILy RESlDEl,lcES onty lnstructions: The licensed contractor of record shall com plete all sections, answer the ten questions andsign the cefffication section below. A copy of this form shall be attached to each of TWO sets of plans, ofminimum 11" x 17" size. lf an rino N O to anv the oue ons. Dla check sh all be ired, Project Address:?-tt1, y. (L.urqz- Sn€f Contractor Company Name: Contractor License Number: O/zn I a{tou,,t r/ Jottp , tr,r( . /tzltLl 1 Are the following applicable to the proposed project? will the PV system rayout provide the required three:foot wide crear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 4 pounds per square feet or less? will the PV system be instaled where the modures do not overhang any roof edges(such as eaves, gabled ends, ridges and hips)? will the PV system be instafled with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counler_weight system? Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Will the minimum 5/16" lag screws be installed with a minimum ol2_llZinch embedment into rooJ rafters (with pre-drifled hores) and is this minimum embedmentshown on the plans? Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specilic site plan, pV layout,anchorage spacing, anchorage details and manufacturer,s pV support inf6rmation.l I certify undor penqrtr of psrlury u Print Name: t'tSHft nl nl.(u r ths laws of the State of Cal raL YES/NOZA da tra 2 3 4 5 daEa 6. zJ ,. da 8. lza 9 EItr 10.ZA Phone Number: EmailAddress: -fr -tft'7 Signature: Date: the --1 lFopocscltt<-t al( . /ot\ 2-.oZo s true: Rev: 8/29/19 To CltyofSanta Ana planning and Building Department, l, (hanh NSuyen, the owner of the property located at: 2112 N Frow.r srest sonra Ana. cA 92708 havecont.acted Oraoge County Solar, lnc, (619fi1023627) to perform the solar installation at my home andhereby authorire them to pufl any permits related to th15 solar instaffatOi proieo. Thank you, 114.277 7629 'l*l;U,4