Loading...
HomeMy WebLinkAbout2123 N Freeman St - Misc. PermitPlanning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M.19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST soL-o1 cBc 2013 Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMILy RESTDENCES Onty lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO s ets of plans, of minimum 11"x 17 Project Address: " size. lf answerinq NO to anv of the qu estions. olan check shall be required. Contractor Company Name: Contractor License Number:4rn 3,]q 2 YES NO Ptr Etr Are the following applicable to the proposed project? Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 4 pounds per square feet or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weight system? Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 inch embedment into roof rafters (with pre-drilled holes) and is this mrnimum embedment shown on the plans? Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, pV layout, anchorage spacing, anchorage details and manufacturer's pV support information.) 3 Ptr ptr Ftr 4 5 6 ?tr ?tr ?tr Ftr atr 7 B 9 10 I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name Uirr,L tln nq Srgnature ill- 0/b v4t t-c/ a7 - ft Date: ?/l7l lct I *,,SNTA NA,"'il]},,ffi 1 Phone Number: Email Address: Rev 1111912015