RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol-o1 cBC 2016
Project Address: 2134 N SPRUCE ST
Contractor Gompany Name. Vivint Solar
contractor License Number: 973756
YES NO
1 tr tr
2
3
tr
tr
4
5
6
trtr
Etr
tru
Etr7
8
I
tr
Etr
10 mtr
I certify under penalty of perlury under the laws of the
p1n1 1136s. Kayla Horta S
State of California that the
ignalure:
phone Number: 951 -496-2292
Email Address: kayla.horta@vivintsolar.com
Rev: 8/29/19
921s.09117120
is true
Solar Photovoltaic (PV) Checklist for Datached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 1 1" x 17" size. lf answerino NO to anv of the questions. olan check shall be required.
Are the following applicable to the proposed proiect?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.1 1 of the Califomia Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one rooling layer with no
overlays?
Will the PV anay be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum lo 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112inch
embedment into roof rafters (with predrilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacture/s PV support information.)