Loading...
HomeMy WebLinkAbout2210 N Laird St - Misc. Permit (2)GEOTECHNIGAL I NTERNATIONAL LAN & ASSOCIATES Civil . Structure. Geotechnical . Topographic Surve-v l3 I 39 Harbor Boulevard. Garden Grove. CA 92843 Tel:(714) 414-9215. Fax: (714)53'1 - 7 97 4, EmaiI : [-annh4n]9[4]hotrnail.com Project No. G I 801 0l 6 Permit No. I 0l 95304 January 26. 201 8 Hai Nguyen 2210 N. Laird Street Sanra Ana. CA 92706 C/O Lindi Vo (714) 414 - 3364 Subject:Ceotechnical Engineer's Certification Of Demolition And Backtilting Of Pre-Existing Swimming Pool For Abandoning Purpose Located at 2210 N. Laird Street. Santa Ana. Califomia 92706. Dear Mr. NguyenrMs. Vo In accordance with the requirements of the City and per your request and authorization. this certification has been prepared for the demolition and backfilling ol the pre-existing swimming pool located at Ihe subject site. We understand that creation of drainage holes along the bottom olthe swimming pool by puncturing/breaking-out the pool shell bottom has been approved by the City inspector prior to backfilling the swimming pool. 2. Removal ol the coping. bond beam. and upper portions of the swimming pool shell side walls has also been performed and approved by the City Inspector. 3. All utility lines serving the swimming pool including electric, gas. and water lines were terminated./disconnected/removed and plugged/capped in an approved manner. and approved by the City Inspector. 4. Some concrete chunks ofthe removed coping. bond beam, and swimming pool shell were placed along the bottom of the swimming pool to be used as a layer of free- drainage-materials. 5. The regular soil fill materials generally consisted of yellowish brown silty fine sand with traces of clay. were placed in thin lifts. added water by using a water hose. and compacted to 9070 relative density by using a Bobcat. Conclusion:The demolition and backfilling of the pre-existing swimming pool is considered geotechnically acceptable and suitable for the intended use for landscaping/ non-structuraI purposes. Note: If a structural object such as a room addition is to be constructed at or near the su'imming pool backfill area in the future. a qualified geotechnical engineer should be consulted and a soil repo( should be prepared for provision ol geotechnical recommendations for foundation design. If you have any questions or required clarification. please contact this office. This opportunity to be ofservice is sincerely appreciated. Very truly yours.---:=-r '.N 4\i.' il fro \io\o, ))t tq Lan N. Pham. P.E. Chief Geotechnical Engineer RGE 686. exp.03/31/19 lv