Loading...
HomeMy WebLinkAbout4006 W Flight Ave - Misc. PermitNorCal Engineering Soils and Geotechnical Consultants 10641 Humbolt Sfieet Los Alamitos, CA 90720 (562)799-9469 Fax (562) 799-9459 January 23, 2020 ProJect Number 21 622-20 Kennah Construction 6251 Vatcher Drive Huntington Beach, California 92647 Attn: Mr. Steve Espenschied RE Report of Geotechnical Observation and Testing of Swimming Pool Backfill Operations - Located at 4006 West Flight Avenue, in the City of Santa Ana, California Dear Mr. Espenschied: Pursuant lo your request, this firm has provided this geotechnical report to summarize the observation and testing performed by this firm for the swimming pool backfill operations at the above referenced project. Our geotechnical services pertaining to the backfill of the excavation are summarized in the subsequent sections of this report. Backfill O Derations The existing pool shell was left intact and two 3 feet by 3 feet holes, one in the middle and one in the shallow end of the pool and one 6 feet by 6 feet hole in the deep end of the pool were placed through the bottom to allow for drainage. The upper 2 feet of the pool walls were removed. The fill area was approximately 28 feet by 15 feet with a maximum depth of 8 feet. The pool was backfilled with approximately 2 feet of 1 inch minus crushed concrete. The crushed concrete was overlain with a filter fabric prior to the placement of compacted fill soils. Fill material placed was compacted to a minimum of 90% of the laboratory standard in lifts not in excess of eight inches in thickness. A rubber{ire Bobcat loader was utilized for compaction control. A water hose provided moisture control. January 23,2020 Page2 Project Number 21 622-20 Laboratorv/Field Testinq The relative compaction was determined by Sand Cone Method (ASTM: D1556) and by the Drive Tube Method (ASTM: D2937). The maximum density of the fill soils was obtained by the laboratory standard (ASTM: D1557) and results are shown on Table l. Tests were performed a minimum of every 500 cubic yards placed and every two feet in depth of lill placed. A summary of the compaction tests of the backfill operations is given in Table ll with locations shown on the accompanying plan- Limitations It should be noted that our work does not warrant or guarantee that the contractor responsible for each phase of the project has performed his work in accordance with the project specifications. we appreciate this opportunity to be of service to you. lf you have any further questions, please do not hesitate to contacl the undersigned. Respectfully submitted, NORCAL ENGINEERI//o I U No. Keith D. Tucker Project Engineer R.G.E. 841 12t3112020 *Mike A. Barone Project Manager CH OF 'A l\t NorCal Engineering A" January 23, 2O2O Page 3 Samole Date of Test Project Number 21 622-20 Maximum Dry Densitv (lbs./cu.ft.) 122.0 120.5 1t9t20 1t10t20 1t10120 Pool Backfill Pool Backfill Pool Backfill Classification Clayey SILT Sandy SILT 4.0-4.5 2.0-2.5 0.0-0.5 Test No.Location Deoth Optimum Moisture 15.0 Percent Unit Wt. Relative Moisture lbs./cu.ft. Comoaction SUMMARY OF COMPACTION TEST RESULTS Soil Tvoe Test S/D 101 102 103 1 6.7 12.9 1 3.1 111.3 1 10.6 1',12.3 91 92 93 D S D S=Sand Cone l\,4ethod D=Drive Tube i,4ethod NorCal Engineering TABLE I MAXIMUM DENSITY TESTS (ASTM: D1557) I I I zJ0- UJEa oNoc!dlza -zzLr . lY oNNc{ (oNFeLl4 U) Ll2? b0 t- d.t 4 q) z c) oU F-bo JU r- \ -l 2(- )Frbil ) 6 o Uti IJzU)J Z bC. l E\ r FaIJ JFzotroo-o l;tr o tZoo al -=8 JJuJ tr l FF t=oo dt r (L ( L (L o - [[ [" IUlztuFI(,JlJ -E uJoztl . loauJtzFaitU o o o