HomeMy WebLinkAbout500 W Warner Ave - Misc. PermitMTG t
(
Coruonla
2992 E La Palma Ave. Ste. A
Anah6lm, CA 02006
T6l:714.632.2s09
Fal.: 714.632.2974
Dispatch: 800.491.2990
san Dlcqo/lhperl.l county
8295 Fenl6 Squar€ Ste. C
San Dlego, CA 92121
Tel:858.537.3999
Far 858.537.3900
DiEpatch: 888.844.5060
lnlird Emplre
14467 Meddlan Pkwy., Bldg 2A
Rlver3lde. CA 92518
Td: 951.653.,(8Sg
Fa* 951.853.4666
Dlsp€tch: 800.491.2990
lndlo
44917 Golf Center Pkwy., S1e.1
lndio, CA 92201
Telt 760.U2.4671
Fax760.342.4525
Drspd.h: 800-491.2990
MTGL PROJECT#| _=::-DAILYINSPECTION DSr',/cm/Hb#_l!j!!_
REPORT Ds,arosHpDAppr. #_P€rmir # 10199747
Report #
-
Page -L- of -]-DSAJLEA #
Soprrlo r6por16 .h.ll b. pr€par6d lor 6rch tt?. of sp.clal h.p€cdd on e d.lly baeb. E ch l6p6l shafl b6 ocr.npi€led aM aignad by hs sp6.ltl lmpcclor conductlrE th6
THE WAS NOT WORK INSPEC
lnspeclod in accordenco with tho.qqulremonls of th€ DS/dJOSPHD
Projoct approvsd documgnts.
The requiremer{s of ths DSA,/oSPHO Project
Samplestaken: N/a
documenlg,
MATERIAL SAMPLING WAS E WAS NOT E N/AE
P€rfomod ln accordsncaw,th DSA/OSPHD Project approvsd documents.
Weather: 6;96r, gunny T6mp: 76 deg
/-L- C uz^-
S nature of Special lnspeclor
Contraclor
Bulldlng DBpartment
Owner Pnnt Name
PRoJEcr NAME: Tenanl lmprov€ment D"t"' s/s/20
ARCHTTECT LBA Logls cs TIME ARRTVED 7Am TIVE DEPARTED spm
TRAVEL TIME 30 min LUNCH TIITEENGINEER MHP structural Engineers
coNTRAcroR Phllco. conslruction lnc SUB CONTRACTOR JBA
INSPECTION ADDRESS 500 w WarnerAvo Unlt#B ADDRESS OF PROJECT 600 W Warner Av€ Unh #B
H
TYPE OF INSPECTION
ENGINEERED FILL
FOUNDATION
BACK FILL
TCH PLANT
PTCONCRETE
SHOTCRETE
CONCRETE
MASONRY
HIGH STRENGTH BOLTING
WELDING
SHOPWELD
FIREPROOFING
ANCHOR/DOWEL
NDE FIELD
NDE SHOP
CEILING WRE
Ught g8ge lramlng
Pemlno:E€ Stopping
DSfuOSHPD PROJECT
APPROVED OOCUMENTS PLANS Y
SOIL REPORT Y f]NE SPECSi Y N
APPROVED SHOP DRAWING Y EIru El
I\,iATERIALS USED BY CoNTRACTOR (NCLUDE RESEARCH REPoRT NO. OR MATERIAL TEST REPORTS):
HlltlHlT- RE V3 Epoxy (s0100833)
CONTRACTORS EQUIPMENT/MANPOWER USED
2 guys, Hammor
AREA, GRID LINES, PIEoES INSPEoTED
Obsorvod th6 placsm6nt ol ( 188) 5/8" Full Thr6ad6d Anchors Rods, with a mln 4 1/2'ohbodmont lnto the €xlstlng concroto p€r gridllnog
Gridllhos: (80) Easl wall b€twgon 1-14ru-R and (124) on tho Wosl wall on lln6 A,/'l -t 4 f,er sh€ot A2.3
Noto: Hol€s w6re verllled lor dopth and cleahlln€ss. All work obsorved abovo ls ln accordanca wllh the plans and spocs at thls tlme,
STRUCTURAL NoTES, OETAIL OR RFIS USEDI
s3,0, A2.3
REMARKS, INCLUDING MEETINGS:
Notoi Holos prevlously drllled. Some holos botween gridlln66l/1-14, wor6 drilled at anglos lo 6vold wall reinforc€ment - contractor noliflod
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE:
rIIa
I
III
IrII E
x t:.I
Proj€ct Archil6ct
Struclural EnOlne€r
DSA Rogional Ofiice
SchoolDisirict
Vorified b)4 Christian
Certification #: 8889657
TUIIG 1
Corporato
2992 E La Palma Av6. Ste. A
Anaheim, CA 92806
Tel: 714.632.2999
Fax 714.632.2974
Dispatch: 800.491.2990
San Dlogofl mpcrlal County
6295 Ferds Square Ste. C
San Diego, CA 92121
Tel: 858.537.3999
Fax:858.537.3990
Dispatch: 888.8,14.5060
lnl.nd EmplrG
14467 M€ridian Pkwy., Edg 2A
Riverside, CA 925 1 8
Tel: 951.653.4993
Fax: 951.653.4666
Dispatch: 800.491.2990
lndlo
,{491 7 Golf Center Pkwy., Ste. 1
lndio, CA 92201
1d:760.312A6n
Faxt760.342.4525
Dispatch: 800.491.2990
DAILY INSPECT!ON
REPORT
DS,/C|TY File#_
DSIr'OSHPD Appl. #_
DSFr'LEA #
Separats r€po.ls shdl bs prepad lor a8ct lyps ot sp€oal inspecllo.t on a daily basjs. Each reporl shall be complsl€d and slgflsd by uls 5p€cjal insp€ctor conducling ihe
THE WORK WAS THE WORK INSPECTEO MET DID N
lnspected an accordance with the requirements oftlle OSfuOSPHO
Projecl approved documents.
The requirements of the PHD Projec{ approved documents.
Samples taken: NO
Wealher: Sun /Warm T 80F
a peclor
Project Architecl
StrucluralEngineer
DSA Regional Ofilce
School Dislrict
Saul Amaya
TnnI Name
Certification*: 5296829
PRoJEcr NAME: seismic Retrolit 5oo w warner Date: g_09-20
ARCHITECT TIME ARRIVED OTOO TIME DEPARTED ,I530
ENGINEER MHP TRAVEL TIME LUNCH TIME 30
CONTRACTOR PhilCo Construction lnc.SUB CONTRACTOR
INSPECTION ADDRESS
500 W Warner Ave, Santa Ana, CA.
AODRESS OF PROJECT
500 W Warnet Ave, Santa Ana, CA
TYPE OF INSPECTION
ENGINEERED FILL
FOUNDATION
BACK FILL
BATCH PLANT
PT CONCRETE
SHOTCRETE
CONCRETE
MASONRY
HIGH STRENGTH BOLTING
WELDING
SHOP WELD
FI FI
ANCHOR/DOWEL
NDE FIELO
NDE SHOP
CEILING WRE
OSA/OSHPD PROJECT
APPROVED DOCUMENTS
IOVED SOIL REPoRT Y EN[f N tr
Ntr trSP€CS:Y
APPROVED SHOP DRAWNG Y
Observed the stressing ol 112" A4161270k post tension tendons in the
glulam beams between gridlines 1-14 and E-N. Tendons were stressed to
the required tension per schedule on 253.0. Elongations were measured
and recorded. See stressing records lor further information. Jack/Guage
#979-2001-017 were used. They were calibrated on 5-13-20.
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
III
Ir!t
):{ItI
TIII
ITII
):(
cc Conkactor
BuildirE Department
Owrler
t\4r61 pp6156# 1'l ggA04
Perm #_
Repod # _ PaO6 _L of _,L
MATERTAL SAMpLTNG wes EJ wns uorE vaE
Pedormed in accordance with DSF./OSPHD Project approved documenls.
verified by: Superintendent not on site
Corpordo
2992 E Lr Palma Avo. Sto. A
AnshCm, CA 92806
Tsl: 714.63221oq
Fex 714.A32.2974
Dlspalch 8fi).491 2990
s.n Dlagdlmp.ric CountY
0295 F€rds Squar€ Ste. C
Ssn Dlego, cA92121
T€l: aS8.637.3999
Fax 858.537.3990
Dlspatcft 888.8,14.5000
lnlend Enplr.
14487 MorUIan Pl(wy., Bldg 2A
RlvoGlde. CA 92518
T€l: 951 .853,4909
Fax 951.85{}.4866
olspdch: efo.4s'1.2990
lndlo
,(4917 GollContor PkwY., Sle.l
lndlo, CA 9220 1
Tsl: 760.34:L4AL
Fax760.3424525
Dispstch: 800.401.2SSO
*n r*rn*, //%ftly'
p*awLflLtL?LIlf
R6pod #- Peg€ L of
-
DAILY INSPECTION
REPORT
DSA./CrY ma *
-
DSA,IOSHPD Apd. *
-
DSA/TEA
Speld l'l3p.c{m R.pdb must bo dlt&old to tlE Ptll.. lbbd bdow ll'lt'h diF oa Ul. tuperbn. R.pdb ol ftn.9.ryT "g'dd'L1]]1-T-ttbdd lflm'dl'ldv'
Sb*ae ripcs "r.n u p."pr.d rd 6en Vp. o{ lidlrt lnsp""t* or : Ortty O-t"'. E:r.h l?ir thct b. 6optd.d 1d !l$.d by h. !p&ld l6P-r @duonlE th.
MTG t
o*'/r'?'&ooPROJECT/L
l)TIME ARRIVETL .X.? 4,a..*aHITECTc--ruN-H-E;TRAVEL TIME J"lvt4PENGINEER
lh
ADORESS OF
CONTRACTOR &
*.
---Fi?a
. - Qnla-
lramlngTYPE OF
OE SHOP
HIGH STRENGTH BOLTINO
wELOlt{G
SHOPWELI)
PT CONCRETE
SHOTCREIE
ENGINEERED FILL
FOUNOATION
BACK FILL
ANCHOM)OWEL
NDE FIELD
sorl- REPORT Y EN Q iEFfi3ffio*r,r.rovDHEPT"ANS Y
DSA,/OSHPD PROJECT
APPROVEO DOCUMENTS
@oRT No. oR MATERTAL TEsr REFoRTS):
6DO U3 o5g 'r/a"I
tt ,/+CONTRACTORS EOUI
AREA, GRIO LINES, PIECES INSPECTED;l)o a
a o/lso
5 i/{DETAIL OR RFIS USEDI
s I ,D
o -l/>o,oc)g LTo/et
PERCENT PROJECT COMPLETEREWORK AS PERCENT OF ALL WORK TODAY:
ln,3p6.led ln ac.odancs wlth tire requlr€ments of ltl6 DSA,/OSPHD
Pmjec, apprDv€d docunonts.
Tho roq uirorn€ntg
Sampl€staken:
THE
MATERTAL sAMpuNG wns E ms tor E Hta E
Perfomsd ln eccodancs wl(h OSA/OSPHO Prdeot appro\€d documenls.
DID NOT
of t}l€ DSNOSPHD Project approved documer*s.
Temp:f{u
Signature of special lrEpectot
cc Prorecl Arnnect
Shrctural Engln€er
DSA Regiond Ofnce
School DlBt ict
Conu-&br
BLdldlrE Depdrtm€nt
Owner
WeatlEr:mn
C€rffcatlon #:
A
llanz
IIITG I
Corporat
2992 E La PalmeAve, Sle. A
Anahcim, CA 92806
T61r714.632.2SS9
Fe,.: 711.632.297 4
Dbmtch: 800.491 .2990
San Dl.go/lmp6rl.l County
6295 F€.rb Square Ste. C
San Oi€o, CA 92121
T6l: 850.537.3999
Fo( 858.537.3990
Dlspatch: 888.8,{4.5060
lhland Emplra
14467 Morldlan Pkwy., Adg 2A
Rlv6r8lde, cA 925,l8
TeJ: 951.653.489s
Fer 951.653.4866
DisFtch: 800.491.2990
lndlo
44017 Golf C6nt6l Pkwy., St6.'l
lndlo, CA 92201
le/.: 780.U2.$7?
Fax:760.342.4525
Dlsprtch: 800,491.2990
MrGL PRoJEcr#: _Ll!!l!!
P6.mtr * 10199747
nepoa +
-
eage -1- or -L
DAILYINSPECTION DsA/crrYFi6# re-22s
REPORT D$r'osHpo Appl. #_
Rcporl! mmt b. dbtrbutsd !olh. p U.6llst6d b6lows/ilhh 14 dEy! of lh! llEpocdo. Rep.it! ol nol-compls condltlons rust b. dlstrbotad |mm.dt(.r.
h.I b€ Pr.Ps€d tur orch tyPo ol 8Pei.l h.pcctoi d a ddly basls. Each roporl .hal bo cdnd€Gd -d Blgn6d by h6 apdcld lmp6otor conducing ulo
DSAJLEA#-
MEETEWAs NOT THE WORK
lnspectod ln accordEnco wllh tho roqulremonts of the DSA,/OSPHD
Project appbwd documonts.
The roquirements of the DS^,/OS
Samples tak6n: N/a
HD Project approved documents.
MATERIAL SAMPLING WAS E WAS NOT E N/A8
Porformed in accordance with DStuOSPHD ProJect approvod docomonts.
W66th6r C|ear sunny Temp: 74 deg
cL- C- ,-.-
Contractor
B!ilding D6partment
Signalure of Special lnsp€ctor
R Getz
Certification #: 8889657
fp-.,---"''
PRoJEcr NAME: Tsnant lmprov6m6nt D'Lt srlzr2o
ARcHirEcr LBA Loglsflcs TIME ARRIVED 7am TrME DEPARTED Spm
ENGINEER [rHPStructuralEngineers TRAVEL T|ME 30 min LUNCH TIME
coNrRAcroR Philco. constructlon lnc suB CoNTRACTOR JBA
INSPECTION ADDRESS
500 W Warnor Av6 Unlt #B ADDRESS OF PROJECT 500 W Warner Avo Unlt #B
ENGINEERED FILL
FOUNOATION
BACK FILL
BATCH PLANT
PT CONCRETE
SHOTCRETE
CONCRETE
TYPE OF INSP N IUASONRY
HIGH STRENGTH BOLTING
WELDING
SHOPWELD
FIREPROOFING
ANCHOF/DOWEL
NOE FIELO
NDE SHOP
CEILING WRE
i5lHsass
framrhs
le Etopping
DSr'./OSHPD PROJECT
APPROVED DOCUMENTS
D
PLANS Y
SOIL REPoRT Y E]N E
Ntr aSPECS: YEINE
APPROVED SHOP DRAWING Y
ED By coNTRAcroR (tNCLUDE RESEARCH REpoRT No. oR MATERTAL TEST REpoRTs):MATERIALS US
Hilti RE V3 Epoxy
CONTRACTORS EQUIPMENTi IT4ANPOWER USEDI
'l guy, Hammer, sclssor llft
AREA, GRIO LINES, PIECES INSPECTED:
ObseN€d th6 placernoht ol (68) 5/8'FullThroaded Anchorg Rods, wlth a lnin 6,'€mbedment lnto th6 exlsll ng concroto for the wallti€ al pudln.
Grldllnes: (12) N wall on llhe '14lL-U and (56) on th€ South wall on lln6 1/A-U por shoot A2.3
Nol€: Holes wero verifiod for dopth and cleanlln€ss. Allwork observed abovo ls in accordanco with tho plan6 and 6pecs at thls time
STRUCTURAL NOTES, DETAIL OR RFIS USEDI
53,0, A2.3, Detall 2/S3.0
REMARKS, INCLUDING MEETINGS
Nole: Holee previously ddllod. M€twllh Chistlan
PERCENT PROJECT COMPLETE:
E
aIrI
IIIr
IIIa
rI
I
Er
cc Proj€ct Archltoct
Struclural Engino€r
DSA RegionalOffice
School Dlsldct
Verified by:
Christian
REWORK AS PERCENT OF ALL WORK TODAY:
Hflnl Name
TIIG I
Co,porato
2992 E La Paha Ave. Ste. A
Anaheim. CA 92806
Tel: 714.632.2999
F ax: 7 14.632.297 4
Dispatch: 800.491.2990
San Ologorlmpodal Couity
6295 Fenis Square Ste. C
San Diego, CA 92121
Telr 858.537.3999
Fax:858.537.3990
Dispatch: E88.8,1,{.5060
lnltnd Emplre
1,1467 Meri an Pkwy.. Bldg 2A
Riverside, CA 92518
Tel: 951.653.4999
Fax: 951.653.4666
Dispatch: 800.491.2990
lndlo
4,1917 Golf Centor Pkwy., Ste-1
lndio. CA 92201
7el:75O.U2 46Tl
F ax:760.Y2.4525
Dispalch: 800.491.2SS0
DAILY INSPECTION
REPORT
Report # Pase LoI lL
S€parale repo.i6 shall be prepred for sach typs of special in6pe<lloo o.r a daaly basis. Each repct shall be compleled 6nd signod by hs sp€clal insp€ctor conducling ih6
Permit #
in
E WAS NOT THE WORK INSPECTED MET DID NOT I\4EET
The requirements ot the DSA,/OSPHO Project approved documents
Samplestakeni NO
I\,4ATERIAL SAMPLING WAS E WAS NOT E N/A E
Perfo.med in accordance with DSA,/OSPHD Project approved documents
Weather: Sun /Warm Temp: 80F
re of llnspeclor
DSA/CITY File # _
DSA/OSHPD Appl. *_
DSAr'LEA #
cc Project Architecl
Struclu.al ErEineer
DSA Reqional Ofiice
School Diskact
Contraclor
BuildirE Department
Owner
Saul Amaya
|-nnt Name
Certification#: 5296829
PROJECT NAME: Seismic Retrolit 5oo W warner Date: B-0S-20
ARCHITECT TIME ARRIVED O70O TIME DEPARTED 1530
ENGINEER MHP TRAVEL TIME LUNCH TII\,!E
30
CONTRACTOR PhilCo Conslruction lnc SUB CONTRACTOR
INSPECTION ADORESS
500 W Warner Ave. Santa Ana, CA.
ADDRESS OF PROJECT
500 W Warner Ave. Santa Ana. CA.
ENGINEERED FILL
FOUNDATION
BACK FILL
PT CONCRETE
SHOTCRETE
CONCRETE
ryPE OF I MASONRY
HIGH STRENGTH EOLTING
WELDING
SHOP !1./ELD
FIREP F
ANCHOR/DOWEL
NDE FIELD
NDE SHOP
CEILING WIRE
DSA.iOSHPD PROJECT
APPROVED DOCUMENTS
AVAILABLE APPROVED
PLANS Y EN E sorl REPoRT Y ENE SPECS:YENE
APPRovED sHoP oRAwrruc v E r.r E
Observed the stressing ol 112" 44161270k post tension tendons in the
glulam beams between gridlines 1-14 and A-E (mezzanine). Tendons were
stressed to the required tension per schedule on 2/53.0. Elongations were
measured and recorded. See stressing records for further information. Jack/
Guage #979-2001-017 were used. They were calibrated on 5-13-20.
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
y161pp6sEgft 1198404
lnspected in accordsnce with the requirements of the DSA,/OSPHD
Projecl approved documents.
verified by: Suoerintendent not on site
TUITG I
Corpo,rte
2992 E La Palma Ave. Ste. A
Anahoim, CA928Oo
Tel: 714.632.2999
Fa,j ?14.832.2974
Dispahn: 800.491.2990
San Dlegorlmperlal County
6295 Ferris Square Sle. C
San Diego, CA 92121
Tel: 858.537.3999
Fax:858.537.3990
Dispalchr 888.8,14.5060
lnltnd Empli.
14467 Meridian Pkwy., Bdg 2A
Riv€rsido, CA S2518
Tel:951.653.4999
Fax: 951.653./t666
Dispatch: 800.491.2990
lndlo
44917 Golf Center Pkwy., Ste.1
lndio. CA 92201
re!.760.342j6n
F ax:760.342.4525
Dispalch: 800.491.2S90
Report * _ Page _L of __L DStuLEA # _
separd€ r€pqG shall be prsp-€d fof s*h lyp€ of spocial insp€dloo on a daily basiB. Eeh repor sha! b€ compl€t€d and brgnsd by rh€ 6p€dar inspcdor conduc{ng [|6
WAS NOT THE WORK INSPECTEO MET D
lnspected in accordance with the requirements ofthe DSA,/OSPHD
Projecl approved documents.
The requirements of the
Samplestaken: No
PHD Proiect approved doqrments.
MATERIAL SAMPLING WAS E WAS NOT E N/A E
Performed in accordance with OSI'iOSPHD Project approved documents.
Weather Sunnyruarm Temp: 80F
y161pp61g611 1198404
Project Architect
Struc{ural Engineer
DSA Regional Office
School District
DAILY INSPECTION
REPORT
DSFJCITY FiIe #
DS,/OSHPD Appl. #_
Contrador
Building Deparlmer{
Oivner
Saul Amaya
Hn Name
Certification#: 5296829
PRoJECT NAME: Seismic Retrotit 5oo W warner Date: 8-04-20
ARCHITECT rlME ARRMED OTOO TIME DEPARTED 1530
ENGINEER l\ilHP TRAVEL TIME LUNCH TIME 30
CONTRACTOR Philco Construction lnc SUB CONTRACTOR
INSPECTION ADORESS
500 W Warner Ave. Santa Ana. CA
ADDRESS OF PROJECI
500 W Warner Ave, Santa Ana, CA
E
TYPE OF INSPECTION
ENGINEERED FILL
FOUNOATION
BACK FILL
BATCH PLANT
PT CONCREI-E
SHOTCRETE
CONCRETE
HIGH STREI.IGTH BOLTING
WELDING
SHOP WELD
RY FIREPROOFING
ANCHO&DOVVEL
NDE FIELD
NDE SHOP
CEILING WRE
DSIJOSHPD PROJECT
APPROVED DOCUMENTS
AVAITABLE APPROVED
PLANS Y ENE
SOIL REPORT Y ENE N tr
Na trSPECS:Y
APPROVED SHOP ORAWNG Y
Observed the stressing ol 112" A416l27Ok post tension tendons in the
glulam beams between gridlines 14-28 and L-R. Tendons were stressed lo
the required tension per schedule on 2/53.0. Elongations were measured
and recorded. See stressing records lor further information. Jack/Guage
#979-2OO1-O17 were used. They were calibrated on 5-13-20.
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COI\,IPLETE
)TITI
TIII
)t
cc
Pemil # _
verified by: Superintendent not on site
MIG I
Corporata
2992 E La Palma Ave. Sto. A
Anehelm, CA 02806
Tel:714.632.2099
Fat: 714.632.2574
Dlspstch: 800.491.2990
Srn Dlegonmperlal County
6295 F6nb Square Ste. C
San Dlego, CA 92121
Te1i858.537.3999
Fer 858.537.3990
DlBpatch: 8a8.844.5060
lnlend EmplrE
1,1467 M€rldlan Pkwy,, Bldg 2A
Rlve6lde, cA 92518
T6l: 951.653.4999
Fax 951.653.4666
Dlspalcht 800,491.2S90
lndlo
44917 Golf Conter Pk$/y., Ste.1
lndlo, CA 92201
]-at 7A0-312-4677
Fax:1AO.342.4525
Dlspatch: 800.491.2990
DAILY INSPECTION
REPORT
Sl,p€r!l6 dports rhati b€ p.lparsd tor oloh tyDa ol si6c.lal lnlpecrbn on a daily b€6b. Erch r€pon shallb€ comprd€d aDd sr€md by ho tpoclallnlFclor conducting lh.
THE WORK WAS THE WORK DID NOT MEET
lnspoctod in accordanc€ wlth tho requlrements of the DS}/OSPHD
Proled approved documBnts.
MATERIAL SAMPLING WAS E] WAS NOT L] }.UA L
Porfomed in accordance wilh DSA,/OSPHD P.ojoct approved documenls.
Th6 r6quir6mont6 of thg DSI'/OSPHD Prolect approved docum€nts
Samples taken:
Temp
ghaturc of Sp€cial lnspector
KnaEoun€aoaan
Certification #: $40676
Project Architscl
Structural Engin6er
DSA Regiohal Ofiic€
School District
Date:PROJECT NAME
TIME DEPARTEDTII\4E ARRIVEDARCHITECT
LUNCH TIMETRAVEL TIiIEENGINEER
SUB CONTRACTORCONTRACTOR
500 Wsst Wam6r Av6. Sanla Ana, CA
ADDRESS OF PRINSPECTION ADDRESS
500 West Wamer Avo. SanlaAna, CA
E cEILING WREtr_tr_o_
D MASoNRY
E HIGH STRENGTH BOLTING
E WELDING
E SHOP WELD
E FIREPROOFING
E] ANCHOR/DOWEL
E] NDE FIELO
E NDE SHOP
TYPE OF INSPECTION
E] ENGINEERED FILL
f] FOUNDATION
D BACK FILL
N BATCH PLANT
O PT CONCREIE
E SHOTCRETE
E CONCREIE
SPECS:YBNtr
APPROVED SHOP ORAWING Y f] N trSOIL REPORTY E] N EDSA,IIOSHPD PROJECT
APPROVED DOCUMENTS
AVAiLABLE APPROVEO
PLANSYtrNE
IV1ATERIALS USED BY COT.ITRACTOR (NCLUDE RESEARCH RE FoR- No. oR MATERTAL ):
Grado 27O 1/2" diameter 7-wire strand, uncoated, stress relioved A416 cable, End brackets aftackad to Glulam beams
coNTRAcToRs EOUtp[,]lENTnvlANpowER UsEDi
# 979-2001-017 Pump Serial# 330098Jack Serial #979-2001-017, Gau
LIN ECES INSPECTED
Observed stresslng of PT cablos located on the glulam b6ams d€signed to assist the lire sprinklers. PT cables were stress
using a calibrated jack that was last calibratsd O5l13l2}2o. PT cables wers stress to 8 klps to 11 kips per plan specificatlons on sheet
53.1. Sit6 speci lications showed gauge prsssuro supersedes elongation. Gaugo pressurs and elongation wero recorded
STRUCTURAL NOTES, OETAIL OR RFIS US ED:
Sheet 53.1
REIVARKS, INCLUOING MEETI
Area stressed was between 2-4 between S-U, 2-13 between P-S and 2-13 between N-P
Registered with the city of Santa Ana
PERCENT PROJECT COMPLETEREWORK AS PERCENT OF ALt WORK TODAY
cc Conlractor
Building Departmont
Owner
Verified
Prtnt Namo
MTOL PROJECT#. l198,aoa
Permlt # ]!]!9{-
R6port# _ Page _of
-
DSA/CITY Fll€ #
-
DSA/OSHPD Appl. #-
DSA,/LEA #
-
/ // \,.----....--
MTG I
Corporatr
2992 E La Palma Ave. S16- A
Anahelln, CA 9280G
T6l:714.832.2900
Fex:714.632.2974
Dispetch: 800.4S1.2SS0
Sln t hgdlmp.rlrl Counly
6295 Fs{rle Sqlare Ste. C
San Dl6go, CA 92121
T6l:858.537.3909
Fa( 858.537.3090
Dlspatch: 888.844.5060
lnl.nd Emplr.
1,t467 Marldlan Phvy., Edg 2A
Riv6rcld6, CA 92518
T6l: S51.653.49S9
Fax 951.853.4668
Dlspatch: 800.491 -2990
lndlo
44917 Golf Conbr Plavy., 516.'l
lndlo, CA S2201
Iel'- 7603/21877
FEx:760.342.4525
Dl6patch: 800.491.2980
MTGL PROJECT# 1198404 DAILYINSPECTION DsA/crrYFre#-
REPORT DsA"/osHpD Appt. #_Permit #101997 47
Report *
-
ease -L ot -!-
DSA,/LEA f
S.paral6 ruporlt lhdl b. prqarGd lo' .ach typ. of lp.cld tnsp€-flon on a dally balls. Eeh r.pql shsll b6 conrpl6t.d .rd llgn.d by ih6 3p€clel lnsp.cl6. corductlng hs
THE WORK WAS WAS NOT
lnspectod ln accordanc6 wlth the requir6ments oftho DStuOSPHD
Prolocl apprcvad documoht!.
The requlrsmonts oI th6 OSA/OSPHD ProJoct approvBd docum€rts.
Samples taken: |'l/A
MATERIAL SAMPLING WAS E WASNOTE N/AE
Po.formod in accordanco with DStuOSPHD Project approved document8.
Wealh€ri C 1"n. BO"(,ffi
Signatur. of SpGclal lnspcctor
Vincent Pelrucclo
Corlificatbn #: 8853142
D'l"t 6rzt2oPRoJEcr NAME: seismic Retrolit 5oo w. warner
TIME ARRIVED g.ooam T|ME DEPARTED 2.OOpmARCHITECT
LUNCH TIMEENGINEERTRAVEL TIME
suB ooNTRACTOR Jas King
ADDRESS OF PROJECT
500 W. Wam6r Av6. Santa Ana, CAINSPECTION AODRESS 500 W, Warn€. Avo. Santa Aha, CA
ENGINEERED FILL
FOUNDATION
BACK FILL
BATCH PLANT
PT CONCRETE
SHOTCRETE
CONCRETE
TYPE OF INSPECTION
HIGH STRENGTH BOLTING
WELDING
SHOPWELO
ANCHOFVDOAi EL
NDE FIELD
NDE SHOP
CEILING
lpery
WIRE
SOIL REPORT Y N
NPLANS Y trNESPECS:Y
APPROVED SHOP DRAWING Y Elru
DSA,/OSHPD PROJECT
APPROVED DOCUMENTS
MATERIALS USED BY CONTRACTOR (NCLUDE RESEARCH REPORT NO. OR i'ATERIAL TEST REPORTS):
HihlHIT-RE 5o0 V3 ( lot *0850 20LS Exp. 012021 ) , 5/8'Allhroad BohB
CONTRACTORS EAUIPMENT/MANPOWER USEDI
Foreman: (1) Crewften: (1)
all thread bolts wlth 6'embodmonl al znd lovel
Hand tools, power drlll, vacuum, alr comprgssor
I thread botts wlth 4 'll2" embod
PIECES INSPECTEID
I
mozzanlno. All hol6s wer€ ddlled 1/8' larger ln dlameler lhan hardware lnstalled and were verlfled of corr6ct depth. All holes rvsre v€rified ot
SiRUCTURAL NoTES, DETAILoR RFis UsED:
S3.0 d€tail 12, 2
REi,lARKS, INCLUDING MEETlNGS:
Allwork obs€rvod ls in accordanc€ with cod6 and approved plahB, Bpsciflcatlons.
PERCENT PROJECT COMPLETEREWORK AS PERCENT OF ALL WORK TODAY:
IxII
I
r:tII
IItI!t xI r:r
Project Architecl
Struclulal Engin6or
DSA Regionaloffice
School Dlstricl
Conkaolor
BulldlrE Dopartm6nt
Ownar
Verified
coNTRAcroR Philco - constructlon
boing clean and cl€ar of alldgbrls prior to placomant ol gpoxy.