Loading...
HomeMy WebLinkAbout801 E Occidental St - Misc. PermitPlanning & Building Ag{1cflr Buildlng Safety Divisidfl ' ' 20 Civic Center Plaza , \ P.O. Box 1988 (M-19) Santa Ana, CA 92102 (7r4) 647.s800 www, sa nla- a n a. o rg {:Er"XS,rrNrAL nt,, ,r 0 RII]'|PSOTOVOLTAIC ,t,, .,i ,.i ,,ria ",',FHECKLIST sol-01 c8c 2013 Solar Photovoltaic (PV) Checklist for Oetached SINGLE FAMILY RESIDENCES Only lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 1 1 ' x '17" size. lf answerinq NO anv of the ouestions. olan check s hall be required Project Address:BO1 E OCCIDENTAL ST, SANTA ANA, CA 92707 Contractor Company Name: Contractor License Number: YES NO 1 El tr 2 EIt] 3 EItr trtr trtr Xtr 10 trtr I certify under Print Name: {4tedon" €t>or,td lOZ11nc1''1 4 5 EtrEtr trtr Are the following applicable to the proposed project? Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 4 pounds per square feet or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)" Will the PV system be installed with a space of 2' minimum to 10" maximum beh/r'een the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weight system? Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer's PV support information.) 6 7 8 I peDalty of perjury under the laws of the il?t/'.t'Jc:,t?-t s State of ignature ia that Phone Number: Oto {a/'Se,7Y Date Zz/ co Re/ llr19/2015 tJ 1-0.<4 c ve is true Emarl Add ress ^.p71 cq)'ud. *,,SANTA NA,W#