{:Er"XS,rrNrAL
nt,, ,r 0 RII]'|PSOTOVOLTAIC
,t,, .,i ,.i ,,ria ",',FHECKLIST
sol-01 c8c 2013
Solar Photovoltaic (PV) Checklist for Oetached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 1 1 ' x '17" size. lf answerinq NO anv of the ouestions. olan check s hall be required
Project Address:BO1 E OCCIDENTAL ST, SANTA ANA, CA 92707
Contractor Company Name:
Contractor License Number:
YES NO
1 El tr
2 EIt]
3 EItr
trtr
trtr
Xtr
10 trtr
I certify under
Print Name:
{4tedon" €t>or,td
lOZ11nc1''1
4
5
EtrEtr
trtr
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)"
Will the PV system be installed with a space of 2' minimum to 10" maximum beh/r'een
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
6
7
8
I
peDalty of perjury under the laws of the
il?t/'.t'Jc:,t?-t s
State of
ignature
ia that
Phone Number: Oto {a/'Se,7Y Date Zz/ co
Re/ llr19/2015
tJ 1-0.<4 c
ve is true
Emarl Add ress ^.p71 cq)'ud.
*,,SANTA
NA,W#