RESIDENTIAL
PHOTOVOLTAIC
CHECKL!ST
sal-i I cSl2rrJ
Project Address
C ontractor Company Name:
Contractor Lice nse Number:
YES NO
r \tz
ft+rA /JJ\n <',j<f-{O(
lc la e11
ds
dn
ds
6
7
8
9
4E
tr
10
tr
Uo
dt
du
6o
6a
I certify under penalty of perjury under the laws ofthe State of C
,lPrint Name ()(
6 Signature
Date:Phone Number t\ q.o B- e,?-7.q
Email Address
Rev: 1 l/l9/2015
ItrfjI^\vtoZ-a 6 k<,,i.,r^[r,{e4e-r .C o'(\
ia that the bove is true:
*-SNTA
NAJffi'ff
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
m nimum 11" x 17'size. lf answerinq NO to anv of the ouestions, plan check shall be reouired.
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
U/ill the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to l0" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without usrng any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spaclng of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
1
2.
3
4.
5.