Loading...
HomeMy WebLinkAbout824 N Garfield St - Misc. Permitsol-o1 cac 2016 Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMTLY RESTDENCES Onty lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the ce(ification sect minimum 11" x 17" size. ion below. A copy of this form shall be attached to each of TWO sets of plans, of ton lan check shall be Project Address:N S l^e +c4 qz70t Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA92702 (714) 647-5800 www.santa-ana.org nn NO to an of h RESIDENTIAL PHOTOVOLTAIC CHECKLIST I 1 Contractor Company Name: Contractor License Number: ? Efl 8 EID 9 Etr ro EE Sol+ r 4 e z-zz Are the following applicable to the proposed project? Will the PV system layout provide the required three-foot wade clear access pathways per Section 605.1 1 of the Californaa Fire Code, and is this shown on the roof plan? Will the PV system be anstalled on a roof having only one roofing layer with no overlays? Will the PV array be flush mounted to the existing roof so that the ptane of the modules (panels) are parallel to the plane of the roof? Will the PV system weigh maximum 4 pounds per square feet or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weaght system? Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Will the min jmum 5/16" lag screws be installed wlth a minimum o! 2-112 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? Are ALL the structural pages ofthe plans stamped and signed by a California licensed professional engineer? (including project specific site plan, pV layout, anchorage spacing, anchorage detaals and manufacturer's PV support information.) I certify under penalty of periu under the laws of State of Califo ia that the above is true: Print Name An ld.-Signature YES NO&o Ftr ptr EuEo EN 2 3 4 5 6 Phone Number: Email Addressl Rev 8/29/19 a sl2 Date: 9. 2-l . LD LD