HomeMy WebLinkAbout1000 E Santa Ana Blvd Unit# 220 - Misc. Permit (3),,*SNTA
A1\A
It1\\l\c
&BilLDl\[
1cnfl
Planning & Building Agency
Bullding Safety Division
20 Clvlc Contor Plaza
P.O. Box 1988 (ir-19)
santa Ana, cA 92702
(714) 647-s800
wwwsanta-ana,org
DISABLED ACCESS COMPLIANCE
DOCUMENTATIOX FORM
ACC-01 CBC 2019A. PT RPOSE OF THIS DOCUMENTATION: (check one)
[f Finding of unreasonable hardship for projects UNDER the valuation threshold.
Q Finding of unreasonable hardship for projects OVER the valuation threshold*
E Certification of Full Compliance with the 2019 California Building Code
' Valuation threshold as defined in the 2019 California Building Code, Section 1 'l 8-202.4 (Exception #8) and
Section 202 is tl!p!@Q (as of January 2020)
B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER:
PIoject Address:
i000 E. Santa Ana Blvd
Permit Number
101103540
ftoject Descdption:
Second Floor Tennant lmprovement
Floor Number
2
Business Name / Owner:
city of Sanla Ana
Business Phone Numbe
714.847 5045
Legal Property Oviner:
city of Santa Ana
Phone Numberl
714.647.5045
Total Construction Cost or Proj€cl Valuation
320,000
Cost of Providing Comdcte Oisabled Access:
$150,000
1. Thecostofall construction contemplated in the determination of the valuation of impmvement threshold
based on the valuation of site and building improvements for the last three-year period.
lssuance Date Valuation of lmprovements
101 1 03540 ln Plan Check $20.000
Total
2. 2Oo/o ol Tolal Construction Cost or Project Valuation:
3. The actual amounl to be spent to provide disabled access
4. Describe the impact of the proposed improvements on financial feasibility of the project
5. Describe the nature of the use of the facility under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
Office Soace - The second floor restrooms are not 100% in comoliance. however thev are
Accessible: however in an extreme case the first floor restroom are 100% com o liant
$ 4,000
$ 4,000
Rev 0210412020 Page 1 ol2
Permit No.
0. ldentify the accessibility features and equivalent facilities that WILL be brought into compliance with the
latest edition of Title 24 as a part of this project and an estimate of the cost of each item: (Documontation
may be required)
Accessible Features to be Made Accessible Cost of lmprov6ment
a. Entrance
Q Door E Landing E Stairway/Steps E Ramp $
b. Path of Travel
f] Path of travel from accessible parking to the building entrance
and area of remodel $
Q Path of travel to sanitary facilities / public phone / drinking
fountain
E Path of travel from the public way to the building entrance $
c. Sanitary facilities ( Floor no. 2 )$4,000
d. Public phone(s)$
e. Drinkingfountain(s)$
f. Parking a
g. Signage & Alarms $
i. Other Q
$Total:
7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is
granted. Provide an estimated cost of compliance for each ilem (Documentation may be required)
Accessible Features Not to be lmproved Cost of lmprov€ment
a. Sink, Water Closets, Urinals, & Partitions $150.000
b $
$
$Total:
I certify that the above noted information is true and correct.
/
! Legal Property Owner @ ArchitecuEngineer ! Contractor E Otner
Print Name: Tyrone Chesanek Phone No. 714.615.0887
Address: 20 Civic C M-22, Santa Ana, CA 92702
Signature Date: Sept 24,2020
Approved by
Revt 0210412020
FOR AGENCY USE ONLY
Date
Page 2 ol 2
$
8. Petitioner must ba the lagal property owner or his/her legal representative: