Loading...
HomeMy WebLinkAbout1000 E Santa Ana Blvd Unit# 220 - Misc. Permit (3),,*SNTA A1\A It1\\l\c &BilLDl\[ 1cnfl Planning & Building Agency Bullding Safety Division 20 Clvlc Contor Plaza P.O. Box 1988 (ir-19) santa Ana, cA 92702 (714) 647-s800 wwwsanta-ana,org DISABLED ACCESS COMPLIANCE DOCUMENTATIOX FORM ACC-01 CBC 2019A. PT RPOSE OF THIS DOCUMENTATION: (check one) [f Finding of unreasonable hardship for projects UNDER the valuation threshold. Q Finding of unreasonable hardship for projects OVER the valuation threshold* E Certification of Full Compliance with the 2019 California Building Code ' Valuation threshold as defined in the 2019 California Building Code, Section 1 'l 8-202.4 (Exception #8) and Section 202 is tl!p!@Q (as of January 2020) B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER: PIoject Address: i000 E. Santa Ana Blvd Permit Number 101103540 ftoject Descdption: Second Floor Tennant lmprovement Floor Number 2 Business Name / Owner: city of Sanla Ana Business Phone Numbe 714.847 5045 Legal Property Oviner: city of Santa Ana Phone Numberl 714.647.5045 Total Construction Cost or Proj€cl Valuation 320,000 Cost of Providing Comdcte Oisabled Access: $150,000 1. Thecostofall construction contemplated in the determination of the valuation of impmvement threshold based on the valuation of site and building improvements for the last three-year period. lssuance Date Valuation of lmprovements 101 1 03540 ln Plan Check $20.000 Total 2. 2Oo/o ol Tolal Construction Cost or Project Valuation: 3. The actual amounl to be spent to provide disabled access 4. Describe the impact of the proposed improvements on financial feasibility of the project 5. Describe the nature of the use of the facility under construction and its availability to persons with disabilities and the nature of accessibility that would be gained or lost: Office Soace - The second floor restrooms are not 100% in comoliance. however thev are Accessible: however in an extreme case the first floor restroom are 100% com o liant $ 4,000 $ 4,000 Rev 0210412020 Page 1 ol2 Permit No. 0. ldentify the accessibility features and equivalent facilities that WILL be brought into compliance with the latest edition of Title 24 as a part of this project and an estimate of the cost of each item: (Documontation may be required) Accessible Features to be Made Accessible Cost of lmprov6ment a. Entrance Q Door E Landing E Stairway/Steps E Ramp $ b. Path of Travel f] Path of travel from accessible parking to the building entrance and area of remodel $ Q Path of travel to sanitary facilities / public phone / drinking fountain E Path of travel from the public way to the building entrance $ c. Sanitary facilities ( Floor no. 2 )$4,000 d. Public phone(s)$ e. Drinkingfountain(s)$ f. Parking a g. Signage & Alarms $ i. Other Q $Total: 7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is granted. Provide an estimated cost of compliance for each ilem (Documentation may be required) Accessible Features Not to be lmproved Cost of lmprov€ment a. Sink, Water Closets, Urinals, & Partitions $150.000 b $ $ $Total: I certify that the above noted information is true and correct. / ! Legal Property Owner @ ArchitecuEngineer ! Contractor E Otner Print Name: Tyrone Chesanek Phone No. 714.615.0887 Address: 20 Civic C M-22, Santa Ana, CA 92702 Signature Date: Sept 24,2020 Approved by Revt 0210412020 FOR AGENCY USE ONLY Date Page 2 ol 2 $ 8. Petitioner must ba the lagal property owner or his/her legal representative: