HomeMy WebLinkAbout2012 S Main St - Misc. Permit (2)Plan ning & Building Agency
B uildin g Safety Division
20 Civic C enter Plaza
P.0. Box 1988 (M-19)
santa Ana, c A 92702
(714) 647-5800
www. santa-ana.org
DISABLED ACCESS COMPLIANCE
DO C UTVII NTATION F O RTVI
ACC-0'1 CBC 2019
A. PURPOSE 0F THIS D0CUMENTATI0N: (check one)
X finoinO ot unreasonable hardship for projects UNDER the valuation threshold.
L_.1 Finding of unreasonable hardship for projects OVER the valuation threshold'
E Certiflcation of Full Compliance with the 2019 California Building Code
' Valuation threshold as defined in the 2019 California Building Code, Section 118-202.4 (Exception ,E) and
Section 202 is $lJgl!00.1@ (as of January 2020)
B. PROJECI INFORIVIATION TO BE COMPLTTED BY PETITIONER:
Project Address:
2012 Marn St
Psrmil Number:
101104317
Proiect Descnption:
Remove ponion of inlorioa non bearing parlilion
Floor Number
Business Name / Ownsr:
TBO - Tanant space ls vacant
Business Phone Number
Legal Properly Owner Phone Nurrber:
Total Conslruction Cost or P.ojecl Valuation$ st.:so
Cost of Providing Complgte Disabled Access$ ssss
The cost of all construction contemplated in the determination of the valuation of improvement threshold
based on the valuation of site and building improvements for the last lhree-year period.
Permit No lssuance Oate Valualion of lmprovements
Total
2. 20o/o oI Total Construction Cost or Project Valuation:
3. The actual amount to be spent to provide disabled access
S 5270
$ $53s
4. Describe the impact of the proposed improvements on financial feasibility of the project.
Accessrble parkrng space shall recerve new srgnage
5. Describe the nature of the use of the facility under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
Bu lding willbe vacanl during conslruclron.
Rev 02t0412020 Page 1 of 2
,,'-SANTA
NAJliilil
6. ldentify the accessibility features and equivalent facilities that gl!! be brought into compliance with the
latest edition of Title 24 as a part of this project and an estimate of the cost of each item: (Docunentation
nay be required)
Accessible Features to be i/ade Accessible Cost of lm prove ment
a. Entrance
E ooor E Landing E StaiMayisteps E Ramp b Exq Corrplres
b. Path of Travel
E Path of travel from accessible parking to the building entrance
and area of remodel $ Exg Complr€s
! Path of travel to sanitary facilities / public phone / drinking
fountain $
E Path of travel trom the public way lo the building entrance S
c Sanitary facilities ( Floor no )s
d. Public phone(s)$
e Drinking fountain(s)s
f. Parking $ 535
g. Signage & Alarms $
i. Other $
$Total
7. ldentify the accessibility features that WlLt N0T comply if a request for unreasonable hardship rs
granled. Provide an estimated cost of compliance for each item: (Docunentation may be required)
Accessible Ieatures Not to be lmproved Cost o[ lmprovement
a. Toilet room upgrades $ 925,ooo
b s
c $
$
8. Petitioner must be the legal property owner or his/her legal representative:
I certify that lhe above noted information is true and correct.
E Legal Property Owner f,ArchitecuEngineer E Conlractor E Otner:
Rlcherd Cle.keHnnI Name:Phone No. 80s-459-1609
Address 2775 Pioneor Ranch Rd. Tomploton, CA 93465
Signature Date Feb 10.2021
Approved by
Rev O2l04l2O2O
Date q
T otal:
FOR AGENCY USI ONtY
Page 2 ol 2