HomeMy WebLinkAbout1300 N Main St - PlanCHECKED DATE
DRAWN CODE
APPPDECHKDESNODATEREVISIONS AND RECORD OF ISSUE
DRAWING NUMBERPROJECT REV
AREADRNAN
S
I
D
3
4
x
2
2
9 17/NOV/22 ISSUED FOR PERMITTING - REVISED PER AHJ COMMENTS IJR IJR DRL DRL DRL
10 16/FEB/23 ISSUED FOR PERMITTING - REVISED PER AHJ COMMENTS IJR IJR JJA JJA JJA
11 06/APR/23 APPROVED FOR CONSTRUCTION IJR IJR JJA JJA JJA
12 11/MAY/23 APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS IJR IJR JJA JJA JJA
13 01/JUN/2302
/
1
4
/
2
0
1
7
0
4
:
1
6
P
M
APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS IJR IJR JJA JJA JJA
14 20/JUL/23 APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS IJR IJR JJA JJA JJA
15 08/FEB/24 APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS IJR IJR JJA JJA JJA
16 19/DEC/24 CONFORMED TO CONSTRUCTION RECORDS IJR IJR JJA JJA
8 28/JUL/22 ISSUED FOR PERMITTING - REVISED PER AHJ COMMENTS AWC AWC JJA JJA JJA
DESIGNER
16R
J.P. MORGAN CHASE
1300 N MAIN ST, SANTA ANA, CA 92701
COVER PAGE
143011: 123.000 kWp
J.P. MORGAN CHASE
1300 N Main ST
SANTA ANA, CA 92701
ASSESSOR'S #: 398-524-06
PROJECT DESCRIPTION:
INSTALL (4) SOLAR CARPORTS
DIMENSIONS:
CARPORT ARRAY 1: 132.41 FT. X 16.61 FT. X (VERT CLEARANCE IS
9' 3"(±3") AND TOP HEIGHT OF THE CARPORT IS 12' 1.75"(±3") AGL)
CARPORT ARRAY 2: 33.06 FT. X 16.61 FT. X (VERT CLEARANCE IS
9 '3"(±3") AND TOP HEIGHT OF THE CARPORT IS 12' 1.75"(±3") AGL)
CARPORT ARRAY 3: 99.29 FT. X 33.26 FT. X (VERT CLEARANCE IS
9' 3"(±3") AND TOP HEIGHT OF THE CARPORT IS 13' 7"(±3") AGL)
CARPORT ARRAY 4: 33.06 FT. X 16.61 FT. X (VERT CLEARANCE IS
9' 3"(±3") AND TOP HEIGHT OF THE CARPORT IS 12' 1.75"(±3") AGL)
AREA:
CARPORT ARRAY 1: 2199.33 SQ. FT.
CARPORT ARRAY 2: 549.12 SQ. FT.
CARPORT ARRAY 2: 3302.38 SQ. FT.
CARPORT ARRAY 2: 549.12 SQ. FT.
INSTALL (1) TRANSFORMER
INSTALL WALL-MOUNTED PV EQUIPMENT
INSTALL (18) CARPORT MOUNTED LIGHTS
AUTHORITIES HAVING JURISDICTION
BUILDING: CITY OF SANTA ANA
ZONING: CITY OF SANTA ANA
UTILITY: SOUTHERN CALIFORNIA EDISON
DESIGN SPECIFICATIONS
CONSTRUCTION: COMMERCIAL / INDUSTRIAL
DESCRIPTION OF USE: SOLAR CARPORT
OCCUPANCY GROUP(S): U
TYPE OF CONSTRUCTION: V-B
FIRE SPRINKLERS: NO
FIRE SPRINKLERS REQUIRED: NO
DESIGN CODES & STANDARDS
ELECTRICAL: CEC 2019 (BASED ON NEC 2017)
FIRE: CFC 2019
BUILDING: CBC 2019
PROJECT INFORMATION
CA-143011-G10
01 AERIAL PHOTO
NOT TO SCALE 02 VICINITY MAP
NOT TO SCALE
SITE SPECIFIC SHEET INDEX
DRAWING NUMBER SHEET TITLE
G10 COVER PAGE
E10 ELECTRICAL PLAN
E11 LIGHTING PLAN
E20 THREE LINE DIAGRAM
E21 ONE LINE DIAGRAM
E30 LABELS & PLACARDS
REQUIRED STANDARD DRAWING INDEX
DRAWING NUMBER SHEET TITLE
SG10 COVER PAGE
SG20 GENERAL ELECTRICAL NOTES
SG21 GENERAL ELECTRICAL NOTES
SE10 ELECTRICAL DETAILS
SE11 ELECTRICAL DETAILS
SE20 METERING DETAILS 3-PHASE
SE21 AC PANEL DETAILS
SR12 THREE PHASE SYSTEM CUTSHEETS
SR26 ELECTRICAL DATA CUSHEETS
SBJ SBJJACOB J. AUGSBURGER
E 22867
CALIFORNIA
29/JUN/21
DRL 29/JUN/21
SE12 ELECTRICAL DETAILS
C10 OVERALL SITE PLAN
C32 ENLARGED SITE PLAN 2
Repair Box Truck Strike: SOW: Remove shifted modules, assess for damage,
replace if needed, Replace (2) damaged purlins.
Bldg #101124326
APPROVALS:
PLNG - A. Chu
BLDG - A. So
CHECKED DATE
DRAWN CODE
APPPDECHKDESDATEREVISIONS AND RECORD OF ISSUE
DRAWING NUMBERPROJECT REV
AREADRNAN
S
I
D
3
4
x
2
2
R
J.P. MORGAN CHASE
DESIGNERNOEL HERRERA
29/JUN/21 C 80849
NJC
JDN
VIG
08/JUL/21
1300 N. MAIN STREET, SANTA ANA, CA, 92701 15
10 16/FEB/23 VIG DMF JDN NH NH
11 06/APR/23 APPROVED FOR CONSTRUCTION VIG NJC JDN NH NH
12 11/MAY/23 VIG DMF JDN NH NH
13 01/JUN/23 APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS GAK AJF JDN NH NH
9 17/NOV/22 ISSUED FOR PERMITTING - REVISED PER AHJ COMMENTS VIG NJC JDN NH NH1420/JUL/23 GAK AJF JDN NH NH
15 08/FEB/24 GAK AJF JDN NH NH
7 14/JUL/22 ISSUED FOR PERMITTING - REVISED PER AHJ AND UTILITY COMMENT KKP NJC JDN NH NH
8 28/JUL/22 ISSUED FOR PERMITTING - REVISED PER AHJ COMMENT KKP NJC JDN NH NH
ISSUED FOR PERMITTING - REVISED PER AHJ COMMENTS
APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS
APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS
APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS
OVERALL SITE PLAN
CA-143011-C10
14
11
CHECKED DATE
DRAWN CODE
APPPDECHKDESDATEREVISIONS AND RECORD OF ISSUE
DRAWING NUMBERPROJECT REV
AREADRNAN
S
I
D
3
4
x
2
2
R
J.P. MORGAN CHASE
DESIGNERNOEL HERRERA
29/JUN/21 C 80849
NJC
JDN
VIG
08/JUL/21
1300 N. MAIN STREET, SANTA ANA, CA, 92701 15
10 16/FEB/23 VIG DMF JDN NH NH
11 06/APR/23 APPROVED FOR CONSTRUCTION VIG NJC JDN NH NH
12 11/MAY/23 VIG DMF JDN NH NH
13 01/JUN/23 APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS GAK AJF JDN NH NH
9 17/NOV/22 ISSUED FOR PERMITTING - REVISED PER AHJ COMMENTS VIG NJC JDN NH NH1420/JUL/23 GAK AJF JDN NH NH
15 08/FEB/24 GAK AJF JDN NH NH
7 14/JUL/22 ISSUED FOR PERMITTING - REVISED PER AHJ AND UTILITY COMMENT KKP NJC JDN NH NH
8 28/JUL/22 ISSUED FOR PERMITTING - REVISED PER AHJ COMMENT KKP NJC JDN NH NH
ISSUED FOR PERMITTING - REVISED PER AHJ COMMENTS
APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS
APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS
APPROVED FOR CONSTRUCTION - REVISED PER CLIENT COMMENTS
ENLARGED SITE PLAN 3
CA-143011-C32
YES NO
INSTRUCTIONS:
ORAN GE COUNTY FI RE AUTHORI TY
Plan Submittal Criteria
COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects
and RESIDENTIAL TRACT developments
· Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place.
· Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section.
· If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA.
· In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations.
· Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding
requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602.
Address Suite City
Project Scope/Business Description
1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways,
curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within
300 feet of an active or proposed oil well? Fire Master Plan (PR145)
2. Property is adjacent to a wildland area or non-irrigated native vegetation?
Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124)
3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from
an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170)
4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving
private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475)
5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000
sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable
to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless
classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration
or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses
where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories
with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285)
6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card,
button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan
depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520)
7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment;
industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible
liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium
ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations?
Special Equipment Plan (PR315, PR340-PR382)
8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft
maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if
H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240)
9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard
commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330)
10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a
commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335)
Initial each of the following two items indicating that you have read and understand the statement:
11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is
required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed
Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications.
12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located
in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327—
Initials the building department will determine specific requirements.
I certify under penalty of perjury under the laws of the State of California that the above is true:
Print Name Signature
Phone Number ( ) Date / /
Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA
review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the
applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the
appropriate plans and fees for OCFA review. 10-08-14 EE
COM
O R A N G E C O U N T Y F I R E A U T H O R I T Y
Plan Referral Form
Required for OCFA to review plans upon the request of the Building Department when
the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”.
City / County Official Requesting Review:
City / County Reference #: Date: __________________________________
City / County: _____________________________________ E-Mail: __________________________________
Contact Name: _____________________________________ Phone #: _________________________________
Title: _____________________________________
** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. **
Reason(s) for Review:
Please describe why OCFA Plan Review is or may be required by the City/County :
OCFA COMMENTS:
No further action required on this specific plan type, based
on information provided on: ____/______/______.
Project to be taken in for OCFA Review.
Other:
Name: _________________________________________
Contact #: ______________________________________ Date: _________________________________
OCFA Authorization
Updated: 06/02/2020 rs