HomeMy WebLinkAboutEven_3100-3130 S Harbor Blvd - Misc. Permit (2)O,-SANTA
NA
tL$\l\c
{8ul.DI\G
iCI\O
Planning & Building Agency
Building Safety Division
20 Civic Centrr Plaza
P.O. Box 198t (M-19)
Santa Ana, CA92702
(714) O47-s800
www.santa-ana.or9
lru;sr 4 F*lort., ; o^ planl
DISABLED ACCESS COMPLIANCE
DOCUMENTATION FORM
ACC-o1 CBC 2016
A. PURPOSE OF THIS DOCUMENTATION: (check one)
! Finding of unreasonable hardship for projects UNDER the valuation threshold-
ffi finding of unreasonable hardship for projects OVER the valuation threshold'
! Certification of Full Compliance with the 2016 California Building Code
' Valuation threshold as defined in the 2016 California Building Code, Section 118-202.4 (Exception #8) and
Section 202 is $1518 102 (as of January 20171
B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER:
The cost of all construction contemplated in the determination of the valuation of improvement
threshold based on the valuation of site and building improvements for lhe last three-year period.
Permit No lssuance Date Valuation of lmprovements
Nol known by new owner
Total
2. 2oyo ol fo|€l Construction Cost or Project Valuation:
3. The actual amount to be spent to provide disabled access
$ 265,000
s s88,079
4. Describe the impact of the proposed improvements on financial feasibility of the proiect.
New bu ldrng ownershrp is 6xcoeding the 20ol. ol construction cosls to upgrade accessibi|ly lealures at entire site
Refer to Table 6 valuatons
buildings, wilh layout to be updated to currenl code. There is an exrsting accessible palh o{ lravel from Harbor 8lvd. lo lhe
rarsed podrum level whrch serves marn I sl lloor enlrances lo bu drngs
Accessrbrlity ,ealure that wou d be gained- Location ol requrred slandard accessible parking slalls al parkrng garage
level, represent the shortesl route possible to bolh buildings, lhrough the elevator lobby Accessibility leature to be
lost- Du6 1o required overh€ad clearance, (8 -2") slandard accessible slalls al parking level will not meet lhis
requrremenl. The proposed van accessrble stall locatron rs located outside ol parkrng garage level, bul does note
meel shortesl roule to buildrng entrances and lhls localion rs also limited lo a single van stall, instead of the required
Rev 1/9/2017 lwo slals Page I ol 2
Project Address:
3100-3130 S. Harbor Blvd
Permrt Number:
10198428-35
Prqect Descnptron:
lnlerior tenanl improvemenls
Floor Number.
1-5
Busrness Name / Owner
Kearny Real Eslate Co
Business Phone Number:
(310) 203- 1861
Legal Property Owner
Kearny Harbor LLC
Phone Number:
(310) 203-1861
Tolal Construction Cost or Project Valuation
$ r,345,000
Cost of Providing Complele Disabled Access:
$ saa,ozg ( w lll^-.$ *--g/i'.l.4ri
n;1. An,
5. Describe the nature of the use of the facility under construction and its availability to persons with
disabilities and the nature of accessibility that would be gained or lost:
Exisling iacility is an otlice use park. There is currenlly accessible parking at garage level, with elevator lobby access to
6. ldentify the accessibility features and equivalent facilities that WILL be brought into compliance with
the latest edition of Title 24 as a part of this prolect and an estimale of the cost of each item:
(Documentation may be required)
Accessible Features to be Made Accessible Cost of lmprovement
a. Entrance
tr Door fl Landing fl Stairway/Steps n Ramp $ 14,500
n Path of travel from accessible parking to the building enlrance
and area of remodel
c
n Path of travel to sanitary facilities / public phone / drinking fountain s
E Path of travel from the public way to the building entrance $ e00
C Sanitary facilities ( Floor no 15 )$ sas,ooo
d. Public phone(s)s
e. Drinkingfountain(s)$
f. Parking
g. Signage & Alarms $
i. Other:$
$ 588,079Total:
7. ldentify the accessibility features that WILL NOT comply if a request for unreasonable hardship is
granted. Provide an estimated cost of compliance for each ilem: (Documentation may be required)
Accessible Features Not to be lmproved Cost of lmprovement
a
Acc€ssible parking rn parking garage level due to existLng building elements lhal do nol
provide requrred clearance (8'.2") existing slruciuralbeams and sewer plumbing lines at $ technically inteasabile
b
garage level, overhead concret€ peflmeter podrum wall al enlry
s
c S
Total
8. Petitioner must be the legal property owner or his/her legal representative:
I certify that the above noted information is true and correct.
n Legal Property Owner I ArchitecuEngineer f] Contractor n Otner
Print Name: L't" K"llY Phone No. (949) 798-7300
. 17A77 Vor Karman Ave. lrvine, CA. 92614Address:
Signature Date
Approved by
Rev 11912017
FOR AGENCY USE ONLY
Date
Page 2 ol 2
b. Path of Travel:
$ zz,ozg