Laserfiche WebLink
COVER <br />SHEET <br />E-01 <br />E-01 <br />E-02 <br />E-03 <br />E-04 <br />E-05 <br />E-06 <br />E-07 <br />E-08 <br />E-09 <br />E-10 <br />SCOPE OF WORK <br />1.EV CHARGERS - PROVIDE AND INSTALL: <br />1.1.(5) NEW LOOP INFINITY FLASH 300KW, <br />DUAL-PORT, PEDESTAL MOUNT, EV <br />CHARGERS. <br />(10 PORTS TOTAL) <br />2.ELECTRICAL EQUIPMENT - PROVIDE AND <br />INSTALL: <br />2.1.(1) NEW UTILITY TRANSFORMER. <br />2.2.(1) NEW MSB: 3000A, 480/277V, 3ɸ, 4W, <br />65kAIC, NEMA 3R ENCLOSURE. <br />2.2.1. (1) NEW EV METER. <br />2.2.2. (1) NEW 3000A, 480V, 3P, 65kAIC <br /> MAIN CIRCUIT BREAKER. <br /> 2.2.3 (5) NEW LOOP INFINITY FLASH POWER <br /> CABINET, 480V, 3ɸ, 3W, 65kAIC, <br /> NEMA 3R ENCLOSURES. <br />2.2.4. (5) NEW 600A, 480V, 3P, 42kAIC <br /> CIRCUIT BREAKERS. <br />3.MISCELLANEOUS: PROVIDE AND INSTALL: <br />3.1.(23) STANDARD BOLLARDS. <br />3.2.(8) REMOVABLE BOLLARDS. <br />3.3.(10) EV CHARGING ONLY STENCILS. 12" <br />LETTERING. PAINTED WHITE. <br />3.4.(9) EV PARKING - ONLY WHILE CHARGING <br />SIGN. <br />3.5.(1) EV PARKING - ONLY WHILE CHARGING <br />SIGN WITH ISA. <br />3.6.(1) NO PARKING STENCIL. 12" LETTERING. <br />PAINTED WHITE. <br />3.7.PAINTED PARKING DIVIDER LINES. <br />3.8.XYLOSMA CONGESTRUM. LANDSCAPING <br />SCREENING FOR ALL MECHANICAL <br />EQUIPMENT ASIDE FROM THE CHARGING <br />STATIONS PER CITY REQUIREMENT. <br />TABLE OF CONTENTS <br />·COVER PAGE <br />·SITE PLAN <br />·EV LAYOUT <br />·SCE LAYOUT <br />·SINGLE LINE DIAGRAM (SLD) <br />·DATA SHEETS <br />·REF-SIGNS & STENCILS <br />·REF-STRUCTURAL <br />·REF-TRENCHING & LANDSCAPING <br />·REF - ACCESSIBLE REACH <br />REVISIONS <br />DESCRIPTION DATE REV <br />AHJ CORRECTION A 10/17/2025 A <br />A <br />VICINITY MAP <br />CLARK LONGHURST, PRESIDENT, C&I DIV. <br />SITELOGIQ, INC. LICENSE NO. 1054171 <br />C-10 ELECTRICAL <br />PE <br />R <br />M <br />I <br />T <br /> <br />A <br />P <br />P <br />L <br />I <br />C <br />A <br />T <br />I <br />O <br />N <br />THE DRAWING AND THE <br />DESIGN SHOWN IS <br />PROPERTY OF <br />SITELOGIQ, INC. THE <br />REPRODUCTION, <br />COPYING, OR USE OF <br />THIS DRAWING <br />WITHOUT WRITTEN <br />CONSENT OF SITELOGIQ <br />IS PROHIBITED. ANY <br />INFRINGEMENT WILL BE <br />SUBJECT TO LEGAL <br />ACTION. <br />EVCS DESIGN <br />DOCUMENTS <br />DRAWN BY: <br />CHECKED BY: <br />DATE: <br />REVISION: <br />SHEET: <br />TEMPLATE:5.14.2025 <br />SU <br />N <br />F <br />L <br />O <br />W <br />E <br />R <br /> <br />M <br />E <br />T <br />R <br />O <br />39 <br />4 <br />1 <br /> <br />S <br />O <br />U <br />T <br />H <br /> <br />B <br />R <br />I <br />S <br />T <br />O <br />L <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />EL <br />ANP <br />10.24.2025 <br />A <br />COMIND009300_42020_RENEWABLE ENERGY PARTNERS_SUNFLOWER METRO SANTA ANA_EV_REV A.DWG <br />BUILDING DATA <br />·APN: 410-301-49 <br />·OCCUPANCY CLASS: B <br />·LEGAL DESCRIPTION: P BK 41 PG 6 PAR 2 PM 41-6 POR OF PAR 2 <br />GENERAL NOTES <br />1. THIS PROJECT WILL COMPLY WITH THE <br />FOLLOWING BUILDING CODES AND <br />ASSOCIATED CITY OF SANTA ANA <br />AMENDMENTS. <br />1.1.2022 CALIFORNIA BUILDING CODE <br />(CBC) AND/OR CALIFORNIA <br />RESIDENTIAL CODE (CRC) <br />1.2.2022 CALIFORNIA GREEN BUILDING <br />STANDARDS CODE (CALGREEN) <br />1.3.2022 CALIFORNIA ELECTRICAL CODE <br />(CEC) <br />1.4.2022 CALIFORNIA MECHANICAL CODE <br />(CMC) <br />1.5.2022 CALIFORNIA PLUMBING CODE <br />(CPC) <br />1.6.2022 CALIFORNIA FIRE CODE (CFC) <br />1.7.2022 CALIFORNIA BUILDING ENERGY <br />EFFICIENCY STANDARDS (CBEES) . <br />2. ALL ELECTRICAL EQUIPMENT SHALL BE <br />LABELED, LISTED OR CERTIFIED BY A <br />NATIONALLY RECOGNIZED LABORATORY <br />ACCREDITED BY THE UNITED STATES <br />OCCUPATIONAL HEALTH <br />ADMINISTRATION (OSHA). <br />3 ALL ASSOCIATED ELECTRICAL EQUIPMENT <br />ARC FLASH WARNING SHALL COMPLY <br />WITH NEC ARTICLE 110.16 AND <br />AVAILABLE FAULT CURRENT MARKING <br />SHALL COMPLY WITH NEC ARTICLE 110.24. <br />4 A WRITTEN TEST RECORD SHALL BE <br />PROVIDED TO THE CITY INSPECTOR PRIOR <br />TO APPROVAL AND METER RELEASE PER <br />CEC 230.95. <br />5 SERVICE ADDRESS TO BE VERIFIED WITH <br />CITY PLANNING PRIOR TO METER <br />RELEASE. <br />A <br />A