HomeMy WebLinkAbout10194676 - Permitb7Project Address: 617 S Diamond St Unil Bldg: Address Range Suite Range:
Zoning: RlLot '16 Block: NA Tract: 4659 Historic. No
city of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA,27O2 Building
Permit Counter; (714) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714) 647-5853
Permit #: {O{94676
Pin #: 93231
Building Use:
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use:
Single Family Dwelling
Solar
Solar
Sfd Watt garage
R-3, U
VB
cBc 2016
x-0602320257J
1st FL Area:
2nd FL Area:
Other Areas:
Garage Area
Total:
Patio:
T.l.Area:
Yards Req'd:
Valuation: $8,000.00
Botch+:4tU79 - [t/l/2t117 I0r C(:UELLAR0llife: CTYH Tr.nns+r 34 t of 1A,:ct+: Rpf+: lt-tl9{676
R.pt+:02tr613,t9 * tt/1/201? 11:13 An
Tr onso t inn Tnlf|I lqfrl rtf,
Phoner
Tenant:
Alfred Padilla
517 S Diamond Street
Santa Ana, CA 92703
(7141944-7357
t50D.110
3l . tl0
t501.[0
Authi | 069822
Contractor: SolarCityCorporation
Address: '1831 Ritchey St
Santa Ana, CA 92705
Phone: (702) 785-2998
State Lic #: 888'104
Lic Type: B, A, c-10, c-20, c{6
Bus. Lic #: 324801
Workers' Compensalion lnsurance:
Carrier: Zurich
Policy #: WC0182018
Expires: 'l0l31l2017
Engineer Solar Ci
Marcus f, g!,66i-ifig1{41 r, r,r r t i o n
Address 3055 cle?Uiqtviw4y
San Matqg g4rt{ro2-.,16rr I rrtrr r-
(888) 76Sa{FP Stds Revolv ins
73045 lrri 1 1 6trlr?" ti161li.r:I-ru'
Uiqn
(.(ti: r I r * * r * * r * rx I2 ?:
Phone:
License #
Architect /
Desiqner
Address
Phone:
License #
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd.
PWA lnsp. Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
Zuniga, Alli
Date:
Date:
Dale:1110112017
Subject to Field:
..M
l/'lisc. Receipt
NIisc. Receipt
lvlisc. Receipt
07776002 51601 Permit Fee
07776002 s7672 Bldg. Stds. Revolving
07776002 51600 General Plan Update
$500.00
$1.00
$0.00
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'd: No O.lt 16002 51601
Evgry pa.mit issued shall becofie invahd unless the work on lhe sito authorized by
such pemit is comfiencod within180 days after ils issuanco,or if lho work authodzed
on tho sil6 by such permit is suspended ot abandoned tor a period of180 days after
the time lhe wo* is commenced.
lnspector MID#: 2017-139673
01116002 s1612
$500.00
$1.00
Fee Total;
Paid lo Dale
Balance Due:
$501.00
$0 00
$s01 .00
Assessor's Parcel 010-302-05
Occupancy:
Constr Type
Code:
Flood Zone:
# of Stories:
Description of Work: lnstall new 3.9 kw roof mounted soolar PV system (12 panels). Per PV checklist.
Planning Conditions:
Owner:
Address
BUILDING. INSPECTOR RECORD
SITE.WORK DATE ID/SIG.COMMENTS O* NI:R BUILDIiT T'EII'ARATION
I hqdl .rh und.r Fuh! Df Frj@ rhd I &i .rdF film rhc (ifuko6' Lk.M l,* for rh. follotrq EMn lsa 1rll.5
Irusrds rnd Phf6ion (id.) Any Cn, or ('ounrt qhkh Equn6 . Fni' lo odrud. rlls, inp.orc, ddnolah or r.rEr Dr
srru.1re Eior to irs istoe., dlso r.quir6 r h. iDhcmr for such Fnni lo filc . sisn.d sllrddr rr,l h. or lhr t li.ns.d puRUMr
ro rh! IiolilioB ofrtr Co.kdors Li.m*d l,s (ch.Fd 9. comncn.in* wirh Sdrbn ,000 of Division I ofrh. B*ins and
fNl*ioB Cod.) or thd lEorrh. is crmpt lhgcfiom d lh. b.ri lor rh. sllcs.d dmplnn AiylioLrionolsdirnT0ll 5b! rn!"
.mlrdlor.Fnn3ulrcGrh.dppl(,nrb..$ilpcohvotdmo(lhtrn\.hu.&dd.llas(1500)
l. B otrF of !h. rnrFnJ. or mr mph)6 trnh rc36 s th6 $k comFEdion. *ill& llE scr dd rtE nturE ir mr
inrqrLd or.lfd.d for sl.(Sd 70,a,1. BueiE tud Pr.r6ii.B Cd. Ilr(.o r.doi!lIdrhw&6mrq',vroDonnqof
rt F\rl6y f,ho boildr or iml'o!6 *Ea.. a"d wh. d.E su.t $.'t hih!.lf .r t@lt or rhmuah hii or hd o*n mrro) 6,
pn*d.d rh.t such imFovffiri s. mt inra,-ldl or olld nr ek It tkJ{66. th. hildinB or in{rolclmt n $U sirh6 on. )@
ofco'r,rlr rE rlE O$B tqxtts uill h!\! lh. l{(tn ot I'ouns rhd lE or tE dd ml hild or !iF.\r th. Frpn'y f.. rhc FirFe of
l. 6 o*E of rh. Fopaq. n crclun.b co r.d'ns *ith liGE d codrrloE ro mlrrud rtr lhrd {sa 7(x l. li6rns
&rl Plbasio. C.d. Ih. (nnrmror'tr Li.dq ll* dE mr rrf rl ro e osn6 oaFoFny qho l ilds or ihprord rhqqrn.
lnd q,no olnE(l3 for $chplj6rrqirhr ( oirrrcro(,liccE d puru,n tolhi Codr&1or'.1i.6k h*)
lnn I. , unds Sdir
lloSaESlliauSEdlrllo!
DECIJBaIqX
I hd.tt.mm un.t i,ndt oftEluryoR.frh. tolt)"s! <tal,r ioN
lh crds,llnmnr n.('d'l-rcar..l(,nro (iS.lllnsur.fi)r*orldr.o,nlmsnrirnr.Nt,rxii.dfo$s{rkrrTlrrrofrhe
(i)d.. forlhc pqfor wrcolrh.\ork ror*h'chrhcp6rnil b ian'61
.lnd$,lloinrli.q.rl6.omp.Nr.nG G( 6 rqutral b) s6rhn !700.riE |ihor Co&. tor rh. Fltuc of
r 6 ed Mv$Mrd .onFd6. inse.cMa l B)lt\ nunb.r 6.
\tz-U+0\t-it t(
I cdilyrh,r i.ih.Fftrlmft.of rh. *ork lor $hrhrh*Fnn B sru.n.I sh6ll mr mphy uy pc$r in.nt mmM
$ 6
'o
b..om $tFtl h lh. m*6'omFui,n Lu! of C.lit Bi4 dd tsc llld if I rlbrld h@m qttr h rlE
uod6 conp.Nron proirbB or Srlior I7oO or tll. llbor Co<!. I Jull, fodt$irr omplr' *nh rh.r provtnd
wAnNlN(; F il@ ro slc {0116' NmFurio. 6f6.sc a uih*ful ed shrll etlcl o alloF lo aihin l Fsllit &d
(r' linr\ trl, n, on. htrn(l'.J rhou\xnd dol
Sc.rnr 1l)7(i ofrhe I xlrtr (n!k- tri.'.1rffd
m a(l(linn ro rh..o ol d!m86 is I,old.n for th(
(.
I h6rl,!.llm urdd Full! orrE jurv lhr I n l(EE d urdd Nrlnn otourrd I (omffifi $nh Sdion 7(,(,r,) ofrhn
.r rh. BurrB sd PmldrB('od., rld mt l'(N 6 m tull LE. erl.i(r
,,.....,".- ,C)tIp,',.\t\qz I b
( rr\\lRt( r()\ I t\Dt\r; \(;t.:\('\
I h6.by lllm und6 Fdly oI p.oury lhd lhd i! . sisrudhn lodins lsfty for lh. Fforlffi. of th. worl hr wnich Ihn pann i!
isu.{ (s(. 1097. civ c )
aftl.t(ANflr[(Jt&Illa!
I h&lr 6llm undd pailrtof Fjo!- onc olrh. followinr d(lddhnr
IX,nohi n Pdmir! stElhr Norifi. ion hlral R.rulartJns (1irk 40. r.d6)
R.qur.J Ldr6 of Ndifkds.
.l d. nor qpl(.bk r. rh. rrnF
iinhndi,'n G(od I arrah c.,npb $irh ill(ir) ind (i,unry
hor i/. rrtxMrdn6 of rhis ( ity dd G,unlylo drE urn.lhc
\
\rl rlra
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Subf loor/VenVlnsulation
Roof Sheathing
Shear Wall
Framin s
lnsulation/Energy
Drpvall
Ext./lnt. Lath
Brown Coat
Masonry
Pool Fence
T-Bar
H?ndicap Req
Deputy Final Report
Engineer Final Reporl
Flood Zone Certif
,t )
FINAL il/4 tH il|L/l?+
Certificate of Occu 7 /pancy
Notes, Remarks, Etc
IE
-"dI lll1_
ns\ ,.lar'ns tu buildrx .onstn{ i,)n.
I
I
Plannlng t Bulldlng Agency
Bulldlng Safety Division
20 Clvic Conter Plaza
P.O. Box 1988 (M.19)
Santa Ana, C49270?
(71'l) 647€800
www.santa-anr.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
soL-01 cBc 2013
Solar Photovoltalc (PV) Checkllst for Detachod SINGLE FAIUILY RESIDENCES Only
lnstructlons: The licensed contraclor of record shall complste all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum ll' x 17" size.
Contractoi Company Name:
Contractor Llcense Number:
Tc sla
YES NO Ars the followlng appllcable to the proposed proiect?
Will the PV system layout provide the required three.foot wide cloat access pathways
per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan?
Wll the PV system be installed on a roof having only one roofing layer with no
ov6days?
Will the PV array be flush mounted lo th€ existing roof so that the plane of the
modules (pansls) are parallel to the plane of the roofl
Will the PV system w€igh maximum 4 pounds per square feet or less?
Wll the PV system b€ installed where the modulos do not overhang any roof edges
(such as €aves, gabled ends, ridges and hips)?
Wll the PV system b€ installed with a space of 2'minimum to 10'maximum between
the underside of modules and the surface of th€ roof?
Wll the PV system be installed without using any ballast system or counter-weight
system?
will the anctors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will th€ minimum 5/16' lag screws be installed with a minimum of 2-112 inch
embedment into roof rafters (with pre{rilled holes) and is this minimum emb€dment
shown on the plans?
Ar€ ALL the structural pages of the plans WET stamped and signed by a Califomia
licens€d professional engineer? (including proiect specific site plan, PV layout,
anchorage spacing, anchorage details and manufacture/s PV support information.)
1 E tr
2 trtr
ao
EltrEtr
tro
4
6
7. EO
8 Etr
I trtr
10.Etr
I cortify undor penalty of poriury under tho laws of tho Stato of California that the above ls true:
print Name: Chris Corniola Signature
Phone Numb€r: 7 02-7 85-2998
Email Address: ccorniola@tesla.com
R€v: 8/1712015
Darr,. t0/27 /17
-,,-SANTA
ANAr,iilr
Project Address' 617 Diamond St, Santa Ana, CA 92703, US
,SAilTA
A}IAffi
a --^
:-r:.::-iir--i:Smoke & CO
Alarm Affidavit'l ?:. ':ll,\i::':l :'r : j :l
7r)t :riJnat, mai oe jtund at..
Qn \)to1,r--ru-d)
&r
^'--':i::
-)-- -1 '):: rt
CRi S:ci,on AJ14 i lx. R315.3
{)==,
1"",
" o:r:; b:1.:,v r.^,,-. L - -<:.-l
'aa--'::'-:.',
I :i::-:::i:i a: l(:l:
:- : <: : .r'-;:: J:: i::: ^:
r- -::;*:.: i:-iL: (':: : i',:i ii,? t::i i.t:r'ie: ir g919lra:ce ,vi;r lr3 govgr:r.;
t,r :'l ai,i - f'
|:iz:< c',21 tr ? a c?2:a I a,\^2a
',l:i r ; ;zl,'-cztiijicotion is only utec fat proj?.ts thnt ofipct th? EXTERIOR of the ttruct,ire. Tht.
.'::.;; ); eccii:tblz ONLY tc proi.ct; whzre a:cess t, ihz intzriot of th9 dwelling by d Sontd And
!i;t.::a: i; at: t2qrii?d.
; compl:ted fcrm and the job-card readiiy avaiiable on final inspectionl
I
i:-:n.:-l:': l::
Pl.nnlng & Bulldlng Agoncy
Bulldlng Safety Dlvision
20 Clvic Conter Plazs
P.O. Box r9EB (M-19)
S.nta Ana, C492702
(71/t) 6475E00
www.srnta-ana.org
RESIDENTIAL
PHOTOVOLTAIC
GHECKLIST
soL-01 cBc 2013
Solar Photovoltalc (PV) Checkllst for Detached SINGLE FAMILY RESIDENCES Only
lnstructlons: Th€ licensed conlractor ol record shall complet€ all sections, answer the ten qu€stions and
sign th6 certiflcation section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimuml'1"x17"size. lf answerlnq NOtoanvof the questlons. plan check shall be requlred.
Project Address:617 Diamond St, Santa Ana, CA 92703, US
Tcsla
4
5
2
3
6
7
Contractor Company Name:
Contractor Llconse Number:
YES NO
tr tr
8 trtr
9 Etr
10 tro
trtr
tro
trtratr
tro
tro
Aro the followlng appllcabl€ to the proposed projoct?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan?
Wll th€ PV system be installed on a roof having only one roofing lay€r with no
overlays?
Will the PV array be flush mounted to tho €xisting roof so that the plane of the
modules (panels) are parallol to the plan€ of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be inslalled where the modules do not overhang any roof edges
(such as eaves, gabled Ends, ridges and hips)?
Will the PV systsm be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roon
Will the PV syslem be installed without using any ballast system or counter-weight
system?
Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Wll th€ minimum 5/16" lag screws be installed with a minimum ot 2-112 inch
embsdment into roof rafters (with pre{rilled holes) and is this minimum embedment
shown on the plans?
tue ALL the structural pag6s of the plans WET stamped and signed by a Califomia
licensed professional engineer? (including proiect spocific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
I cortlty under penalty ot poriury under the laws of the State of Callfoinla that tho above ls true:
print Name: Chris Corniola Sign
Phone Number:702-785-2998 Darg. t0/27 /17
Emait Address: ccorniola@tesla.com
ature: ' '
R€v: 8/1712015