HomeMy WebLinkAbout10194811 - Permitcity of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA,27O2 Building
Permit Counter: (714) 647-5800 lnspection Requests: (714) 667-2738 lnspector Section: (714),647-5853
Permit#: {Ol948ll
Pin #: 4225o
EProject Address:2122N Wriqht St
Assessor's Parcel: 396-072-36 Lol 5
Unit Bldg: Address Range Suite Range:
Zoning: R'lBlock NA Tract 5690 Historic. No
Building Usel
Job Type:
Nature of Work:
Existing Bldg. & Use
Proposed Use:
Single Family Dwelling
Solar
Solar
Sfd Waft garage
Occupancy:
Consk Type
Code:
Flood Zone:
# of Stories:
R-3, U
VB
cBc 2016
x-0502320163J
1
Description of Work: lnstallation of roof mounted PV system. Worksheet attached to plans
8.54 kw.
1st FL Area: Patio:
2nd FL Area: T.l.Area:
Other Areas: Yards Req'd:
Garage Area: Valuation: $24,000.00
Total: :
OK to issue per OCFA:email attached to pldrs. 28 pan€16,
Planning conditions
Owner:
Address
Phone:
Tenant:
JORGE A LOPEZ
2122 N Wright St
Santa Ana, CA 927057160
/.714l-724-2745
Conlraclor. McGuireConstructionServi
Address: 310 N. lndian Hill Blvd. #103
Claremont, CA 91711
Phone: (714) 715-5901
State Lic #: 805496
Lic Type: B, C-5
Bus. Lic #: 367603
Workers' Compensalion lnsurance:
Carrier: BenchmarklnsuranceCompany
Policy #: CST5011094
Expires: 09/25/2018
CNG Solar Engineering
Cerenico G Madrona
501 S Brand Blvd, Suite 104
San Fernando, CA 91340
(818) 336-687'l
7 2319
Engineer
Address
Architect /
Desiqner:
Address:
Phone:
License #:
Phonel
License #
McGuire Construction Services
310 N. lndian Hill Blvd. #103
Claremont, CA 91711
(7r4) 715-5901
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp. Req'd:
Planning lnsp. Req'd;
Landscaping lnsp. Req'd
Date: Misc. Receipt
Dale: Misc Receipt
Chavez. Oave_i?a-, Dale: 1111s12o17 Misc. Receipt
Y . Subject to Field:
07776002 5160I Permil Fee
07776002 51672 Bld9. Stds. Revolving
07776002 51500 General Plan Update
$500.00
$1.00
$0.00
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'd: No 01.11600251601
Every pefi1it issued shall become invalid unless the wot* on lhe sile authorized by
such pennit is commenced within 180 days afler its issuance ot if the work authorized
on lhe sita by such pennil is suspended ot abandoned for a period ol 180 days aftot
the time the wo* iscommenced
$501.00
$0 00
$501.00
lnspector MID#: 2017-139962
01 1 16002 51612
$500.00
$1.00
Fee Tolal.
Paid to Date:
Balance Due
BUILDING- INSPECTOR RECORD
owlrt:R atrtt,t DR Dr,uc R ItoN
I ha.b! alfm und.' Full! of FruD rh.i I m.ro ton rh. Codmon t-k.* 1.,{ fo. rhc folhui4 tdn lS<r0ll.5
Bsrndr .nd ProlB6n Cql.) AN Cnt or (-oud! lhih rntund . Fbn !. cod'!d. .hq. imFo\e d.hlnh or qEr Dr
srruc1@. Fbr !o ir. su4.. .lo r.qun6 rh. +pl.. lor ru.h tEnit b 6L. sBrd nnml lhr h. or nt ! ltnn d tlE8i
ro rfi. FlvbioB of tlE (ontncro.! l-ico&d Iil (( hrrn( 9. ( onnfrinB tr h sftr.n 70ft or Dnirion I ofrh. lrcin*.nd
PNf*nr.s Cod.) or rhi h. 3h. itd.mpr lha.6om xd rhc bGn for rh. llks.d .!md nn Ar) vioklionofsalhn TDrl 5 6yanl
aptlicanlforuFmilrubJ(trth..pplicanilo!civiltn.hrolnolmor.lheiv.hu.dt.ddolld(t500)
L c olle oarh. F.Fnr. or my.nplot6 q trt wa86 a rh.ir $k comFulio.. will.h lh. smt.d tlE rB'i@ ! i.l
inrdnd sofiad for nL (Sd ?O1,4. BBilr* Dd Pr.fdrpN cod. Th. Codrrloir I rtr llw &d mr +?ly ro orn6ol
!fi. FoFry * ln hrrl& or 'trFNB rlEEo &rt * h. dE qll Nrt fiiBlaor h.r*lf or rthuah h,r or lE o*n .!tPh) c.
proriLd tnd ufi mF!!Er! e 'd
-rdr,.dtrolEol fs el. l[ tn*6s. tlE hr'ld'ilc dF llrda$ld$rhooE\*
of.dpl.io^ rlE ().*ffi Br'lda $il! l$! ih. hddr ofFoiry rk lr n llE dn trr hnld o. !rrF\! ltE FlFr! tu rF,Frol
l.6o$Eof rlE I'trt'dr, m cr.lurcl, conk*1ms qirh lic6s.d co.'r,rroR ro o4dtu.r rh. For.d (Sd 70,1,4. ndit6
and fttrEsiodC.d. I hc ( on'rrdor. Li.ds. l,w .h6 ton qrl, r. e o*nd ot lroFn y uho blildr o. iFpror6 lhsnrn,
lnd wto co n.t! fLtr ruch r,lja-ls wirh a co *1o(r licd.d pu6ur rorhc ('onti.roai l.icl@ t:s)
l.fl.rcmpt u"dd S(ion
D.r. OUF
laalil:8li.(autErr rax
IISJa3IIOT
I hdrb.mm utuLr F6lr) olFrlur] oRoarh.Iolh(n8 d.(1 r'r.B
I har. &n $,ll tuuun ! (.nift.r. of Congr ro s.lt lBu,c f.r l$16' .omtdMon, a Fo\ i(k lor b' SdrM r7m or lh.
I ibor Codc. for llE p<follM.c of th. uort for which lh. p6 il a nsud
I hav.and $,llnr.int.'n sorlm' c.np.roarlon iNu,.n.., ir rsttrn.d hr s(lion r7l)(rDlrh.lib.r('od.. for lh. p.nrnninc.ol
rh. $ o.l for qhich lhit ndn{ n isdl My vorlft- comn adhn iBurdc. camd orn rni(r nuob6 t.:
llzof t
I c6iifr_ lhd i.tlEFformnc.of lh.sort for shEhth! Fmn a is.d.I rldl mi nrkl)..r Fsn inant m&M
e a ro tdoG sut'j<t ro rh. *ortd omFdFn L*r .l( rl'fomi., dln .€R rhd il I JFULI trrom llbjc(l ro 'risortd' onFMl io. pnrvi!'oN ol sdion I700 of rh. Lhr ( od( I JEII. fonhqilh .oFt'ly wiln lhos Forn.6
WARj\!NC Flilurc to Ku. worlm' comFo$lirn covms. is urhwfrrl. od !h!ll tubidl m dntloF io aim'hal Fmhii lnd
civil fitr.s up k, on. hundr.n thousand dollas ($llr(r.(r(x)). in addilion to rhc rorr or.o f.mtrion
S(tion 1076 orth.l,htr (i'd., ml6.s d.llorrr s ts a),J- 1' ls-lf- 11
r l( [N.BTF!F cnii
D}I9SSAIIAT
I @ lllm unds rElhr o, Frurr tht I m lEd!.d !.lF rF'Enn ol Ch.fld el(onrffi'ns rih Sdhn 7ur.).f l)'\il'n ]
.r tn. BsilB d Pr.f6mB (-otL. d ny lkc ir M flll foR rn dT<'
o
.t0-/5- t?t
I hot' lrm un& Fnlhy .f Fjrr! lhi ItEc a . m'druclbn ladts .sdy for rhc Fftffi. of dE m* tut rtf,h tt! Fn. i,
is&! (Sc 1097, Cir ( )
altu(axr"DlltJaallo!
I hErt y altoo und.r todlry dl pfiu.y on. of rh. followins d<l,nr iJn3
llrrlinrn Pmil.-AltElo! Nolilicnio. Fcdid R.ruhlnnrll L.m. Pd6)
R.quiEd l!'dorN{frdM
I csrii rha rh. tdsd rcsuhrioN rredms al or ,@n 'l m to{ @litahL (,
'h! FoFl
rfrrhdlh.\.r..nrhirrrpli.ltionsld sl.thd! rh.anr. inlomdion L.orNr lr*ralocompl) * h all ( iJ d.d ( otrnrt
Md St.r.l,\Bi.htnu lo h{ildio-s codrucrN.. @] i(cby iuthorncrqrMr.rn6 ofrhir ( ny Md Colnly to olq u|on lh.
. l0-t5-t)
SITE-WORK DATE ID/SIG.COMMENTS
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
SubfloorNenUl nsulation
Roof Sheathing
Shear Wall
Framing
lnsulation/Energy
Drylvall
Ext./lnt. Lath
Brown Coat
Masonry
Pool Fence
T-Bar
Handicap Req
Deputy Final Report
Engineer Final Report
Flood Zone Certif.
FINAL o -:ai\/
Certificate of Occu pancy T T VI
Notes, Remarks, Etc
:::-m*::w*E y\4L(5J.i ^<-
7oE Yib
/ t^/,>_
I
I
,,.-SANTA
NA,',il,*ffi
Planning & Building Agency
Building Safety Division
20 Civic Cenler Plaza
P.O. Box 1988 (M-ig)
Santa Ana, CA 92702
(7r4) 647-5800
www.sanla-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
sol-o1 cBc 2013
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below, A copy of this form shall be attached to each of TWO sets of plans, of
minimum 1 1" x '17" size. lf answerinq NO to anv of the questions. plan check shall be required.
Project Address:L \.i tl t
Contractor Company Name:
Contractor License Number:
YES NODg
Etr
Etr
r\c
6 9qb
Are the following applicable to the proposed project?
wirr the pv system rayout pro".";";";ffi;#.", -,0" oim\..[h]"*
per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
ovedays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to 10" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minjmum of 2-112 incn
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including project specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
Signature
Date 1
\
*y Fir<
*pgu''-\
4
2
3
6
7
8
Etr
tstr
&tr
Etr
Etr
Ettr
9
10 trtr
I certify under penalty of periury under the laws of the Stale of California at the abo ue
PrintName:@
Phone Number: 7tq -115' F1o\
Email Address: \6:.\u^r-a \ ,.c.L 77 @ c "^^.\
', Lau-
t-
J J
Rev: 11/19/2015
1.