Loading...
HomeMy WebLinkAbout10194352 - Permitcity of Santa Ana 20 Civic Center Plaza (M-19), Santa Ana, CA 92702 Building Permit Counter: (714) 647-5800 lnspection Requests: (714\ 667 -2738 lnspector Section: (714) 647-5853 Permit #: 1lJ194352 Pin #: 25727 Project Address: 2510 W Chandler Ave Assessofs Parcel: 112-292-13 Lot: 88 U nit Bldg: Address Range Suite Range: Zoning: RlBlock NA Tract: 8346 Hisloric: No Building Use: Job Type: Nature of Work: Existing Bldg. & Use Proposed Use: Single Family Dwelling Solar Solar SFD w/att garag€ R.3, U VB cBc 201 6 x-0602320259J Patio: T.l.Area: Yards Req'd: Valuataon:$ 14,500.00 Description of Work: lnstall solar panels Planning Conditions: Owneri Address: Phone: Tenant: Thuy Cong 25'10 W Chandler Ave Santa Ana, CA 927046041 (714) 910-4803 Contractor: South Weat Sun Solar, lnc. Address: 13752 Harbor Blvd Garden Grove, CA 92843 Phone: (714) 582-3909 State Lic #: 1004667 Lic Type: C-10 Bus. Lic #: 350754 Workers' Compensalion lnsurance: Carrier: COMMERCE & INDUSTRY INSURA Policy #: 03357i255 Expires: 06/01/2018 Engineer Address: Phone: License # Architect / Desiqner: Address: Phone: License #: Planning Approval By: Plan Checked By: Permit lssued By: NPDES lnsp. Req'd: PWA lnsp. Req'd: Planning lnsp. Req'd: Landscaping lnsp. Req'd Misc. Receipt Misc. Receipt lvlisc. Receapt $500.00 $1.00 $0.00 07776002 5160, Permit Fee 07776002 57672 Bldq. Stds. Revolving 07776002 57600 Gene.al Plan Update \tt\ aernanoez, xatry No No No No Fire lnsp. Req'd: Police lnsp. Req'd ffi Account#Total Flood Zone Cert. Req'd: No 01116002 51601 Every pefinit issued shall become invalid unless the work o,l the site authotized by such permit is commanced wilhin 180 days after its issuance,ot if the wo* aulhoi|ed on lhe site by such pemil is susponded ot abandoned fot a peiod of180 days after the lifie the wod< is commehced. $501.00 $0.00 $501 .00 lnspector MID#: 2017-139068 011 16002 51612 $s00.00 $1.00 Fee Total: Paid to Dale: Balance Due OY Occupancy: Constr Type: Coder Flood Zone: # of Stories: 1st FL Area: 2nd FL Area: Other Areas: Garage Area Total: Date; Date: Date 1O|OZ2O17 Subjecl to Field: BUILDING- INSPECTOR RECORD SITE.WORK DATE ID/SIG.COMMENTS OWNER BUII,DIJR DEI-('ARA toN I h(.t'y rtlim u.dd ,6aly .l p.rjury thlt I m .r.mpl fiom lh. (n.t@loE l,icdE li{ nnth.foll.triry,R$n(S(70rl5 lltrlind and PtulBion Cdi.) Any Cny or Cou.n) u'hich lcquir6 . p6nii ln cotrrnrci. !hs, iol'ovc ddnolish .r rq$tuy rlruc'u( Fin ro ns isuM.c. llso ..rtun6 rhc ,pplrdl to, ruch Fro( ro fl. ! rrn d rld.|mr rh, lt or 3h. ir li.G.d aE& r io lhi FovilnJN ofllE Conlra.loar Lrc.$.d hs (( h.pr6 9, (orm6(inB w h Sdlrcn ?u)0 of l)niu'n I oIlhrBu.inslnd P(f*FB C({j.) or lhrl lEor rh. sctmpr lhs.liom md rh. h6n 6. rh. llk*aj.rmpiio. A.r rnrhlo.ofs.(nn 70 15h\lny rmli..d for r Fhii subJcr. ih. arplics[o ! ov il p.Elt! o I nd mr. rhd 6r. hund'.J AlllJr (15tu1 l. a dxG of ltt FoFry..r my ddolc \ ilt *!a6 6lh.ir $L onFErion, qdl6 llE rqi d rlE !r*rc. dr iddrd.d d ofir.n for $k (sc 70.1-1, BGi6 ed PirtBioB Co<l. TIE Condrft r l.r.c ti* &,6 mi +pl! '. m o$ffi ol th. FopaD * ho hrJd tr i,rgoc ilEaa rd *lF &6 *$ w* him*lf or lExlt or rfimu*fi h'r m hc .nr mrklld- Forid.d lh.t rxt inpmrffi e d ndrkl d olid.d tu nrr l( lN$sq. rlE h llB m rp(^-_.trd i! $B ri'hin m 16 ol ongkioo ilE O*a BuilCa ril hn rh. hrbr orFori,E lhi lE 6 !n. dn r{ h]ild 6 lr!.Drc rh. FFr li{ F F,pocoa l. a oqF oallE FoF y. M.rclBir.ly .ofrf rU tr rh lr.rB.d.odr-B r. odtud rlE Fnl.d (S< r(}r.l. ttliB .rrd PrDisinC6dc Th. Co.rr..rols Lk@ tr$ &,6 mr lrplt ro xotr.q ofFoFn) *ho huldt or mrrcrdihq<tn. tud \ho ond! for .h p.oj.di $ht. Codddlr,la.c.d p(l!d u rh. cndkc r l-kcB Ls ) I n.r.m undd Sa'ion D.r. O'rd Mli}:85:(!Uf[l-S,t-u()r DfcraErlr!.ll I hd.h\ !mm undr lHahr otlElur) on. olrh. hllNr 'nr d(l.r.rtrrns I n$. ei will rointri, a cdifica. oaco.sr r. s.lf l.iur. for q orkns' comlt,runrn, ii F,\ !d.d f.t he sdion 17(r0 . f rh. l,tn (-o.1.. for rh. Faotruc. o f th. *orl for $nich th. p6n 6 Esld lt I h!\. and rill nainl.in sork6 comp.netion imurrnc.. a r.quEn br sdt tun r70(r o I rh. Lhor ( id., ntr rh. pcfomanc. or lhr $ ort for rhich lhs Fnil is is.d My sorta mmpaslion i.s!fum. .Mid .Dd rFl(y numtd d.: iTU P.ti,rN"-t*,, f\2.+ < 7- [2O L r,rrn6 C'r- l& I c.nilr rhal in lhc pshrtunc. ofthcxork for qhich lht p..mil is it!u.d. I sh.ll.ol dDloy !.y F:otr rn ny mm.d yr N k' lEcom. subjer to th. *ort6' conFMion Lrs olcrlrl6m,i. nd ,{€ ihd ia l lh.uld t-om. robjd tu th. \ 0116' conFlel ion pmvbioN of S.(ion 1700 of th. ljthr ( o!.. I tlsll, f.nh$ ilh 6ndy rvirh tbr F,vitioNIV RNING FiiluE 16 s@ *6116' .onpq6d ion co\dqr. n unbwful. &d !h!ll luhld e opk'F r. (mm.l tEst'6 dd (nil find up ro on. hu.drcd rh.@nd dollc (tlOO.000). h .ddirio, ro rh. co3r oI cohFaerion. d!m+6 prorid.n nn rh. Sclirn :1076 ofrh. ti.r Cod.. ini.d.nd dbffi 3 fGa i - """-j--"';Dr,., l'l z l r't ^"",,-.,, l, +-\'' Llct'iEEp aoNr &ra?oR DfCr \i.^ r roN I hd.t ) a,rrn u<Lr rqEllyoIp6jur}lhi I M lic.6.d undd F!\ ihn of (trqr6 e (c.nlffi'n8 silh sdno 7(x[l orl)rn'o. I or rh. E6ind lrd PmfdioB Cod., rn my lr.tr 6 n! tull lor.. l.rTdi /' -l ^,l(ms.rtis L Lol l0 oVot T lalzltT T calslal.(fiaNrE8Drdc-acElra I lE.b! .rm u.&r FMh, of Fiury rht rlE n. slgto.ri,n lddig rsn' Lrrh.FLl1rte. ofrh.*. forrnrh'h6Fni 6rs.dtsc !0e7.( 'f c) APPLI('A'\ DE('LAIIA'I'I(TN I hd*, arm u.d6 p.n.hy ol pcrjury- on ofrh. foll.$mr dc(l&didn l).ftohion Pm.irs-Alb.ios Nolifi..rio. F.ddal R.suli ioN (Titlc t0. rrn6l R.qun.d tnrd of Ndifi.nion I .d ify rhar rhc Ld6al rcgulalioN rcssdins Bbcslos rano\ al ar. nor .pl'lrc0blc r' this lford I(drl!rhdlh.\ereadrIhitflicdrlonM (d.rlmr rhcah\r inntrtr'arkr ar.nNr lr!lrt,(otr,lnr\ l'ill(lrva d(\nn! irr tud (ifunrt!. mtrr trFnrh. ro [z1t o in.rc6 nd Sl.lc rlas Elar ing ro hiilding codtuclo( dd_hscby lurhorizt r.F.sr v6ofrhn(' rh\r nrm(tr,n d propdJ lo, tupa",on !r,Eo6----> / A,pr(rn, or Ard, srrnr,u* l.-' -4-' 1 .o,.' .'; I t / Pmr,( ,.n. rprrno: l//?* L llt Forms/Steel/Holdowns Erection Pads UFER Ground SLAB Floor Subf Ioor/VenUlnsulation Roof Sheathin s Shear Wall Framing lnsulation/Energy Drywall Ext./lnt. Lath Brown Coat Masonry Pool Fence T-Bar Handica Re Deputy Final Report Engineer Flnal Report Flood Zone Certif . FINAL /tlr(hl)Nn @.n 5A Certificate of Occu pancy Remarks, Etc. Set Backs I I I Notes, *,,SANTA NA-Iffi, Plannlng & Bullding Agency Buildlng Srloty Divislon 20 Clvlc Cont€r Plsza P.O. Box 1988 (M-19) Sant. Ana, CA 92702 (71'l) 647-s800 www.santa.ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST sol-01 csc 2013 Solar Photovoltalc (PV) Checklist for Detached STNGLE FAMtLy RESTDENCES Onty lnslructlons: Ths licensed contractor of record shall complete all soctions, answer the ten queslions and sign the certification seclion below. A copy of this form shall b6 attachod to 6ach of TWO sets of plans, of minimum 11" x 17" size. lf answerlnq NO to anv of the ouestions. ol an check shall be required. Project Address 2510 W. CHANDLER AVE, SANTA ANA, CA 92704 conlractor company tlame: SOUTHWEST SUN SOLAR, INC contractorLlcenseNumber: 1004667 YES NO tr tr Etr g. tstr Rov:8/1712015 4 5 2 3 6 7 I Etr Ettr atr Ero atr atr Are the followlng applicable to the proposed project? Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the Califomia Fire Code, and is this shown on the rool plan? Will the PV system be installed on a roof having only one roofing layer with no overlays? Will the PV anay b€ flush mount€d to the existing roof so that th€ ptane of the modules (panels) are parallel to the plane of the roon Will the PV system weigh maximum 4 pounds per square feel or less? Will the PV system be installed where the modulos do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will the PV system be installed with a space of 2" minimum to 10" maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weight system? Will the anchors be installed with a maximum horizonlal anchor spacing of 6 feet and is lhis maximum horizontal spacing shown on the plans? Will the minimum 5/16'lag screws bo installed with a minlmum of 2-112 inch embedment into roof rafters (with pre-drillsd holes) and is this minimum embedment shown on the plans? Are ALL the structural pages of the plans WET stamped and signed by a California10Etr licensed professional engineer? (including project specific site plan,layout, anchorage spacing, anchorage details and manufaclure/s PV su rt information.) I cerlify under penalty of perjury under the laws of the State of Californi that e above is true Print Name. TRANG CONG PHAM phone Number: 714 582 3909 Signature Date: Emait Address: PERMIT@SOUTHWESTSUNSOTAR.COM I iac- t L L,;i5inc I ce rtc:. t€, F ata qass arr€; r : E:, 1gEE IM.'19) S;rr? Aii. Ct 927C2 ltr1r 6.;.5600 /..ler rr, IiJldat,il This do.u|:reni ilcy be lound c1... (please use z bleci ct blue ink ball-poinl pen) Projecl Adcress /- lo contractor: l5 o, Stu uJ clo^lltr fvL ( Permii ltiumber c|\\5L zo t (\j 01 Fropeny Owner [., ^r{Jl J_,. 5b ,tyz'License #:looYr( State of Caliiornra requires that smoke and carbon monoxide (CO)aLarms are rrslalled in residential b u ild ing s. California R€sidentialCode (CRC) Section R314.1and R315.2 states in part that existing dwellings be "retrofitted wrth smoke alarms and carbon monoxide alarms. CRC Secrion R314 3 and R315 3 define the r€quired locations. f,\ eotn bor., below must be checked: I Crrbon monoride alarms: Are installed outside of each sleep,n5 area in the rnmediate vrcrnrty of bedrooms anC also on each levelof the dwelling. Alarms are recorr,rnended rn bedrooms with gas-fired appliances (i.e. hot water heater, cooktop. furnace)or a fireplace. I S-ot e alarms: Are installed in each room used for sleepinB, rn each hallway outside of a sleeping room, and on each level of the dwelling. Retrofitted detectors may be batlery-operated for buildings where no interior alterations are perlormed Combinatlon 5moke/CO alarms must comply with all applicable standards and b€ approved by the State Fire Marshall (5FM) Battery life must be 10 years I hereby certify thal lam the contractor or the propeny owner of the above proJect. lfunher certify that smoke alarms and carbon monoxide alarms have been insta!led in rompliance with the governing Codes ard have been tesled to be Signoture Dote lcheck onel a Licensed Contractor tr Pr o perty Ow ner NOit: ihis seu-c e rt iticotia n is only used lor proiects thot ollect the EXTERIOq al the structute. This pracess is opplicoble ONLY lc ptojetts whete occess to the intetia, ol the dwelling by a Sonla Ano lnspectot is nol t equired. IU i) Hey€ this cor--,pl€ied torm and the job-card readily evai;able on final inspecticnl J 15 b] *,,SANTA NA-"ffi Planning & Bullding Agenqy Building Safoty Divlston 20 Clvic Centor Plaza P.O. Box 1988 (M.19) Santa Ana, CA 92702 (714) 647.s800 www.santa.ana.org RESIDENTIAL PHOTOVOLTAIC CHECKLIST sol-01 cBc 2013 Solar Pholovoltaic (PV) Checklist for Detached SINGLE FAMtLy RESIDENCES Onty lnstructions: ThB licensed contractor of record shall co mplete all seclions, answer the ten questions andsign the certification section below. A copy of this form shall be attachsd to aach of TWO sets of plans, ofminimum 1'1" x'l7" size. lf answe rinq NO to anv of th e ouestions. o lan check shall be required. Proiecr Address: 2510 W. CHANDLER AVE, SANTA ANA, CA92704 Conlractor Company Name: Contractor License Number: SOUTHWEST SUN SOLAR, INC 1004667 YES NO Are the following applicable to the proposed prolect? Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.1 'l of the Califomia Fire Code, and is this shown on the roof ptan? Will the PV system be installod on a roof having only one rooling layer with no overlays? Will the PV anay be flush mounted to the existing roof so thal the ptane of the modules (panels) are para el to the plane of th6 roof? Will the PV system weigh maximum 4 pounds per square feet or less? Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? Will lhe PV system be installed with a space of 2" minimum to .10,. maximum between the underside of modules and the surface of the roof? Will the PV system be installed without using any ballast system or counter-weight sYStem? Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? Wll the minimum 5/16" lag screws be installed with a minimum ol 2-1lZ inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on lhe plans? Are ALL the structural pages of the plans WET stamped and signed by a California licensed professjonal engineer? (including project specific site plan, pV layout, anchorage spacing, anchorage details and manufacturer,s pV support inf;rmation.) m tr 2 atr EItr Ertratr Btr Eltr 3 4 6 7 Etr I Etr 1O EE I certify under penalty of perjury under th€ taws o, the State of Cal Print Name: TRANG CONG PHAM phone Number: 714 582 3309 Signature Date: Emair Address: PERMIT@SOUTHWESTSUNSOLAR.COM Rev:8h712015 th above is true: