Loading...
HomeMy WebLinkAbout1329 W McFadden Unit #2 - Plan Ha Dong Le lethidongha@yahoo.com 714-251-2000 11/17/2025 I, Ha Dong Le, hereby give my authorization to High Line Designs, and its agents: Scott Toyama Cole Thacker Anisa Ayu on my behalf to pick up and/or pay for any applicable fees for building permits for projects at the following addresses, 1329 W McFadden Ave, 1621 S Diamond St, I ensure my full consent for this authorization. ___________________________________________ [Signature] Ha Dong Le lethidongha@yahoo.com 714-251-2000 11/17/2025 I, Ha Dong Le, hereby give my authorization to High Line Designs, and its agents: Scott Toyama Cole Thacker Anisa Ayu on my behalf to pick up and/or pay for any applicable fees for building permits, and to install for projects at the following addresses, 1329 W McFadden Ave, 1621 S Diamond St, I ensure my full consent for this authorization. ___________________________________________ [Signature] Ha Dong Le (Nov 17, 2025 16:34:54 PST) Ha Dong Le Copy of HLD Authorization Form .docx Final Audit Report 2025-11-18 Created:2025-11-17 By:Cole Thacker (permits@highline-designs.com) Status:Signed Transaction ID:CBJCHBCAABAAmw4sTjBMTagpj0I7aWJyxsBuHvqSuc3u "Copy of HLD Authorization Form .docx" History Document created by Cole Thacker (permits@highline-designs.com) 2025-11-17 - 11:56:47 PM GMT Document emailed to Ha Dong Le (lethidongha@yahoo.com) for signature 2025-11-17 - 11:56:50 PM GMT Email viewed by Ha Dong Le (lethidongha@yahoo.com) 2025-11-18 - 0:33:49 AM GMT Document e-signed by Ha Dong Le (lethidongha@yahoo.com) Signature Date: 2025-11-18 - 0:34:54 AM GMT - Time Source: server Agreement completed. 2025-11-18 - 0:34:54 AM GMT Attn.: To Whom It May Concern re job:MCFADDEN ADU 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 Design Criteria: Code:2022 CBC ASCE 7-16 Live Load:20 psf Ult Wind Speed:95 mph Exposure Cat:B Ground Snow:0 psf Min Roof Snow:NA AHZ Consulting Engineers Inc. Professional Engineer projects@ahzengineers.com 11/17/2025 The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I certify that the roof structure has sufficient structural capacity for the applied PV loads. All mounting equipment shall be designed and installed per manufacturer's approved installation specifications. www.ahzengineers.com Date :11/17/2025 Job Code: MCFADDEN ADU 2 of 6 Roof Properties: Roof Type = Roof Pitch (deg) = Mean Roof Height (ft) = Attachment Trib Width (ft) = Attachment Spacing (ft) = Framing Type = Framing Size = Framing OC Spacing (in.) = Section Thickness, b (in.) = Section Depth, d (in.) = Section Modulus, Sx (in.^3) = Moment of Inertia, Ix (in.^4) = Framing Span (ft) = Deflection Limit D+L (in.) = Deflection Limit S or W (in.) = Attachments Pattern = Framing Upgrade = Sister Size = Wood Species = Wood Fb (psi) = Wood Fv (psi) = Wood E (psi) = CD (Wind) = CD (Snow) = CLS = CM = Ct = CL = Ci = CF = Cfu = Cr = F'b_wind (psi) = F'b_snow (psi) = F'v_wind (psi) = F'v_snow (psi) = M_allowable_wind (lb-ft) = M_allowable_snow (lb-ft) = V_allowable_wind (lbs) = V_allowable_snow (lbs) =1139 1139 1121 1121 1584 1584 207 207 1560 1560 1779 1779 288 288 1.15 1.15 2476 2476 1.3 1.3 1.00 1.00 1.15 1.15 1.0 1.0 1.6 1.6 1.15 1.15 180 180 1600000 1600000 DF #2 DF #2 900 900 Adequate Adequate NA NA 0.93 0.93 Fully Staggered Fully Staggered 7 7 1.4 1.4 7.6 7.6 20.8 20.8 1.5 1.5 5.5 5.5 2x6 2x6 16 16 5.33 5.33 Rafter Rafter 23 23 2.75 2.75 Shingle Shingle 18 18 Roof 1 Roof 2 www.ahzengineers.com Date :11/17/2025 Job Code: MCFADDEN ADU 3 of 6 E' (psi) = Load Calculation: Panels Dead Load (psf) = Roofing Weight (psf) = Decking Weight (psf) = Framing Weight (psf) = Misc. Additional Weight (psf) = Existing Dead Load (psf) = Total Dead Load (psf) = Ultimate Wind Speed (mph) = Directionality Factor, kd = Topographic Factor, kzt = Velocity Press Exp Factor, kz = Ground Elevation Factor, ke = Velocity Pressure, qz (psf) = Array Edge Factor, γE = Solar Equalization Factor, γa = External Pressure Up, GCp_1 = External Pressure Up, GCp_2 = External Pressure Up, GCp_3 = External Pressure Down, GCp = Design Pressure Up, p_1 (psf) = Design Pressure Up, p_2 (psf) = Design Pressure Up, p_3 (psf) = Design Pressure Down, p (psf) = Hardware Checks: Ref. Widthrawal Value, W (lb/in) = (CM = Ct = Ceg = 1.0) CD = Adjusted Widthrawal Value, W' (lb/in) = Lag Penetration, p (in.) = 426 426 2.5 2.5 266 266 1.6 1.6 Lag Screw Checks: Roof 1 Roof 2 16.0 16.0 -28.8 -28.8 -34.4 -34.4 0.6 0.6 -22.2 -22.2 -2.6 -2.6 -3.1 -3.1 1.25 0.64 0.64 -2 -2 0.70 0.70 1.00 13.8 13.8 95 0.85 1.0 Roof 1 Roof 2 Wind Load Calculations: 7.4 7.4 10.1 10.1 1.4 1.4 1.0 1.0 3.0 3.0 2.0 2.0 Dead Load Calculations: 2.7 Roof 1 Roof 2 1600000 1600000 www.ahzengineers.com Date :11/17/2025 Job Code: MCFADDEN ADU 4 of 6 Allowable Widthrawal Force, W'p (lbs) = Applied Uplift Force (lbs) = Uplift DCR = Ref. Lateral Value, Z (lbs) = (CM = Ct = CΔ = Ceg = 1.0) CD = Adjusted Lateral Value, Z' (lbs) = Applied Laeral Force (lbs) = Angle of Resultant Force, α (deg) = Adjusted Interaction Lateral Value, Z'α (lbs) = Lateral DCR = Roof Framing Checks: LC1: D+S Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC2: D+0.6W Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC3: D+0.75(S+0.6W) Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = Moment DCR = Shear DCR = LC4: 0.6D+0.6W Applied Moment (lb-ft) = Applied Shear (lbs) = Allowable Moment (lb-ft) = Allowable Shear (lbs) = 1560 1560 1584 1584 59 59 34 34 0.09 0.09 0.05 0.05 1560 1560 1584 1584 141 141 81 81 0.10 0.10 0.06 0.06 1560 1560 1584 1584 161 161 92 92 0.07 0.07 0.04 0.04 1121 1121 1139 1139 47 47 Force Checks: Roof 1 Roof 2 83 83 1052 1052 0.01 0.01 12 12 87 87 0.9 0.9 243 243 0.20 0.20 270 270 1064 1064 -211 -211 www.ahzengineers.com Date :11/17/2025 Job Code: MCFADDEN ADU 5 of 6 Moment DCR = Shear DCR = LC1: D+L Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC2: S Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC3: W (Down) Deflection (in.) = Deflection Limit (in.) = Deflection DCR = LC4: W (Up) Deflection (in.) = Deflection Limit (in.) = Deflection DCR = Seismic Check: Wall Weight (psf) = Tributary Wall Area (ft2) = Total Wall Weight (lbs) = Roof Weight (psf) = Roof Area (ft2) = Total Roof Weight (lbs) = Total Existing Weight (lbs) = PV Panel Weight (lbs) = Number of Panels = Total Additional PV Weight (lbs) = (Existing W + Additional W)/(Existing W) =1.01 Additional PV Weight: 49 8 392 Weight Increase: 2100 35700 7 1200 8902 44602 0.02 0.02 Existing Weight: 17 -0.02 -0.02 1.07 1.07 1.07 1.07 0.01 0.01 0.00 0.00 0.01 0.01 0.00 0.00 1.07 1.07 1.61 1.61 0.02 0.02 Deflection Checks (Service Level): Roof 1 Roof 2 0.03 0.03 0.04 0.04 0.02 0.02 www.ahzengineers.com Date :11/17/2025 Job Code: MCFADDEN ADU 6 of 6 The increase in weight as a result of the solar system is less than 10% of the existing structure and therefore no further seismic analysis is required. Limits of Scope of Work and Liability: Existing structure is assumed to have been designed and constructed following appropriate codes at time of erection, and assumed to have appropriate permits. The calculations produced are only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were completed according to generally recognized structural analysis standards and procedures, professional engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or were not observable during time of inspection are not included in this scope of work. All PV modules, racking, and mounting equipment shall be designed and installed per manufacturer's approved installation specifications. The Engineer of Record and the engineering consulting firm assume no responsibility for misuse or improper installation. This analysis is not stamped for water leakage. Framing was determined based on information in provided plans and/or photos, along with engineering judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any concerns prior to starting construction. www.ahzengineers.com 62' 94 ' 11 9 ' 36' 40' 4' 5' 11' 25 ' 3' 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-1 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA STARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 HUY THIEU NGUYEN C10 #833971 1/16" = 1'-0" COVER SHEET SITE PLAN ·(08) LONGI LR5-54HPB-400M MODULES ·(08) TIGO TS4-A-F RAPID SHUTDOWN ·(01) GROWATT MIN 6000TL-XH-US (240V) INVERTER ·(01) NON-FUSED AC DISCONNECT ALL WORK TO COMPLY WITH: ·2022 CALIFORNIA ELECTRICAL CODE ·2022 CALIFORNIA RESIDENTIAL CODE ·2022 CALIFORNIA FIRE CODE ·2022 CALIFORNIA BUILDING CODE TABLE OF CONTENTS PV-1 COVER SHEET PV-2 ROOF PLAN & MODULES PV-2A STRINGING PAGE PV-3+ ATTACHMENT DETAILS PV-4 SINGLE-LINE DIAGRAM PV-4A ELECTRICAL CALCULATIONS PV-5 LABELS & PLACARD PV-6+ EQUIPMENT DATASHEETS SITE DETAILS ASHRAE MIN TEMP ASHRAE 2% HIGH TEMP BUILDING OCCUPANCY TYPE OF CONSTRUCTION SPRINKLERS SYSTEM PER NFPA 13D # OF STORIES WIND SPEED (ASCE 7-16) WIND EXPOSURE RISK CATEGORY GROUND SNOW LOAD SQUARE FOOTAGE UTILITY 2°C 31°C R-3 V-B NO 1 95 MPH B II 0 PSF 1500 SQ FT SCE VICINITY MAP GOVERNING CODES TOTAL PV SIZE: 3.200 KW DC, 2.902 KW CEC AC SCOPE OF WORK INSTALL A ROOF-MOUNTED PV SYSTEM: GENERAL NOTES ·ALL WORK SHALL CONFORM TO APPLICABLE BUILDING, ELECTRICAL CODE AND ANY LOCALLY ADOPTED ORDINANCES. ·DRAWINGS ARE DIAGRAMMATIC, SITE CONDITIONS SHALL PREVAIL. IF NO SCALE IS GIVEN, DRAWINGS ARE NOT TO SCALE. ALL DIMENSIONS SHALL BE VERIFIED BY THE CONTRACTOR IN THE FIELD UPON COMMENCEMENT OF CONSTRUCTION. ·ALL CONDUIT AND WIRE RUNS ARE DIAGRAMMATIC, SUBJECT TO FIELD CONDITIONS ROUTING OF RACEWAYS SHALL BE FINALIZED BY THE CONTRACTOR. IF THE DISTANCES FOR WIRE RUNS ARE DIFFERENT THAN AS SHOWN, THE CONTRACTOR SHALL NOTIFY THE DESIGN TEAM TO VALIDATE THE WIRE SIZE. ·ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED TESTING LABORATORY AND INSTALLED PER THE LISTING AND MANUFACTURER'S REQUIREMENTS. ·ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH REQUIRED ACCESS AND WORKING CLEARANCES PER CEC ARTICLE 110. ·ALL NEW MAIN SERVICE PANELS AND SUBPANELS WILL HAVE APPROPRIATE FIELD IDENTIFICATION PER CEC 408.4. ·ALL EQUIPMENT WILL BE INSTALLED WHERE IT IS NOT EXPOSED TO PHYSICAL DAMAGE PER CEC 110.27(B) W MCFADDEN AVE GR A H A M L N FRONT OF HOUSE PROPERTY LINE 18" FIRE SETBACK 18" FIRE SETBACK 18 " F I R E S E T B A C K 18 " F I R E S E T B A C K 16 ' - 3 " 11 ' - 2 " 6' - 5 " 8' - 9 " 18 ' - 8 " 6' - 5 " 3"1'-6"1'-6"3" JB 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-2 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 1/8" = 1'-0" ROOF PLAN & MODULES PV ROOF COVERAGE (E) PV AREA [SQ FT] (N) PV AREA [SQ FT] TOTAL PV AREA [SQ FT] TOTAL ROOF AREA [SQ FT] PERCENTAGE COVERED BY PV 0 155.77 155.77 2471.52 6% ROOF DESCRIPTION ROOF ROOF TILT AZIMUTH ROOF MATERIAL RAFTER SIZE RAFTER SPACING MAX RAFTER SPAN #1 18° 90°COMP SHINGLE 2" X 6"16" O.C. 7'-0" #2 18° 270°COMP SHINGLE 2" X 6"16" O.C. 7'-0" LEGEND JB - JUNCTION BOX - RAFTER OR TRUSS - ROOF OBSTRUCTION - ROOF ATTACHMENT - 36" FIRE SETBACKS / PATHWAYS - ACCESS POINTX W MCFADDEN AVE (08) LONGI LR5-54HPB-400M MODULES WITH (08)TIGO TS4-A-F RAPID SHUTDOWN (16) IRONRIDGE FLASHFOOT 2 ATTACHMENTS WITH MAX 64" O.C. SPAN (N) EMT CONDUIT ROOF #1 (E) MAIN SERVICE PANEL (RAPID SHUTDOWN INITIATION DEVICE) (E) UTILITY METER (N) GROWATT MIN 6000TL-XH-US INVERTER (INTEGRATED DC DISCONNECT) X X (N) NON-FUSED AC DISCONNECT GR A H A M L N ROOF #2 (N) IRONRIDGE XR10 RAIL STARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1. PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL VERIFY THE FRAMING SIZES, SPACINGS, AND SPANS NOTED IN THE STAMPED PLANS AND ACCOMPANYING CALCULATIONS AND NOTIFY THE ENGINEER OF RECORD OF ANY DISCREPANCIES PRIOR TO STARTING CONSTRUCTION. 2. THESE PLANS ARE STAMPED FOR STRUCTURAL CODE COMPLIANCE OF THE ROOF FRAMING SUPPORTING THE PROPOSED PV INSTALLATION REFERENCED ONLY. THESE PLANS ARE NOT STAMPED FOR WATER LEAKAGE. PV MODULES, RACKING, AND ATTACHMENT COMPONENTS MUST FOLLOW MANUFACTURER GUIDELINES AND REQUIREMENTS. 3. PLEASE SEE THE ACCOMPANYING STRUCTURAL CALCULATIONS REPORT FOR DETAILS REGARDING CALCULATIONS AS WELL AS LIMITS OF SCOPE OF WORK AND LIABILITY. JB 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-2A DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 1/8" = 1'-0" STRINGING PAGE W MCFADDEN AVE GR A H A M L N A A B B STARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 PV MODULE (E) COMP SHINGLE IRONRIDGE FLASHFOOT 2 IRONRIDGE XR 10 RAIL (E) COMP SHINGLE IRONRIDGE XR 10 RAIL PV MODULE 5/16"X3" 304 STAINLESS STEEL COMPRESSION WASHER BLACK 4 3/4" X 5/16" WITH 2.5" MIN LAG SCREW EMBEDMENT SEE BELOW FOR ENLARGED VIEW IRONRIDGE FLASHFOOT 2 MID/END CLAMP 6" MAX 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-3 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 ATTACHMENT DETAILS NTSSTARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 (N) JBOX, NEMA 3R (N) GROWATT MIN 6000TL-XH-US INVERTER, WITH INTEGRATED LOCKABLE DISCONNET, (240V) [SI1-SB] 4 (N) 08 - LONGI LR5-54HPB-400M MODULES STRING A: 05 MODULES STRING B: 03 MODULES (N) 08 - TIGO TS4-A-F RAPID SHUTDOWN 05 1 2 (N) NON-FUSED AC DISCONNECT, SQUARE D DU222RB 60A, 240V, NEMA 3R 3 (E) MAIN BREAKER 100A 100A/2P M UTILITY METER #---- 1Ø, 3W, 240V100A/2P M UTILITY (E) MAIN SERVICE PANEL, 200A, 240V, NEMA 3R 705.12(B)(3)(2) (E) GROUND ROD (E) ADU SUBPANEL, 125A, 240V, NEMA 3R 705.12(B)(3)(3) 40A/2P (E) HOUSE SUBPANEL, 125A, 240V, NEMA 3R 705.12(B)(3)(3) E E 03 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-4 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 SINGLE-LINE DIAGRAM NTS THE MAIN BREAKER IN THE MAIN SERVICE PANEL WILL INITIATE RAPID SHUTDOWN AND MEET THE REQUIREMENTS OUTLINED IN CEC 690.12. THE PV BREAKER(S) LAND IN A PANEL THAT MEETS THE PV DISCONNECT REQUIREMENTS OUTLINED IN CEC 690.13. THIS PANEL IS READILY ACCESSIBLE, AND THE PANEL ENCLOSURE IS LOCKABLE. THE SOLAR MODULE CONNECTORS MEET THE ISOLATING DEVICE REQUIREMENTS OUTLINED IN CEC 690.15 AND 690.33. *CODE COMPLIANT WIRE/CONDUIT SUBSITUTIONS MAY BE MADE TO THE ABOVE TABLE. *SEE THE NEXT PAGE FOR ELECTRICAL CALCULATIONS AND ADDITIONAL ELECTRICAL NOTES. ID UNGROUNDED CONDUCTORS NEUTRAL CONDUCTOR EQUIPMENT GND CONDUCTOR CONDUIT 1 (2) 10 AWG, PV WIRE, CU N/A (1) 6 AWG, SOLID BARE, CU FREE AIR 2 (4) 10 AWG, THWN-2, CU N/A (1) 10 AWG, THWN-2, CU 0.75" EMT 3 (2) 8 AWG, THWN-2, CU (1) 8 AWG, THWN-2, CU (1) 10 AWG, THWN-2, CU 0.75" EMT 4 (2) 8 AWG, THWN-2, CU (1) 8 AWG, THWN-2, CU (1) 10 AWG, THWN-2, CU 0.75" EMT STARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-4A DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 ELECTRICAL CALCULATIONS NTS INVERTER OUTPUT CALCULATIONS & 705.12 COMPLIANCE ELECTRICAL NOTES (APPLICABILITY BASED ON SCOPE OF WORK) ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH NEC ARTICLE 250. A SUPPLEMENTAL GROUND ROD WILL BE DRIVEN IN ACCORDANCE WITH CEC 250.53(A)(3) IF THE EXISTING GROUND ROD HAS A RESISTANCE TO EARTH THAT IS GREATER THAN 25 OHMS. IF ANY EXISTING LOAD CONDUCTORS ARE EXTENDED BY MORE THAN 6', AFCI PROTECTION WILL BE PROVIDED PER CEC 210.12(D). PER CEC 690.47(A) PV SYSTEMS THAT ARE NOT SOLIDLY GROUNDED, THE EQUIPMENT GROUNDING CONDUCTOR FOR THE OUTPUT OF THE PV SYSTEMS SHALL BE PERMITTED TO BE THE CONNECTION TO GROUND FOR GROUND-FAULT PROTECTION AND EQUIPMENT GROUNDING OF THE PV ARRAY. THE ESS CIRCUIT BREAKER SHALL BE SECURED IN PLACE BY AN ADDITIONAL FASTENER PER CEC 408.36(D). NO SINGLE BACK-UP LOAD WILL BE LARGER THAN THE MAXIMUM CONTINUOUS OUTPUT OF THE ESS PER CEC 710.15(A). AS-BUILT CHANGES TO THE ABOVE WIRING ARE PERMISSIBLE AS LONG AS SUBSITUTIONS ARE CODE COMPLIANT. FOR EXAMPLE, APPROPRIATELY SIZED NM-B MAY BE USED FOR MICROINVERTER OUTPUT CIRCUITS IF INSTALLED IN ACCORDANCE WITH CEC ARTICLE 334, OR MC CABLE MAY BE USED FOR DC SOLAR STRINGS IF INSTALLED IN ACCORDANCE WITH CEC ARTICLE 330. ALL OUTDOOR EQUIPMENT SHALL BE RAINTIGHT & HOLD A MINIMUM NEMA 3R RATING, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND SWITCHES. CONDUCTORS EXPOSED TO WET CONDITIONS SHALL BE SUITABLE FOR USE IN WET CONDITIONS PER CEC 310.10(C). ALL TERMINAL TEMPERATURES OF EQUIPMENT WILL BE VERIFIED TO BE RATED FOR 75°C, OR THE WIRE WILL NEED TO BE RESIZED USING THE 60°C TERMINAL TEMPERATURE RATINGS FOR 100A OR LESS. ALL NM-B SHALL BE INSTALLED AND PROTECTED PER CEC 334, AND ALL SER CABLE SHALL BE INSTALLED AND PROTECTED PER CEC 338. ALL ROOFTOP RACEWAYS AND CABLES EXPOSED TO DIRECT SUNLIGHT WILL BE INSTALLED >7/8" ABOVE THE ROOF. x ID STARTING LOCATION FINAL LOCATION UNGROUNDED CONDUCTORS NEUTRAL CONDUCTOR EQUIPMENT GND CONDUCTOR CONTROL WIRE TERM. TEMP. # OF CCC ASHARE 2% HIGH TEMP.CCC ADJUSTMENT AMBIENT TEMP CORR.90°C RATING DERATED AMP. TERM. TEMP. RATING OCPD CONDUIT CONDUIT FILL LENGTH LOAD VOLTAGE VOLTAGE DROP 1 STRING JUNCTION BOX (2) 10 AWG, PV WIRE, CU N/A (1) 6 AWG, SOLID BARE, CU -- 75°C 2 31°C 30.0A N/A FREE AIR N/A 08FT 10.4A 86.2V 0.25% 2 JUNCTION BOX INVERTER (4) 10 AWG, THWN-2, CU N/A (1) 10 AWG, THWN-2, CU -- 75°C 4 31°C 35.0A N/A 0.75" EMT 19.09%44FT 10.4A 86.2V 1.37% 3 INVERTER NON-FUSED AC DISCONNECT (2) 8 AWG, THWN-2, CU (1) 8 AWG, THWN-2, CU (1) 10 AWG, THWN-2, CU -- 75°C 2 31°C 50.0A 40A 0.75" EMT 23.86% 5FT 25.0A 240V 0.08% 4 NON-FUSED AC DISCONNECT MAIN SERVICE PANEL (2) 8 AWG, THWN-2, CU (1) 8 AWG, THWN-2, CU (1) 10 AWG, THWN-2, CU -- 75°C 2 31°C 50.0A 40A 0.75" EMT 23.86% 5FT 25.0A 240V 0.08% x = x x = x 0.96 40.0Ax =0.8 N/AN/A N/A N/A 1 55.0A INVERTER OUTPUT CIRCUIT INVERTER OR ESS # OF INVERTERS / ESS CONTINUOUS OUTPUT 125% SAFETY FACTOR TOTAL BACKFEED MINIMUM BREAKER SIZE #1 GROWATT 6KW 1 25.00A 125% 31.25A 40A PANEL 705.12 COMPLIANCE BUSBAR OCPD PROTECTING PANEL BUSBAR X 120% MAX GENERATION BACKFEED MSP 705.12(B)(3)(2)200A 200A 240A 40A SUBPANEL 705.12(B)(3)(3)125A N/A N/A N/A 30.7A 52.8A x x =1 55.0A 0.96 0.96 52.8A STARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-5 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 LABELS & PLACARDS NTS -THE LABELS/PLACARD SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD. -ALL WARNING & HAZARD LABELS SHALL BE INSTALLED PER CEC 110.21(B). -IF THERE IS EXISTING PV OR ESS, LABELS FOR EXISTING PV SYSTEMS WILL BE TRANSFERRED OR REPLACED ON NEW EQUIPMENT. WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. LOCATED AT ANY PANEL THAT MEETS CEC 705.12(B)(3)(3) 9 WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE LOCATED AT POINT OF INTERCONNECTION. CEC 705.12(B)(3)(2) 1 WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION LOCATED AT PV DISCONNECT CEC 690.13(B) !3 5 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY SOLAR ELECTRIC PV PANELS LOCATED AT MAIN SERVICE DISCONNECT. CEC 690.56(C)(2) 4 RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM LOCATED AT MAIN SERVICE PANEL. CEC 690.56(C) 2 PHOTOVOLTAIC AC DISCONNECT MAXIMUM AC OPERATING CURRENT: LOCATED AT PV DISCONNECT. CEC 690.56(B), 609.54, 705.20 240V 25.0A NOMINAL OPERATING AC VOLTAGE: INSTALLED PER CEC 705.10 6 TWO POWER SOURCES SOURCES: UTILITY GRID & SOLAR WARNING!! 8 WARNING: PHOTOVOLTAIC POWER SOURCE LOCATED AT DC SOLAR CIRCUIT; CEC 690.31(D)(2) 7 PHOTOVOLTAIC SYSTEM DC DISCONNECT OPERATING VOLTAGE LOCATED AT PV DISCONNECT. CEC 690.56(B), 609.54, 705.20 OPERATING CURRENT MAX SYSTEM VOLTAGE SHORT CIRCUIT CURRENT 13.7A 229.9V 10.4A 295.2V CAUTION MULTIPLE SOURCES OF POWER WITH DISCONNECTS LOCATED AS SHOWN: LOCATED AT MAIN SERVICE PANEL. CEC 690.56(B), 690.4(D), 705.10 1329 W MCFADDEN AVE PV & MAIN SERVICE DISCONNECT (RAPID SHUTDOWN INITIATION DEVICE) INVERTER FRONT OF HOUSE PV MODULES STARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-6 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 EQUIPMENT DATASHEET NTSSTARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-7 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 EQUIPMENT DATASHEET NTSSTARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-8 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 EQUIPMENT DATASHEET NTSSTARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-9 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 EQUIPMENT DATASHEET NTSSTARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-10 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 EQUIPMENT DATASHEET NTSSTARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 1329 W MCFADDEN AVE UNIT 2 SANTA ANA, CA 92704 MCFADDEN ADU PV-11 DATE: 08/20/2025 REV A AHJ: APN: 10906429 SANTA ANA CITYSCALE: SHEET SIZE: 11" x 17" TEMPLATE V2.0 PREPARED BY: HIGH LINE DESIGNS SCOTT TOYAMA HUY THIEU NGUYEN C10 #833971 EQUIPMENT DATASHEET NTSSTARS CONSTRUCTION SERVICES INC 6022 WESTERN AVE BUENA PARK, CA 90621 714.262.3929 Expedited Permit Process for PV Systems 1 Expedited Permit Process for PV Systems Standard String System The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- cess provides a means to differentiate systems that can be permitted quickly and easily due to their similarity with the majority of small-scale PV systems. Those systems with unique characteristics may be handled with small additions to this Expedited Permit Process or may require much more information, depending on the uniqueness of the installation. The following pages contain forms for the Standard String System to use with the Expe- dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- tions that have adopted the Expedited Permit Process for PV Systems, these forms can be filled out electronically and submitted in either printed form and via email. An elec- tronic format is used so that the supplied information is standardized and legible for the local jurisdiction. Expedited Permit Process for PV Systems 2 Expedited Permit Process for Small-Scale PV Systems Standard String System The information in this guideline is intended to help local jurisdictions and contractors identify when PV system installations are simple, needing only a basic review, and when an installation is more complex. It is likely that 50%-75% of all residential systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been suggested to provide as a path to permit approval. Required Information for Permit: 1. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings with a 3’ perimeter space at ridge and sides may not need separate fire service review. 2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, required signs, and ac connection to building (see supplied standard electrical diagram). 3. Specification sheets and installation manuals (if available) for all manufactured components including, but not limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. Step 1: Structural Review of PV Array Mounting System Is the array to be mounted on a defined, permitted roof structure? l Yes l No If No due to non-compliant roof or a ground mount, submit completed worksheet for the structure WKS1. Roof Information: 1. Is the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc…)__________________________ ____________________________________________________________________________________________________ If No, submit completed worksheet for roof structure WKS1 (No = heavy masonry, slate, etc…). 2. Does the roof have a single roof covering? l Yes l No If No, submit completed worksheet for roof structure WKS1. 3. Provide method and type of weatherproofing roof penetrations (e.g. flashing, caulk).____________________________ Mounting System Information: 1. Is the mounting structure an engineered product designed to mount PV modules with no more than an 18” gap beneath the module frames? l Yes l No If No, provide details of structural attachment certified by a design professional. 2. For manufactured mounting systems, fill out information on the mounting system below: a. Mounting System Manufacturer ___________Product Name and Model#________________________________ b. Total Weight of PV Modules and Rails ___________lbs c. Total Number of Attachment Points____________ d. Weight per Attachment Point (b÷c)_________________lbs (if greater than 45 lbs, see WKS1) e. Maximum Spacing Between Attachment Points on a Rail ______________inches (see product manual for maximum spacing allowed based on maximum design wind speed) f. Total Surface Area of PV Modules (square feet)_________________ ft2 g. Distributed Weight of PV Module on Roof (b÷f)_______________ lbs/ft2 If distributed weight of the PV system is greater than 5 lbs/ft2, see WKS1. Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) In order for a PV system to be considered for an expedited permit process, the following must apply: 1. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. 2. The PV array is composed of 4 series strings or less per inverter. 3. The total inverter capacity has a continuous ac power output 13,440 Watts or less 4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). 5. One of the standard electrical diagrams (E1.1, E1.1a, E1.1b, or E1.1c) can be used to accurately represent the PV system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the applicant understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can effectively communicate, provide an alternative diagram with appropriate detail. E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 3 Standard String System Site Plan               E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 4 Standard String System Electrical Diagram                                                                                                            E x p e d i t e d P e r m i t P r o c e s s f o r P V S y s t e m s 5 Notes for Standard String System Electrical Diagram Contractor Name, Address and Phone: _________________ _________________ _________________ _________________ Notes for One-Line Standard Electrical Diagram for Single-Phase PV Systems Site Name: __________________________ Site Address: ________________________ System AC Size: ______________________ SIZE FSCM NO DWG NO REV SCALE NTS Date:SHEET Drawn By: Checked By: MAX POWER-POINT CURRENT (IMP) MAX POWER-POINT VOLTAGE (VMP) OPEN-CIRCUIT VOLTAGE (VOC) SHORT-CIRCUIT CURRENT (ISC) MAX SERIES FUSE (OCPD) MAXIMUM POWER (PMAX) MAX VOLTAGE (TYP 600VDC) VOC TEMP COEFF (mV/oC or %/oC ) IF COEFF SUPPLIED, CIRCLE UNITS A V V A A W V MODULE MAKE MODULE MODEL PV MODULE RATINGS @ STC (Guide Section 5) MAX DC VOLT RATING MAX POWER @ 40oC NOMINAL AC VOLTAGE MAX AC CURRENT MAX OCPD RATING V W V A A INVERTER MAKE INVERTER MODEL INVERTER RATINGS (Guide Section 4) 1) IF UTILITY REQUIRES A VISIBLE-BREAK SWITCH, DOES THIS SWITCH MEET THEREQUIREMENT? YES NO N/A 2) IF GENERATION METER REQUIRED, DOES THIS METER SOCKET MEET THEREQUIREMENT? YES NO N/A 3) SIZE PHOTOVOLTAIC POWER SOURCE (DC) CONDUCTORS BASED ON MAXCURRENT ON NEC 690.53 SIGN OR OCPD RATING AT DISCONNECT 4) SIZE INVERTER OUTPUT CIRCUIT (AC) CONDUCTORS ACCORDING TO INVERTEROCPD AMPERE RATING. (See Guide Section 9) 5) TOTAL OF ______ INVERTER OCPD(s), ONE FOR EACH INVERTER. DOES TOTALSUPPLY BREAKERS COMPLY WITH 120% BUSBAR EXCEPTION IN 690.64(B)(2)(a)?YES NO NOTES FOR INVERTER CIRCUITS (Guide Section 8 and 9): 1.) LOWEST EXPECT AMBIENT TEMPERATURE BASED ON ASHRAE MINIMUM MEANEXTREME DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TOINSTALLATION LOCATION. LOWEST EXPECTED AMBIENT TEMP ______oC 2.) HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED ON ASHRAE HIGHESTMONTH 2% DRY BULB TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TOINSTALLATION LOCATION. HIGHEST CONTINUOUS TEMPERATURE _____oC 2.) 2005 ASHRAE FUNDEMENTALS 2% DESIGN TEMPERATURES DO NOT EXCEED47oC IN THE UNITED STATES (PALM SPRINGS, CA IS 44.1oC). FOR LESS THAN 9CURRENT-CARRYING CONDUCTORS IN ROOF-MOUNTED SUNLIT CONDUIT ATLEAST 0.5" ABOVE ROOF AND USING THE OUTDOOR DESIGN TEMPERATURE OF47oC OR LESS (ALL OF UNITED STATES), a) 12 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULESWITH Isc OF 7.68 AMPS OR LESS WHEN PROTECTED BY A 12-AMP OR SMALLERFUSE. b) 10 AWG, 90oC CONDUCTORS ARE GENERALLY ACCEPTABLE FOR MODULESWITH Isc OF 9.6 AMPS OR LESS WHEN PROTECTED BY A 15-AMP OR SMALLERFUSE. NOTES FOR ARRAY CIRCUIT WIRING (Guide Section 6 and 8 and Appendix D): OCPD = OVERCURRENT PROTECTION DEVICE NATIONAL ELECTRICAL CODE® REFERENCES SHOWN AS (NEC XXX.XX) NOTES FOR ALL DRAWINGS: SIGNS–SEE GUIDE SECTION 7 SIGN FOR DC DISCONNECT SIGN FOR INVERTER OCPD AND AC DISCONNECT (IF USED) RATED MPP CURRENT RATED MPP VOLTAGE MAX SYSTEM VOLTAGE MAX CIRCUIT CURRENT A V V A PHOTOVOLTAIC POWER SOURCE WARNING: ELECTRICAL SHOCK HAZARD–LINE AND LOAD MAY BE ENERGIZED IN OPEN POSITION AC OUTPUT CURRENT NOMINAL AC VOLTAGE A V SOLAR PV SYSTEM AC POINT OF CONNECTION THIS PANEL FED BY MULTIPLE SOURCES (UTILITY AND SOLAR) Rev: 7/15/2021 RESIDENTIAL PHOTOVOLTAIC SOL-01 CBC 2019 Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of minimum 11” x 17” size. If answering NO to any of the questions, plan check shall be required. Project Address: Contractor Company Name: Contractor License Number: YES NO Are the following applicable to the proposed project? 1. Will the PV system layout provide the required three-foot wide clear access pathways per Section 605.11 of the California Fire Code, and is this shown on the roof plan? 2. Will the PV system be installed on a roof having only one roofing layer with no overlays? 3. Will the PV array be flush mounted to the existing roof so that the plane of the modules (panels) are parallel to the plane of the roof? 4. Will the PV system weigh maximum 4 pounds per square feet or less? 5. Will the PV system be installed where the modules do not overhang any roof edges (such as eaves, gabled ends, ridges and hips)? 6. Will the PV system be installed with a space of 2” minimum to 10” maximum between the underside of modules and the surface of the roof? 7. Will the PV system be installed without using any ballast system or counter-weight system? 8. Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet and is this maximum horizontal spacing shown on the plans? 9. Will the minimum 5/16” lag screws be installed with a minimum of 2-1/2 inch embedment into roof rafters (with pre-drilled holes) and is this minimum embedment shown on the plans? 10. Are ALL the structural pages of the plans stamped and signed by a California licensed professional engineer? (including project specific site plan, PV layout, anchorage spacing, anchorage details and manufacturer’s PV support information.) I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name: Signature: Phone Number: Date: Email Address: Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org 1329 W McFadden Ave, Unit 2, Santa Ana, CA 92704 Sungate Power 833971 Cole Thacker 8014040939 permits@highline-designs.com 11/10/2025 Stars Construction Services Inc 6022 Western Ave, Buena Park, CA 90621 714.262.3929 833971 11/14/2025 I, Huy Thieu Nguyen, hereby give my authorization to High Line Designs, and its agents to pull permits for the following addresses: 1329 W Mcfadden Ave, Unit 2, Santa Ana, CA 92704 and 1621 S Diamond St, Unit 2, Santa Ana, CA 92704 Scott Toyama Karee Toyama Amy Lopez Jarret Hauger Cole Thacker Anisa Ayu Elaine Nunez Jazzmin Wong Marc Cossio on my behalf to pick up and/or pay for any applicable fees for building permits and business licenses on behalf of our company, Stars Construction Services Inc, I ensure my full consent for this authorization. If you have any questions, please contact me or my staff at 714.262.3929 . ___________________________________________ [Signature] Huy Thieu Nguyen (Nov 14, 2025 12:09:08 PST) Huy Thieu Nguyen HLD Authorization Form .docx Final Audit Report 2025-11-14 Created:2025-11-14 By:Cole Thacker (permits@highline-designs.com) Status:Signed Transaction ID:CBJCHBCAABAAXaqA-5P0-zPNKQABiqLQNKBewJNTs6vo "HLD Authorization Form .docx" History Document created by Cole Thacker (permits@highline-designs.com) 2025-11-14 - 8:07:25 PM GMT Document emailed to Huy Thieu Nguyen (starsconstruction@yahoo.com) for signature 2025-11-14 - 8:07:29 PM GMT Email viewed by Huy Thieu Nguyen (starsconstruction@yahoo.com) 2025-11-14 - 8:08:38 PM GMT Document e-signed by Huy Thieu Nguyen (starsconstruction@yahoo.com) Signature Date: 2025-11-14 - 8:09:08 PM GMT - Time Source: server Agreement completed. 2025-11-14 - 8:09:08 PM GMT