HomeMy WebLinkAbout10197443 - PermitCity of Santa Ana 20 civic center Plaza (M-19)' Santa Ana, cAg27o2 Building
PermitCounter: (714l|647-5800 Inspection Requests: (714\ 667-2738 lnspector Sectionr (714) 647-5853
Permit #: 1lJ197443
Pin #: 9OO14
q
Proiect Address: 1528 E Vance Pl
Assessor's Parcel 400-27 5-14 Lot: 157
Unil Bldg: Address Range Suite Range:
Zoning: R lBlock NA Tract: 2648 Historic: No
Building Use:
Job Type:
Nature of Workl
Existing Bldg. & Use
Proposed Use:
Single Family Dwelling
Solar
Solar
SFD datt garage
Occupancy:
Constr Type
Code:
Flood Zone:
# of Stories:
R-3, U
VB
cBC 2016
x-0602320163J
1st FL Area:
znd FL Area:
Other Areas:
Garage Area
Patio
T.l.Area:
Yards Req'd:
Valuation:$44,100.00
Oescription of Work: lnstallation of roof mounted PV system
Total:
Worksheet attached to plans. 35 modules, 35 microinverters, 12.6kw
Planning Conditions:
ll l1r
liEl
Ownerl
Address
Phone:
Tenant:
David Peronto
1528 E Vance Pl
Santa Ana, CA 927013233
(7141227-3721
Contractor: Precis Development dba Pr€
Add.ess: 36625 Kevin Rd #'147
Wildomar, CA 92595
Phone: (951) 969-9400
State Lic #: 952305
Lic Type: C-46
Bus. Lic #: 356962
Workers' Compensation lnsurance:
Carrier: State Compensation lnsurance Fu
Policy #: 9045374
Expires: 0211512019
Enganeer
Address:
Phone:
License #.
Architect /
Desiqner:
Address:
Phone:
License #:
Planning Approval By:
Plan Checked By:
Permit lssued By:
NPDES lnsp. Req'd:
PWA lnsp. Req'd:
Planning lnsp. Req'd:
Landscaping lnsp. Req'd
Chavez, Oavqva..
Date:
Date:
Dale: 0812112018
Subject to Field:
$450.00
$2.00
$0.00
No
No
No
No
Fire lnsp. Req'd:
Police lnsp. Req'd
No
No Account#Total
Flood Zone Cert. Req'd: No 01.t .16002 51601
Every perfiit issued shallbecome invalid unless the wo*on the site authoized by
such permit is commenced within 180 days after ils issuance.ot if the wo* authorized
on the site by such permit is suspended or abandoned fot a period of 180 days after
lhe time the wotk is commencocl
$450 00
$2.00
lnspector MID#: 20'18-'145558
01116002 51612
Fee Total:
Paid to Dalel
Balance Due
tr,rrt rlhft Fr
I 6L|] rr_ltl-
,ro 1,,'ins
.,1?r-r:rIr-
l\,4isc. Receipt:
lVisc. Receipt:
lvlisc. Receipt:
07116002 515O1 Permit Fee
07776002 57672 gldq. Stds Revolving
07716002 51600 Genetal Plan Update
$452.00
$0.00
$452.00
BUILDING- INSPECTOR RECORD
SITE.WORK DATE ID/SIG.COMMENTS OWNEI AUII,DER DEI-CARATI(}N
I hc'cb, ar'ilrm undcr Fnrlr, or rjxry rha' I m.rcnfl rro,n rhc c.nkrhF Licctr{ trq' r'or rhc r.ll{,sing rcnu (sc..7orl 5
Bun..s\ and Proiasnon Codc): Any C[y or Counry Ehi.h rcqutc\ 0 pcnnil ro d {tucr. rlrcr, nhl)rovc. dcnFlth or rcPli 0n!
rdcrurc, prior lo irs issuamc. rko rcquircs lhc applicaDt f(tr such p.rnir b filca \i8trcd nrr.mtu thnt hco! shc t liccns.d l)Urul.r
ro rh. piolisn N oI rh. Contr.rols Li.cnscd l-rw (Ch.J)lcr 9. C.mmcEin8 wilh S.crion 7nn of Divhbn I oflhc 8u\trc$ ind
ProfcshtrsCodc)orlhrr hcorshe hcxcmfl lncrcl'ron and I hc hosis lnrrhc allegcd crcmrrnr. Any violalionofSs-'rion?(,.r15 by riy
alplicanr ftraFnnn sxbje!rhc rprli. ror.ivillcnrlryoffr, barhrtr fivc huodrcddolloi\ ($5(X,
-l-
.\ owrcr ol rhc pnpcn,. (tr my c'npk,yc.s sirh *rBs n\ I hct \ok .oi4cn$r ion, eill do lhc sflk and rh. (ndm i mr
i'rcndsl or.fcrcd for qh (S( 7{Y4, Burirc$ md Pmfcssiois Cdlc: Thc Conrdois I-iccnc liw dtrs noi atPly ro.nowncr oI
rhc F)IEny qho hrildsot inll)mk! rhcmn. sJi wt dms smh qrrl hihscll or h$$lf or thoulh ht or h.r o*n crpbyc.i.
piovidcd rh sx.h inlmw!ftn* m R, inr.uk{t nolTcrd ln {h ll !n'wcw. rhc hnikling or imtiov. bnt is $kl sirh'tr nnc rtr
ol'conr0lcli(nr r& Osner Buikicr *illhnv. rrr hrr&norpmvin! rl rr or shc did not huild or in{rorc rhc rn,Fiy r(r rhc Pqnt ol
-1.{so*rcrofrhcpmpcny.rflcx.lu\ivcly.ont..rir8wirhli..n*d.onlri.torr.connrucrrhcpojmr(s..7u-r.8u\iEs\dtrd Psii\st tr Cod.: Thc Coniro.rois l-icctrsc Las docs nor anply ro otr osncr of prund! ah, builds or improrcs lhcrcon.
and who conlnds tnr such F(,jccrs wirh a conhcbns) liccn{d Nnxam t' rhc Cont!c1,, \ l-iccns ll*)
-l
mexcmpl undcr Sction ,B &PC fdrhi\rcason
Ir3l.: ()wner
rYanxlB,Stl:lJuf,[INsdll9N
DE(I,^8 IIAN
I ltrchyrll nntrtr,]cr |Imlryol pcrrur!o rrl rhclnlhsi'rgdcclx'nf'r(
-l
hNe mi $illroinrain aCcniftar..f c.trrm t, s.lf ln\ur. for nukcs' comlicnsd t,r. !s prcvidcd f.r hy s.dion:1700 oflhe
lihor Cod., for rhc ncrforEEc ofrhc work for shti rhc p.drir ir iisucd
I hlvc rtrd *lllnrii0lrir sorkcrl conr|[nr0lion in\uran.c. r" rc!uirrilhJSc.h.r:17(X)ofrhc L.horCodc. for rhc rrrnnnni{..r
rr'r r r(L'ul,hr!.r( rr.l.'1, lll{!'l!r, ' g-l*+ Fi^..rJ
\'comtcnsrri{in ntrurrncL u'ricr xtrd F,li.} Nnrhcr ir.
o
I.cdilyrh
'nthc
pcrrormarccolthc w.rk lo, *hichlhi\ ncflnir i\ ilsxcd,I sh.ll nor cnrlloyonrlc6on inany mtur
s s to lleconE suhrd ro rhc sorld( .omF.qriotr lnws or ('alirornir. and .src hlr if I \nodd bcmn* subj.{r ro 'if,wolkcn'conrncnsarionD!o!isn,n\ofS..tn,n:l?0(l.frh.bborCdlc,lsholl.lonh$irhcomply(irhrhr{pn,vtnrns.
IVARNINC: Fuilur. ro *rr. Norkctr conrtcnsario covcr0$ is nnhwtul. and shnll.ubj..r rn cnrFloyer ro dinrinrl |l.nllris.id
cilll lnros rf n, on. htrtrdr.d rlNn\nrl
:::-r"#i;ild"
trrgc\ r\ ni(rnloJ lnr rhc
I hcEhynllnrnuon.r pcnrlryol Irrjuryrh r I r'xnd.r pbvNn ol Chatrs9l.r'D.rncing wirh S.dion rux)) oal)ivi\n]n l
., rh. B"(i,,.$ xtrd Pbf.sio,N aidc rlnN li.cnsc n i', hi Ll l,trN rtrtl cl1cri.
l-aLtb o
qilns
I hcrchy !finnr undc! rcnalryoipcrjory rhd rh.( i\ r
issucdlss 1(I)7, Civ. C.)
crinr [.rlirgr8.acy l{tr rhc p.r,]mnftr ofrhcwolk tur shirhrhi\ Pcrmir is
Ltrdcas Arldrc\\l
AT.g.ICANLDEIIAtr{IIQ!
I ffiy!fiianundcr pctrrllyof ncrj!ryonc orihd r.llouiit d(hturn s:
l)cmlnbn PcrnrirlAshcsros Norificarion r{dcdl R.gxlarions lTirlc {0. Pd6r
Rcquircd ktlcr olNolifEalion
I (cnirlrh rtu ladcrnlrcgtrl n,r! rc!{dirt rslx .\ '.nn,vr c nor l'l)pll.rhl. ki rhr t)n,l.cr
-[kin,r1 rru r t'^c -"a rr,,.,pp Itrr ion adl rar. rhd rh. ,trlr innrM ion h cor*.'r I lg.( n, .o rrly wirh .ll Cny lnn Counrt
ordin!nccs rn,l Sxrrclj$\ ml,rirgr. hui
ahovc nr ioncd [o|.ny lor iNrNrion
rchy iurh.riz. rcprc\cnrdnt\ ofrhi\ ciry rnd Counrt b.nri !,rn! rlt
,\!t,li(nnl.r ,\sLnl Sisnnlu
OJt l(("el)"r ",,,"' tf.tt fw
Set Backs
Forms/Steel/Holdowns
Erection Pads
UFER Ground
SLAB Floor
Subf loo r/Ve nt/ ln s u lat ion
Roof Sheathing
Shear Wall
Framing
ln s u lation/E nerq y
Drywall
Ext./lnt. Lath
Brown Coat
[/lasonry
Pool Fence
T-Bar
Handicap Beq.
Deputy Final Report
Enoineer Final Report
Flood Zone Certif .
FINAL Nnflc €N&-
Certificate ol Occupancy
Notes, Remarks, Etc.
#ANTA
NA,'ffi
Planning & Building Agency
Building Safety Oivision
20 Civic Center Plaza
P.O. Box 1988 (M-'19)
Santa Ana. CA 92702
(714) 647-5800
www.santa-ana.org
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Onlv
sol-o1 cBc 2013
,4 q)10
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
Signthecertificationsectionoerow-.ecopyofthisformSl.,allbe.attachedtoeachofTWosetsofplans,of
Vc.n"e S",e +Project Address:
Contractor ComPanY Name:
Contractor License Number:
YES NOr4tr
,{O
tr
C\
3
Are the following applicable to the proposed proiect?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.1 1 oi the California Fire Code, and is this shown on the roof plan?
WillthePVsystembeinstalledonaroofhavingonlyoneroofinglayerwithno
ovedays?
U/ill the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to l0" maximum between
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be instalted with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16' lag screws be installed with a minimum of 2'112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the Plans?
Are ALL the structural pages of the plans stamped and signed by a California
ticensed professional engineer? (including project specific slte, plan' PV layout'
"n"noi"g"
.p""ing, anchorage oetaits an-o minutacturers PV support information')
4gtr
5 Ertr
6wa
?. qa
sWJ
e Ertr
VA10
Print Narne
Phone Number
Email Address:
5t-1 fl,9 440
I certify under Pen ofp erI ury under the laws of t State of California that the above is true
Signature
Date:
6
0
Rev 1 1/19/2015
I
*-SNTA
NAJhffi
I
Planning & Building Agency
Building Safety oivision
20 Civic Center Plaza
P.O. Box '1988 (M-'19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
soL-0r c3c 2c rl
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only
lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and
sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of
minimum 11 ' x 17" size. lf answerinq NO to an v of the ouestions. olan chec k shall be required.
Vc.n"e S",Project Address:
Contractor Company Name:
Contractor License Number:
YES NO,4J
z. VJ
tr
e ]o.4 q)-7ol
C\
3
Are the following applicable to the proposed project?
Will the PV system layout provide the required three-foot wide clear access pathways
per Section 605.11 of the California Fire Code, and is this shown on the roof plan?
Will the PV system be installed on a roof having only one roofing layer with no
overlays?
Will the PV array be flush mounted to the existing roof so that the plane of the
modules (panels) are parallel to the plane of the roof?
Will the PV system weigh maximum 4 pounds per square feet or less?
Will the PV system be installed where the modules do not overhang any roof edges
(such as eaves, gabled ends, ridges and hips)?
Will the PV system be installed with a space of 2" minimum to l0" maximum betlveen
the underside of modules and the surface of the roof?
Will the PV system be installed without using any ballast system or counter-weight
system?
Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet
and is this maximum horizontal spacing shown on the plans?
Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch
embedment into roof rafters (with pre-drilled holes) and is this minimum embedment
shown on the plans?
Are ALL the structural pages of the plans stamped and signed by a California
licensed professional engineer? (including prolect specific site plan, PV layout,
anchorage spacing, anchorage details and manufacturer's PV support information.)
4gtr
5 Ertr
6 EI-tr
?wa
8wJ
e Ertr
10 Va
Phone Number:
Email Address:
q 5t-
I certify under pen of pe jury under the laws of t
Print Name
California that the above is true:r,15
State of
ignatu re
Dateqc
Rev 1 1/19/2015
RESIDENTIAL
PHOTOVOLTAIC
CHECKLIST
I