Loading...
HomeMy WebLinkAbout101 W Fourth St, Unit B - PlanJ. SPIX 4th & Main 05/01/2024 WE L L S F A R G O B A N K 4T H & M A I N 10 1 W 4 T H S T R E E T , U N I T B SA N T A A N A , C A 9 2 7 0 1 6 A12/06/24 B03/19/25 C05/15/25 WELLS FARGO BANK NEW ATM - 4TH & MAIN SHEET SCHEDULEVICINITY MAP PROJECT TEAM PARCEL MAP PROPOSED RENDERING ABBREVIATIONS SYMBOL LEGEND N N PROJECT OVERVIEW INSTALL ATM WITH NEW ATM ENCLOSURE AND ASSOCIATED WORK. SQ SQUARE CLR CLEAR HDR HEADER H.S.B. INT, INTR HORIZ, (H) LONGIT JST(S) LB, # COL CONC CONN. CONST DIA, Ø DIAG DLT DBL CSK CONT DWG HGT JNT MAX M.B. LG DIAMETER DIAGONAL DEEP LEG TRAC CONCRETE CONNECTION COLUMN CONSTRUCTION DOUBLE CONTINUOUS COUNTERSINK DRAWING STGRD STIFF STRUC STL STRUCT, STR T.O.C. T.O.F. T.O.S. T.O. T&B THD LONGITUDINAL MAXIMUM MACHINE BOLT HIGH STRENGTH BOLTS HORIZONTAL INTERIOR HEIGHT JOIST(S) LONG POUND JOINT TOP OF CONCRETE TOP OF FOOTING TOP OF STEEL TOP OF STIFFENER STEEL STRUCTURAL STAGGERED STRUCTURE THREAD TOP & BOTTOM (E), EXIST EMBED EL, ELEV EXT, EXTR F.O.C. FRMG GALV EA A.B.ANCHOR BOLT BLW, BEL BTWN, BET BLDG A.F.F. ALT AGL ABV BLK'G BLKD B.O. B.O.W. BM BRG BOT. C.I.P. C.J. C= C/L E.W. E.S. E.F. BUILDING ABOVE FINISHED FLOOR ALTERNATE ANGLE ABOVE FIN FLG FLR FND F.O. F.P. GA FTG GRD BLOCKING BELOW BLOCKED CONSTRUCTION JOINT BEARING BETWEEN BOTTOM OF BOTTOM BOTTOM OF WALL CAMBER CAST IN PLACE BEAM CENTER LINE @ & DWL AT AND NEW(N) EACH O.H. O.C. OPEN'G SPCG SCHED S.O.G. SMS SIM EACH WAY ELEVATION (DATUM) EACH SIDE EMBEDMENT EACH FACE FACE OF CONCRETE FULL PENETRATION EXTERIOR FINISH FLANGE FOUNDATION FACE OF GALVANIZED FLOOR FRAMING GAGE FOOTING GRADE REMOVE PLATE OPENING PIECE OPPOSITE HAND ON CENTER RELOCATED REFER TO REMOVE & RELOCATE SPACING ROOF SCHEDULE SIMILAR REQUIRED REQUIREMENTS SHEET METAL SCREW SLAB ON GRADE REINFORCING (R) PC P/L, PLT (RE) RE: REQM'TS REQ'D REINF RF (R/R) NIC MIN EXISTING DOWEL NOT IN CONTRACT MINIMUM STRUCTURAL TUBING,TS UNLESS NOTED OTHERWISE WITHOUT WITH TYPICAL VERTICAL (TUBE STEEL) W/O VERT, (V) U.N.O. W/ TYP WEIGHT WORK POINT WELDED HEADED STUD WATER RESISTANT WELDED WIRE FABRIC WOOD SCREW W.P. WHS W/R W.W.F. WT, WGT W.S. TRANSVERSETRANS T.O.W. TOP OF WALL P.T.PRESSURE TREATED OVEROVR, O/ FINISH FACEF.F., F/F FINISH FACE OFF.F.O. PROJECT DATA SCOPE OF WORK A0.0 PR O J E C T D E T A I L S GE N E R A L N O T E S N JOB: DRAWN: SCALE: DATE: REV OF NOTED Im p l e m e n t a t i o n S o l u t i o n S e r v i c e s I n c . 59 0 W C e n t r a l A v e , S u i t e C Br e a , C A 9 2 8 2 1 71 4 . 7 3 8 . 7 9 3 5 SACRAMENTO, CA 95820 3701 BUSINESS DR, SUITE 100 POINT 2 STRUCTURAL ENGINEERS STRUCTURAL ENGINEER c/o BRAD J. ROLLINS 916.452.8200 No. 2837 SANTA ANA, CA 92701 JOHN ADGER OWNER 101 W 4TH STREET 714.928.1000 c/o O.C. MANAGEMENT attn: GEORGE SCOPE OF WORK: ·REMOVE EXISTING NIGHT DEPOSITORY. ·FRAME NEW INTERIOR 2x4 FRAMED WALL. ·INSTALL NEW DN430 ATM. ·INSTALL NEW WF9200 ATM SURROUND. ·INSTALL NEW CARD ACCESS LOCK & READER. NOTE: ·NO ELECTRICAL WORK TO BE DONE. USE EXISTING OUTLETS. EXISTING RENDERING 21ST FLOOR SAN FRANCISCO, CA 94105 525 MARKET STREET WELLS FARGO BANK PROJECT PROPONENT BREA, CA 92821 c/o MICHAEL JOHNSON 590 W CENTRAL AVE, SUITE C ISSI INC. PROJECT COORDINATOR 714.956.2827 x204 IMOCMNGT@GMAIL.COM SITE ADDRESS: 101 W FOURTH ST UNIT B SANTA ANA, CA 92701-4645 PARCEL: 398-258-08 LEGAL DESCRIPTION: SANTA ANA CITY LOT 1 BLK 14 E 46.83 FT THEREOF LOT4 BLK 14 E 46.83 FT -INC WLY .37 FT ELY LOT / BLOCK / TRACK POR 1, POR 4 / 14 / TOWN OF SANTA ANA GENERAL PLAN: DC-3 3.0 ZONING: TRANSIT ZONING CODE SD 84 YEAR BUILT: 1986 OCCUPANCY TYPE: GROUP U - UNOCCUPIED ATM CONSTRUCTION TYPE: IIB TOTAL AREA AND AGGREGATE AREAS: 3975 SQ FT NUMBER OF STORIES: 4 OCCUPANCY LOAD(s): 0 FIRE SPRINKLER - TYPE: RECESSED PENDENT OCCUPANCY TYPE: B CODES: ·2022 CALIFORNIA BUILDING CODE (CBC) ·2022 CALIFORNIA ENERGY CODE ·2022 CALIFORNIA ELECTRICAL CODE A IRVING, TX 75062 580 DECKER DRIVE, SUITE 170 JAMES M. HAMILL ARCHITECT IRVING, TX 75062 580 DECKER DRIVE SUITE 170 JAMES M. HAMILL ARCHITECT p: 972.714.0420 f: 972.714.0282