Loading...
HomeMy WebLinkAbout2150 & 2160 E Fourth St - Plumbing & Mechanical Revision - PlanPC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 TITLE 24 SHEET INDEX NO.SHEET DESCRIPTION 1 T24-MM MANDATORY MEASURES FORMS 2 T24-1 ENERGY COMPLIANCE FORMS - BLDG A1 3 T24-2 ENERGY COMPLIANCE FORMS - BLDG A1 CON'T 4 T24-3 ENERGY COMPLIANCE FORMS - BLDG A2 5 T24-4 ENERGY COMPLIANCE FORMS - BLDG A2 CON'T T24-MM TITLE 24 FORMS MANDATORY MEASURES PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 T24-1 TITLE 24 ENERGY COMPLIANCE FORMS BLDG A1 OL I V E C R E S T R E S I D E N T I A L 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T 1 1 PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 T24-2 TITLE 24 ENERGY COMPLIANCE FORMS BLDG A1 CON'T OL I V E C R E S T R E S I D E N T I A L 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T 1 1 1 PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 T24-3 TITLE 24 ENERGY COMPLIANCE FORMS BLDG A2 OL I V E C R E S T R E S I D E N T I A L 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T 1 1 PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 T24-4 TITLE 24 ENERGY COMPLIANCE FORMS BLDG A2 CON'T OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T 1 1 1 1 M BDD UP DN A.D. 12X24 H C FD FSD 8Ø SA UP DN RA EA NECK SIZE/TAG AIR FLOW (CFM) T S P T SD TS HS # DESIGNATION C CO GENERAL NOTES 1.MECHANICAL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE CALIFORNIA MECHANICAL CODE (CMC) AND ALL APPLICABLE LOCAL CODES AND REGULATIONS WITH AMENDMENTS (LATEST EDITION). 2.ALL DIMENSIONS SHOWN ON THESE PLANS ARE APPROXIMATE AND MUST BE CONFIRMED ON SITE. 3.PROVIDE ANCHORAGE FOR ALL PIPING, DUCTWORK, AND EQUIPMENT IN ACCORDANCE WITH THE LATEST EDITION OF GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS PER SMACNA. 4.VENTILATION SYSTEMS DESIGNED AND INSTALLED SHALL MEET ASHRAE 62.2 REQUIREMENTS. 5.WHERE DEEMED ARCHITECTURALLY UNACCEPTABLE TO PROVIDE ADEQUATE DOOR UNDERCUT FOR PROPER AIR RETURN BETWEEN ROOMS, TRANSFER GRILLS SHALL BE INSTALLED AND COORDINATED WITH THE ARCHITECT. 6.WHEN SUPPLIED, DESIGN ENGINEER SHALL REVIEW AND APPROVE SUBMITTALS FOR ALL EQUIPMENT. IN THE CASE WHERE SUGGESTED SUBSTITUTE IS NOT ADEQUATE, SUBMITTAL SHALL BE RETURNED TO CONTRACTOR AND STAMPED AS "REVIEW AND RESUBMIT." SUBMITTAL APPROVAL CONFIRMS ONLY THAT SUGGESTED SUBSTITUTE HAS EQUIVALENT TECHNICAL PARAMETERS AND DESIGN CONSULTANT IS NOT RESPONSIBLE FOR ANY FINANCIAL IMPACT THAT THIS SUBSTITUTE CAUSES. 7.RESIDENTIAL HVAC SYSTEMS WITH CENTRAL FORCED AIR UNITS (FURNACES OR FAN COILS) HAVE LIMITED ZONING AND TEMPERATURE CONTROL ABILITY. THIS TYPE OF SYSTEMS ARE NOT CAPABLE OF CONTROLLING TEMPERATURES IN EACH ROOM INDIVIDUALLY. TEMPERATURES CAN BE CONTROLLED ONLY IN REFERENCE ROOMS WHERE THERMOSTATS ARE LOCATED. WHEN INDIVIDUAL ROOM TEMPERATURE CONTROL IS CRITICAL, CLIENT SHALL CONSULT WITH DESIGN TEAM AND CONTRACTORS FOR DIFFERENT SYSTEMS/SOLUTIONS. A. GENERAL 1.BEFORE SUBMITTING BID, CONTRACTOR SHALL SURVEY THE ENTIRE PROJECT SITE AND BECOME THOROUGHLY FAMILIAR WITH ACTUAL EXISTING CONDITIONS. THE INTENT OF WORK IS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN. BY THE ACT OF SUBMITTING A BID PROPOSAL FOR WORK, THE CONTRACTOR SHALL BE DEEMED TO HAVE MADE SUCH A STUDY AND EXAMINATION AND TO ACCEPT ALL CONDITIONS PRESENT AT SITE. NO REQUEST FOR ADDITIONAL PAYMENT SHALL BE CONSIDERED VALID, DUE TO CONTRACTOR FAILURE TO ALLOW IN COST ESTIMATE FOR CONDITIONS WHICH MAY EXIST. 2.CONTRACTOR SHALL REVIEW THE MECHANICAL AND OTHER CONSULTANTS DRAWINGS PRIOR TO STARTING ANY WORK AND INFORM ENGINEER AND ARCHITECT OF ANY DISCREPANCIES, OMISSIONS, OR IF CLARIFICATIONS ARE REQUIRED IN ORDER TO COMPLETE THE INSTALLATION PRIOR TO COMMENCING THE WORK. OWNER OR ITS REPRESENTATIVE SHALL SCHEDULE A MEETING WITH THE CONTRACTOR, ENGINEER, ARCHITECT AND OTHER CONSULTANTS DURING BIDDING PROCESS TO REVIEW AND DISCLOSE ANY DISCREPANCIES, OMISSIONS AND/OR CLARIFICATIONS RELATED TO THE CONSTRUCTION DOCUMENTS AND/OR SPECIFICATIONS NOTED BY CONTRACTOR AND/OR OWNER. 3.CONTRACTOR BID SHALL NOT BE LIMITED TO THE WORK SHOWN ON THE PLANS AND SPECIFICATIONS. ALL PREMIUM OVERTIME COSTS, UTILITY CHARGES, COST FOR TEMPORARY UTILITY SERVICES, ALL ALTERATIONS, ALL DEMOLITION AND EXTENSION WORKS, PERMITS, INSPECTION FEES, MISCELLANEOUS CONTINGENCY COST, ETC., SHALL BE INCLUDED IN BID. 4.ANY WORK TO BE PERFORMED MUST BE PLANNED IN ADVANCE. SCHEDULING SHALL BE DONE IN COOPERATION WITH CONSTRUCTION MANAGER. INCLUDE ALL PREMIUM TIME CHARGES IN BID TO COVER AFTER-HOURS AND WEEKEND WORK. 5.THE CONTRACTOR SHALL COORDINATE HIS WORK HARMONIOUSLY WITH ALL TRADES. COORDINATE THE LOCATIONS OF ALL CEILING DIFFUSERS, REGISTERS AND GRILLES WITH THE ARCHITECTURAL CEILING PLAN, ELECTRICAL LIGHTING LAYOUT AND ARCHITECTURAL ROOM ELEVATIONS. ALL WORK SHALL BE IN ACCORDANCE WITH BEST CONSTRUCTION PRACTICES. 6.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, TOOLS, LABOR, ETC. TO INSTALL A COMPLETE AND FUNCTIONING SYSTEM AS INDICATED ON DRAWINGS. 7.THE CONTRACTOR SHALL REPORT TO THE CONSTRUCTION MANAGER IMMEDIATELY ANY INTERFERENCE BETWEEN TRADES OR WITH BUILDING OBSTRUCTIONS. 8.CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR ALL EQUIPMENT, DUCTWORK, PIPING, DAMPERS, ETC. AND SUBMIT IT TO THE CONSTRUCTION MANAGER FOR APPROVAL. 9.COVER ALL WALLS, FLOOR, CEILING, AND ROOF OPENINGS LEFT AS THE RESULT OF THE WORK. PROVISIONS SHALL BE MADE TO PROTECT PEOPLE FROM INJURY AND TO PROTECT EQUIPMENT FROM WEATHER. 10.THE CONTRACTOR SHALL VERIFY THE INPUT VOLTAGE AND AMPERAGE (HORSEPOWER) RATING OF ALL EQUIPMENT AND CONFIRM WITH ELECTRICAL CONTRACTOR PRIOR TO INSTALLATION. 11.CONTRACTOR SHALL PROVIDE ALL SAFETY MATERIALS AND EQUIPMENT NOT LIMITED TO BARRIERS, SIGNS, LIGHTS, ETC. 12.CONTRACTOR SHALL PROVIDE BARRICADE, SAFETY SIGNS AND OTHER DEVICES TO ISOLATE WORK AREA DURING CONSTRUCTION, UPON CONSTRUCTION MANAGER APPROVAL. 13.CONTRACTOR SHALL REPAIR/PATCH AND WEATHER PROOF ANY OPENING CAUSED BY EQUIPMENT/PIPING INSTALLATION, AND SHALL PAINT WHERE NECESSARY. 14.THE CONTRACTOR SHALL PREPARE ONE (1) SET OF "RECORD DRAWINGS" PLANS AND KEEP AT JOB SITE FOR REVIEW BY THE CONSTRUCTION MANAGER. ANY CHANGES FROM THE DESIGN DRAWINGS SHALL BE NOTED WITH RED INK. UPON COMPLETION OF PROJECT THE CONTRACTOR SHALL SUBMIT THE PLANS TO THE CONSTRUCTION MANAGER. 15.THE CONTRACTOR SHALL THOROUGHLY CLEAN THE UNITS, REMOVE ALL PACKING LABELS, STICKERS AND ANY CRATING DEBRIS, AND LEAVE ALL INSTALLATION FINISHED AND READY FOR OPERATION. 16.AFTER COMPLETION, THE COMPLETE SYSTEM SHALL BE TESTED AND BALANCED. ANY ADDITIONAL BALANCING DEVICES REQUIRED FOR PROPER BALANCING SHALL BE INSTALLED. PRIOR TO BALANCING, ALL FILTERS SHALL BE REPLACED WITH NEW CLEAN FILTERS. 17.UPON COMPLETION OF PROJECT AND PRIOR TO ACCEPTANCE OF THE WORK BY THE CONSTRUCTION MANAGER, CONTRACTOR SHALL FURNISH TO HIM FOUR (4) COPIES OF OPERATION AND MAINTENANCE MANUAL OF EQUIPMENT BOUND IN BOOK FORM AND INDEXED. MANUAL SHALL CONTAIN PARTS LIST, RECOMMENDED PERIODS OF INSPECTION, ETC., AND NAME, ADDRESS AND PHONE NUMBER OF ALL SUPPLIERS. 18.THE CONTRACTOR SHALL FURNISH A TRAINED AND COMPETENT SERVICE ENGINEER TO INSTRUCT THE OPERATORS IN THE OPERATION AND MAINTENANCE OF THE SYSTEM. 19.COMPLETE INSTALLATION SHALL BE GUARANTEED, AND CONTRACTOR SHALL PROVIDE A MINIMUM 1 YEAR SERVICE, INCLUDING PARTS AND LABOR. B. CONTRACTOR NOTES 1.SEAL ALL PENETRATIONS THROUGH WALLS, CEILINGS, FLOOR, ETC. TO MAINTAIN THE FIRE RATING, AND BUILDING PRESSURIZATION. 2.EACH SINGLE SYSTEM HEATING OR COOLING AIR IN EXCESS OF 2,000 CUBIC FEET PER MINUTE SHALL BE EQUIPPED WITH AN AUTOMATIC SHUTOFF ACTIVATED BY SMOKE DETECTORS PER 2022 CMC SECTION 608. 3.PROVIDE LISTED DUCT TYPE SMOKE DETECTOR IN THE SUPPLY AIR DUCT IN EVERY AIR MOVING SYSTEM SUPPLYING AIR IN EXCESS 2000 CFM (MULTIPLE UNITS SERVING THE SAME ROOM, OR HAVING A COMMON RETURN AIR PLENUM OR COMMON OCA DUCT ARE CONSIDERED TO BE ONE SYSTEM FOR DETERMINATION OF THE CFM). 4.COMBINATION FIRE / SMOKE DAMPERS (FSD) SHALL CLOSE AUTOMATICALLY UPON DETECTION OF HEAT AND/OR SMOKE TO RESIST THE PASSAGE OF FLAME AND SMOKE. THE DAMPER SHALL BE CONTROLLED BY HEAT/FIRE AND SMOKE DETECTION SYSTEM IN CONFORMANCE WITH LOCAL CODE. ·HEAT/FIRE DETECTION SYSTEM SHALL BE FACTORY PROVIDED WITH DAMPER. ·SMOKE DETECTION SYSTEM SHALL BE A DUCT SMOKE DETECTOR INSTALLED PER LOCAL CODE. DUCT SMOKE DETECTOR SHALL BE FACTORY PROVIDED WITH DAMPER OR BY THIRD PARTY. F. FIRE PROTECTION 1.ROUTING AND TERMINATION OF FLUE AND COMBUSTION AIR INTAKE FOR EACH HEATING UNIT SHALL COMPLY WITH CH 8. AND CH 7 OF CMC 2022 AND WITH MANUFACTURER'S SPECIFICATIONS. PROVIDE MANUFACTURER'S SPECIFICATIONS AND INSTALLATIONS INSTRUCTIONS TO VERIFY COMPLIANCE. 2.DRYER VENTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS PER 2022 CMC SECTION 504.4 3.SCREENS/LOUVERS SHALL NOT BE INSTALLED ON A DRYER VENT TERMINATION PER 2022 CMC (504.4.) 4.FLEXIBLE CLOTHES DRYER TRANSITION DUCTS SHALL NOT BE CONCEALED WITH CONSTRUCTION. 5.CLOTHES DRYER EXHAUST TERMINATION AT THE EXTERIOR OF A BUILDING SHALL MAINTAIN A MINIMUM FIVE (5) FEET SEPARATION FROM THE CONDENSING UNIT. 6.EXHAUST DUCT FOR TYPE 1 DRYERS SHALL COMPLY WITH 2022 CMC SECTION 504.4.2. 7.FURNACES, BOILERS, AND WATER HEATERS LOCATED WITHIN THE HOME’S PRESSURE BOUNDARY ARE MECHANICALLY DRAFTED OR DIRECT-VENTED. AS AN EXCEPTION, NATURALLY DRAFTED EQUIPMENT IS ALLOWED IN CLIMATE ZONES 1-3. FOR NATURALLY DRAFTED FURNACES, BOILERS, AND WATER HEATERS, THE RATER HAS FOLLOWED RESNET OR BPI COMBUSTION SAFETY TEST PROCEDURES AND MET THE SELECTED STANDARD’S LIMITS FOR DEPRESSURIZATION, SPILLAGE, DRAFT PRESSURE, AND CO-CONCENTRATION IN AMBIENT AIR, AS WELL AS A CO-CONCENTRATION IN THE FLUE OF ≤ 25 PPM. 8.OPENINGS USED TO CONNECT INDOOR SPACES WHERE INDOOR COMBUSTION AIR IS USED SHALL BE SIZED AND LOCATED IN ACCORDANCE WITH THE FOLLOWING PER 2022 CMC 701.5: ·EACH OPENING SHALL HAVE A FREE AREA OF NOT LESS THAN ONE (1) SQUARE INCH PER 1000 BTU/HR OF THE TOTAL INPUT RATING OF THE APPLIANCE IN THE SPACE, BUT NOT LESS THAN 100 SQUARE INCHES OF THE TOP OF THE ENCLOSURE AND ONE OPENING SHALL COMMENCE WITHIN TWELVE (12) INCHES OF THE BOTTOM OF THE ENCLOSURE. THE DIMENSION OF AIR OPENINGS SHALL BE NOT LESS THAN THREE (3) INCHES. ·THE VOLUMES OF SPACES IN DIFFERENT STORIES SHALL BE CONSIDERED AS COMMUNICATING SPACES WHERE SUCH SPACES ARE CONNECTED BY ONE OR MORE OPENINGS IN DOORS OR FLOORS HAVING A TOTAL FREE AREA OF NOT LESS THAN TWO (2) SQUARE INCHES PER 1000 BTU/HR OF TOTAL INPUT RATING OF APPLIANCES. C. COMBUSTION AIR 1.ALL DUCTWORK SHALL BE CONSTRUCTED, ERECTED, AND SEALED IN ACCORDANCE WITH THE MOST RESTRICTIVE OF LOCAL REGULATIONS AND PROCEDURES DETAILED IN ASHRAE HANDBOOK OF FUNDAMENTALS OR THE APPLICABLE STANDARDS ADOPTED BY THE SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION AND THE UNIFORM MECHANICAL CODE. 2.ALL DUCT SIZES ARE CLEAR INSIDE SIZES. OBTAIN APPROVAL FROM CONSTRUCTION MANAGER FOR SIZING OF ANY DUCTWORK, WHERE SIZES ARE NOT SHOWN ON DRAWINGS. 3.MANUAL VOLUME DAMPERS SHALL BE PROVIDED IN ALL DUCT BRANCHES TO INDIVIDUAL BOXES, DIFFUSERS, GRILLES AND REGISTERS AND SHALL BE LOCKED IN THE FINAL POSITION AFTER COMPLETION OF AIR BALANCE. 4.TRANSVERSE AND LONGITUDINAL JOINTS FOR ALL SUPPLY AIR DUCTS SHALL BE SEALED WITH APPROVED MASTIC PER SMACNA. 5.APPROVED MATERIALS SHALL BE INSTALLED WITHIN DUCTS AND PLENUMS FOR INSULATING, SOUND DEADENING OR OTHER PURPOSES. MATERIALS SHALL HAVE A MOLD HUMIDITY AND RESISTANT SURFACE THAT MEETS THE REQUIREMENTS OF UL181. 6.ANY METALLIC DUCT WORK USED SHALL BE INSTALLED IN ACCORDANCE WITH 2022 CMC SECTION 603.3. 7.ANY FLEXIBLE AIR DUCTS MUST COMPLY WITH UL 181 AND BE INSTALLED PER THE MANUFACTURER’S INSTRUCTIONS AND SMACNA HVAC DUCT STANDARDS, IN ACCORDANCE WITH SECTION 604 OF THE 2022 CMC. 8.ALL HANGARS AND SUPPORTS SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES. ALL CONNECTIONS TO JOISTS SHALL BE MADE AT THE TOP CORD. 9.IN NON RESIDENTIAL OCCUPANCIES PORTIONS OF SUPPLY AND RETURN AlR DUCTS AND PLENUMS LOCATED IN UNCONDITIONED SPACES SHALL BE INSULATED TO A MINIMUM LEVEL OF R8. D. DUCTWORK 1.ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. 2.ALL HVAC EQUIPMENT SHALL BE U.L. LISTED AND BEAR A U.L. LABEL. 3.CONDENSER PAD SHALL BE A MINIMUM OF THREE (3) INCHES HIGH AND SHALL BE PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE SPECIFIED. THE CONDENSER SHALL BE SECURELY FASTENED TO THE PAD TO PREVENT EXCESSIVE MOTION DURING NORMAL OPERATING CONDITIONS AND SEISMIC ACTIVITY. 4.LISTED DIRECT-VENT APPLIANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. CMC SECTION 802.2.6. 5.ALL CHIMNEYS SHALL BE INSTALLED IN ACCORDANCE WITH 2022 CMC SECTION 802.5.1 THROUGH 802.5.3. 6.A CHIMNEY FOR RESIDENTIAL-TYPE OR LOW-HEAT APPLIANCE SHALL EXTEND NOT LESS THAN THREE (3) FEET ABOVE THE HIGHEST POINT WHERE IT PASSES THROUGH A ROOF OF A BUILDING AND NOT LESS THAN TWO (2) FEET HIGHER THAN A PORTION OF A BUILDING WITHIN A HORIZONTAL DISTANCE OF TEN (10) FEET. 2022 CMC SECTION 802.5.4. 7.THE FUEL INPUT RATE TO THE APPLIANCE SHALL NOT BE INCREASED OR DECREASED IN VIOLATION OF THE APPROVED RATING AT THE ALTITUDE WHERE IT IS BEING USED. CMC 2022 SECTION 902.6. 8.ALL ELECTRICAL AIR CONDITIONER SYSTEMS DESIGNED FOR PERMANENT INSTALLATION SHALL COMPLY WITH UL 1995 OR UL 60335-2-40. 2022 CMC SECTION 903.1. 9.ALL GAS FIRED AIR CONDITIONERS SHALL COMPLY WITH SECTION 903.2.1 THROUGH SECTION 903.2.7. 2022 CMC SECTION 903.2. 10.LISTED OUTDOOR COOKING APPLIANCES SHALL BE INSTALLED IN ACCORDANCE WITH THEIR LISTING AND THE MANUFACTURER'S INSTALLATION INSTRUCTIONS, 2022 CMC SECTION 923.1. UNLISTED OUTDOOR COOKING APPLIANCES SHALL BE INSTALLED OUTDOORS WITH CLEARANCES TO COMBUSTIBLE MATERIAL OF NOT LESS THAN THIRTY-SIX(36) INCHES AT THE SIDES AND BACK AND NOT LESS THAN FOURTY-EIGHT (48) INCHES AT THE FRONT. IN NO CASE SHALL THE APPLIANCE BE LOCATED UNDER OVERHEAD COMBUSTIBLE CONSTRUCTION. 2022 CMC 923.2 11.HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) EQUIPMENT, WATER HEATERS, SHOWER HEADS FAUCETS, AND ALL OTHER REGULATED APPLIANCES MUST BE CERTIFIED BY THE MANUFACTURER TO THE CALIFORNIA ENERGY COMMISSION 2022 CEC 110.0 & 110.3. E. EQUIPMENT/APPLIANCES CALGREEN NOTES APPLICABLE CODES APPLICABLE CODES AS OF JANUARY 1, 2023: 2022 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R. ; 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R. ; (2021 INTERNATIONAL BUILDING CODE & 2022 CALIFORNIA AMENDMENTS) 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R. ; (2020 NATIONAL ELECTRICAL CODE & 2022 CALIFORNIA AMENDMENTS) 2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, TITLE 24 C.C.R. ; (2021 UNIFORM MECHANICAL CODE & 2022 CALIFORNIA AMENDMENTS) 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R. ; (2021 UNIFORM PLUMBING CODE & 2022 CALIFORNIA AMENDMENTS) 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R. ; 2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R. ; (2021 INTERNATIONAL FIRE CODE & 2022 CALIFORNIA AMENDMENTS) 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen), PART 11, TITLE 24 C.C.R. ; 2022 CALIFORNIA REFERENCED STANDARDS, PART 12, TITLE 24 C.C.R. ; TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS ABBREVIATIONS AD DESCRIPTIONABBREVIATION 1.OPENINGS IN THE BUILDING ENVELOPE SEPARATING CONDITIONED SPACE FROM UNCONDITIONED SPACE NEEDED TO ACCOMODATE GAS, PLUMBING, ELECTRICAL LINES AND OTHER NECESSARY PENETRATIONS MUST BE SEALED IN COMPLIANCE WITH CALIFORNIA ENERGY CODE. CAL GREEN 4.406.1 2.AT THE TIME OF FINAL INSPECTION, A MANUAL, COMPACT DISC, WEB-BASED REFERENCE OR OTHER MEDIA ACCEPTABLE TO THE ENFORCING AGENCY INCLUDING ITEMS 1 THROUGH 10 IN ACCORDANCE WITH THIS SECTION SHALL BE PLACED IN THE BUILDING. CAL GREEN 4.410.1 2.1.DIRECTIONS TO THE OWNER OR OCCUPANT THAT THE MANUAL SHALL REMAIN WITHIN BUILDING THROUGHOUT THE LIFE CYCLE OF THE STRUCTURE. 2.2.OPERATION AND MAINTENANCE INSTRUCTIONS FOR THE FOLLOWING: 2.2.1.EQUIPMENT AND APPLIANCES, INCLUDING WATER-SAVING DEVICES AND SYSTEMS, HVAC SYSTEMS, PHOTOVOLTAIC SYSTEMS, ELECTRIC VEHICLE CHARGERS, WATER-HEATING SYSTEMS AND OTHER MAJOR APPLIANCES AND EQUIPMENT. 2.2.2.ROOF AND YARD DRAINAGE, INCLUDING GUTTERS AND DOWNSPOUTS. 2.2.3.SPACE CONDITIONING SYSTEMS, INCLUDING CONDENSERS AND AIR FILTERS. 2.2.4.LANDSCAPE IRRIGATION SYSTEMS. 2.2.5.WATER REUSE SYSTEMS. 2.3.INFORMATION FROM LOCAL UTILITY, WATER AND WASTE RECOVERY PROVIDERS ON METHODS TO FURTHER REDUCE CONSUMPTION, INCLUDING RECYCLE PROGRAMS AND LOCATIONS. 2.4.PUBLIC TRANSPORTATION AND/OR CARPOOL OPTIONS AVAILABLE IN THE AREA. 2.5.EDUCATIONAL MATERIAL ON THE POSITIVE IMPACTS OF AN INTERIOR RELATIVE HUMIDITY BETWEEN 30-60 PERCENT AND WHAT METHODS AN OCCUPANT MAY USE TO MAINTAIN THE RELATIVE HUMIDITY LEVEL IN THAT RANGE. 2.6.INFORMATION ABOUT WATER-CONSERVING LANDSCAPE AND IRRIGATION DESIGN AND CONTROLLER WHICH CONSERVE WATER. 2.7.INSTRUCTIONS FOR MAINTAINING GUTTERS AND DOWNSPOUTS AND THE IMPORTANCE OF DIVERTING WATER AT LEAST 5 FEET AWAY FROM THE FOUNDATION. 2.8.INFORMATION ON REQUIRED ROUTINE MAINTENANCE MEASURES, INCLUDING, BUT NOT LIMITED TO, CAULKING, PAINTING, GRADING AROUND THE BUILDING, ETC. 2.9.INFORMATION ABOUT STATE SOLAR ENERGY AND INCENTIVE PROGRAMS AVAILABLE. 2.10.A COPY OF ALL SPECIAL INSPECTION VERIFICATIONS REQUIRED BY THE ENFORCING AGENCY OR THIS CODE. 3.AT THE TIME OF ROUGH INSTALLATION OR DURING STORAGE ON THE CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING AND COOLING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST OR DEBRIS WHICH MAY COLLECT IN THE SYSTEM. CAL GREEN 4.504.1 4.HEATING AND AIR-CONDITIONING SYSTEMS HAS BEEN SIZED, DESIGNED AND HAVE THEIR EQUIPMENT SELECTED USING THE FOLLOWING METHODS: 4.1.THE HEAT LOSS AND HEAT GAIN IS ESTABLISHED ACCORDING TO ACCA MANUAL J, ASHRAE HANDBOOKS OR OTHER EQUIVALENT DESIGN SOFTWARE OR METHODS. 4.2.DUCT SYSTEMS ARE SIZED ACCORDING TO ACCA 29-D MANUAL D, ASHRAE HANDBOOKS OR OTHER EQUIVALENT DESIGN SOFTWARE OR METHODS. 4.3.SELECT HEATING AND COOLING EQUIPMENT ACCORDING TO ACCA 36-S MANUAL S OR OTHER EQUIVALENT DESIGN SOFTWARE OR METHODS. EXCEPTION: USE OF ALTERNATE DESIGN TEMPERATURES NECESSARY TO ENSURE THE SYSTEMS FUNCTION ARE ACCEPTABLE. CAL GREEN 4.507.2 5.INSTALLATIONS OF HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL NOT CONTAIN ANY CFCs OR HALONS. CAL GREEN 5.508.1 6.DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING SYSTEMS. SYSTEMS TO BE INCLUDED FOR TESTING AND ADJUSTING SHALL INCLUDE, AS APPLICABLE TO THE PROJECT, THE SYSTEMS LISTED IN SECTION 5.410.4.2. 7.ADHESIVES, SEALANTS, AND CAULKS USED ON THE PROJECT SHALL MEET THE REQUIREMENTS OF SECTIONS 5.504.4.1 THROUGH 5.504.4.6. 8.BATHROOM EXHAUST FANS SHALL BE ENERGY STAR COMPLIANT AND DUCTED TO TERMINATE OUTSIDE THE BUILDING. 9.UNLESS FUNCTIONING AS A COMPONENT OF A WHOLE HOUSE VENTILATION SYSTEM, BATHROOM EXHAUST FANS MUST BE CONTROLLED BY A HUMIDITY CONTROL, WHICH SHALL BE CAPABLE OF ADJUSTMENT BETWEEN A RELATIVE HUMIDITY RANGE OF 50 TO 80% (SEC 4.506.1) LEGEND RECTANGULAR DIFFUSER KEY NOTE RECTANGULAR OR FLAT OVAL DUCTWORK SIZE (FIRST NUMBER IS SIDE SHOWN) FLEXIBLE DUCTWORK DUCT SECTION AIR DEVICE MARK SIDE-WALL MOUNTED SUPPLY GRILLE OR RETURN/EXHAUST GRILLE AIR FLOW MOTORIZED DAMPER MANUAL VOLUME DAMPER OPPOSED BLADE DAMPER BACKDRAFT DAMPER OFF-SET UP OR DOWN INTERNALLY LINED DUCTWORK BOTTOM OUTLET/INLET REGISTER (PATTERN AS SHOWN ON PLANS) DUCT MOUNTED SIDE OUTLET/INLET REGISTER FLEXIBLE CONNECTION TYPE EQUIPMENT TAG HVAC FURNACE HVAC A/C UNIT OR HEAT PUMP CEILING MOUNTED EXHAUST FAN STORAGE TANK HVAC ACCESS PANEL THERMOSTAT THERMOSTAT SUSPENDED TEMPERATURE SENSOR/TRANSMITTER HUMIDITY SENSOR/ TRANSMITTER PRESSURE DIFFERENTIAL SENSOR SMOKE DETECTOR POINT OF CONNECTION (P.O.C) DROPPED CEILING CONTROLLERRECTANGULAR TO ROUND TRANSITION CO SENSORELBOWS WITH TURNING VANES ACCESS DOOR HC - HEATING COIL CC - COOLING COIL PHC - PRE-HEAT COIL RHC - RE-HEAT COIL FIRE DAMPER FIRE SMOKE DAMPER FILTER LOUVER DESCRIPTIONSYMBOL DESCRIPTIONSYMBOL 1.ALL HANGARS AND SUPPORTS SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES. ALL CONNECTIONS TO JOISTS SHALL BE MADE AT THE TOP CORD. 2.PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDENSATE DRAIN LINES WITH CONNECTIONS TO AN APPROVED RECEPTOR IN ACCORDANCE WITH THE CALIFORNIA PLUMBING CODE. REFER TO PLUMBING PLANS FOR ALL PRIMARY AND SECONDARY CONDENSATE ROUTING. 3.CONTRACTOR SHALL VERIFY IN FIELD THE SHORTEST ROUTING FOR REFRIGERANT LINES THAT COMPLY WITH MANUFACTURER'S INSTALLATION GUIDELINES AND DO NOT INTERFERE OR RESTRICT OTHER TRADES. 4.THE LIQUID AND SUCTION LINES SHALL BE PROTECTED FROM THE ENVIRONMENT USING A WATER RESISTANT METAL JACKET, PAINTED CANVAS, PLASTIC COVER OR COATING PER 2022 CEC. G. PIPING ACCESS DOOR BDD BACKDRAFT DAMPER CFM CUBIC FEET PER MINUTE dBA A-WEIGHTED DECIBEL EA EXHAUST AIR EF EXHAUST FAN FC FAN COIL FD FIRE DAMPER HP HEAT PUMP HSPF HEATING SEASONAL PERFORMANCE FACTOR LAU LAUNDRY ROOM MVD MANUAL VOLUME DAMPER NG NATURAL GAS OSA OUTSIDE AIR PDR POWDER ROOM RA RETURN AIR RL REFRIGERANT LIQUID RS REFRIGERANT SUCTION RVD REMOTE OPERATED DAMPER SA SUPPLY AIR SQFT SQUARE FEET SD SMOKE DETECTOR SA RA EA SA RA/EA SA RA/EA SA RA/EA SA RA EA DESCRIPTIONABBREVIATION MECHANICAL SHEET INDEX NO.SHEET DESCRIPTION 1 M-0.1 GENERAL NOTES & LEGENDS 2 M-0.2 EQUIPMENT SCHEDULES 3 M-1.1 SITE PLAN 4 M-2.1 BUILDING A1 - LEVEL 1 FLOOR PLAN 5 M-2.2 BUILDING A2 - LEVEL 1 FLOOR PLAN 6 M-2.3 BUILDING A1, A2 - LEVEL 2 FLOOR PLAN 7 M-2.4 BUILDING A1, A2 - ROOF PLAN 8 M-3.1 UNIT FLOOR PLANS 9 MD-1 DETAILS al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 M-0.1 GENERAL NOTES & LEGENDS PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 DIFFUSERS/GRILLES/REGISTERS TAG AIRFLOW RANGE (CFM)NOTES DUCT SIZE (IN.) NOTES: 1.ALL PERFORMANCE DATA SHALL BE IN ACCORDANCE WITH ANSI/ASHRAE STANDARDS. 2.UNLESS OTHERWISE NOTED, ALL DIFFUSERS/REGISTERS/GRILLES SHALL HAVE NC RATINGS <30. 3.COORDINATE FRAME TYPE WITH ARCHITECTURAL RCP. 4.COLOR TO BE SPECIFIED BY ARCHITECT. 5.PROVIDE GRILLE WITH VERTICAL ORIENTED BLADES AND MULTI SHUTTER DAMPER. MANUFACTURER MODEL NO. FACE SIZE (IN.) PRESS. DROP (IN. W.G.) FUNCTION TAG CFM S-1 TRUAIRE 210VM CEILING & WALL SUPPLY GRILLE Ø5 Ø6 Ø7 Ø8 Ø9 Ø10 0 - 50 51 - 100 101 - 150 151 - 200 201 - 300 301 - 400 0.01 0.01 0.01 0.02 0.02 0.01 10 x 4 10 x 6 12 x 6 14 X 6 14 X 8 14 X 12 1,2,3,4,5 R-1 TRUAIRE 290 FIXED BAR CEILING & WALL RETURN GRILLE Ø10 Ø18 0 - 850 0 - 2500 0.06514 X 14 30 X 20 1,2,3,4,5 GENERAL SCHEDULE OF FANS TYPE TAG SERVICE MANUFACTURER MODEL NO. NOTES LOCATION NOTES: 1.ALL FANS SHALL BE TESTED AND RATED, CERTIFIED, AND SEALED IN ACCORDANCE WITH AMCA FOR BOTH SOUND AND AIR PERFORMANCE. ALL FANS SHALL BE U.L. LISTED. 2.FAN SHALL BE PROVIDED WITH A NEMA-1 (INDOORS) OR NEMA-3R (OUTDOORS) DISCONNECT SWITCH. REFER TO ELECTRICAL DRAWINGS FOR MORE INFORMATION. 3.PROVIDE GRAVITY BACKDRAFT DAMPER IN THROAT OF EXHAUST DUCT. 4.FAN SHALL BE PROVIDED WITH BUILT-IN HUMIDITY SENSOR. FAN DATA MOTOR WEIGHT (LBS) TYPE / DESIGN TAG TYPE SONES EXTERNAL STATIC PRESSURE (IN. W.G.) TOTAL AIR QTY (CFM) MOTOR TYPE RATED SIZE VOLTS/ PHASE/ HERTZ EF B BATHROOM AIRKING ES80SH CEILING 17.0 CEILING MOUNTED 80 0.1 0.3 29.4 W 120/1/60 1,2,3PSC NOTE: ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL RELAYS AS REQUIRED TO ACHIEVE CONTROL OF UNITS AS SPECIFIED BELOW SEQUENCE OF OPERATIONS Unit shall operate via a wall-mounted thermostat. Fan to operate as required by thermostat. Cooling and heating modes shall operate as required by thermostat.FC/CU's Fan to operate continuously while house is occupied. Fan to act as IAQ fan to meet ASHRAE 62.2 ventilation requirements.EF B AIR SYSTEM DESIGN CRITERIA CITY SANTA ANA COUNTY ORANGE CLIMATE ZONE 08 SUMMER AMBIENT DESIGN TEMPERATURE (°F DB/WB)91 / 68 SUMMER DAILY RANGE (°F WB)26 WINTER AMBIENT DESIGN TEMPERATURE (°F DB)33 SUMMER INDOOR DESIGN TEMPERATURE (°F DB)75 WINTER INDOOR DESIGN TEMPERATURE (°F DB)68 WHOLE UNIT VENTILATION CALCULATION (ASHRAE 62.2) CONTINUOUSLY LOCATION UNIT A-1 FLOOR AREA (SQFT)830 NO. OF BEDROOMS 2 VENTILATION RATE (CFM) = 0.03(SQFT) +7.5(BEDROOMS+1)47.4 DESIGNED VENTILATION (CFM)80 18 GENERAL SCHEDULE OF NEW HEAT PUMP CONDENSING UNITS TAG SERVICE MANUFACTURER MODEL NO.TONSLOCATION AMB. DB (°F) TOTAL LOAD (MBH) SENS. LOAD (MBH) COOLING HEATING WEIGHT (LBS) TOTAL LOAD (MBH) REF. PIPING TYPE VOLTS/ PHASE/ HERTZ MCA (A) MOCP (A) ELECTRICAL TAG HP NOTESAMB. DB (°F) EER (EER2) SEER / (SEER2) HSPF/ (HSPF2) CONN. Ø LIQUID / SUCTION (IN.) SYSTEM CHARGE (LBS) NOTES: 1.DISCONNECT SWITCH TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 2.PROVIDE CONTROL WIRING, CONDUIT, ETC. FOR A COMPLETE AND OPERABLE SYSTEM. 3.PROVIDE ALL REQUIRED MATERIALS & INSULATED REFRIGERANT LINES FOR COMPLETE INSTALLATION. SIZE RS/RL PIPING PER MANUFACTURERS GUIDELINES. 4.RS/RL ACCESS PORTS LOCATED OUTDOORS SHALL BE PROTECTED FROM UNAUTHORIZED ACCESS WITH LOCKING TYPE TAMPER RESISTANT CAPS. UNLESS THEY ARE PROTECTED BY WALLS OR FENCING AND REQUIRING KEY ACCESS. 5.CONDENSING UNIT SHALL REST ON A CONCRETE OR OTHER APPROVED BASE PER DETAILS ON MD-1. 6.INSTALL EQUIPMENT IN ACCORDANCE WITH BOTH THE DETAILS SHOWN IN THE CONTRACT DOCUMENTS AND IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. NOTES: 1.DISCONNECT SWITCH TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 2.PROVIDE HARD-WIRED PROGRAMMABLE SETBACK THERMOSTAT, CONTROL WIRING, CONDUIT, ETC. FOR A COMPLETE AND OPERABLE SYSTEM. 3.PROVIDE UNIT WITH ECM MOTOR SET TO PROVIDE CFM QUANTITIES PER SCHEDULE. 4.PROVIDE UNIT WITH ACCESS PER MANUFACTURER'S RECOMMENDATIONS AND LOCAL CODE REQUIREMENTS. 5.PROVIDE UNIT WITH FACTORY SECONDARY DRAIN PAN. 6.PROVIDE ALL REQUIRED MATERIALS & INSULATED REFRIGERANT LINES FOR COMPLETE INSTALLATION. SIZE RS/RL PIPING PER MANUFACTURERS GUIDELINES. 7.INDOOR UNIT TO RECEIVE POWER FROM OUTDOOR UNIT. 8.PROVIDE MERV 13 FILTER. GENERAL SCHEDULE OF NEW FAN COIL UNITS TAG SERVICE MANUFACTURER MODEL NO.HPLOCATION WEIGHT (LBS) VOLTS/ PHASE/ HERTZ MCA (A) MOCP (A) ELECTRICAL TAG FC NOTESOUTSIDE AIR QTY (CFM) EXTERNAL STATIC PRESSURE (IN. W.G.) TOTAL AIR QTY (CFM) FAN DATA TOTAL LOAD (MBH) SENS. LOAD (MBH) COOLING HEATING TOTAL LOAD (MBH) ELEC. HEAT 18 CARRIER 40MBDQ18---3 18 54 16.5 18.0 N/A 1,2,6,7,80600SEE PLAN --SEE PLAN 208/230/1 /60 POWERED BY OUTDOOR UNIT 1.20.4 1.5 208/230/1 /60 251616.5 --1/4 1/2 1,2,3,4,5,612.5 (11.7) 19.6 (18.0)19.0 4.08R-410A11.0 (9.5)95 47CARRIER 38MARBQ18--3 101SEE PLAN GROUND EF L LAUNDRY AIRKING E130S CEILING 14.1 CEILING MOUNTED 130 0.1 <0.3 37.0 120/1/60 1,2,3PSC SF C CORRIDOR BROAN FIN-180P CEILING 11.0 CEILING MOUNTED 180 0.2 -28.2 120/1/60 1,2,3ECM al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 M-0.2 EQUIPMENT SCHEDULES PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 FIRE LANE 14 0 140 140 140 140 FP IC V 2 2 1 DS DS DS DS DS DSDS DS DSDS DS DS BT W N . B L D G S . 10 ' - 0 " PR O V I D E D S T B K 10 ' - 0 " E E REMOVE EX. BOLLARDS TRASH ENCLOSURE, SEE LANDSCAPE OFF STREET LOADING AREA (300 SF MIN, 420 SF SHOWN; NO DIM LESS THAN 10 FT) R 41' - 9 " 11 ' - 6 " 11 ' - 6 " 11 ' - 6 " R 4 1 ' - 1 " R 41' - 9 " 11 ' - 6 " R 4 1 ' - 1 " R 4 1 ' - 9 " TRASH TRUCK ROUTE 20' - 0" 21 ' - 0 " 18 HP 2 18 HP 2 18 HP 2 18 HP 2 18 HP 2 18 HP 2 18 HP 218 HP2 18 HP 218 HP2 18 HP 2 18 HP 2 18 HP 2 18 HP 2 18 HP 218 HP2 HVAC GENERAL NOTES 1.REFER TO DRAWING M-0.1 FOR LEGENDS, SYMBOLS, ABBREVIATIONS & GENERAL NOTES. 2.REFER TO DRAWING M-0.2 FOR EQUIPMENT SCHEDULES. 3.REFER TO DRAWINGS MD-1 FOR MECHANICAL DETAILS. 4.COORDINATE EXACT ROUTING OF DUCTWORK WITH STRUCTURAL AND ALL OTHER TRADES, ROUTING SHOWN IS SCHEMATIC ONLY. 5.PROVIDE CAN AND DUCT COLLAR AS REQUIRED FOR ALL GRILLES AND DIFFUSERS. 6.OPENINGS IN THE ROOF SHALL NOT BE LOCATED WITHIN 5 FEET (1,524 MM) OF THE 1-HOUR FIRE-RESISTANCE-RATED EXTERIOR WALL FOR GROUPS R AND U AND 10 FEET (3,048 MM) OR OTHER OCCUPANCIES, MEASURED FROM THE INTERIOR SIDE OF THE WALL. (CBC 705.11.4.3). 7.PROVIDE A MINIMUM OF 100 SQ. IN FREE AREA OPENING(S) INTO LAUNDRY ROOM FOR MAKE-UP AIR AS REQUIRED BY CODE (CMC 504.4.1). 8.FIRE SEAL ALL PENETRATIONS AS REQUIRED BY CODE. 9.FIRE DAMPER RATINGS SHALL BE IN ACCORDANCE WITH 717.3.2.1 THROUGH 717.3.2.4. FIRE DAMPERS SHALL HAVE THE MINIMUM FIRE PROTECTIONS RATING SPECIFIED IN TABLE 717.3.2.1 FOR TYPES OF PENETRATION. 10.FOR CEILING HEIGHTS SEE ARCHITECTURAL DRAWINGS. 11.ALL ENVIRONMENTAL AIR VENTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS (SECTION 504.0 CMC). 12.UNLESS NOTED DIFFERENT ON THE PLANS, ALL SUPPLY REGISTERS SHALL BE BAR TYPE (TRUAIRE TYPE 210, 220, 230, OR SIMILAR) WITH TOTAL PRESSURE LOSS LESS THAN. 0.025 in.w.g. 13.THE FLUE DUCT FOR SEALED COMBUSTION WATER HEATER IS SIDE-WAL DISCHARGE. 3 FEET AWAY FROM OPENINGS INTO THE BUILDING AND 5' AWAY FROM THE PROPERTY LINE. SEE CIVIL DRAWINGS FOR PROPERTY LINE DETAILS. 14.IF HUMIDISTAT IS REQUIRED, LOCATE IT ADJACENT TO THERMOSTAT. 15."REGISTERED' COPY OF THE CF-2R FORMS SHALL BE SUBMITTED PRIOR TO FINAL INSPECTION, SIGNED BY HERS RATER, FOR FIELD VERIFICATION AND DIAGNOSTIC TESTING. 16.WHEN LOCAL EXHAUST FANS ARE USED FOR "CONTINUOUS" WHOLE BUILDING VENTILATION, THE LOCAL EXHAUST FAN SWITCH SHALL BE PERMITTED AS AN OVERRIDE CONTROL. (SECTION 4.3 ASHRAE 62.2) 17.CONTRACTOR TO VERIFY INSTALLED DRYER LENGTHS ON FIELD. 18.KITCHEN HOODS SHALL BE RATED FOR SOUND IN ACCORDANCE WITH 2022 CALIFORNIA ENERGY CODE SECTION 150.0(o)G. 19.MECHANICAL SYSTEMS INCLUDING HEATING AND AIR CONDITIONING SYSTEMS THAT SUPPLY AIR TO HABITABLE SPACES SHALL HAVE MERV 13 FILTERS OR BETTER (NOMINAL 2" THICK FILTER, OR EQUIVALENT 1" FILTER PER EQUATION 150.0-A). DESIGNERS SHOULD CONSIDER HOW THIS MAY IMPACT SYSTEM DESIGN AIRFLOW. (2022 CEC SECTION 150.0(m) 12(C)). 20.COMBUSTION APPLIANCES SHALL BE PROPERLY VENTED AND AIR SYSTEMS SHALL BE DESIGNED TO PREVENT BACK DRAFTING. 21.ENVIRONMENTAL AIR DUCT EXHAUST SHALL TERMINATE AT LEAST 3 FEET (914 MM) FROM THE PROPERTY LINE, 10 FEET (3048 MM) FROM A FORCED AIR INLET, 10 FEET (3048 MM) ABOVE A PUBLIC WALKWAY, AND 3 FEET (914 MM) FROM BUILDING OPENINGS. THE DISCHARGE SHALL NOT BE DIRECTED ONTO A PUBLIC WALKWAY. 22.UNDER THE 2022 CEC, MULTIFAMILY LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS MAY USE A CONTINUOUSLY OPERATED EXHAUST-ONLY OR SUPPLY-ONLY VENTILATION APPROACH IF ENVELOPE LEAKAGE IS ≤0.3 CFM AT 50 PA PER SQUARE FOOT. THIS MUST BE FIELD-TESTED AND VERIFIED THROUGH A BLOWER DOOR TEST AS AN ALTERNATIVE TO THE BALANCED VENTILATION REQUIREMENT UNDER CEC 160.2(B)2A IV AND 150.0(O)1C. IF CHOSEN, THE DEVELOPER MUST ENSURE THE GENERAL CONTRACTOR IMPLEMENTS ALL NECESSARY BUILDING TECHNIQUES TO MEET LEAKAGE REQUIREMENTS. 23.WHEN SPACE CONDITIONING SYSTEMS USE FORCED-AIR DUCT SYSTEMS TO SUPPLY AIR TO AN OCCUPIABLE SPACE, THE DUCTS MUST BE SEALED AND TESTED FOR LEAKAGE. COMPLIANCE MUST BE CONFIRMED THROUGH FIELD VERIFICATION AND DIAGNOSTIC TESTING PER REFERENCE RESIDENTIAL APPENDIX RA3.1 OF THE 2022 CEC 150.0(M)11. 24.THE AIRFLOW REQUIRED PER 2022 CEC 150.0(O)1C MUST BE MEASURED USING A FLOW HOOD, FLOW GRID, OR ANOTHER AIRFLOW MEASURING DEVICE AT THE FAN'S INLET OR OUTLET TERMINALS/GRILLES, AS SPECIFIED IN REFERENCE RESIDENTIAL APPENDIX RA3.7. WHOLE-DWELLING UNIT VENTILATION SYSTEMS MUST MEET THE SOUND RATING REQUIREMENTS OF ASHRAE 62.2 §7.2 AT OR ABOVE THE MINIMUM AIRFLOW RATE REQUIRED BY 2022 CEC 150.0(O)1C. HVAC KEY NOTES CAP SHOULD BE LISTED FOR CLOTHES DRYER VENTING (DRYER JACK). DRYER MOISTURE DUCT SHALL BE EQUIPPED WITH BACK DRAFT DAMPER. DRYER MOISTURE DUCT SHALL BE MADE OUT OF METAL WITH SMOOTH INTERIOR FACE. LISTED CONNECTOR SHALL BE MAX. 6 FT. LONG. RUN 3/4" PRIMARY CONDENSATE LINE TO THE LAVATORY TAILPIECE. SECONDARY CONDENSATE TO DRAIN TO THE EXTERIOR ABOVE A WINDOW. OPTIONALLY USE OVERFLOW SWITCH. COORDINATE WITH THE PLUMBER. PROVIDE WHOLE HOUSE EXHAUST FAN PER 2022 ENERGY CODE SECTION 150(O). THE EXHAUST OUTLET SHALL TERMINATE AT LEAST 3 FEET FROM BUILDING OPENINGS AND THE PROPERTY LINE, AS SHOWN IN THE CIVIL DRAWINGS. OUTDOOR EXHAUST OPENINGS MUST BE COVERED WITH A CORROSION-RESISTANT SCREEN WITH OPENINGS BETWEEN 1/4 INCH (6.4 MM) AND 1/2 INCH (12.7 MM). EXCEPTION: CLOTHES DRYERS. PROVIDE FLUE DUCT FOR WATER HEATER. INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL. PROVIDE RS/RL PIPING SIZE PER MANUFACTURER'S GUIDELINES. ROUTE FROM REMOTE CONDENSATE UNIT TO FAN COIL. PROVIDE 6" CONCRETE PAD /PLATFORM FOR REMOTE CONDENSER. EXHAUST VENT PIPE UP THRU ROOF, INSTALLED PER MANUFACTURER GUIDELINES. ROUTING AND TERMINATION OF VENT FOR HEATING UNIT SHALL COMPLY WITH CH. 8, CMC 2022. PROVIDE OPENING NOT LESS THAN 100 SQ. IN. FREE NET AREA FOR DRYER MAKEUP AIR PER CMC 2022 (504.4.1). 1 2 3 4 5 6 7 8 9 PROVIDE DOOR UNDERCUT.10 6"Ø EA DUCT UP THRU ROOF W/ CAP. 4"Ø LINT DUCT UP THRU ROOF W/ CAP. 8"Ø HOOD DUCT UP THRU ROOF W/ CAP. CONNECT KITCHEN HOOD TO 8"Ø KITCHEN HOOD EXHAUST AIR DUCT (MIN. 8"Ø). SEE DETAIL NUMBER #2 ON SHEET MD-1 FOR MINIMUM CFM RATE. 11 12 13 PROVIDE A 30" X 20" MAKE-UP AIR LOUVER (MINIMUM NET FREE AREA OF 300 SQUARE INCHES). THE LOUVER SHALL BE EQUIPPED WITH AN INSECT SCREEN. 14 0 10'20'5' 1/20" = 1'-0" 30' 1SITE PLAN M-1.1 SITE PLAN al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 HVAC GENERAL NOTES 1.REFER TO DRAWING M-0.1 FOR LEGENDS, SYMBOLS, ABBREVIATIONS & GENERAL NOTES. 2.REFER TO DRAWING M-0.2 FOR EQUIPMENT SCHEDULES. 3.REFER TO DRAWINGS MD-1 FOR MECHANICAL DETAILS. 4.COORDINATE EXACT ROUTING OF DUCTWORK WITH STRUCTURAL AND ALL OTHER TRADES, ROUTING SHOWN IS SCHEMATIC ONLY. 5.PROVIDE CAN AND DUCT COLLAR AS REQUIRED FOR ALL GRILLES AND DIFFUSERS. 6.OPENINGS IN THE ROOF SHALL NOT BE LOCATED WITHIN 5 FEET (1,524 MM) OF THE 1-HOUR FIRE-RESISTANCE-RATED EXTERIOR WALL FOR GROUPS R AND U AND 10 FEET (3,048 MM) OR OTHER OCCUPANCIES, MEASURED FROM THE INTERIOR SIDE OF THE WALL. (CBC 705.11.4.3). 7.PROVIDE A MINIMUM OF 100 SQ. IN FREE AREA OPENING(S) INTO LAUNDRY ROOM FOR MAKE-UP AIR AS REQUIRED BY CODE (CMC 504.4.1). 8.FIRE SEAL ALL PENETRATIONS AS REQUIRED BY CODE. 9.FIRE DAMPER RATINGS SHALL BE IN ACCORDANCE WITH 717.3.2.1 THROUGH 717.3.2.4. FIRE DAMPERS SHALL HAVE THE MINIMUM FIRE PROTECTIONS RATING SPECIFIED IN TABLE 717.3.2.1 FOR TYPES OF PENETRATION. 10.FOR CEILING HEIGHTS SEE ARCHITECTURAL DRAWINGS. 11.ALL ENVIRONMENTAL AIR VENTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS (SECTION 504.0 CMC). 12.UNLESS NOTED DIFFERENT ON THE PLANS, ALL SUPPLY REGISTERS SHALL BE BAR TYPE (TRUAIRE TYPE 210, 220, 230, OR SIMILAR) WITH TOTAL PRESSURE LOSS LESS THAN. 0.025 in.w.g. 13.THE FLUE DUCT FOR SEALED COMBUSTION WATER HEATER IS SIDE-WAL DISCHARGE. 3 FEET AWAY FROM OPENINGS INTO THE BUILDING AND 5' AWAY FROM THE PROPERTY LINE. SEE CIVIL DRAWINGS FOR PROPERTY LINE DETAILS. 14.IF HUMIDISTAT IS REQUIRED, LOCATE IT ADJACENT TO THERMOSTAT. 15."REGISTERED' COPY OF THE CF-2R FORMS SHALL BE SUBMITTED PRIOR TO FINAL INSPECTION, SIGNED BY HERS RATER, FOR FIELD VERIFICATION AND DIAGNOSTIC TESTING. 16.WHEN LOCAL EXHAUST FANS ARE USED FOR "CONTINUOUS" WHOLE BUILDING VENTILATION, THE LOCAL EXHAUST FAN SWITCH SHALL BE PERMITTED AS AN OVERRIDE CONTROL. (SECTION 4.3 ASHRAE 62.2) 17.CONTRACTOR TO VERIFY INSTALLED DRYER LENGTHS ON FIELD. 18.KITCHEN HOODS SHALL BE RATED FOR SOUND IN ACCORDANCE WITH 2022 CALIFORNIA ENERGY CODE SECTION 150.0(o)G. 19.MECHANICAL SYSTEMS INCLUDING HEATING AND AIR CONDITIONING SYSTEMS THAT SUPPLY AIR TO HABITABLE SPACES SHALL HAVE MERV 13 FILTERS OR BETTER (NOMINAL 2" THICK FILTER, OR EQUIVALENT 1" FILTER PER EQUATION 150.0-A). DESIGNERS SHOULD CONSIDER HOW THIS MAY IMPACT SYSTEM DESIGN AIRFLOW. (2022 CEC SECTION 150.0(m) 12(C)). 20.COMBUSTION APPLIANCES SHALL BE PROPERLY VENTED AND AIR SYSTEMS SHALL BE DESIGNED TO PREVENT BACK DRAFTING. 21.ENVIRONMENTAL AIR DUCT EXHAUST SHALL TERMINATE AT LEAST 3 FEET (914 MM) FROM THE PROPERTY LINE, 10 FEET (3048 MM) FROM A FORCED AIR INLET, 10 FEET (3048 MM) ABOVE A PUBLIC WALKWAY, AND 3 FEET (914 MM) FROM BUILDING OPENINGS. THE DISCHARGE SHALL NOT BE DIRECTED ONTO A PUBLIC WALKWAY. 22.UNDER THE 2022 CEC, MULTIFAMILY LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS MAY USE A CONTINUOUSLY OPERATED EXHAUST-ONLY OR SUPPLY-ONLY VENTILATION APPROACH IF ENVELOPE LEAKAGE IS ≤0.3 CFM AT 50 PA PER SQUARE FOOT. THIS MUST BE FIELD-TESTED AND VERIFIED THROUGH A BLOWER DOOR TEST AS AN ALTERNATIVE TO THE BALANCED VENTILATION REQUIREMENT UNDER CEC 160.2(B)2A IV AND 150.0(O)1C. IF CHOSEN, THE DEVELOPER MUST ENSURE THE GENERAL CONTRACTOR IMPLEMENTS ALL NECESSARY BUILDING TECHNIQUES TO MEET LEAKAGE REQUIREMENTS. 23.WHEN SPACE CONDITIONING SYSTEMS USE FORCED-AIR DUCT SYSTEMS TO SUPPLY AIR TO AN OCCUPIABLE SPACE, THE DUCTS MUST BE SEALED AND TESTED FOR LEAKAGE. COMPLIANCE MUST BE CONFIRMED THROUGH FIELD VERIFICATION AND DIAGNOSTIC TESTING PER REFERENCE RESIDENTIAL APPENDIX RA3.1 OF THE 2022 CEC 150.0(M)11. 24.THE AIRFLOW REQUIRED PER 2022 CEC 150.0(O)1C MUST BE MEASURED USING A FLOW HOOD, FLOW GRID, OR ANOTHER AIRFLOW MEASURING DEVICE AT THE FAN'S INLET OR OUTLET TERMINALS/GRILLES, AS SPECIFIED IN REFERENCE RESIDENTIAL APPENDIX RA3.7. WHOLE-DWELLING UNIT VENTILATION SYSTEMS MUST MEET THE SOUND RATING REQUIREMENTS OF ASHRAE 62.2 §7.2 AT OR ABOVE THE MINIMUM AIRFLOW RATE REQUIRED BY 2022 CEC 150.0(O)1C. HVAC KEY NOTES CAP SHOULD BE LISTED FOR CLOTHES DRYER VENTING (DRYER JACK). DRYER MOISTURE DUCT SHALL BE EQUIPPED WITH BACK DRAFT DAMPER. DRYER MOISTURE DUCT SHALL BE MADE OUT OF METAL WITH SMOOTH INTERIOR FACE. LISTED CONNECTOR SHALL BE MAX. 6 FT. LONG. RUN 3/4" PRIMARY CONDENSATE LINE TO THE LAVATORY TAILPIECE. SECONDARY CONDENSATE TO DRAIN TO THE EXTERIOR ABOVE A WINDOW. OPTIONALLY USE OVERFLOW SWITCH. COORDINATE WITH THE PLUMBER. PROVIDE WHOLE HOUSE EXHAUST FAN PER 2022 ENERGY CODE SECTION 150(O). THE EXHAUST OUTLET SHALL TERMINATE AT LEAST 3 FEET FROM BUILDING OPENINGS AND THE PROPERTY LINE, AS SHOWN IN THE CIVIL DRAWINGS. OUTDOOR EXHAUST OPENINGS MUST BE COVERED WITH A CORROSION-RESISTANT SCREEN WITH OPENINGS BETWEEN 1/4 INCH (6.4 MM) AND 1/2 INCH (12.7 MM). EXCEPTION: CLOTHES DRYERS. PROVIDE FLUE DUCT FOR WATER HEATER. INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL. PROVIDE RS/RL PIPING SIZE PER MANUFACTURER'S GUIDELINES. ROUTE FROM REMOTE CONDENSATE UNIT TO FAN COIL. PROVIDE 6" CONCRETE PAD /PLATFORM FOR REMOTE CONDENSER. EXHAUST VENT PIPE UP THRU ROOF, INSTALLED PER MANUFACTURER GUIDELINES. ROUTING AND TERMINATION OF VENT FOR HEATING UNIT SHALL COMPLY WITH CH. 8, CMC 2022. PROVIDE OPENING NOT LESS THAN 100 SQ. IN. FREE NET AREA FOR DRYER MAKEUP AIR PER CMC 2022 (504.4.1). 1 2 3 4 5 6 7 8 9 PROVIDE DOOR UNDERCUT.10 6"Ø EA DUCT UP THRU ROOF W/ CAP. 4"Ø LINT DUCT UP THRU ROOF W/ CAP. 8"Ø HOOD DUCT UP THRU ROOF W/ CAP. CONNECT KITCHEN HOOD TO 8"Ø KITCHEN HOOD EXHAUST AIR DUCT (MIN. 8"Ø). SEE DETAIL NUMBER #2 ON SHEET MD-1 FOR MINIMUM CFM RATE. 11 12 13 PROVIDE A 30" X 20" MAKE-UP AIR LOUVER (MINIMUM NET FREE AREA OF 300 SQUARE INCHES). THE LOUVER SHALL BE EQUIPPED WITH AN INSECT SCREEN. 14 DS DS DS DS DS UP FE FE 101 102 103 ALIGN ALIGN DRYER DRYER WASHER / DRYER WASHERWASHER FOLDING TABLE LAUNDRY CONFERENCE ROOM COMMUNITY ROOM JAN. ALL-GENDER RESTROOM KITCHEN (RESIDENCE USE ONLY) 60"x54"48"x48 60"x54"48"x48" 60"x54"48"x36" 60"x54" 48"x36" 3 A500 6 30"X10" WALL R.A.G . . T FC-18 10 10 10 3 . . . . . . . 12" DROP 12" DROP 12" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 7 116 12X6 18 FC 7"Ø 7"Ø 9"Ø 7"Ø 7"Ø 8"Ø 6"Ø 7"Ø 10"Ø 10"Ø 6 30"X10" WALL R.A.G . . TFC-18 10 10 10 3 . . . . . . 12" DROP12" DROP 12" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 18 FC 7"Ø 7"Ø 9"Ø 7"Ø8"Ø 6"Ø 7"Ø 10"Ø 10"Ø 6 30"X10" WALL R.A.G . . TFC-18 10 10 10 3 . . . . . . 12" DROP12" DROP 12" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 18 FC 7"Ø 7"Ø 9"Ø 7"Ø8"Ø 6"Ø 7"Ø 10"Ø 10"Ø NOTE: PLEASE REFER TO SITE PLAN SHEET M-1.1 FOR THE CONDENSOR LOCATIONS. . . 3 18 FC 7 121 12X6 8 167 14X6 8 167 14X6 7 137 12X6 . 8"Ø . 7"Ø . 7"Ø 12" DROP 30"X10" WALL R.A.G T FC-18 10"Ø 10"Ø 6 6 59 10X6 9"Ø . . 6"Ø . 8"Ø 10 L EF7 7 9 7 7 4"Ø 4"Ø 4"Ø (4 FT, 1E) (4 FT, 1E) (4 FT, 1E) 30"X20" MAKEUP AIR LOUVER 14 OPERABLE PORTION OPERABLE PORTION OPERABLE PORTION OPERABLE PORTION 1' - 0 " 10" DROP 1' - 0 " 10" DROP 7 1' - 0 " 1' - 0 " RUN IN LINED JOIST BAY 10" DROP 7 RUN IN LINED JOIST BAY 10" DROP 7 RUN IN LINED JOIST BAY 10" DROP RUN IN LINED JOIST BAY 7 6"Ø 6"Ø 6"Ø 6"Ø B EF 5 B EF 5 B EF5 B EF 5 8"Ø 8"Ø C SF 8 180 14X6 . 7"Ø 7 116 12X6 . 7 116 12X6 7"Ø 14" DROP 7 6"Ø RUN IN LINED JOIST BAY 14" DROP 7 RUN IN LINED JOIST BAY 6"Ø OPERABLE PORTION 14" DROP 7 RUN IN LINED JOIST BAY 14" DROP 7 RUN IN LINED JOIST BAY 6"Ø 6"Ø OPERABLE PORTION OPERABLE PORTION OPERABLE PORTION al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A1 - LEVEL 1 FLOOR PLAN M-2.1 BUILDING A1 LEVEL 1 FLOOR PLAN 1. PROVIDE ACCESS PANEL PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 HVAC GENERAL NOTES 1.REFER TO DRAWING M-0.1 FOR LEGENDS, SYMBOLS, ABBREVIATIONS & GENERAL NOTES. 2.REFER TO DRAWING M-0.2 FOR EQUIPMENT SCHEDULES. 3.REFER TO DRAWINGS MD-1 FOR MECHANICAL DETAILS. 4.COORDINATE EXACT ROUTING OF DUCTWORK WITH STRUCTURAL AND ALL OTHER TRADES, ROUTING SHOWN IS SCHEMATIC ONLY. 5.PROVIDE CAN AND DUCT COLLAR AS REQUIRED FOR ALL GRILLES AND DIFFUSERS. 6.OPENINGS IN THE ROOF SHALL NOT BE LOCATED WITHIN 5 FEET (1,524 MM) OF THE 1-HOUR FIRE-RESISTANCE-RATED EXTERIOR WALL FOR GROUPS R AND U AND 10 FEET (3,048 MM) OR OTHER OCCUPANCIES, MEASURED FROM THE INTERIOR SIDE OF THE WALL. (CBC 705.11.4.3). 7.PROVIDE A MINIMUM OF 100 SQ. IN FREE AREA OPENING(S) INTO LAUNDRY ROOM FOR MAKE-UP AIR AS REQUIRED BY CODE (CMC 504.4.1). 8.FIRE SEAL ALL PENETRATIONS AS REQUIRED BY CODE. 9.FIRE DAMPER RATINGS SHALL BE IN ACCORDANCE WITH 717.3.2.1 THROUGH 717.3.2.4. FIRE DAMPERS SHALL HAVE THE MINIMUM FIRE PROTECTIONS RATING SPECIFIED IN TABLE 717.3.2.1 FOR TYPES OF PENETRATION. 10.FOR CEILING HEIGHTS SEE ARCHITECTURAL DRAWINGS. 11.ALL ENVIRONMENTAL AIR VENTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS (SECTION 504.0 CMC). 12.UNLESS NOTED DIFFERENT ON THE PLANS, ALL SUPPLY REGISTERS SHALL BE BAR TYPE (TRUAIRE TYPE 210, 220, 230, OR SIMILAR) WITH TOTAL PRESSURE LOSS LESS THAN. 0.025 in.w.g. 13.THE FLUE DUCT FOR SEALED COMBUSTION WATER HEATER IS SIDE-WAL DISCHARGE. 3 FEET AWAY FROM OPENINGS INTO THE BUILDING AND 5' AWAY FROM THE PROPERTY LINE. SEE CIVIL DRAWINGS FOR PROPERTY LINE DETAILS. 14.IF HUMIDISTAT IS REQUIRED, LOCATE IT ADJACENT TO THERMOSTAT. 15."REGISTERED' COPY OF THE CF-2R FORMS SHALL BE SUBMITTED PRIOR TO FINAL INSPECTION, SIGNED BY HERS RATER, FOR FIELD VERIFICATION AND DIAGNOSTIC TESTING. 16.WHEN LOCAL EXHAUST FANS ARE USED FOR "CONTINUOUS" WHOLE BUILDING VENTILATION, THE LOCAL EXHAUST FAN SWITCH SHALL BE PERMITTED AS AN OVERRIDE CONTROL. (SECTION 4.3 ASHRAE 62.2) 17.CONTRACTOR TO VERIFY INSTALLED DRYER LENGTHS ON FIELD. 18.KITCHEN HOODS SHALL BE RATED FOR SOUND IN ACCORDANCE WITH 2022 CALIFORNIA ENERGY CODE SECTION 150.0(o)G. 19.MECHANICAL SYSTEMS INCLUDING HEATING AND AIR CONDITIONING SYSTEMS THAT SUPPLY AIR TO HABITABLE SPACES SHALL HAVE MERV 13 FILTERS OR BETTER (NOMINAL 2" THICK FILTER, OR EQUIVALENT 1" FILTER PER EQUATION 150.0-A). DESIGNERS SHOULD CONSIDER HOW THIS MAY IMPACT SYSTEM DESIGN AIRFLOW. (2022 CEC SECTION 150.0(m) 12(C)). 20.COMBUSTION APPLIANCES SHALL BE PROPERLY VENTED AND AIR SYSTEMS SHALL BE DESIGNED TO PREVENT BACK DRAFTING. 21.ENVIRONMENTAL AIR DUCT EXHAUST SHALL TERMINATE AT LEAST 3 FEET (914 MM) FROM THE PROPERTY LINE, 10 FEET (3048 MM) FROM A FORCED AIR INLET, 10 FEET (3048 MM) ABOVE A PUBLIC WALKWAY, AND 3 FEET (914 MM) FROM BUILDING OPENINGS. THE DISCHARGE SHALL NOT BE DIRECTED ONTO A PUBLIC WALKWAY. 22.UNDER THE 2022 CEC, MULTIFAMILY LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS MAY USE A CONTINUOUSLY OPERATED EXHAUST-ONLY OR SUPPLY-ONLY VENTILATION APPROACH IF ENVELOPE LEAKAGE IS ≤0.3 CFM AT 50 PA PER SQUARE FOOT. THIS MUST BE FIELD-TESTED AND VERIFIED THROUGH A BLOWER DOOR TEST AS AN ALTERNATIVE TO THE BALANCED VENTILATION REQUIREMENT UNDER CEC 160.2(B)2A IV AND 150.0(O)1C. IF CHOSEN, THE DEVELOPER MUST ENSURE THE GENERAL CONTRACTOR IMPLEMENTS ALL NECESSARY BUILDING TECHNIQUES TO MEET LEAKAGE REQUIREMENTS. 23.WHEN SPACE CONDITIONING SYSTEMS USE FORCED-AIR DUCT SYSTEMS TO SUPPLY AIR TO AN OCCUPIABLE SPACE, THE DUCTS MUST BE SEALED AND TESTED FOR LEAKAGE. COMPLIANCE MUST BE CONFIRMED THROUGH FIELD VERIFICATION AND DIAGNOSTIC TESTING PER REFERENCE RESIDENTIAL APPENDIX RA3.1 OF THE 2022 CEC 150.0(M)11. 24.THE AIRFLOW REQUIRED PER 2022 CEC 150.0(O)1C MUST BE MEASURED USING A FLOW HOOD, FLOW GRID, OR ANOTHER AIRFLOW MEASURING DEVICE AT THE FAN'S INLET OR OUTLET TERMINALS/GRILLES, AS SPECIFIED IN REFERENCE RESIDENTIAL APPENDIX RA3.7. WHOLE-DWELLING UNIT VENTILATION SYSTEMS MUST MEET THE SOUND RATING REQUIREMENTS OF ASHRAE 62.2 §7.2 AT OR ABOVE THE MINIMUM AIRFLOW RATE REQUIRED BY 2022 CEC 150.0(O)1C. HVAC KEY NOTES CAP SHOULD BE LISTED FOR CLOTHES DRYER VENTING (DRYER JACK). DRYER MOISTURE DUCT SHALL BE EQUIPPED WITH BACK DRAFT DAMPER. DRYER MOISTURE DUCT SHALL BE MADE OUT OF METAL WITH SMOOTH INTERIOR FACE. LISTED CONNECTOR SHALL BE MAX. 6 FT. LONG. RUN 3/4" PRIMARY CONDENSATE LINE TO THE LAVATORY TAILPIECE. SECONDARY CONDENSATE TO DRAIN TO THE EXTERIOR ABOVE A WINDOW. OPTIONALLY USE OVERFLOW SWITCH. COORDINATE WITH THE PLUMBER. PROVIDE WHOLE HOUSE EXHAUST FAN PER 2022 ENERGY CODE SECTION 150(O). THE EXHAUST OUTLET SHALL TERMINATE AT LEAST 3 FEET FROM BUILDING OPENINGS AND THE PROPERTY LINE, AS SHOWN IN THE CIVIL DRAWINGS. OUTDOOR EXHAUST OPENINGS MUST BE COVERED WITH A CORROSION-RESISTANT SCREEN WITH OPENINGS BETWEEN 1/4 INCH (6.4 MM) AND 1/2 INCH (12.7 MM). EXCEPTION: CLOTHES DRYERS. PROVIDE FLUE DUCT FOR WATER HEATER. INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL. PROVIDE RS/RL PIPING SIZE PER MANUFACTURER'S GUIDELINES. ROUTE FROM REMOTE CONDENSATE UNIT TO FAN COIL. PROVIDE 6" CONCRETE PAD /PLATFORM FOR REMOTE CONDENSER. EXHAUST VENT PIPE UP THRU ROOF, INSTALLED PER MANUFACTURER GUIDELINES. ROUTING AND TERMINATION OF VENT FOR HEATING UNIT SHALL COMPLY WITH CH. 8, CMC 2022. PROVIDE OPENING NOT LESS THAN 100 SQ. IN. FREE NET AREA FOR DRYER MAKEUP AIR PER CMC 2022 (504.4.1). 1 2 3 4 5 6 7 8 9 PROVIDE DOOR UNDERCUT.10 6"Ø EA DUCT UP THRU ROOF W/ CAP. 4"Ø LINT DUCT UP THRU ROOF W/ CAP. 8"Ø HOOD DUCT UP THRU ROOF W/ CAP. CONNECT KITCHEN HOOD TO 8"Ø KITCHEN HOOD EXHAUST AIR DUCT (MIN. 8"Ø). SEE DETAIL NUMBER #2 ON SHEET MD-1 FOR MINIMUM CFM RATE. 11 12 13 PROVIDE A 30" X 20" MAKE-UP AIR LOUVER (MINIMUM NET FREE AREA OF 300 SQUARE INCHES). THE LOUVER SHALL BE EQUIPPED WITH AN INSECT SCREEN. 14 DS DS DS DS DS DS 2 2 B B C C A A 1 1 3 3 4 4 UP FE FE 100 101 102 103 ALIGN ALIGN E E E E E E E E BEDROOM 1 BEDROOM 2 BATH KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT INACCESSIBLE AREA UNDER STAIR 10" DROP 30"X10" WALL R.A.G . . T FC-18 10 10 10 3 . . . . . . 12" DROP 12" DROP 12" DROP 14" DROP 7 . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 B EF 5 18 FC 7"Ø 7"Ø 9"Ø 7"Ø 8"Ø 6"Ø 7"Ø 6"Ø 10"Ø 10"Ø 6 10" DROP 7 30"X10" WALL R.A.G . . T FC-18 10 10 10 3 . . . . . . 12" DROP 12" DROP 12" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 18 FC 7"Ø 7"Ø 9"Ø 7"Ø 8"Ø 6"Ø 7"Ø 10"Ø 10"Ø 6"Ø 1' - 0 " 30"X10" WALL R.A.G . . TFC-18 10 10 10 3 . . . . . . 12" DROP12" DROP 12" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 18 FC 7"Ø 7"Ø 9"Ø 7"Ø8"Ø 6"Ø 7"Ø 10"Ø 10"Ø 1' - 0 " 30"X10" WALL R.A.G . . TFC-18 10 10 10 3 . . . . . . 12" DROP12" DROP 12" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 18 FC 7"Ø 7"Ø 9"Ø 7"Ø8"Ø 6"Ø 7"Ø 10"Ø 10"Ø NOTE: PLEASE REFER TO SITE PLAN SHEET M-1.1 FOR THE CONDENSOR LOCATIONS. OPERABLE PORTION OPERABLE PORTION OPERABLE PORTION OPERABLE PORTION 6"Ø RUN IN LINED JOIST BAY 6 10" DROP 7 RUN IN LINED JOIST BAY 6"Ø 6"Ø 6 10" DROP 7 RUN IN LINED JOIST BAY 6"Ø 6"Ø 6 10" DROP RUN IN LINED JOIST BAY 6"Ø 7 RUN IN LINED JOIST BAY 14" DROP 7 B EF 5 RUN IN LINED JOIST BAY B EF 5 B EF5 6"Ø 8"Ø 8"Ø C SF 8 180 14X6 12" DROP . 7"Ø 7 116 12X6 . 7 116 12X6 7"Ø .. 7 116 12X6 7"Ø 7"Ø OPERABLE PORTION OPERABLE PORTION 14" DROP 7 RUN IN LINED JOIST BAY 14" DROP 7 RUN IN LINED JOIST BAY OPERABLE PORTION OPERABLE PORTION 6"Ø 6"Ø PROVIDE ACCESS PANEL al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A2 - LEVEL 1 FLOOR PLAN M-2.2 BUILDING A2 LEVEL 1 FLOOR PLAN 1. PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 DS DS DS DS DS DS 2 2 B B C C A A 1 1 3 3 4 4 DN FE FE 200 201 202 203 E E E E E E E E BEDROOM 1 BEDROOM 2 KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT 30"X10" WALL R.A.G . . T FC-18 10 10 10 3 . . . . . . 12" DROP 12" DROP 12" DROP 14" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 B EF 5 18 FC 11 6 137"Ø 6"Ø 8"Ø 7"Ø 9"Ø 7"Ø 7"Ø 6"Ø 30"X10" WALL R.A.G . . T FC-18 10 10 10 3 . . . . . . 12" DROP 12" DROP 12" DROP 14" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 B EF 5 18 FC 11 6 137"Ø 6"Ø 8"Ø 7"Ø 9"Ø 7"Ø 7"Ø 6"Ø 30"X10" WALL R.A.G . . TFC-18 10 10 10 3 . . . . . . 12" DROP12" DROP 12" DROP 14" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 B EF5 18 FC 11 6 13 7"Ø 6"Ø 8"Ø 7"Ø 9"Ø 7"Ø 7"Ø 6"Ø 30"X10" WALL R.A.G . . TFC-18 10 10 10 3 . . . . . . 12" DROP12" DROP 12" DROP 14" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 B EF 5 18 FC 11 6 13 7"Ø 6"Ø 8"Ø 7"Ø 9"Ø 7"Ø 7"Ø 6"Ø 10"Ø 10"Ø 10"Ø 10"Ø 10"Ø 10"Ø 10"Ø 10"Ø NOTE: PLEASE REFER TO SITE PLAN SHEET M-1.1 FOR THE CONDENSOR LOCATIONS. 8"Ø 8"Ø C SF 8 180 14X6 . 7"Ø 7 116 12X6 . 7 116 12X6 7"Ø .. 7 116 12X6 7"Ø 7 116 12X6 7"Ø 12" DROP HVAC GENERAL NOTES 1.REFER TO DRAWING M-0.1 FOR LEGENDS, SYMBOLS, ABBREVIATIONS & GENERAL NOTES. 2.REFER TO DRAWING M-0.2 FOR EQUIPMENT SCHEDULES. 3.REFER TO DRAWINGS MD-1 FOR MECHANICAL DETAILS. 4.COORDINATE EXACT ROUTING OF DUCTWORK WITH STRUCTURAL AND ALL OTHER TRADES, ROUTING SHOWN IS SCHEMATIC ONLY. 5.PROVIDE CAN AND DUCT COLLAR AS REQUIRED FOR ALL GRILLES AND DIFFUSERS. 6.OPENINGS IN THE ROOF SHALL NOT BE LOCATED WITHIN 5 FEET (1,524 MM) OF THE 1-HOUR FIRE-RESISTANCE-RATED EXTERIOR WALL FOR GROUPS R AND U AND 10 FEET (3,048 MM) OR OTHER OCCUPANCIES, MEASURED FROM THE INTERIOR SIDE OF THE WALL. (CBC 705.11.4.3). 7.PROVIDE A MINIMUM OF 100 SQ. IN FREE AREA OPENING(S) INTO LAUNDRY ROOM FOR MAKE-UP AIR AS REQUIRED BY CODE (CMC 504.4.1). 8.FIRE SEAL ALL PENETRATIONS AS REQUIRED BY CODE. 9.FIRE DAMPER RATINGS SHALL BE IN ACCORDANCE WITH 717.3.2.1 THROUGH 717.3.2.4. FIRE DAMPERS SHALL HAVE THE MINIMUM FIRE PROTECTIONS RATING SPECIFIED IN TABLE 717.3.2.1 FOR TYPES OF PENETRATION. 10.FOR CEILING HEIGHTS SEE ARCHITECTURAL DRAWINGS. 11.ALL ENVIRONMENTAL AIR VENTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS (SECTION 504.0 CMC). 12.UNLESS NOTED DIFFERENT ON THE PLANS, ALL SUPPLY REGISTERS SHALL BE BAR TYPE (TRUAIRE TYPE 210, 220, 230, OR SIMILAR) WITH TOTAL PRESSURE LOSS LESS THAN. 0.025 in.w.g. 13.THE FLUE DUCT FOR SEALED COMBUSTION WATER HEATER IS SIDE-WAL DISCHARGE. 3 FEET AWAY FROM OPENINGS INTO THE BUILDING AND 5' AWAY FROM THE PROPERTY LINE. SEE CIVIL DRAWINGS FOR PROPERTY LINE DETAILS. 14.IF HUMIDISTAT IS REQUIRED, LOCATE IT ADJACENT TO THERMOSTAT. 15."REGISTERED' COPY OF THE CF-2R FORMS SHALL BE SUBMITTED PRIOR TO FINAL INSPECTION, SIGNED BY HERS RATER, FOR FIELD VERIFICATION AND DIAGNOSTIC TESTING. 16.WHEN LOCAL EXHAUST FANS ARE USED FOR "CONTINUOUS" WHOLE BUILDING VENTILATION, THE LOCAL EXHAUST FAN SWITCH SHALL BE PERMITTED AS AN OVERRIDE CONTROL. (SECTION 4.3 ASHRAE 62.2) 17.CONTRACTOR TO VERIFY INSTALLED DRYER LENGTHS ON FIELD. 18.KITCHEN HOODS SHALL BE RATED FOR SOUND IN ACCORDANCE WITH 2022 CALIFORNIA ENERGY CODE SECTION 150.0(o)G. 19.MECHANICAL SYSTEMS INCLUDING HEATING AND AIR CONDITIONING SYSTEMS THAT SUPPLY AIR TO HABITABLE SPACES SHALL HAVE MERV 13 FILTERS OR BETTER (NOMINAL 2" THICK FILTER, OR EQUIVALENT 1" FILTER PER EQUATION 150.0-A). DESIGNERS SHOULD CONSIDER HOW THIS MAY IMPACT SYSTEM DESIGN AIRFLOW. (2022 CEC SECTION 150.0(m) 12(C)). 20.COMBUSTION APPLIANCES SHALL BE PROPERLY VENTED AND AIR SYSTEMS SHALL BE DESIGNED TO PREVENT BACK DRAFTING. 21.ENVIRONMENTAL AIR DUCT EXHAUST SHALL TERMINATE AT LEAST 3 FEET (914 MM) FROM THE PROPERTY LINE, 10 FEET (3048 MM) FROM A FORCED AIR INLET, 10 FEET (3048 MM) ABOVE A PUBLIC WALKWAY, AND 3 FEET (914 MM) FROM BUILDING OPENINGS. THE DISCHARGE SHALL NOT BE DIRECTED ONTO A PUBLIC WALKWAY. 22.UNDER THE 2022 CEC, MULTIFAMILY LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS MAY USE A CONTINUOUSLY OPERATED EXHAUST-ONLY OR SUPPLY-ONLY VENTILATION APPROACH IF ENVELOPE LEAKAGE IS ≤0.3 CFM AT 50 PA PER SQUARE FOOT. THIS MUST BE FIELD-TESTED AND VERIFIED THROUGH A BLOWER DOOR TEST AS AN ALTERNATIVE TO THE BALANCED VENTILATION REQUIREMENT UNDER CEC 160.2(B)2A IV AND 150.0(O)1C. IF CHOSEN, THE DEVELOPER MUST ENSURE THE GENERAL CONTRACTOR IMPLEMENTS ALL NECESSARY BUILDING TECHNIQUES TO MEET LEAKAGE REQUIREMENTS. 23.WHEN SPACE CONDITIONING SYSTEMS USE FORCED-AIR DUCT SYSTEMS TO SUPPLY AIR TO AN OCCUPIABLE SPACE, THE DUCTS MUST BE SEALED AND TESTED FOR LEAKAGE. COMPLIANCE MUST BE CONFIRMED THROUGH FIELD VERIFICATION AND DIAGNOSTIC TESTING PER REFERENCE RESIDENTIAL APPENDIX RA3.1 OF THE 2022 CEC 150.0(M)11. 24.THE AIRFLOW REQUIRED PER 2022 CEC 150.0(O)1C MUST BE MEASURED USING A FLOW HOOD, FLOW GRID, OR ANOTHER AIRFLOW MEASURING DEVICE AT THE FAN'S INLET OR OUTLET TERMINALS/GRILLES, AS SPECIFIED IN REFERENCE RESIDENTIAL APPENDIX RA3.7. WHOLE-DWELLING UNIT VENTILATION SYSTEMS MUST MEET THE SOUND RATING REQUIREMENTS OF ASHRAE 62.2 §7.2 AT OR ABOVE THE MINIMUM AIRFLOW RATE REQUIRED BY 2022 CEC 150.0(O)1C. HVAC KEY NOTES CAP SHOULD BE LISTED FOR CLOTHES DRYER VENTING (DRYER JACK). DRYER MOISTURE DUCT SHALL BE EQUIPPED WITH BACK DRAFT DAMPER. DRYER MOISTURE DUCT SHALL BE MADE OUT OF METAL WITH SMOOTH INTERIOR FACE. LISTED CONNECTOR SHALL BE MAX. 6 FT. LONG. RUN 3/4" PRIMARY CONDENSATE LINE TO THE LAVATORY TAILPIECE. SECONDARY CONDENSATE TO DRAIN TO THE EXTERIOR ABOVE A WINDOW. OPTIONALLY USE OVERFLOW SWITCH. COORDINATE WITH THE PLUMBER. PROVIDE WHOLE HOUSE EXHAUST FAN PER 2022 ENERGY CODE SECTION 150(O). THE EXHAUST OUTLET SHALL TERMINATE AT LEAST 3 FEET FROM BUILDING OPENINGS AND THE PROPERTY LINE, AS SHOWN IN THE CIVIL DRAWINGS. OUTDOOR EXHAUST OPENINGS MUST BE COVERED WITH A CORROSION-RESISTANT SCREEN WITH OPENINGS BETWEEN 1/4 INCH (6.4 MM) AND 1/2 INCH (12.7 MM). EXCEPTION: CLOTHES DRYERS. PROVIDE FLUE DUCT FOR WATER HEATER. INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL. PROVIDE RS/RL PIPING SIZE PER MANUFACTURER'S GUIDELINES. ROUTE FROM REMOTE CONDENSATE UNIT TO FAN COIL. PROVIDE 6" CONCRETE PAD /PLATFORM FOR REMOTE CONDENSER. EXHAUST VENT PIPE UP THRU ROOF, INSTALLED PER MANUFACTURER GUIDELINES. ROUTING AND TERMINATION OF VENT FOR HEATING UNIT SHALL COMPLY WITH CH. 8, CMC 2022. PROVIDE OPENING NOT LESS THAN 100 SQ. IN. FREE NET AREA FOR DRYER MAKEUP AIR PER CMC 2022 (504.4.1). 1 2 3 4 5 6 7 8 9 PROVIDE DOOR UNDERCUT.10 6"Ø EA DUCT UP THRU ROOF W/ CAP. 4"Ø LINT DUCT UP THRU ROOF W/ CAP. 8"Ø HOOD DUCT UP THRU ROOF W/ CAP. CONNECT KITCHEN HOOD TO 8"Ø KITCHEN HOOD EXHAUST AIR DUCT (MIN. 8"Ø). SEE DETAIL NUMBER #2 ON SHEET MD-1 FOR MINIMUM CFM RATE. 11 12 13 PROVIDE A 30" X 20" MAKE-UP AIR LOUVER (MINIMUM NET FREE AREA OF 300 SQUARE INCHES). THE LOUVER SHALL BE EQUIPPED WITH AN INSECT SCREEN. 14 al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 M-2.3 BUILDING A1, A2 LEVEL 2 FLOOR PLAN 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A1, A2 - LEVEL 2 FLOOR PLAN 1. PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 DS DS DS DS DS DS RI D G E RIDGE RIDGE RI D G E RI D G E VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y 11 13 11 13 11 13 11 13 HVAC GENERAL NOTES 1.REFER TO DRAWING M-0.1 FOR LEGENDS, SYMBOLS, ABBREVIATIONS & GENERAL NOTES. 2.REFER TO DRAWING M-0.2 FOR EQUIPMENT SCHEDULES. 3.REFER TO DRAWINGS MD-1 FOR MECHANICAL DETAILS. 4.COORDINATE EXACT ROUTING OF DUCTWORK WITH STRUCTURAL AND ALL OTHER TRADES, ROUTING SHOWN IS SCHEMATIC ONLY. 5.PROVIDE CAN AND DUCT COLLAR AS REQUIRED FOR ALL GRILLES AND DIFFUSERS. 6.OPENINGS IN THE ROOF SHALL NOT BE LOCATED WITHIN 5 FEET (1,524 MM) OF THE 1-HOUR FIRE-RESISTANCE-RATED EXTERIOR WALL FOR GROUPS R AND U AND 10 FEET (3,048 MM) OR OTHER OCCUPANCIES, MEASURED FROM THE INTERIOR SIDE OF THE WALL. (CBC 705.11.4.3). 7.PROVIDE A MINIMUM OF 100 SQ. IN FREE AREA OPENING(S) INTO LAUNDRY ROOM FOR MAKE-UP AIR AS REQUIRED BY CODE (CMC 504.4.1). 8.FIRE SEAL ALL PENETRATIONS AS REQUIRED BY CODE. 9.FIRE DAMPER RATINGS SHALL BE IN ACCORDANCE WITH 717.3.2.1 THROUGH 717.3.2.4. FIRE DAMPERS SHALL HAVE THE MINIMUM FIRE PROTECTIONS RATING SPECIFIED IN TABLE 717.3.2.1 FOR TYPES OF PENETRATION. 10.FOR CEILING HEIGHTS SEE ARCHITECTURAL DRAWINGS. 11.ALL ENVIRONMENTAL AIR VENTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS (SECTION 504.0 CMC). 12.UNLESS NOTED DIFFERENT ON THE PLANS, ALL SUPPLY REGISTERS SHALL BE BAR TYPE (TRUAIRE TYPE 210, 220, 230, OR SIMILAR) WITH TOTAL PRESSURE LOSS LESS THAN. 0.025 in.w.g. 13.THE FLUE DUCT FOR SEALED COMBUSTION WATER HEATER IS SIDE-WAL DISCHARGE. 3 FEET AWAY FROM OPENINGS INTO THE BUILDING AND 5' AWAY FROM THE PROPERTY LINE. SEE CIVIL DRAWINGS FOR PROPERTY LINE DETAILS. 14.IF HUMIDISTAT IS REQUIRED, LOCATE IT ADJACENT TO THERMOSTAT. 15."REGISTERED' COPY OF THE CF-2R FORMS SHALL BE SUBMITTED PRIOR TO FINAL INSPECTION, SIGNED BY HERS RATER, FOR FIELD VERIFICATION AND DIAGNOSTIC TESTING. 16.WHEN LOCAL EXHAUST FANS ARE USED FOR "CONTINUOUS" WHOLE BUILDING VENTILATION, THE LOCAL EXHAUST FAN SWITCH SHALL BE PERMITTED AS AN OVERRIDE CONTROL. (SECTION 4.3 ASHRAE 62.2) 17.CONTRACTOR TO VERIFY INSTALLED DRYER LENGTHS ON FIELD. 18.KITCHEN HOODS SHALL BE RATED FOR SOUND IN ACCORDANCE WITH 2022 CALIFORNIA ENERGY CODE SECTION 150.0(o)G. 19.MECHANICAL SYSTEMS INCLUDING HEATING AND AIR CONDITIONING SYSTEMS THAT SUPPLY AIR TO HABITABLE SPACES SHALL HAVE MERV 13 FILTERS OR BETTER (NOMINAL 2" THICK FILTER, OR EQUIVALENT 1" FILTER PER EQUATION 150.0-A). DESIGNERS SHOULD CONSIDER HOW THIS MAY IMPACT SYSTEM DESIGN AIRFLOW. (2022 CEC SECTION 150.0(m) 12(C)). 20.COMBUSTION APPLIANCES SHALL BE PROPERLY VENTED AND AIR SYSTEMS SHALL BE DESIGNED TO PREVENT BACK DRAFTING. 21.ENVIRONMENTAL AIR DUCT EXHAUST SHALL TERMINATE AT LEAST 3 FEET (914 MM) FROM THE PROPERTY LINE, 10 FEET (3048 MM) FROM A FORCED AIR INLET, 10 FEET (3048 MM) ABOVE A PUBLIC WALKWAY, AND 3 FEET (914 MM) FROM BUILDING OPENINGS. THE DISCHARGE SHALL NOT BE DIRECTED ONTO A PUBLIC WALKWAY. 22.UNDER THE 2022 CEC, MULTIFAMILY LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS MAY USE A CONTINUOUSLY OPERATED EXHAUST-ONLY OR SUPPLY-ONLY VENTILATION APPROACH IF ENVELOPE LEAKAGE IS ≤0.3 CFM AT 50 PA PER SQUARE FOOT. THIS MUST BE FIELD-TESTED AND VERIFIED THROUGH A BLOWER DOOR TEST AS AN ALTERNATIVE TO THE BALANCED VENTILATION REQUIREMENT UNDER CEC 160.2(B)2A IV AND 150.0(O)1C. IF CHOSEN, THE DEVELOPER MUST ENSURE THE GENERAL CONTRACTOR IMPLEMENTS ALL NECESSARY BUILDING TECHNIQUES TO MEET LEAKAGE REQUIREMENTS. 23.WHEN SPACE CONDITIONING SYSTEMS USE FORCED-AIR DUCT SYSTEMS TO SUPPLY AIR TO AN OCCUPIABLE SPACE, THE DUCTS MUST BE SEALED AND TESTED FOR LEAKAGE. COMPLIANCE MUST BE CONFIRMED THROUGH FIELD VERIFICATION AND DIAGNOSTIC TESTING PER REFERENCE RESIDENTIAL APPENDIX RA3.1 OF THE 2022 CEC 150.0(M)11. 24.THE AIRFLOW REQUIRED PER 2022 CEC 150.0(O)1C MUST BE MEASURED USING A FLOW HOOD, FLOW GRID, OR ANOTHER AIRFLOW MEASURING DEVICE AT THE FAN'S INLET OR OUTLET TERMINALS/GRILLES, AS SPECIFIED IN REFERENCE RESIDENTIAL APPENDIX RA3.7. WHOLE-DWELLING UNIT VENTILATION SYSTEMS MUST MEET THE SOUND RATING REQUIREMENTS OF ASHRAE 62.2 §7.2 AT OR ABOVE THE MINIMUM AIRFLOW RATE REQUIRED BY 2022 CEC 150.0(O)1C. HVAC KEY NOTES CAP SHOULD BE LISTED FOR CLOTHES DRYER VENTING (DRYER JACK). DRYER MOISTURE DUCT SHALL BE EQUIPPED WITH BACK DRAFT DAMPER. DRYER MOISTURE DUCT SHALL BE MADE OUT OF METAL WITH SMOOTH INTERIOR FACE. LISTED CONNECTOR SHALL BE MAX. 6 FT. LONG. RUN 3/4" PRIMARY CONDENSATE LINE TO THE LAVATORY TAILPIECE. SECONDARY CONDENSATE TO DRAIN TO THE EXTERIOR ABOVE A WINDOW. OPTIONALLY USE OVERFLOW SWITCH. COORDINATE WITH THE PLUMBER. PROVIDE WHOLE HOUSE EXHAUST FAN PER 2022 ENERGY CODE SECTION 150(O). THE EXHAUST OUTLET SHALL TERMINATE AT LEAST 3 FEET FROM BUILDING OPENINGS AND THE PROPERTY LINE, AS SHOWN IN THE CIVIL DRAWINGS. OUTDOOR EXHAUST OPENINGS MUST BE COVERED WITH A CORROSION-RESISTANT SCREEN WITH OPENINGS BETWEEN 1/4 INCH (6.4 MM) AND 1/2 INCH (12.7 MM). EXCEPTION: CLOTHES DRYERS. PROVIDE FLUE DUCT FOR WATER HEATER. INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL. PROVIDE RS/RL PIPING SIZE PER MANUFACTURER'S GUIDELINES. ROUTE FROM REMOTE CONDENSATE UNIT TO FAN COIL. PROVIDE 6" CONCRETE PAD /PLATFORM FOR REMOTE CONDENSER. EXHAUST VENT PIPE UP THRU ROOF, INSTALLED PER MANUFACTURER GUIDELINES. ROUTING AND TERMINATION OF VENT FOR HEATING UNIT SHALL COMPLY WITH CH. 8, CMC 2022. PROVIDE OPENING NOT LESS THAN 100 SQ. IN. FREE NET AREA FOR DRYER MAKEUP AIR PER CMC 2022 (504.4.1). 1 2 3 4 5 6 7 8 9 PROVIDE DOOR UNDERCUT.10 6"Ø EA DUCT UP THRU ROOF W/ CAP. 4"Ø LINT DUCT UP THRU ROOF W/ CAP. 8"Ø HOOD DUCT UP THRU ROOF W/ CAP. CONNECT KITCHEN HOOD TO 8"Ø KITCHEN HOOD EXHAUST AIR DUCT (MIN. 8"Ø). SEE DETAIL NUMBER #2 ON SHEET MD-1 FOR MINIMUM CFM RATE. 11 12 13 PROVIDE A 30" X 20" MAKE-UP AIR LOUVER (MINIMUM NET FREE AREA OF 300 SQUARE INCHES). THE LOUVER SHALL BE EQUIPPED WITH AN INSECT SCREEN. 14 al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 M-2.4 BUILDING A1, A2 ROOF PLAN 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A1, A2 - ROOF PLAN PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 HVAC GENERAL NOTES 1.REFER TO DRAWING M-0.1 FOR LEGENDS, SYMBOLS, ABBREVIATIONS & GENERAL NOTES. 2.REFER TO DRAWING M-0.2 FOR EQUIPMENT SCHEDULES. 3.REFER TO DRAWINGS MD-1 FOR MECHANICAL DETAILS. 4.COORDINATE EXACT ROUTING OF DUCTWORK WITH STRUCTURAL AND ALL OTHER TRADES, ROUTING SHOWN IS SCHEMATIC ONLY. 5.PROVIDE CAN AND DUCT COLLAR AS REQUIRED FOR ALL GRILLES AND DIFFUSERS. 6.OPENINGS IN THE ROOF SHALL NOT BE LOCATED WITHIN 5 FEET (1,524 MM) OF THE 1-HOUR FIRE-RESISTANCE-RATED EXTERIOR WALL FOR GROUPS R AND U AND 10 FEET (3,048 MM) OR OTHER OCCUPANCIES, MEASURED FROM THE INTERIOR SIDE OF THE WALL. (CBC 705.11.4.3). 7.PROVIDE A MINIMUM OF 100 SQ. IN FREE AREA OPENING(S) INTO LAUNDRY ROOM FOR MAKE-UP AIR AS REQUIRED BY CODE (CMC 504.4.1). 8.FIRE SEAL ALL PENETRATIONS AS REQUIRED BY CODE. 9.FIRE DAMPER RATINGS SHALL BE IN ACCORDANCE WITH 717.3.2.1 THROUGH 717.3.2.4. FIRE DAMPERS SHALL HAVE THE MINIMUM FIRE PROTECTIONS RATING SPECIFIED IN TABLE 717.3.2.1 FOR TYPES OF PENETRATION. 10.FOR CEILING HEIGHTS SEE ARCHITECTURAL DRAWINGS. 11.ALL ENVIRONMENTAL AIR VENTS SHALL BE EQUIPPED WITH BACK-DRAFT DAMPERS (SECTION 504.0 CMC). 12.UNLESS NOTED DIFFERENT ON THE PLANS, ALL SUPPLY REGISTERS SHALL BE BAR TYPE (TRUAIRE TYPE 210, 220, 230, OR SIMILAR) WITH TOTAL PRESSURE LOSS LESS THAN. 0.025 in.w.g. 13.THE FLUE DUCT FOR SEALED COMBUSTION WATER HEATER IS SIDE-WAL DISCHARGE. 3 FEET AWAY FROM OPENINGS INTO THE BUILDING AND 5' AWAY FROM THE PROPERTY LINE. SEE CIVIL DRAWINGS FOR PROPERTY LINE DETAILS. 14.IF HUMIDISTAT IS REQUIRED, LOCATE IT ADJACENT TO THERMOSTAT. 15."REGISTERED' COPY OF THE CF-2R FORMS SHALL BE SUBMITTED PRIOR TO FINAL INSPECTION, SIGNED BY HERS RATER, FOR FIELD VERIFICATION AND DIAGNOSTIC TESTING. 16.WHEN LOCAL EXHAUST FANS ARE USED FOR "CONTINUOUS" WHOLE BUILDING VENTILATION, THE LOCAL EXHAUST FAN SWITCH SHALL BE PERMITTED AS AN OVERRIDE CONTROL. (SECTION 4.3 ASHRAE 62.2) 17.CONTRACTOR TO VERIFY INSTALLED DRYER LENGTHS ON FIELD. 18.KITCHEN HOODS SHALL BE RATED FOR SOUND IN ACCORDANCE WITH 2022 CALIFORNIA ENERGY CODE SECTION 150.0(o)G. 19.MECHANICAL SYSTEMS INCLUDING HEATING AND AIR CONDITIONING SYSTEMS THAT SUPPLY AIR TO HABITABLE SPACES SHALL HAVE MERV 13 FILTERS OR BETTER (NOMINAL 2" THICK FILTER, OR EQUIVALENT 1" FILTER PER EQUATION 150.0-A). DESIGNERS SHOULD CONSIDER HOW THIS MAY IMPACT SYSTEM DESIGN AIRFLOW. (2022 CEC SECTION 150.0(m) 12(C)). 20.COMBUSTION APPLIANCES SHALL BE PROPERLY VENTED AND AIR SYSTEMS SHALL BE DESIGNED TO PREVENT BACK DRAFTING. 21.ENVIRONMENTAL AIR DUCT EXHAUST SHALL TERMINATE AT LEAST 3 FEET (914 MM) FROM THE PROPERTY LINE, 10 FEET (3048 MM) FROM A FORCED AIR INLET, 10 FEET (3048 MM) ABOVE A PUBLIC WALKWAY, AND 3 FEET (914 MM) FROM BUILDING OPENINGS. THE DISCHARGE SHALL NOT BE DIRECTED ONTO A PUBLIC WALKWAY. 22.UNDER THE 2022 CEC, MULTIFAMILY LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS MAY USE A CONTINUOUSLY OPERATED EXHAUST-ONLY OR SUPPLY-ONLY VENTILATION APPROACH IF ENVELOPE LEAKAGE IS ≤0.3 CFM AT 50 PA PER SQUARE FOOT. THIS MUST BE FIELD-TESTED AND VERIFIED THROUGH A BLOWER DOOR TEST AS AN ALTERNATIVE TO THE BALANCED VENTILATION REQUIREMENT UNDER CEC 160.2(B)2A IV AND 150.0(O)1C. IF CHOSEN, THE DEVELOPER MUST ENSURE THE GENERAL CONTRACTOR IMPLEMENTS ALL NECESSARY BUILDING TECHNIQUES TO MEET LEAKAGE REQUIREMENTS. 23.WHEN SPACE CONDITIONING SYSTEMS USE FORCED-AIR DUCT SYSTEMS TO SUPPLY AIR TO AN OCCUPIABLE SPACE, THE DUCTS MUST BE SEALED AND TESTED FOR LEAKAGE. COMPLIANCE MUST BE CONFIRMED THROUGH FIELD VERIFICATION AND DIAGNOSTIC TESTING PER REFERENCE RESIDENTIAL APPENDIX RA3.1 OF THE 2022 CEC 150.0(M)11. 24.THE AIRFLOW REQUIRED PER 2022 CEC 150.0(O)1C MUST BE MEASURED USING A FLOW HOOD, FLOW GRID, OR ANOTHER AIRFLOW MEASURING DEVICE AT THE FAN'S INLET OR OUTLET TERMINALS/GRILLES, AS SPECIFIED IN REFERENCE RESIDENTIAL APPENDIX RA3.7. WHOLE-DWELLING UNIT VENTILATION SYSTEMS MUST MEET THE SOUND RATING REQUIREMENTS OF ASHRAE 62.2 §7.2 AT OR ABOVE THE MINIMUM AIRFLOW RATE REQUIRED BY 2022 CEC 150.0(O)1C. HVAC KEY NOTES CAP SHOULD BE LISTED FOR CLOTHES DRYER VENTING (DRYER JACK). DRYER MOISTURE DUCT SHALL BE EQUIPPED WITH BACK DRAFT DAMPER. DRYER MOISTURE DUCT SHALL BE MADE OUT OF METAL WITH SMOOTH INTERIOR FACE. LISTED CONNECTOR SHALL BE MAX. 6 FT. LONG. RUN 3/4" PRIMARY CONDENSATE LINE TO THE LAVATORY TAILPIECE. SECONDARY CONDENSATE TO DRAIN TO THE EXTERIOR ABOVE A WINDOW. OPTIONALLY USE OVERFLOW SWITCH. COORDINATE WITH THE PLUMBER. PROVIDE WHOLE HOUSE EXHAUST FAN PER 2022 ENERGY CODE SECTION 150(O). THE EXHAUST OUTLET SHALL TERMINATE AT LEAST 3 FEET FROM BUILDING OPENINGS AND THE PROPERTY LINE, AS SHOWN IN THE CIVIL DRAWINGS. OUTDOOR EXHAUST OPENINGS MUST BE COVERED WITH A CORROSION-RESISTANT SCREEN WITH OPENINGS BETWEEN 1/4 INCH (6.4 MM) AND 1/2 INCH (12.7 MM). EXCEPTION: CLOTHES DRYERS. PROVIDE FLUE DUCT FOR WATER HEATER. INSTALLED PER MANUFACTURER'S INSTALLATION MANUAL. PROVIDE RS/RL PIPING SIZE PER MANUFACTURER'S GUIDELINES. ROUTE FROM REMOTE CONDENSATE UNIT TO FAN COIL. PROVIDE 6" CONCRETE PAD /PLATFORM FOR REMOTE CONDENSER. EXHAUST VENT PIPE UP THRU ROOF, INSTALLED PER MANUFACTURER GUIDELINES. ROUTING AND TERMINATION OF VENT FOR HEATING UNIT SHALL COMPLY WITH CH. 8, CMC 2022. PROVIDE OPENING NOT LESS THAN 100 SQ. IN. FREE NET AREA FOR DRYER MAKEUP AIR PER CMC 2022 (504.4.1). 1 2 3 4 5 6 7 8 9 PROVIDE DOOR UNDERCUT.10 6"Ø EA DUCT UP THRU ROOF W/ CAP. 4"Ø LINT DUCT UP THRU ROOF W/ CAP. 8"Ø HOOD DUCT UP THRU ROOF W/ CAP. CONNECT KITCHEN HOOD TO 8"Ø KITCHEN HOOD EXHAUST AIR DUCT (MIN. 8"Ø). SEE DETAIL NUMBER #2 ON SHEET MD-1 FOR MINIMUM CFM RATE. 11 12 13 PROVIDE A 30" X 20" MAKE-UP AIR LOUVER (MINIMUM NET FREE AREA OF 300 SQUARE INCHES). THE LOUVER SHALL BE EQUIPPED WITH AN INSECT SCREEN. 14 DS 103 ALIGN E C KITCHEN DINING BEDROOM 2 BATH BEDROOM 1 LIVING CL O S E T 2 CLOSET 1COAT 3 30"X10" WALL R.A.G . . TFC-18 10 10 10 3 . . . . . . 12" DROP12" DROP 12" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 18 FC 7"Ø 7"Ø 9"Ø 7"Ø8"Ø 6"Ø 7"Ø 10"Ø 10"Ø OPERABLE PORTION 6 10" DROP RUN IN LINED JOIST BAY 7 6"Ø B EF5 . 7"Ø 7 116 12X6 14" DROP 7 RUN IN LINED JOIST BAY OPERABLE PORTION 6"Ø DS A 203 A KITCHEN DINING BEDROOM 2 BATH BEDROOM 1 LIVING CL O S E T 2 CLOSET 1COAT 30"X10" WALL R.A.G . . TFC-18 10 10 10 3 . . . . . . 12" DROP12" DROP 12" DROP 14" DROP . 7 121 12X6 7 119 12X6 7 121 12X6 6 65 10X6 7 121 12X6 B EF5 18 FC 11 6 13 7"Ø 6"Ø 8"Ø 7"Ø 9"Ø 7"Ø 7"Ø 6"Ø . 7"Ø 7 116 12X6 DRYER DRYER WASHER / DRYER WASHERWASHER FOLDING TABLE LAUNDRY CONFERENCE ROOM COMMUNITY ROOM JAN. ALL-GENDER RESTROOM KITCHEN (RESIDENCE USE ONLY) A112 23 60"x54"48"x48" 60"x54"48"x48" 60"x54"48"x36" 60"x54" 48"x36" /3 A500 . . 3 18 FC 7 121 12X6 8 167 14X6 8 167 14X6 . 8"Ø . 7"Ø 12" DROP 30"X10" WALL R.A.G T FC-18 10"Ø 10"Ø 6 59 10X6 9"Ø . . 6"Ø . 8"Ø 10 9 L EF7 7 7 7 4"Ø 4"Ø 4"Ø (4 FT, 1E) (4 FT, 1E) (4 FT, 1E) 30"X20" MAKEUP AIR LOUVER 14 6 10" DROP RUN IN LINED JOIST BAY 7 7 137 12X6 . 7"Ø B EF 5 6"Ø 14" DROP 7 RUN IN LINED JOIST BAY 6"Ø OPERABLE PORTION al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 M-3.1 UNIT FLOOR PLANS 1UNIT A-1 LEVEL 1 12' 1/4" = 1'-0" 2'8'4'0 2UNIT A-1 LEVEL 2 12' 1/4" = 1'-0" 2'8'4'0 3LAUNDRY PARTIAL (BLDG A1) - LEVEL 1 12' 1/4" = 1'-0" 2'8'4'0 4NOT USED PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 2 33 1.EYEBROW W/ BACKDRAFT DAMPER MAINTAIN MINIMUM THREE FEET AWAY FROM BUILDING OPENINGS (TYP.) 2.EXHAUST FAN IN CEILING OR WALL, SEE MECH DWSS. 3.2X JOIST SEE STRUCT, DWSS. (TYP) 4.FLOOR CEILING ASSEMBLY 5.BLOCKING BY OTHERS (TYP) 6.ROOF - CEILING ASSEMBLY 7.FINISHED FLOOR 8.SHEET METAL FLASHING 9.TEE-TOP SHEET METAL ROOF JACK W/ WIRE MESH SCREEN 10.MIN 26 GAUGE SHEET METAL EXHAUST DUCT (TYP) 11.FIRE CAULK AT PLATE PENETRATION (TYP) 12.WALL (TYP) NOTE: 1.SIMILAR FOR ADDITIONAL LEVELS. 2.SEE LINED JOIST BAY DETAIL WHEN DUCT DOES NOT ENTER FLOOR-CEILING. ASSEMBLY FROM WALL CAVITY. 3.SEE EXHAUST/ VENT TERMINATION DETAIL. 7 12 5 1110 3 4 11 2 8 9 6 2 4 5 6 8 BATHROOM EXHAUST VENTING A. 4' B. 6' MAX BEND SHALL BE MADE WITH NOT LESS THAN 1 DUCT DIAMETER CENTERLINE RADIUS. DUCTS SHOULD EXTEND A FEW INCHES BEYOND THE END OF A SHEET METAL CONNECTION BEFORE BENDING. DUCTS SHOULD NOT BE COMPRESSED. D D FLEX DUCT DETAIL FLEX DUCT CEILINGEXPANDING FOAM (SPF) ATTIC NOTE: SPF CAN BE USED AS DRAFT STOP AS LONG AS IT MEETS THE MINIMUM THICKNESS REQUIRED TO BE AN AIR BARRIER. ROOF TRUSS HANGER WIDTH SHOULD BE 1.5" MAX. SAG 1 2" PER FOOT VERTICALLY INSTALLED DUCT SHALL BE STABILIZED BY SUPPORT STRAPS AT A MAX. OF 6 FEET ON CENTER. C. SUPPORT DUCT BETWEEN METAL CONNECTION AND A BEND BY ALLOWING DUCT TO EXTEND STRAIGHT FOR A FEW INCHES BEFORE BENDING SUPPORTED AT LEAST EVERY 4 FEET. CEILING JOISTS D. FLEX DUCTS MAY REST ON CEILING JOISTS OR TRUSS SUPPORTS IN DRY CLIMATES IF SUPPORTED AT LEAST EVERY 4 FEET. 1.EXTERIOR WALL OR PARAPET WALL SEAL PENETRATION OUTLET WITH ELASTOMERIC LINE-SET COMPRESSION SLEEVE TYPE 'TITANGS30" BY AIREX MANUFACTURING INC. 2.INSULATION PROTECTIVE PVC COVER TYPE "E-FLEX GUARD" BY AIREX MANUFACTURING INC OR SIMILAR 3.ELASTOMERIC LINE-SET COMPRESSION & ANTI-VIBRATION SLEEVE (COMPONENT OF REFERENCE 1 "TITAN GS30") 4.INSULATION FOR REFRIGERATION SUCTION LINE 5.REFRIGERATION SUCTION LINE 6.REFRIGERATION LIQUID LINE 7.MECHANICAL CONNECTION SECURED WITH STAINLESS STEEL CLAMP (COMPONENT OF REFERENCE 1 "TITAN GS30") 8.WALL FASTENERS SELF-TAPPING 3/8" HEX HEAD 1/4" DIAMETER ALL MATERIAL ANCHORS SCREWS WITH ELASTOMERIC WASHERS (COMPONENT OF REFERENCE 1 "TITAN GS30") 9.WALL SURFACE SEAL ELASTOMERIC GASKET (COMPONENT OF REFERENCE 1 "TITAN GS30") 1 2 3 4 5 6 7 8 9 REFRIGERANT PIPE PENETRATION DETAIL WALL PENETRATION DETAIL FLAT ROOF PENETRATION DETAIL "PELICAN HOOD" 1 2 3 4 1."PELICAN HOOD", "BIRDHOUSE" OR SIMILAR SHEET METAL RAIN HOOD PRODUCT 2.REFRIGERANT PIPES 3.SHEET METAL FLASHING WATER PROOFING PER ARCHITECTURAL DRAWINGS 4.ROOF "BIRDHOUSE" BLOW THROUGH UNIT (COIL AT POSITIVE PRESSURE) DRAW THROUGH UNIT (COIL AT NEGATIVE PRESSURE) H H/2 min. H=ESP(in.W.C.)+1" 1/2" RECOMMENDATION H H=ESP(in.W.C.)+1/2" 1 1.CONDENSATE DRAIN CONNECTION 2.HAND TIGHT PLUG 3.P-TRAP WITH WATER SEAL 4.CONDENSATE LINE. MIN 1% (1/8" PER 1') SLOPE PVC OR COPPER PIPE ESP = EXTERNAL STATIC PRESSURE (SEE MECHANICAL SCHEDULE). PIPE MATERIAL - PVC/COPPER OR ANY OTHER MATERIAL APPROVED FOR DRAIN PIPES PER CPC MANUFACTURER'S APPROVED CONDENSATE DRAIN KITS ARE ACCEPTABLE ALTERNATIVE TO THIS P TRAP. 1 2 2 3 4 4 2 2 3 CONDENSATE DRAIN DETAIL 7 KITCHEN RANGE HOOD AIRFLOW RATES AND ASTM E3087 CAPTURE EFFICIENCY (CE) RATINGS ACCORDING TO DWELLING UNIT FLOOR AREA AND KITCHEN RANGE FUEL TYPE. KITCHEN RANGE HOOD MINIMUM AIRFLOW PER CEnE TABLE 150.0(o) - 1G DWELLING UNIT FLOOR AREA (SQFT)HOOD OVER ELECTRIC RANGE HOOD OVER NATURAL GAS RANGE > 1500 50% CE OR 110 CFM 70% CE OR 180 CFM 1000 - 1500 50% CE OR 110 CFM 80% CE OR 250 CFM 750 - 1000 55% CE OR 130 CFM 85% CE OR 280 CFM < 750 65% CE OR 160 CFM 85% CE OR 280 CFM KITCHEN HOOD MINIMUM AIRFLOW MOUNTING RAILS JOIST OR 2X6 BLOCKING FLOOR 1/4"Øx3" LAG SCREWS (TYP. 4) or ENSURE DUCT JOINTS AND EXTERIOR PENETRATIONS ARE SEALED WITH CAULK OR OTHER SIMILAR MATERIAL TO CREATE AN AIR-TIGHT PATH. WHEN DUCTS IS LOCATED IN UNCONDITIONED SPACE PLACE /WRAP INSULATION AROUND THE DUCT AND FAN TO MINIMIZE POSSIBLE CONDENSATION BUILDUP WITHIN THE DUCT INSULATION (PLACE AROUND AND OVER FAN HOUSING) POWER CABLE SEAL GAPS AROUND HOUSING ROUND DUCT SEAL JOINTS WALL CAP ROOF CAP FAN HOUSING FLOOR JOIST 1/4" LAG BOLTS, FASTEN TO STRUCTURE EXHAUST FAN CEILING GRILL FURNISHED WITH FAN EXHAUST DUCT WALL CAP ALL JOINTS SEALED TIGHTLY WITH DUCT MASTIC SLOPE DUCT TOWARD EXHAUST VENT BACK DRAFT DAMPER EXHAUST FAN IN SOFFIT EXHAUST FAN IN ATTIC EXHAUST FAN MOUNTING IN FLOOR / ROOF FRAMING CEILING TYPE EXHAUST FAN DETAIL FAN COIL 1.FLOOR OR ROOF FRAMING PER PLANS (SEE DIFFERENT CONDITIONS BELOW) 2.2"x6" BLOCKING WITH 2-16d's TOE NAILS AT ENDS. NOTCHED AT TRUSS / TJI BOTTOM CORD 3.1/4"Ø LAG SCREW WITH MIN. 2-1/2" PENETRATION 4.NEOPRENE HANGER MOUNT TYPE MASON HMIB OR SIMILAR 5.INSULATED SUPPLY PLENUM 6.SEALED RETURN AIR PLENUM (WHEN BOTTOM RETURN OPTION IS USED. 7.NON RATED SOFFIT 8.3/4" CONDENSATE LINE WITH TRAP 9.REFRIGERANT PIPES (LIQUID AND SUCTION) 10.FACTORY SUPPLIED LOUVERED ACCESS PANEL (REFER TO PLAN ) OR (2) STD STAMPFACE FILTER RETURN AIR GRILLS. 2 2 5 6 3 4 8 9 7 NOTE: UNLESS DWELLING UNIT, MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL BE NONCOMBUSTIBLE OR SHALL HAVE A FLAME SPREAD INDEX NOT TO EXCEED 25 AND A SMOKE-DEVELOPED INDEX NOT TO EXCEED 50, WHERE TESTED AS A COMPOSITE PRODUCT IN ACCORDANCE WITH ASTM E84 OR UL 723. FAN COIL a ROOF SHEATHING.a. b ROOF SYSTEM PER PLAN.b. FLOOR SHEATHING.c. FLOOR SYSTEM PER PLAN.d. 2X4 BLK'G W/ (3) 16d's FACE NAILS AT ENDS.e. e f. g. ROOF TRUSS SYSTEM: FAN COIL IN SOFFIT c d TJI-FLOOR SYSTEM: FAN COIL IN SOFFIT 2X6 BLK'G W/ (3) 16d's FACE NAILS AT ENDS. i. h. ADD 1X WEB STIFFENER. g f NOTCHED AT TIJ BOTTOM CHORD. 2X6 BLK'G W/ (2) 16d's TOE NAILS AT ENDS. NOTCHED AT FLOOR TRUSS BOTTOM CHORD. 1 2X FLOOR JOIST SYSTEM: FAN COIL IN SOFFIT OPEN FLOOR WEB TRUSS SYSTEM: FAN COIL IN SOFFIT c dh c di FAN COIL FAN COIL FAN COIL 2X6 BLK'G W/ (3) 16d's FACE NAILS AT ENDS. CONCRETE / LWT CONCRETE DECK FAN COIL STRUCTURAL ATTACHMENTS j k k j.CONCRETE SLAB / LIGHT WEIGHT CONCRETE DECK k.HILTI KWIK BOLT 3 (KB3) 3/8" - 3" EMBEDED (FOR PT SLAB SOFFIT FAN COIL INSTALLATION CONDENSING UNIT MOUNTING SEE SCHEDULE CONDENSING UNIT PIPE CLAMPS ROUTING AND SIZING LINES. SEE PLAN FOR LIQUID AND SUCTION 3/16" (TYP.) 6" HIGH LEVEL CONCRETE PAD (BY G.C.). REFER TO DETAIL 11 SHEET S1.2. 3/8" DIA. HILTI KB-TZ (ESR-1917) x 3-1/2" EMBED. (4 TOTAL) 1/4" STEEL PLATE 3/4" NEOPRENE PAD 9" EDGE DISTANCE 1 CO I L S I D E 20" 24" 8"6" 24"" 20" 6" 6" WA L L 24" SERVICE 8" CO I L S I D E WA L L NOTE: CONTRACTOR SHALL REVIEW AND CONFIRM REQUIRED CLEARANCES PER MANUFACTURERS INSTALLATION MANUAL. WHEN INSTALLING MULTIPLE UNITS, ENSURE THE DISCHARGE AIR FROM ONE UNIT IS NOT DRAWN INTO ANOTHER UNIT. WHEN INSTALLING SINGLE OR MULTIPLE UNITS IN AN ALCOVE, ROOF WELL, OR PARTIALLY ENCLOSED AREA, ENSURE THERE IS ADEQUATE VENTILATION TO PREVENT RECIRCULATION OF DISCHARGE AIR. IF THERE IS 40” (1016 MM) CLEARANCE ABOVE UNIT AND THE TOP PANEL IS ACCESSIBLE FOR REMOVAL ALLOW 8” (203.2 MM) MINIMUM CLEARANCE ON COMPRESSOR END FOR SERVICE. OTHERWISE PROVIDE 24" OD CLEARANCE ON COMPRESSOR SIDE. AIR CONDITIONING REFRIGERANT CIRCUIT ACCESS PORTS LOCATED OUTDOORS SHALL BE PROTECTED FROM UNAUTHORIZED ACCESS WITH LOCKING-TYPE TAMPER-RESISTANT CAPS OR IN A MANNER APPROVED BY THE AUTHORITY HAVING JURISDICTION. SERVICE WA L L CO I L S I D E 8" CO I L S I D E 8" CO I L S I D E 24"24" 24" 24"8" DETAIL APPLIES TO (CARRIER) 38MBRQ - HEAT PUMP SLIM CONDENSING UNIT CLEARANCES DETAIL APPLIES TO (CARRIER) 25HHA4 - HEAT PUMP (CARRIER) 24AHA4 - AIR CONDITIONER 24" 4" 24" 4" 9 al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL SHEET TITLE SHEET NO. CLIENT: DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 3RD PLAN CHECK SUBMITTAL 04/17/2025 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 MD-1 DETAILS PC COMMENTS RESPONSE #1 01/29/2025A DATEREVISION PC COMMENTS RESPONSE #2 04/17/2025B PC COMMENTS RESPONSE #3 07/10/2025C WATER REVISIONS 09/12/2025D PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 SHEET INDEX NO.SHEET DESCRIPTION 1 P-0.1 GENERAL NOTES & SHEET INDEX 2 P-0.2 MATERIAL - FIXTURE SCHEDULES 3 P-0.3 CALCULATIONS 4 P-0.4 WATER HEATER SPECIFICATIONS 5 P-1.1 SITE PLAN 6 P-2.1A BUILDING A1 - LEVEL 1 FLOOR PLAN - COLD WATER 7 P-2.1B BUILDING A1 - LEVEL 2 FLOOR PLAN - COLD WATER 8 P-2.1C BUILDING A1 - LEVEL 1 FLOOR PLAN - WASTE / VENT PIPING 9 P-2.1D BUILDING A1 - LEVEL 2 FLOOR PLAN - WASTE / VENT PIPING 10 P-2.1E BUILDING A1 - ROOF PLAN - VENT THRU ROOF 11 P-2.2A BUILDING A2 - LEVEL 1 FLOOR PLAN - COLD WATER 12 P-2.2B BUILDING A2 - LEVEL 2 FLOOR PLAN - COLD WATER 13 P-2.2C BUILDING A2 - LEVEL 1 FLOOR PLAN - WASTE / VENT PIPING 14 P-2.2D BUILDING A2 - LEVEL 2 FLOOR PLAN - WASTE / VENT PIPING 15 P-2.2E BUILDING A2 - ROOF PLAN - VENT THRU ROOF 16 P-3.1 UNIT - FLOOR PLANS - COLD / HOT WATER - WASTE / VENT PIPING AND FC CONDENSATE 17 P-4.1 WATER DIAGRAM 18 P-4.2 WASTE / VENT DIAGRAM 19 P-4.3 WASTE / VENT DIAGRAM 20 P-D.1 DETAILS PLUMBING GENERAL NOTES A.GENERAL 1.ALL WORK SHALL COMPLY WITH CALIFORNIA PLUMBING CODE, CALIFORNIA ENERGY CODE, CALIFORNIA GREEN BUILDING CODE AND APPLICABLE LOCAL, STATE CODES AND REGULATIONS WITH AMENDMENTS (LATEST EDITION). 2.WHEN SUPPLIED, DESIGN ENGINEER SHALL REVIEW AND APPROVE SUBMITTALS FOR ALL EQUIPMENT. IN THE CASE WHERE A SUGGESTED SUBSTITUTE IS NOT ADEQUATE, SUBMITTAL SHALL BE RETURNED TO CONTRACTOR AND STAMPED AS "REVIEW AND RESUBMIT". SUBMITTAL APPROVAL CONFIRMS ONLY THAT THE SUGGESTED SUBSTITUTE HAS EQUIVALENT TECHNICAL PARAMETERS AND DESIGN CONSULTANT IS NOT RESPONSIBLE FOR ANY FINANCIAL IMPACT THAT THE SUBSTITUTE CAUSES. 3.PLUMBING DRAWINGS SHOW ONLY PERTINENT INFORMATION FOR LOCATION, SIZE AND CLASS OF PIPING, EQUIPMENT AND FIXTURES TO BE INSTALLED. SPECIFICATIONS WHICH FORM A PART OF THE DRAWINGS, SPECIFY MATERIAL TO BE USED FOR VARIOUS SIZES AND CLASSES OF PIPING, EQUIPMENT AND FIXTURES. 4.ELEVATIONS SHOWN ON PLUMBING DRAWINGS ARE REFERENCED FROM NOMINAL FINISHED FLOOR ELEVATION. B.CONTRACTOR NOTES 1.BEFORE SUBMITTING THE BID, CONTRACTOR SHALL SURVEY THE ENTIRE PROJECT SITE AND BECOME THOROUGHLY FAMILIAR WITH ACTUAL EXISTING CONDITIONS. THE INTENT OF WORK IS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN. BY THE ACT OF SUBMITTING A BID PROPOSAL FOR WORK, THE CONTRACTOR SHALL BE DEEMED TO HAVE MADE SUCH A STUDY AND EXAMINATION AND TO ACCEPT ALL CONDITIONS PRESENT AT SITE. NO REQUEST FOR ADDITIONAL PAYMENT SHALL BE CONSIDERED VALID, DUE TO CONTRACTOR FAILURE TO ALLOW COST ESTIMATES FOR CONDITIONS WHICH MAY EXIST. 2.CONTRACTOR BID SHALL NOT BE LIMITED TO THE WORK SHOWN ON THE PLANS AND SPECIFICATIONS. ALL PREMIUM OVERTIME COSTS, UTILITY CHARGES, COST FOR TEMPORARY UTILITIES, ALL ALTERATIONS, ALL DEMOLITION AND EXTENSION WORKS, PERMITS, INSPECTION FEES, MISCELLANEOUS CONTINGENCY COSTS, ETC., SHALL BE INCLUDED IN BID. 3.THIS LEGEND DRAWING IS GENERAL COMPILATION OF NOTES AND SYMBOLS THAT ARE REGULARLY REQUIRED ON PLUMBING DRAWINGS. SOME INFORMATION SHOWN ON THIS DRAWING MAY NOT NECESSARILY BE APPLICABLE TO THIS SPECIFIC PROJECT. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING INFORMATION ON PLANS WITH PERTINENT DATA ON THIS DRAWING. 4.CONTRACTOR SHALL COORDINATE HIS WORK HARMONIOUSLY WITH ALL OTHER TRADES. 5.IF THE CONTRACTOR REQUIRES A SOFFIT OR PLUMBING WALL THAT IS NOT SPECIFIED ON THE ARCHITECTURAL PLANS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND DESIGN ENGINEER PRIOR TO THE INSTALLATION OF THE RELATED PIPING. 6.VALVE HANDLE ORIENTATION SHALL BE BY CONTRACTOR UNLESS SPECIFICALLY SHOWN ON DRAWINGS OR DIRECTED BY CONSTRUCTION MANAGER. VALVE HANDLE SHALL CLEAR VEHICLE AND/OR PERSONNEL TRAFFIC AND SHALL BE EASILY ACCESSIBLE. 7.CONTRACTOR SHALL SEAL PENETRATIONS THROUGH FIRE WALLS AND FLOORS WITH APPROVED FIRE SEALANT. REFER TO SPECIFICATION. INSTALL PER MANUFACTURERS INSTRUCTIONS FOR APPLICABLE PIPE MATERIAL AND SIZE. 8.ANY DIMENSIONS SHOWN ON THESE DRAWINGS ARE APPROXIMATE, AND MUST BE CONFIRMED AT THE SITE BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ARCHITECT AND ENGINEER SHALL BE NOTIFIED IN WRITING IMMEDIATELY FOR CLARIFICATION. 9.ALL FIXTURE LOCATIONS, INCLUDING BUT NOT LIMITED TO FLOOR DRAINS, AREA DRAINS, ROOF DRAINS, PLANTER DRAINS, SCUPPERS, DOWNSPOUTS, WATER-CLOSETS, LAVATORIES, SINKS, WASHER BOXES, BATHTUBS AND SHOWERS, SHALL BE LOCATED BY THE ARCHITECTURAL PLANS OR LANDSCAPE PLANS. ROUTING FROM FIXTURES TO THE APPROPRIATE DRAIN SYSTEM IS SHOWN ON THESE PLANS. CONTRACTOR SHALL CONTACT EOR IMMEDIATELY IF LOCATIONS DO NOT MATCH BETWEEN ARCHITECTURAL AND PLUMBING PLANS. 10.PLASTIC AND COPPER OR COPPER ALLOY PIPING PENETRATING FRAMING MEMBERS TO WITHIN 1 INCH OF THE EXPOSED FRAMING SHALL BE PROTECTED BY STEEL NAIL PLATES NOT LESS THAN NO. 18 GAUGE IN THICKNESS. THE STEEL NAIL PLATE SHALL EXTEND ALONG THE FRAMING MEMBER NOT LESS THAN 1-1/2 INCHES BEYONE THE OUTSIDE DIAMETER OF THE PIPE OR TUBING. CPC 312.9. C.POTABLE WATER 1.POTABLE WATER SYSTEM SHALL BE DISINFECTED PRIOR TO USE IF REQUIRED BY THE LOCAL AUTHORITY HAVING JURISDICTION AND OUTLINED IN THE PLUMBING CODE. 2.ALL INSTALLATIONS OF PEX PIPE AND CPVC PIPE SHALL BE FLUSHED TWICE OVER A PERIOD OF AT LEAST ONE WEEK. CONTRACTOR SHALL FOLLOW THE FLUSHING REQUIREMENTS AS OUTLINED IN CPC SECTIONS 604.1.1(h)(i) AND 604.1.2. 3.ALL PLUMBING FIXTURES SHALL BE CONNECTED TO AN APPROVED WATER SUPPLY. LAVATORIES, BATHTUBS, SHOWERS, AND OTHER SHALL BE PROVIDED WITH HOT AND COLD WATER. CRBC R306.4 4.HOT WATER DELIVERED FROM PUBLIC-USE LAVATORIES SHALL BE LIMITED TO A MAXIMUM TEMPERATURE OF 120°F (49°C). THE MAXIMUM TEMPERATURE SHALL BE REGULATED BY ONE OF THE FOLLOWING MEANS: A.A LIMITING DEVICE CONFORMING TO EITHER ASSE 1070/ASME A112.1070 OR CSA B125.70 B.A WATER HEATER CONFORMING TO ASSE 1084. 5.PROVIDE WATER HAMMER ARRESTORS FOR ALL QUICK-ACTING VALVES. 6.PIPES, PIPE FITTING, VALVES, AND FAUCETS UTILIZED IN THE WATER SUPPLY SYSTEM FOR NON-DRINKING WATER APPLICATIONS SHALL HAVE A MAXIMUM OF 8 PERCENT LEAD CONTENT. CPC SECTION §604.2.1 7.POTABLE WATER SUPPLY TO BEVERAGE DISPENSERS CARBONATED BEVERAGE DISPENSERS, OR COFFEE MACHINES SHALL BE PROTECTED BY AN AIR GAP OR A VENTED BACK-FLOW PREVENTER THAT COMPLIES WITH ASSE 1022. 8.POTABLE WATER MAKE UP SUPPLY FOR SWIMMING POOLS, SPAS AND HOT TUBS SHALL BE PROTECTED FROM BACK-FLOW USING AN APPROPRIATED REDUCED PRESSURE PRINCIPLE BACK-FLOW PREVENTER. 9.WHERE MORE THAN ONE BUILDING IS BEING SUPPLIED ON A SINGLE PREMISE, EACH BUILDING SHALL BE PROVIDED A FULL WAY SHUT OFF VALVE IN AN ACCESSIBLE LOCATION. THIS REQUIREMENT DOES NOT APPLY FOR SINGLE FAMILY RESIDENCES WITH ACCESSORY STRUCTURES. 10.IN MULTI-DWELLING UNITS, ONE OR MORE SHUT OFF VALVES SHALL BE PROVIDED IN EACH DWELLING UNIT SO THAT THE WATER MAY BE SHUT OFF WITHOUT AFFECTING THE WATER SUPPLY TO OTHER DWELLING UNITS. 11.WHERE A BOOSTER PUMP IS CONNECTED TO A BUILDING SUPPLY OR UNDERGROUND WATER PIPE, A LOW-PRESSURE CUTOFF SWITCH ON THE INLET SIDE OF THE PUMP SHALL BE INSTALLED NOT MORE THAN 5 FEET OF THE INLET. THE CUTOFF SWITCH SHALL BE SET FOR NOT LESS THAN 10 PSI. A PRESSURE GAUGE SHALL BE INSTALLED BETWEEN THE SHUTOFF VALVE AND THE PUMP. 12.A CONTROL VALVE SHALL BE INSTALLED IMMEDIATELY AHEAD OF EACH WATER-SUPPLIED APPLIANCE AND IMMEDIATELY AHEAD OF EACH SLIP JOINT OF APPLIANCE SUPPLY. CPC 606.5 13.WHERE DOMESTIC WATER PIPING IS REQUIRED TO BE ROUTED UNDER A CONCRETE FLOOR SLAB WITHIN A BUILDING, PRIOR APPROVAL FROM THE AUTHORITY HAVING JURISDICTION MAY BE REQUIRED. IF APPROVED, SUCH PIPING SHALL BE INSTALLED IN ACCORDANCE WITH CPC 609.3(1) AND 609.3(2). D.SANITARY AND STORM DRAINAGE 1.SANITARY DRAINAGE PIPING SHALL SLOPE 1/4" PER FOOT UNLESS OTHERWISE APPROVED BY THE BUILDING OFFICIAL. DRAINAGE PIPING 4" & LARGER SHALL SLOPE 1/8" PER FOOT WHERE IT IS IMPRACTICAL DUE TO STREET SEWER ELEVATION OR STRUCTURAL FEATURES TO OBTAIN 1/4" PER FOOT. 2.FLOOR DRAINS OR SIMILAR TRAPS DIRECTLY CONNECTED TO THE DRAINAGE SYSTEM AND SUBJECT TO INFREQUENT USE SHALL BE PROVIDED WITH AN APPROVED AUTOMATIC MEANS OF MAINTAINING THEIR WATER SEALS. 3.FLOOR DRAIN & HUB DRAIN P-TRAPS SHALL BE DEEP SEAL TYPE UNLESS NOTED OTHERWISE. FLOOR DRAIN AND HUB DRAIN P-TRAPS WITH TRAP PRIMER SHALL BE STANDARD SEAL TYPE UNLESS NOTED OTHERWISE. 4.TOP OF FLOOR CLEANOUTS SHALL BE FLUSH WITH FINISHED FLOOR UNLESS NOTED OTHERWISE. 5.VENT PIPE EXTENSIONS THRU ROOF SHALL TERMINATE 1'-0" (MINIMUM) ABOVE FINISHED ROOF, NOT LESS THAN TEN FEET FROM OR AT LEAST THREE FEET ABOVE ANY WINDOW, DOOR, OPENING OR AIR INTAKE PER CPC 906.2. 6.ALL SANITARY SYSTEM MATERIALS SHALL BE LISTED BY AN APPROVED LISTING AGENCY. 7.ALL PLUMBING FIXTURES SHALL BE CONNECTED TO A SANITARY SEWER SYSTEM. CRBC R3.063 8.COPPER ALLOY OR CAST-IRON DRAINAGE BODY CLEANOUTS SHALL NOT BE USED AS A REDUCER OR ADAPTER FROM CAST-IRON DRAINAGE PIPE TO IRON PIPE SIZE (IPS) PIPE. CPC SECTION §316.1 9.EACH CLEAN-OUT IN PIPING 2 INCHES OR LESS IN SIZE SHALL BE INSTALLED SO THAT THERE IS A CLEARANCE OF NOT LESS THAN 18 INCHES IN FRONT OF THE CLEAN-OUT. CLEANOUTS IN PIPING EXCEEDING 2 INCHES SHALL HAVE A CLEARANCE OF NOT LESS THAN 24 INCHES IN FRONT OF THE CLEAN-OUT. CPC SECTION §707.9 10.ANY CLEANOUTS SHOWN ON PLANS THAT DO NOT SPECIFY A SIZE SHALL BE SIZED PER CPC TABLE 707.1. ANY ADDITIONAL CLEAN-OUTS INSTALLED BY CONTRACTOR SHALL BE SIZED PER CPC TABLE 707.1. ALL CLEANOUTS SHALL BE INSTALLED PER CPC 707.0 AND 719.0. 11.BUILDING DRAIN AND VENT PIPING MATERIALS SHALL COMPLY WITH SECTIONS 701.0 AND 903.0 OF THE CPC. 12.EACH VENT SHALL RISE VERTICALLY TO A POINT NOT LESS THAN SIX(6) INCHES ABOVE THE FLOOD-LEVEL RIM OF THE FIXTURE SERVED BEFORE OFFSETTING HORIZONTALLY OR BEFORE BEING CONNECTED TO ANY OTHER VENT.HORIZONTAL VENT PIPING SHALL BE GRADED AND CONNECTED AS TO DRIP PACK BY GRAVITY TO THE DRAINAGE PIPE IT SERVES PER CPC 905.1 13.DRAINAGE CONNECTIONS SHALL NOT BE MADE INTO A DRAINAGE PIPING SYSTEM WITHIN EIGHT (8) FEET OF A VERTICAL TO HORIZONTAL CHANGE OF DIRECTION OF A STACK CONTAINING SUDS PRODUCING FIXTURES. BATHTUBS, LAUNDRIES, WASHING MACHINE STANDPIPES, KITCHEN SINKS, AND DISHWASHERS SHALL BE CONSIDERED SUDS-PRODUCING FIXTURES. WHERE PARALLEL VENT STACKS ARE REQUIRED, THEY SHALL CONNECT TO THE DRAINAGE STACK AT A POINT EIGHT (8) FEET ABOVE THE LOWEST POINT OF THE DRAINAGE STACK. CPC SECTION 711.0 13.1.EXCEPTIONS: (1) SINGLE FAMILY RESIDENCES. (2) STACKS RECEIVING THE DISCHARGE FROM LESS THAN THREE STORIES OF PLUMBING FIXTURES. E.PLUMBING FIXTURES, EQUIPMENT AND APPLIANCES 1.EXACT LOCATION OF PLUMBING EQUIPMENT, DEVICES AND FIXTURES SHALL BE CONFIRMED BY CONTRACTOR PRIOR TO INSTALLATION. CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR FIXTURE LOCATIONS AND MOUNTING HEIGHTS. 2.WATER HEATER SHALL BE ANCHORED OR STRAPPED TO RESIST HORIZONTAL DISPLACEMENT DUE TO EARTHQUAKE MOTION PER SECTION 507.2 CPC. 3.ROUTING AND TERMINATION OF FLUE AND COMBUSTION AIR INTAKE FOR WATER HEATER SHALL COMPLY WITH CH.5 CPC 2022 AND MANUFACTURERS SPECIFICATIONS. 4.INSTANTANEOUS WATER HEATERS WITH AN INPUT RATING GREATER THAN 6.8 kBTU/HR (2kW) SHALL HAVE ISOLATION VALVES ON BOTH THE COLD WATER SUPPLY AND THE HOT WATER PIPE LEAVING THE WATER HEATER, AND HOSE BIBBS OR OTHER FITTINGS ON EACH VALVE FOR FLUSHING THE WATER HEATER WHEN THE VALVES ARE CLOSED. CBEES 110.3(C)6. 5.BATHTUB, SHOWER, AND TUB-SHOWER COMBINATIONS REQUIRE INDIVIDUAL CONTROL VALVES OF THE PRESSURE BALANCE OR THERMOSTATIC MIXING VALVE TYPE. HANDLE POSITION STOPS SHOULD BE PROVIDED ON THE VALVES AND SHOULD BE ADJUSTED PER MANUFACTURER'S INSTRUCTIONS TO DELIVER A MAXIMUM 120°F. 6.FLEXIBLE PVC HOSES AND TUBING INTENDED TO BE USED ON WHIRLPOOL BATH-TUB WATER CIRCULATION SYSTEMS OR PNEUMATIC SYSTEMS SHALL BE IN ACCORDANCE WITH IAPMO Z1033. CPC SECTION §409.6.1 7.CONTROL VALVES AND SHOWERHEADS SHALL BE LOCATED ON THE SIDEWALL OF SHOWER COMPARTMENTS OR OTHERWISE ARRANGED SO THAT THE SHOWERHEAD DOES NOT DISCHARGE DIRECTION AT THE ENTRANCE TO THE COMPARTMENT SO THAT THE BATHER CAN ADJUST THE VALVES BEFORE STEPPING INTO THE SHOWER SPRAY. 8.WHERE A WATER HEATER IS LOCATED IN AN ATTIC, IN OR ON AN ATTIC CEILING ASSEMBLY, FLOOR-CEILING ASSEMBLY, OR FLOOR-SUBFLOOR ASSEMBLY WHERE DAMAGE RESULTS FROM A LEAKING WATER HEATER, A WATERTIGHT PAN OF CORROSION-RESISTANT MATERIAL SHALL BE INSTALLED BENEATH THE WATER HEATER WITH NOT LESS THAN 3/4" DIAMETER DRAIN TO AN APPROVED LOCATION. SUCH PAN SHALL BE NOT LESS THAN 1-1/2" IN DEPTH. 9.ALL FIXTURES AND APPLIANCES ARE REQUIRED TO BE LISTED AND LABELED BY AN APPROVED TESTING AGENCY. F.PIPING 1.ELEVATIONS BELOW GROUND LEVEL ARE NOTED IN FEET AND DECIMALS OF FEET AND SHALL DENOTE INVERT ELEVATION OF PIPE. ELEVATIONS ABOVE GROUND LEVEL ARE NOTED IN FEET & INCHES AND SHALL DENOTE WORK POINT ELEVATION OF PIPE, UNLESS NOTED OTHERWISE. BOTTOM OF PIPE ELEVATIONS REFER TO BOTTOM OF PIPE ON UNINSULATED LINES AND TO BOTTOM OF SADDLE ON INSULATED LINES. 2.PIPING SHOWN ON DRAWINGS WITHOUT DIMENSIONAL LOCATION SHALL BE FIELD ROUTED BY CONTRACTOR. CONTRACTOR SHALL VERIFY PROPOSED PIPE ROUTINGS AND CHECK OTHER TRADES WORK PRIOR TO INSTALLATION, INCLUDING INTERFERENCE WITH BUILDING STRUCTURES, EQUIPMENT AND WORK OF OTHER TRADES WHETHER NEW OR EXISTING. PROPOSED ROUTINGS SHALL BE REVIEWED WITH THE CONSTRUCTION MANAGER. 3.REDUCERS, REDUCING INSERTS, UNIONS & APPURTENANCES NOT SHOWN ON DRAWINGS BUT REQUIRED FOR PROPER INSTALLATION SHALL BE PROVIDED BY CONTRACTOR. 4.PLUMBING LINE SIZE REDUCTIONS NOT SHOWN WITH REDUCERS SHALL BE MADE WITH REDUCING FITTINGS. 5.PIPE SLEEVES FOR PLUMBING LINES SHALL BE FURNISHED AND INSTALLED BY CONTRACTOR. PROVIDE LOCATION AND SIZE TO CONCRETE CONTRACTOR AND STRUCTURAL ENGINEER PRIOR TO INSTALLATION. 6.PIPE PENETRATION THROUGH NON-RATED WALLS AND FLOORS SHALL BE SEALED AIR TIGHT. 7.ANNULAR SPACES AROUND PIPES, ELECTRIC CABLES, OR OTHER OPENINGS IN PLATES AT EXTERIOR WALLS SHALL BE PROTECTED AGAINST THE PASSAGE OF RODENTS BY CLOSING SUCH OPENINGS WITH CEMENT MORTAR, CONCRETE MASONRY OR A SIMILAR METHOD ACCEPTABLE TO THE ENFORCING AGENCY. 8.PVC PIPING EXPOSED TO SUNLIGHT MUST BE PROTECTED BY WATER BASED SYNTHETIC LATEX PAINT OR WRAPPED WITH NOT LESS THAN 0.04 INCH(1.02 MM) THICK TAPE OR OTHERWISE PROTECTED FROM UV DEGRADATION. CPC SECTION §312.14 9.WATER SUPPLY AND DRAIN PIPES UNDER ACCESSIBLE LAVATORIES AND SINKS SHALL BE INSULATED OR OTHERWISE BE CONFIGURED TO PROTECT AGAINST CONTACT. PROTECTORS, INSULATORS, OR BOTH SHALL COMPLY WITH ASME A112.18.9. CPC SECTION §403.3 10.TRENCHES DEEPER THAT THE FOOTING OF A BUILDING OR STRUCTURE, AND PARALLELING THE SAME, SHALL BE LOCATED NOT LESS THAN 45 DEGREES FROM THE BOTTOM EXTERIOR OF FOOTING, OR AS APPROVED IN ACCORDANCE WITH SECTION 301.2. CPC SECTION §314.1 11.PLASTIC PIPE AND FITTINGS JOINED WITH SOLVENT CEMENT SHALL UTILIZE LOW VOC PRIMER(S), IF A PRIMER IS REQUIRED, AND LOW VOC CEMENT(S) AS DEFINED IN SECTION 214.0. CPC SECTION §705.1.2 & §705.6.2 12.FIXTURES HAVING CONCEALED SLIP JOINT CONNECTIONS SHALL BE PROVIDED WITH AN ACCESS PANEL OR UTILITY SPACE NOT LESS THAN 12 INCHES IN ITS LEAST DIMENSION AND SO ARRANGED WITHOUT OBSTRUCTIONS AS TO MAKE SUCH CONNECTIONS ACCESSIBLE FOR INSPECTION AND REPAIR. CAL GREEN AND CALIFORNIA ENERGY NOTES 1.WATER HEATERS, SHOWERHEADS, FAUCETS AND ALL OTHER REGULATED APPLIANCES ARE CERTIFIED BY THE ENERGY COMMISSION. CEC §110-§113: 2.SUBMETERS SHALL BE INSTALLED TO MEASURE WATER USAGE OF INDIVIDUAL RENTAL DWELLING UNITS IN ACCORDANCE WITH THE 2022 CALIFORNIA PLUMBING CODE SECTION 601.2.2. 3.WATER HEATING RECIRCULATION LOOPS SERVING MULTIPLE DWELLING UNITS AND HIGH-RISE RESIDENTIAL OCCUPANCIES SHALL MEET THE AIR RELEASE VALVE, BACKFLOW PREVENTION, PUMP ISOLATION VALVE, AND RECIRCULATION LOOP CONNECTION REQUIREMENTS OF CEC SECTION §110.3(c)4. 4.CONTINUOUSLY BURNING PILOT LIGHTS ARE PROHIBITED FOR NATURAL GAS: FAN-TYPE CENTRAL FURNACES, HOUSEHOLD COOKING APPLIANCES (APPLIANCES WITH AN ELECTRICAL SUPPLY VOLTAGE CONNECTION WITH PILOT LIGHTS THAT CONSUME LESS THAN 150 BTU/HR ARE EXEMPT), AND POOL AND SPA HEATERS. CEC SECTION §110.5. 5.STORAGE GAS WATER HEATERS RATED WITH AN ENERGY FACTOR NO GREATER THAN THE FEDERAL MINIMAL STANDARD ARE EXTERNALLY WRAPPED WITH INSULATION HAVING AN INSTALLED THERMAL RESISTANCE OF R-12 OR GREATER. CEC SECTION §150(J)1A. 6.UNFIRED STORAGE TANKS, SUCH AS STORAGE TANKS OR BACKUP TANKS FOR SOLAR WATER-HEATING SYSTEM, OR OTHER INDIRECT HOT WATER TANKS HAVE R-12 EXTERNAL INSULATION OR R-16 INTERNAL INSULATION WHERE THE INTERNAL INSULATION R-VALUE IS INDICATED ON THE EXTERIOR OF THE TANK. CEC SECTION §150(J)1B. 7.ANY INSTALLED GAS FIREPLACE SHALL BE A DIRECT-VENT SEALED-COMBUSTION TYPE. 8.COOLING SYSTEM PIPING (SUCTION, CHILLED WATER, OR BRINE LINES),AND PIPING INSULATED BETWEEN HEATING SOURCE AND INDIRECT HOT WATER TANK SHALL BE INSULATED TO TABLE 120.3-A AND EQUATION 120.3-A. CEC SECTION §120.3(a). 9.PIPE INSULATION FOR STEAM HYDRONIC HEATING SYSTEMS OR HOT WATER SYSTEMS >15 PSI, MEETS THE REQUIREMENTS OF STANDARDS TABLE 120.3-A. CEC SECTION §120.3(a). 10.SOLAR WATER-HEATING SYSTEMS AND/OR COLLECTORS ARE CERTIFIED BY THE SOLAR RATING AND CERTIFICATION CORPORATION. CEC SECTION §150(n)4. 11.INSULATION SHALL BE PROTECTED FROM DAMAGE, INCLUDING THAT DUE TO SUNLIGHT, MOISTURE, EQUIPMENT MAINTENANCE, AND WIND. CELLULAR FOAM INSULATION SHALL BE PROTECTED AS ABOVE OR PAINTED WITH A COATING THAT IS WATER RETARDANT AND PROVIDES SHIELDING FROM SOLAR RADIATION THAT CAN CAUSE DEGRADATION OF THE MATERIAL. CEC SECTION §120.3(b). 12.ALL PLUMBING FIXTURES SHALL BE CERTIFIED BY THE CALIFORNIA ENERGY COMMISSION AND MEET THE CALIFORNIA GREEN BUILDING STANDARDS CODE WATER CONSUMPTION RATES. 13.CIRCULATING SERVICE WATER-HEATING SYSTEMS SHALL HAVE A CONTROL CAPABLE OF AUTOMATICALLY TURNING OFF THE CIRCULATING PUMP WHEN HOT WATER IS NOT REQUIRED. CEC SECTION §110.3(c)2. 14.ALL DOMESTIC HOT WATER PIPING SHALL BE INSULATED AS SPECIFIED IN SECTION 609.12 OF THE CALIFORNIA PLUMBING CODE AND CALIFORNIA ENERGY CODE SECTIONS 150.0(J)2 AND 120.3(C). i.THE FIRST 5 FEET (1.5 METERS) OF HOT AND COLD WATER PIPES FROM THE STORAGE TANK. ii.ALL HOT WATER PIPING WITH A NOMINAL DIAMETER EQUAL TO OR GREATER THAN ¾ INCH AND LESS THAN 1 INCH. iii.ALL HOT WATER PIPING WITH A NOMINAL DIAMETER LESS THAN ¾ INCH THAT IS: A.ADDOSIACTED WITH A DOMESTIC HOT WATER RECIRCULATION SYSTEM B.FROM THE HEATING SOURCE TO THE KITCHEN FIXTURES C.FROM THE HEATER SOURCE TO A STORAGE TANK OR BETWEEN STORAGE TANKS; OR D.BURIED BELOW GRADE P-0.1 GENERAL NOTES & SHEET INDEX PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 MATERIAL AND FIXTURE SCHEDULES FIXTURE FLOW RATES (2022 CAL GREEN MANDATORY MEASURES) FIXTURE TYPE MAXIMUM FLOW RATE SHOWERHEADS, RESIDENTIAL 1.8 GPM @ 80 PSI WHEN A SHOWER IS SERVED BY MORE THAN ONE SHOWERHEAD, THE COMBINED FLOW RATE OF ALL SHOWERHEADS AND/OR OTHER SHOWER OUTLETS CONTROLLED BY A SINGLE VALVE SHALL NOT EXCEED 1.8 GPM AT 80 PSI, OR THE SHOWER SHALL BE DESIGNED TO ALLOW ONLY ONE SHOWER OUTLET TO BE IN OPERATION AT A TIME LAVATORY FAUCETS, RESIDENTIAL 1.2 GPM @ 60 PSI THE MINIMUM FLOW RATE OF RESIDENTIAL LAVATORY FAUCETS SHALL NOT BE LESS THAN 0.8 GPM AT 20 PSI. LAVATORY FAUCETS, PUBLIC AREAS 0.5 GPM @ 60 PSI KITCHEN FAUCETS 1.8 GPM @ 60 PSI KITCHEN FAUCETS MAY TEMPORARILY INCREASE THE FLOW ABOVE THE MAXIMUM RATE, BUT NOT TO EXCEED 2.2 GPM AT 60 PSI, AND MUST DEFAULT TO A MAXIMUM FLOW RATE OF 1.8 GPM AT 60 PSI. WATER CLOSETS 1.28 GALLONS/FLUSH THE EFFECTIVE FLUSH VOLUME OF DUAL FLUSH TOILETS IS DEFINED AS THE COMPOSITE, AVERAGE FLUSH VOLUME OF TWO REDUCED FLUSHES AND ONE FULL FLUSH. URINALS 0.125 GALLON/FLUSH METERING FAUCETS 0.2 GALLON/CYCLE 1. FLOW RATES ARE BASED ON THE 2022 CALIFORNIA GREEN BUILDING CODE STANDARDS SECTION 4.303 & 5.303. NOTES: THE DIAMETER OF AN INDIVIDUAL VENT SHALL NOT BE LESS THAN ONE AND ONE-FOURTH (1-1/4) INCHES NOR LESS THAN ONE-HALF (1/2) THE DIAMETER OF THE DRAIN TO WHICH IT IS CONNECTED. FIXTURE UNIT LOAD VALUES FOR DRAINAGE AND VENT PIPING SHALL BE COMPUTED FROM CALIFORNIA PLUMBING CODE TABLES 702.1 AND 702.2. NOT TO EXCEED ONE-THIRD (1/3) OF THE TOTAL PERMITTED LENGTH OF ANY VENT MAY BE INSTALLED IN A HORIZONTAL POSITION. WHERE VENTS ARE INCREASED ONE (1) PIPE SIZE FOR THEIR ENTIRE LENGTH, THE MAXIMUM LENGTH LIMITATIONS SPECIFIED IN THIS TABLE DO NOT APPLY. CPC TABLE 703.2 DRAINAGE AND VENT PIPE SIZING TABLE NOMINAL PIPE DIAMETER DRAINAGE PIPING MAXIMUM UNITS (DFU) VERTICAL 2% SLOPE 1% SLOPE DRAINAGE PIPING MAX VERTICAL LENGTH (FT) VENT PIPING HORIZONTAL AND VERTICAL (SEE NOTE) MAXIMUM UNITS (DFU) MAXIMUM LENGTH (FT) 1-1/4"1 1 45 1 45 1-1/2" 2" 3" 4" 5" 6" 8" 2 16 48 256 600 1380 3600 1 8 35 216 428 720 2640 172 342 576 2112 65 85 212 300 390 510 750 8 24 84 256 600 1380 3600 60 120 212 300 390 510 750 2 3 4 3 4 5 5 5 5 3 1 5 4 3 2 1 EXCLUDING TRAP ARM. EXCEPT SINKS, URINALS AND DISHWASHERS - EXCEEDING 1 FIXTURE UNIT. EXCEPT SIX-UNIT TRAPS OR WATER CLOSETS. NOT TO EXCEED FIVE WATER CLOSETS OR FIVE SIX-UNIT TRAPS. BASED ON ONE-FOURTH (1/4) INCH PER FOOT (2%) SLOPE. FOR ONE-EIGHTH (1/8) INCH PER FOOT (1%) SLOPE, MULTIPLY HORIZONTAL FIXTURE UNITS BY A FACTOR OF 0.8. 6 WHERE IMPRACTICAL TO MAINTAIN 1/4 INCH PER FOOT UNIFORM SLOPE, DRAINAGE PIPE FOUR (4) INCHES OR LARGER MAY HAVE A SLOPE NOT LESS THAN 1/8 INCH PER FOOT, WHEN FIRST APPROVED BY AUTHORITY HAVING JURISDICTION. 6 6 6 6 FLOW IN GPM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 FIXTURE UNITS FLUSH TANK 0 1 3 4 6 7 8 10 12 13 15 16 18 20 21 FLUSH VALVE - 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 23 24 26 28 30 32 34 36 39 42 44 46 49 51 54 5 6 7 8 9 10 11 12 13 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 56 58 60 63 66 69 74 78 83 86 90 95 99 103 107 14 15 16 18 20 21 23 25 26 28 30 31 33 35 37 -------------- ------ FIXTURE UNITS VS. GPM CONVERSION TABLE 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 111 115 119 123 127 130 135 141 146 151 155 160 165 170 175 39 42 44 46 48 50 52 54 57 60 63 66 69 73 76 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 185 195 205 215 225 236 245 254 264 275 284 294 305 315 326 82 88 95 102 108 116 124 132 140 148 158 168 176 186 195 92 94 96 98 100 105 110 115 120 125 130 135 140 145 150 337 348 359 370 380 406 431 455 479 506 533 559 585 611 638 205 214 223 234 245 270 295 329 365 396 430 460 490 521 559 FLOW IN GPM FIXTURE UNITS FLUSH TANK FLUSH VALVE FLOW IN GPM FIXTURE UNITS FLUSH TANK FLUSH VALVE FLOW IN GPM FIXTURE UNITS FLUSH TANK FLUSH VALVE FLOW IN GPM FIXTURE UNITS FLUSH TANK FLUSH VALVE FLOW IN GPM FIXTURE UNITS FLUSH TANK FLUSH VALVE 155 160 165 170 175 180 185 190 200 210 220 230 240 250 260 665 692 719 748 778 809 840 879 945 1018 1091 1173 1254 1335 1418 596 631 666 700 739 775 811 850 931 1009 1091 1173 1254 1335 1418 FLOW IN GPM FIXTURE UNITS 1583 1668 1755 1845 1926 2018 2110 2204 2298 2388 2480 2575 2670 2765 FLOW IN GPM FIXTURE UNITS FLUSH TANK FLUSH VALVE 1500 420 430 440 450 500 550 600 650 700 750 800 850 900 950 1000 2960 3060 3150 3620 4070 4480 4930 5380 5830 6280 6780 7280 7790 8300 FLOW IN GPM FIXTURE UNITS 2862 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 FLUSH TANK FLUSH VALVE FLUSH TANK FLUSH VALVE GPM EQUIVALENTS ARE BASED ON CPC CHARTS A 103.1(1) AND A 103.1(2). INSULATION WALL THICKNESS NOMINAL PIPE DIAMETER (INCHES) LESS THAN 1"2 TO <4" 1"2" 1.75"1" TO 1.5" 1.5"1.75" PIPE INSULATION THICKNESS WATER HEATING SYTEMS (105°-140° OPERATING RANGE) R 7.7 R 12.5 R 11 R 11R-VALUE 8" & LARGER4" TO <8" R 9 R 8 2"2" 1.THE INSULATION FOR HOT WATER PIPES SHALL MEET THE MINIMUM THICKNESS PER CPC 609.12 AND CEC TABLE 120.3-A OR THE MINIMUM R-VALUE PER CEC TABLE 120.3.-A. 2.INSULATION THICKNESSES SHOWN REPRESENT THE LARGER REQUIREMENT FOR DESIGNATED PIPE SIZES PER CPC SECTION 609.12 AND CEC TABLE 120.3-A. 3.THE R-VALUES FOR ALL PIPE DIAMETERS ARE BASED ON TABLE 120.3-A OF THE CALIFORNIA ENERGY CODE. GENERAL PIPE SIZING TABLES WALL CLEANOUT VENT P-TRAP GROUND CLEANOUT WYE W/CLEANOUT PLUG WYE SANITARY TEE FLOOR SINK, KITCHEN FLOOR DRAIN, SQUARE PLUMBING FIXTURES FLOOR DRAIN RISER ID TAG # TAG EQUIPMENT ID TAG CONNECT TO EXISTING VALVE SYMBOL GLOBE BALL GATE DIAPHRAGM BUTTERFLY 3-WAY 4-WAY SYMBOL REMARKS TAG # SYMBOL REMARKS PRESSURE REDUCING ANGLE GATE ANGLE GLOBE RELIEF OR SAFETY CHECK TRIPLE DUTY VALVE SOLENOID DIAPHRAGM VALVE S (NORMALLY CLOSED) VALVE (PRV) W/PURGE PORTS HOSE BIBB UNION PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, SIDE TEE, DOWN TEE, UP WATER HAMMER ARRESTER PIPING FIXTURES PIPE STUB BUILDING SUPPLY PIPE POINT OF CONNECTION BACKFLOW PREVENTOR WATER SUB-METER TWH TERMINATION CW CW HW HW HWR HW_RETURN TEXT SYMBOLS CD CONDENSATE WASTE_BELOW WASTE_ABOVE VENT RD ROOF DRAIN SUBSURFACE SD SD_ABOVE OVERFLOW OFD DRAIN STORM DRAIN PLUMBING LEGEND SYMBOL REMARKS SYMBOL REMARKS ABBREVIATIONS SYMBOL REMARKS ABOVE CONDENSATE DRAIN ABV CD HWR CW HW CPC CEC CA PLUMBING CODE CA ENERGY CODE DOMESTIC COLD WATER DOMESTIC HOT WATER DOMESTIC HW RETURN FORCED AIR UNIT FLOOR FEET PER SECOND FAU FLR FPS DN DOWN GALLONS PER MINUTEGPM TBD V TO BE DETERMINED VENT VTR W WCO VENT TO ROOF WASTE WALL CLEANOUT BELOWBLW (E)EXISTING SQ FT SQUARE FEET NEW(N) PSI POUND PER SQUARE INCH BRITISH THERMAL UNITS PER HOURBTUH CEILINGCLG SD STORM DRAIN OVERFLOW DRAINOFD POINT OF CONNECTIONPOC SOV SHUTOFF VALVE INVERT ELEVATIONIE SYMBOL REMARKS RW RECYCLED GW GREY_BELOW GW GW GREY_ABOVE GREASE WASTEGSW GROUND CLEANOUTGCO RW RECYCLED WATER GREYWATERGW SSD SUBSURFACE DRAIN WATER EQUIP GSW GREASE_BELOW GSW GSW GREASE_ABOVE FIXTURE SCHEDULE ITEM FIXTURE CO L D WA T E R HO T WA T E R WA S T E VE N T ST O R M DR A I N DESCRIPTION ICE MAKER BOX 1/2"----SELECTION TBD BY OWNER. PROVIDE WATER HAMMER ARRESTOR. PROVIDE A FIRE-RATED OUTLET BOX WHERE APPLICABLE. DISHWASHER -3/4"---DRAIN TO KITCHEN SINK. SELECTION TBD BY OWNER. PROVIDE WATER HAMMER ARRESTOR. KITCHEN SINK 3/4"3/4"2"1-1/2"-1.8 GPM FAUCET. SELECTION TBD BY OWNER. HUB DRAIN --2"1-1/2"-SIOUX CHIEF OXBOX DRAIN BOX WITH SECONDARY DRAIN FUNNEL. PROVIDE TRAP PRIMER. WATER CLOSET, FLUSH TANK 3/4"-3"2"-1.28 GPF, FLUSHTANK TYPE. SELECTION TBD BY OWNER. TUB-SHOWER COMBO 3/4"3/4"2"1-1/2"- SELECTION TBD BY OWNER.1.8 GPM SHOWER HEAD. PROVIDE A THERMOSTATIC OR PRESSURE BALANCE TYPE MIXING VALVE FOR THERMAL SHOCK AND SCALD PROTECTION. LAVATORY 1/2"1/2"2"1-1/2"-1.2 GPM FAUCET. SELECTION TBD BY OWNER. CLOTHES WASHER BOX (3 OR MORE)3/4"3/4"3"2"-SELECTION TBD BY OWNER. PROVIDE WATER HAMMER ARRESTOR. PROVIDE A FIRE-RATED OUTLET BOX WHERE APPLICABLE. FIRE SPRINKLER HUB DRAIN TRAP PRIMER -4"2"-STANDPIPE FOR FLUSHING FIRE SPRINKLER SYSTEM ELECTRONIC TRAP PRIMER 1/2"---- P.P.P NO. MPB-500 (120/60 VOLT, 6.3 WATTS), MINI-PRIME ELECTRONIC TRAP PRIMING MANIFOLD W/BOX (INSTALL PER MANUFACTURER'S RECOMMENDATIONS). TRAP PRIMER 1/2"---- PPP PR-500 PRESSURE DROP ACTIVATED TRAP PRIMER (INSTALL PER MANUFACTURER'S RECOMMENDATIONS). SELECT THE DISTRIBUTION UNIT DU-U OPTION IF CONNECTED TO TWO FLOOR DRAINS. FLOOR DRAIN --2"1-1/2"-SELECTION TBD BY OWNER. PROVIDE TRAP PRIMER. HOSE BIBB 3/4"----WALL MOUNTED WITH ATMOSPHERIC VACUUM BREAKER. ARROWHEAD ARROWBREAKER MODEL OR EQUIVALENT. MOP SINK 3/4"3/4"3"2"-SELECTION TBD BY OWNER. IMB 1 DW 1 KS 1 HD 1 WC 1 BT 1 L 1 WSH 1 SHD 1 TP 1 TP 2 FD 1 HB 1 MS 1 PIPING MATERIAL SCHEDULE DOMESTIC WATER PIPING INSIDE BUILDING ABOVE FLOOR SIZES 1/2" TO 2" UPONOR 'AQUAPEX' PEX TUBING WITH PROPEX (EP) FITTINGS, OR ALTERNATE BRANDS CONFORMING TO ASTM F876 AND ASTM F877 STANDARDS AND SDR9 DIMENSIONAL STANDARD. NOTE: 1. THE INSTALLATION OF PEX TUBING IN POTABLE WATER SUPPLY SYSTEMS MUST FOLLOW INDIVIDUAL MANUFACTURERS' INSTALLATION PROCEDURES AND THE PROCEDURES SET FORTH IN 2022 CPC SECTIONS 605.9 THRU 605.9.3. 2. PEX TUBING WHEN PLACED IN THE SOIL AND USED IN POTABLE WATER SYSTEMS INTENDED TO SUPPLY DRINKING WATER, THE TUBING SHALL BE SLEEVED WITH A MATERIAL APPROVED FOR POTABLE PAGE 3 OF 3 PERMIT TRACKING NUMBER 3014-6191-241 WATER USE IN SOIL OR MATERIAL(S) THAT ARE IMPERVIOUS TO SOLVENTS OR PETROLEUM PRODUCTS. 2022 CPC TBL. 604.1 FOOTNOTE #3. 3. PEX TUBING SHALL MEET OR EXCEED THE REQUIREMENTS OF ASTM F876-2015A WHEN USED IN CONTINUOUSLY RECIRCULATING HOT WATER SYSTEMS WHERE PEX TUBING IS EXPOSED TO THE HOT WATER 100% OF THE TIME. 2022 CPC TBL. 604.1 FOOTNOTE #4. 4. NEW POTABLE WATER SYSTEMS ARE REQUIRED TO BE DISINFECTED BY CHLORINATION. 2022 CPC SEC.609.10 (1, 2, 3, 4). SEWER, WASTE AND VENT PIPING INSIDE BUILDING ABOVE FLOOR SCHEDULE 40 PVC OR ABS PLASTIC PIPE WITH DWV TYPE FITTINGS. SEWER, WASTE AND VENT PIPING INSIDE BUILDING BELOW GRADE SCHEDULE 40 PVC OR ABS PLASTIC PIPE WITH DWV TYPE FITTINGS. 1.BUILDING DRAIN AND VENT PIPING MATERIALS SHALL COMPLY WITH CPC SECTIONS 701.0 AND 903.0. 2.ALL SANITARY SYSTEM MATERIALS SHALL BE LISTED BY AN APPROVED LISTING AGENCY. 3.ANY COPPER PIPING JOINTS UNDER CONCRETE SLAB SHALL BE BRAZED INSTEAD OF SOLDERED. 4.TYPE M COPPER TUBING MAY BE USED FOR ABOVE GROUND WATER PIPING INSIDE OR ON THE BUILDING. 5.CPVC TUBING MAY BE USED FOR CONDENSATE DRAIN PIPING WHEN DISCHARGE FROM FLUE-BURNING APPLIANCES IS ACIDIC OR CORROSIVE. 6.ALL COPPER PIPING INSTALLED BELOW GRADE SHALL BE COATED. EQUIP. NUMBER LOCATION MANUFACTURER SERIES MODEL TYPE TOTAL VOLUME ACCEPTANCE FACTOR MAX TEMPERATURE MAX PRESSURE FACTORY PRECHARGE PH Y S DA T A DIAMETER HEIGHT CONNECTION SHIPPING WEIGHT EXPANSION TANK SCHEDULE *ANY WATER SYSTEM PROVIDED WITH A CHECK VALVE OR BACKFLOW PREVENTER SHALL BE PROVIDED WITH AN APPROVED, LISTED, ADEQUATELY SIZED EXPANSION TANK OR OTHER APPROVED DEVICE HAVING A SIMILAR FUNCTION TO CONTROL THERMAL EXPANSION. AMTROL THERM-X-TROL ST-5 IN-LINE 2.0 GALLONS 0.45 200°F 150 PSIG 50 PSIG 8" 13" 3/4" NPT 5 LBS ET BY WH-1 1 WATER HEATER ROOM RHEEM PROH50 T2 RH310BM HYBRID ELECTRIC 67 26 37-145°F N/A 3.50 22-1/4"D X 61"H 172 3/4" NPT 208-240V - 1PH 24 A WH 1 HYBRID ELECTRIC WATER HEATER SCHEDULE EQUIPMENT NUMBER MANUFACTURER LOCATION MODEL TYPE WATER CONN. PH Y S DA T A WEIGHT (EMPTY) DIMENSIONS CO N N . SI Z E SUPPLY POWEREL E C . DA T A 1ST HOUR RATING GPH AMBIENT OPERATING RANGE ENERGY FACTOR (ELECTRIC) RECOVERY 90°F RISE, GPH ENERGY FACTOR (EFFICIENT) HYBRID ELECTRIC WATER HEATER SCHEDULE EQUIPMENT NUMBER MANUFACTURER LOCATION MODEL TYPE WATER CONN. PH Y S DA T A WEIGHT (EMPTY) DIMENSIONS CO N N . SI Z E SUPPLY BREAKER SIZEEL E C . DA T A 1ST HOUR RATING GPH RECOVERY 90°F RISE, GPH AMBIENT OPERATING RANGE ENERGY FACTOR (EFFICIENT) *OR APPROVED EQUAL 2 WH RHEEM* HPLD80* HYBRID ELECTRIC WATER HEATER ROOM 244 24-1/4"D X 74"H 3/4" NPT 89 29 35-145°F 3.70 208V- 1PH - 30 AMPS 30 P-0.2 MATERIAL AND FIXTURE SCHEDULES PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 WATER AND SEWER DEMAND CALCULATIONSWATER PRESSURE CALCULATIONS FIXTURE UNIT CALCULATION - UNIT A1 FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU1 DRAINAGE1 FIXTURE DEMAND HOT OR 75%2 COLD OR 75%2 TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD BRANCH DEMAND DFU TOTAL WATER CLOSET, FLUSH TANK 1 2.5 0 2.5 2.5 0.0 2.5 3 3 BATHTUB OR TUB-SHOWER COMBO 1 4 3 3 4 3 3 2 2 LAVATORY 1 1 0.8 0.8 1 0.8 0.8 1 1 KITCHEN SINK 1 1.5 1.2 1.2 1.5 1.2 1.2 2 2 DISHWASHER (DRAIN TO KITCHEN SINK)1 1.5 1.5 0 1.5 1.5 0 0 0 TOTAL FIXTURE UNITS 10.5 6.5 7.5 8 EQUIVALENT WATER DEMAND IN GPM3 9 6 7 FIXTURE UNIT CALCULATION - BUILDING A2 - UNIT TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU1 DRAINAGE1 FIXTURE DEMAND HOT OR 75%2 COLD OR 75%2 TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD BRANCH DEMAND DFU TOTAL HUB DRAIN 4 0 0 0 0 0 0 1 4 FIRE SPRINKLER HUB DRAIN 1 0 0 0 0 0 0 6 6 PRIMARY HOSE BIBB 1 2.5 0 2.5 2.5 0 2.5 0 0 UNIT A1 8 10.5 6.5 7.5 84.0 52.0 60.0 8 64 TOTAL FIXTURE UNITS 86.5 52.0 62.5 74 EQUIVALENT WATER DEMAND IN GPM3 41 30 34 FIXTURE UNIT CALCULATION - BUILDING A2 - FIXTURE TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU1 DRAINAGE1 FIXTURE DEMAND HOT OR 75%2 COLD OR 75%2 TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD BRANCH DEMAND DFU TOTAL HUB DRAIN 4 0 0 0 0.0 0.0 0.0 1 4 WATER CLOSET, FLUSH TANK 8 2.5 0 2.5 20.0 0 20.0 3 24 BATHTUB OR TUB-SHOWER COMBO 8 4 3 3 32 24 24.0 2 16 LAVATORY 8 1 0.8 0.8 8 6.4 6.4 1 8 KITCHEN SINK 8 1.5 1.2 1.2 12.0 9.6 9.6 2 16 FIRE SPRINKLER HUB DRAIN 1 0 0 0 0 0 0.0 6 6 PRIMARY HOSE BIBB 1 2.5 0 2.5 2.5 0 2.5 0 0 DISHWASHER (DRAIN TO KITCHEN SINK)8 1.5 1.5 0 12.0 12.0 0.0 0 0 TOTAL FIXTURE UNITS 86.5 52.0 62.5 74 EQUIVALENT WATER DEMAND IN GPM3 41 30 34 PIPE SIZING CHART, PEX PIPE SIZE COLD WATER HOT WATER TANK FU GPM FU GPM BASED ON UPONOR AQUAPEX PRESSURE LOSS TABLES IN CH 4 OF THE PLUMBING DESIGN ASSISTANCE MANUAL 2" 1-1/2" 1-1/4" 1" 3/4" 1/2" FOR VELOCITY OF 8FPS (CW) AND 5FPS(HW); PRESSURE LOSS PER 100FT IN PSI=5.5 1 -1.7 1 1.9 5 -4.5 6 5.0 11 -8.9 12 9.1 23 -15.5 19 13.6 39 7 24.2 27 18.9 127 48 50.0 58 32.4 VALVE FU PIPE SIZING CHART, PEX PIPE SIZE TANK FU 2" 1-1/2" 1-1/4" 1" 3/4" 1/2" BASED ON UPONOR AQUAPEX PRESSURE LOSS TABLES IN CH 4 OF THE PLUMBING DESIGN ASSISTANCE MANUAL PIPE ID 1.629" 1.244" 1.054" .862" .671" .475" COLD WATER HOT WATER GPM FU GPM VALVE FU PIPE SIZING CHART, CPVC SDR 11 COLD WATER HOT WATER TANK FU GPM FU GPM BASED ON THE HAZEN-WILLIAMS EQUATIONS FOR VELOCITY OF 8FPS (CW) AND 5FPS(HW); PRESSURE LOSS PER 100FT IN PSI=5.5 1 -2.2 1 2.2 6 -5.3 6 5.3 13 -10.5 13 9.9 26 -17.9 21 14.9 49 11 28.0 32 21.0 160 66 57.0 69 36.0 2" 1-1/2" 1-1/4" 1" 3/4" 1/2" 1.716" 1.309" 1.105" 0.901" 0.695" 0.496" PIPE SIZE NOMINAL DIAMETER INNER DIAMETER VALVE FU PIPE SIZING CHART,CPVC SCH80 COLD WATER HOT WATER TANK FU GPM FU GPM BASED ON THE HAZEN-WILLIAMS EQUATIONS 6" 5" 4" 3" 2-1/2" 5.761" 4.813" 3.826" 2.9" 2.323" PIPE SIZE NOMINAL DIAMETER INNER DIAMETER FOR VELOCITY OF 8FPS (CW) AND 5FPS(HW); PRESSURE LOSS PER 100FT IN PSI=4.0 411 270 105.7 211 66.1 719 666 164.7 395 102.9 1639 1639 286.7 798 179.2 3186 3186 453.7 1615 283.5 4930 4930 650.0 2729 406.2 VALVE FU 1.CONTRACTOR SHALL VERIFY WATER PRESSURE AT A LOCATION BETWEEN THE POINT OF CONNECTION SHOWN ON THE CIVIL PLANS AND THE ENTRANCE TO THE BUILDING PRIOR TO INSTALLING WATER PIPING. IF THE FIELD MEASURED WATER PRESSURE IS DISCOVERED TO BE LOWER THAN THE PRESSURE INDICATED ABOVE, IMMEDIATELY CONTACT THE PLUMBING ENGINEER ON RECORD. SHOULD THE CONTRACTOR FAIL TO VERIFY WATER PRESSURE PRIOR TO INSTALLING PIPING, ANY CHANGES REQUIRED BY LOW PRESSURE OR VOLUME SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. IF THE DOMESTIC SYSTEM IS TO BE COMBINED WITH FIRE SPRINKLERS, REFER TO FIRE SPRINKLER PLANS FOR ANY ADDITIONAL PRESSURE REQUIREMENTS. FIXTURE UNIT CALCULATION - LAUNDRY ROOM FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU1 DRAINAGE1 FIXTURE DEMAND HOT OR 75%2 COLD OR 75%2 TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD BRANCH DEMAND DFU TOTAL WATER CLOSET, FLUSH TANK 1 2.5 0 2.5 2.5 0.0 2.5 3 3 LAVATORY 1 1 0.8 0.8 1 0.8 0.8 1 1 KITCHEN SINK 1 1.5 1.2 1.2 1.5 1.2 1.2 2 2 CLOTHES WASHER 3 4 3 3 12 9 9 6 18 FLOOR DRAIN 1 0 0 0 0 0 0 2 2 MOP SINK 1 4 3 3 4 3.0 3.0 3 3 DISHWASHER (DRAIN TO KITCHEN SINK)1 1.5 1.5 0 1.5 1.5 0 0 0 TOTAL FIXTURE UNITS 22.5 15.5 16.5 29 EQUIVALENT WATER DEMAND IN GPM3 16 12 13 1.FIXTURE UNITS ARE BASED ON CPC TABLE A 103.1 FOR WATER SUPPLY AND TABLE 702.1 FOR DRAINAGE. 2.SEPERATE HOT AND COLD WATER FIXTURE UNITS ARE TAKEN AS AT LEAST THREE-QUARTERS (3/4) OF TOTAL FIXTURE DEMAND, PER CPC TABLE A 103.1, NOTE 3. 3.GPM EQUIVALENTS ARE BASED ON CPC CHARTS A 103.1(1) AND A 103.1(2). WATER PRESSURE CALCULATIONS - WATER METER TO FURTHEST UNIT PLAN BUILDING 2 PLUMBING SYSTEM PIPING ELEVATION DIFFERENCE 23 FT LONGEST DEVELOPED RUN OF PIPE 750 FT MIN PRESSURE AT MAIN1 (PER FIREFLOW DATED 08/29/25)97 PSIG PRESSURE SET BY PRV AT BUILDING WATER P.O.C.80 PSIG PRESSURE LOSSES BEFORE PRV 2" WATER METER @ 41 GPM (PER CPC CHART A-102.2)2 PSIG 2" BACKFLOW PREVENTOR @ 41 GPM (PER FEBCO SERIES 860)11 PSIG PRESSURE LOSSES AFTER PRV 2" PRV @ 41 GPM (APOLLO 36HLF)4.0 PSIG WATER HEATER LOSSES 5.0 PSIG ELEVATION HEAD LOSS 9.9 PSIG REQUIRED PRESSURE PRESSURE BALANCE SHOWER CONTROL VALVE 20 PSIG PRESSURE AVAILABLE FOR FRICTION LOSS SUPPLY PRESS - [PRESS LOSSES + REQ'D PRESS]41.1 PSIG ALLOWABLE FRICTION LOSS PER 100 FT [100 * PRESS AVAILABLE FOR FRICTION LOSS] ¸ [LONGEST DEVELOPED RUN OF PIPE]5.5 PSIG WATER PRESSURE CALCULATIONS - WATER METER TO FURTHEST UNIT PLAN BUILDING 1 PLUMBING SYSTEM PIPING ELEVATION DIFFERENCE 23 FT LONGEST DEVELOPED RUN OF PIPE 675 FT MIN PRESSURE AT MAIN1 (PER FIREFLOW DATED 08/29/25)97 PSIG PRESSURE SET BY PRV AT BUILDING WATER P.O.C.80 PSIG PRESSURE LOSSES BEFORE PRV 2" WATER METER @ 43 GPM (PER CPC CHART A-102.2)2 PSIG 2" BACKFLOW PREVENTOR @ 43 GPM PER CIVIL 11 PSIG PRESSURE LOSSES AFTER PRV 2" PRV @ 43 GPM (APOLLO 36HLF)4.0 PSIG WATER HEATER LOSSES 5.0 PSIG ELEVATION HEAD LOSS 9.9 PSIG REQUIRED PRESSURE PRESSURE BALANCE SHOWER CONTROL VALVE 20 PSIG PRESSURE AVAILABLE FOR FRICTION LOSS SUPPLY PRESS - [PRESS LOSSES + REQ'D PRESS]41.1 PSIG ALLOWABLE FRICTION LOSS PER 100 FT [100 * PRESS AVAILABLE FOR FRICTION LOSS] ¸ [LONGEST DEVELOPED RUN OF PIPE]6.1 PSIG FIXTURE UNIT CALCULATION - BUILDING A1 - UNIT TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU¹DRAINAGE¹ FIXTURE DEMAND HOT OR 75%² COLD OR 75%² TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD WATER DEMAND DFU TOTAL HUB DRAIN 4 0 0 0 0.0 0.0 0.0 1 4.0 UNIT A1 7 10.5 6.5 7.5 73.5 45.5 52.5 8 56.0 FIRE SPRINKLER HUB DRAIN 1 0 0 0 0.0 0.0 0.0 6 6.0 PRIMARY HOSE BIBB 1 2.5 0 2.5 2.5 0.0 2.5 0 0.0 LAUNDRY ROOM 1 22.5 15.5 16.5 22.5 15.5 16.5 29 29.0 TOTAL FIXTURE UNITS 98.5 61.0 71.5 95.0 EQUIVALENT WATER DEMAND IN GPM³43 34 37 FIXTURE UNIT CALCULATION - BUILDING A1 - FIXTURE TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU¹DRAINAGE¹ FIXTURE DEMAND HOT OR 75%² COLD OR 75%² TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD WATER DEMAND DFU TOTAL WATER CLOSET, FLUSH TANK 8 2.5 0 2.5 20.0 0.0 20.0 3 24.0 BATHTUB OR TUB-SHOWER COMBO 7 4 3 3 28.0 21.0 21.0 2 14.0 LAVATORY 8 1 0.8 0.8 8.0 6.4 6.4 1 8.0 KITCHEN SINK 8 1.5 1.2 1.2 12.0 9.6 9.6 2 16.0 DISHWASHER (DRAIN TO KITCHEN SINK)8 1.5 1.5 0 12.0 12.0 0.0 0 0.0 CLOTHES WASHER 3 4 3 3 12.0 9.0 9.0 6 18.0 FLOOR DRAIN 1 0 0 0 0.0 0.0 0.0 2 2.0 MOP SINK 1 4 3 3 4.0 3.0 3.0 3 3.0 HUB DRAIN 4 0 0 0 0.0 0.0 0.0 1 4.0 FIRE SPRINKLER HUB DRAIN 1 0 0 0 0.0 0.0 0.0 6 6.0 PRIMARY HOSE BIBB 1 2.5 0 2.5 2.5 0.0 2.5 0 0.0 TOTAL FIXTURE UNITS 98.5 61.0 71.5 95.0 EQUIVALENT WATER DEMAND IN GPM³43 34 37 FIXTURE UNIT CALCULATION - WHOLE SITE - BUILDING TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU¹DRAINAGE¹ FIXTURE DEMAND HOT OR 75%² COLD OR 75%² TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD WATER DEMAND DFU TOTAL BUILDING A1 1 98.5 61 71.5 98.5 61.0 71.5 95 95.0 BUILDING A2 1 86.5 52 62.5 86.5 52.0 62.5 74 74.0 TOTAL FIXTURE UNITS 185.0 113.0 134.0 169.0 EQUIVALENT WATER DEMAND IN GPM³62 47 52 FIXTURE UNIT CALCULATION - WHOLE SITE - BUILDING TYPE (FIXTURE TYPE) FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU¹DRAINAGE¹ FIXTURE DEMAND HOT OR 75%² COLD OR 75%² TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD WATER DEMAND DFU TOTAL HUB DRAIN 8 0 0 0 0.0 0.0 0.0 1 8.0 FIRE SPRINKLER HUB DRAIN 2 0 0 0 0.0 0.0 0.0 6 12.0 PRIMARY HOSE BIBB 2 2.5 0 2.5 5.0 0.0 5.0 0 0.0 WATER CLOSET, FLUSH TANK 8 2.5 0 2.5 20.0 0.0 20.0 3 24.0 BATHTUB OR TUB-SHOWER COMBO 7 4 3 3 28.0 21.0 21.0 2 14.0 LAVATORY 8 1 0.8 0.8 8.0 6.4 6.4 1 8.0 KITCHEN SINK 8 1.5 1.2 1.2 12.0 9.6 9.6 2 16.0 DISHWASHER (DRAIN TO KITCHEN SINK)8 1.5 1.5 0 12.0 12.0 0.0 0 0.0 CLOTHES WASHER 3 4 3 3 12.0 9.0 9.0 6 18.0 FLOOR DRAIN 1 0 0 0 0.0 0.0 0.0 2 2.0 MOP SINK 1 4 3 3 4.0 3.0 3.0 3 3.0 UNIT A1 8 10.5 6.5 7.5 84.0 52.0 60.0 8 64.0 TOTAL FIXTURE UNITS 185.0 113.0 134.0 169.0 EQUIVALENT WATER DEMAND IN GPM³62 47 52 P-0.3 CALCULATIONS PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 1 1 1 1 1 FIXTURE UNIT CALCULATION - UNIT A1 FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU1 DRAINAGE1 FIXTURE DEMAND HOT OR 75%2 COLD OR 75%2 TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD BRANCH DEMAND DFU TOTAL WATER CLOSET, FLUSH TANK 1 2.5 0 2.5 2.5 0.0 2.5 3 3 BATHTUB OR TUB-SHOWER COMBO 1 4 3 3 4 3 3 2 2 LAVATORY 1 1 0.8 0.8 1 0.8 0.8 1 1 KITCHEN SINK 1 1.5 1.2 1.2 1.5 1.2 1.2 2 2 DISHWASHER (DRAIN TO KITCHEN SINK)1 1.5 1.5 0 1.5 1.5 0 0 0 TOTAL FIXTURE UNITS 10.5 6.5 7.5 8 EQUIVALENT WATER DEMAND IN GPM3 9 6 7 FIXTURE UNIT CALCULATION - BUILDING A2 - UNIT TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU1 DRAINAGE1 FIXTURE DEMAND HOT OR 75%2 COLD OR 75%2 TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD BRANCH DEMAND DFU TOTAL HUB DRAIN 4 0 0 0 0 0 0 1 4 FIRE SPRINKLER HUB DRAIN 1 0 0 0 0 0 0 6 6 PRIMARY HOSE BIBB 1 2.5 0 2.5 2.5 0 2.5 0 0 UNIT A1 8 10.5 6.5 7.5 84.0 52.0 60.0 8 64 TOTAL FIXTURE UNITS 86.5 52.0 62.5 74 EQUIVALENT WATER DEMAND IN GPM3 41 30 34 FIXTURE UNIT CALCULATION - BUILDING A2 - FIXTURE TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU1 DRAINAGE1 FIXTURE DEMAND HOT OR 75%2 COLD OR 75%2 TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD BRANCH DEMAND DFU TOTAL HUB DRAIN 4 0 0 0 0.0 0.0 0.0 1 4 WATER CLOSET, FLUSH TANK 8 2.5 0 2.5 20.0 0 20.0 3 24 BATHTUB OR TUB-SHOWER COMBO 8 4 3 3 32 24 24.0 2 16 LAVATORY 8 1 0.8 0.8 8 6.4 6.4 1 8 KITCHEN SINK 8 1.5 1.2 1.2 12.0 9.6 9.6 2 16 FIRE SPRINKLER HUB DRAIN 1 0 0 0 0 0 0.0 6 6 PRIMARY HOSE BIBB 1 2.5 0 2.5 2.5 0 2.5 0 0 DISHWASHER (DRAIN TO KITCHEN SINK)8 1.5 1.5 0 12.0 12.0 0.0 0 0 TOTAL FIXTURE UNITS 86.5 52.0 62.5 74 EQUIVALENT WATER DEMAND IN GPM3 41 30 34 FIXTURE UNIT CALCULATION - LAUNDRY ROOM FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU1 DRAINAGE1 FIXTURE DEMAND HOT OR 75%2 COLD OR 75%2 TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD BRANCH DEMAND DFU TOTAL WATER CLOSET, FLUSH TANK 1 2.5 0 2.5 2.5 0.0 2.5 3 3 LAVATORY 1 1 0.8 0.8 1 0.8 0.8 1 1 KITCHEN SINK 1 1.5 1.2 1.2 1.5 1.2 1.2 2 2 CLOTHES WASHER 3 4 3 3 12 9 9 6 18 FLOOR DRAIN 1 0 0 0 0 0 0 2 2 MOP SINK 1 4 3 3 4 3.0 3.0 3 3 DISHWASHER (DRAIN TO KITCHEN SINK)1 1.5 1.5 0 1.5 1.5 0 0 0 TOTAL FIXTURE UNITS 22.5 15.5 16.5 29 EQUIVALENT WATER DEMAND IN GPM3 16 12 13 FIXTURE UNIT CALCULATION - BUILDING A1 - UNIT TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU¹DRAINAGE¹ FIXTURE DEMAND HOT OR 75%² COLD OR 75%² TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD WATER DEMAND DFU TOTAL HUB DRAIN 4 0 0 0 0.0 0.0 0.0 1 4.0 UNIT A1 7 10.5 6.5 7.5 73.5 45.5 52.5 8 56.0 FIRE SPRINKLER HUB DRAIN 1 0 0 0 0.0 0.0 0.0 6 6.0 PRIMARY HOSE BIBB 1 2.5 0 2.5 2.5 0.0 2.5 0 0.0 LAUNDRY ROOM 1 22.5 15.5 16.5 22.5 15.5 16.5 29 29.0 TOTAL FIXTURE UNITS 98.5 61.0 71.5 95.0 EQUIVALENT WATER DEMAND IN GPM³43 34 37 FIXTURE UNIT CALCULATION - BUILDING A1 - FIXTURE TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU¹DRAINAGE¹ FIXTURE DEMAND HOT OR 75%² COLD OR 75%² TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD WATER DEMAND DFU TOTAL WATER CLOSET, FLUSH TANK 8 2.5 0 2.5 20.0 0.0 20.0 3 24.0 BATHTUB OR TUB-SHOWER COMBO 7 4 3 3 28.0 21.0 21.0 2 14.0 LAVATORY 8 1 0.8 0.8 8.0 6.4 6.4 1 8.0 KITCHEN SINK 8 1.5 1.2 1.2 12.0 9.6 9.6 2 16.0 DISHWASHER (DRAIN TO KITCHEN SINK)8 1.5 1.5 0 12.0 12.0 0.0 0 0.0 CLOTHES WASHER 3 4 3 3 12.0 9.0 9.0 6 18.0 FLOOR DRAIN 1 0 0 0 0.0 0.0 0.0 2 2.0 MOP SINK 1 4 3 3 4.0 3.0 3.0 3 3.0 HUB DRAIN 4 0 0 0 0.0 0.0 0.0 1 4.0 FIRE SPRINKLER HUB DRAIN 1 0 0 0 0.0 0.0 0.0 6 6.0 PRIMARY HOSE BIBB 1 2.5 0 2.5 2.5 0.0 2.5 0 0.0 TOTAL FIXTURE UNITS 98.5 61.0 71.5 95.0 EQUIVALENT WATER DEMAND IN GPM³43 34 37 FIXTURE UNIT CALCULATION - WHOLE SITE - BUILDING TYPE FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU¹DRAINAGE¹ FIXTURE DEMAND HOT OR 75%² COLD OR 75%² TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD WATER DEMAND DFU TOTAL BUILDING A1 1 98.5 61 71.5 98.5 61.0 71.5 95 95.0 BUILDING A2 1 86.5 52 62.5 86.5 52.0 62.5 74 74.0 TOTAL FIXTURE UNITS 185.0 113.0 134.0 169.0 EQUIVALENT WATER DEMAND IN GPM³62 47 52 1.FIXTURE UNITS ARE BASED ON CPC TABLE A 103.1 FOR WATER SUPPLY AND TABLE 702.1 FOR DRAINAGE. 2.SEPERATE HOT AND COLD WATER FIXTURE UNITS ARE TAKEN AS AT LEAST THREE-QUARTERS (3/4) OF TOTAL FIXTURE DEMAND, PER CPC TABLE A 103.1, NOTE 3. 3.GPM EQUIVALENTS ARE BASED ON CPC CHARTS A 103.1(1) AND A 103.1(2). FIXTURE UNIT CALCULATION - WHOLE SITE - BUILDING TYPE (FIXTURE TYPE) FIXTURE TYPE QTY DEMAND WEIGHT IN WSFU¹DRAINAGE¹ FIXTURE DEMAND HOT OR 75%² COLD OR 75%² TOTAL SUPPLY DEMAND TOTAL HOT WATER DEMAND TOTAL COLD WATER DEMAND DFU TOTAL HUB DRAIN 8 0 0 0 0.0 0.0 0.0 1 8.0 FIRE SPRINKLER HUB DRAIN 2 0 0 0 0.0 0.0 0.0 6 12.0 PRIMARY HOSE BIBB 2 2.5 0 2.5 5.0 0.0 5.0 0 0.0 WATER CLOSET, FLUSH TANK 8 2.5 0 2.5 20.0 0.0 20.0 3 24.0 BATHTUB OR TUB-SHOWER COMBO 7 4 3 3 28.0 21.0 21.0 2 14.0 LAVATORY 8 1 0.8 0.8 8.0 6.4 6.4 1 8.0 KITCHEN SINK 8 1.5 1.2 1.2 12.0 9.6 9.6 2 16.0 DISHWASHER (DRAIN TO KITCHEN SINK)8 1.5 1.5 0 12.0 12.0 0.0 0 0.0 CLOTHES WASHER 3 4 3 3 12.0 9.0 9.0 6 18.0 FLOOR DRAIN 1 0 0 0 0.0 0.0 0.0 2 2.0 MOP SINK 1 4 3 3 4.0 3.0 3.0 3 3.0 UNIT A1 8 10.5 6.5 7.5 84.0 52.0 60.0 8 64.0 TOTAL FIXTURE UNITS 185.0 113.0 134.0 169.0 EQUIVALENT WATER DEMAND IN GPM³62 47 52 WATER HEATER SPECIFICATIONS WH 2 WH 1 P-0.4 WATER HEATER SPECIFICATIONS PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 SYMBOLS LEGENDKEY NOTES - WATER 1/2" NOMINAL I.D. DOMESTIC WATER PIPE 3/4" NOMINAL I.D. DOMESTIC WATER PIPE 1" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/4" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/2" NOMINAL I.D. DOMESTIC WATER PIPE 2" NOMINAL I.D. DOMESTIC WATER PIPE 1 2 3 4 1 11 4 11 2 2 PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # WALL CLEANOUT GROUND CLEANOUT WYE CW CW HW HW HWR HW_RETURN G GAS_LPG MPG GAS_MPG WASTE_BELOW WASTE_ABOVE VENT CD COND. DRAIN GREY_ABOVE GREY_BELOW GREASE_ABOVE GREASE_BELOW GW GW GW GW GSW GSW GSW GSW KEY NOTES - WASTE 2" WASTE PIPE WITH DWV FITTINGS 3" WASTE PIPE WITH DWV FITTINGS 4" WASTE PIPE WITH DWV FITTINGS 2 3 4 15 S S 15 S S 12 D W 15 S S T T12 D W T 12 D W T T 12 D W T 12 D W 12 D W 15 S S 15 S S T T T12 D W T 12 D W T T 12 D W T 12 D W T 12 D W 15 S S 15 S S 15 S S 15 S S 15 S S ST L T E T ST L E T T T ST L E T ST L TE T ST L E TST L E T ST L E ST L E T TEST L T E S T L T E ST L NG NG NG NG NG NG NG NG NG NG NG NG NG NGNGNGNGNGNGNGNG REFER TO BUILDING A1 PLAN FOR CONTINUATION (2) 2" WATER METER REFER TO CIVIL PLAN FOR EXACT LOCATION BACKFLOW PREVENTER REFER TO BUILDING A2 PLAN FOR CONTINUATION 3 4 REFER TO BUILDING A2 PLAN FOR CONTINUATION REFER TO CIVIL PLAN FOR CONTINUATION BACKWATER VALVE 3 REFER TO BUILDING A1 PLAN FOR CONTINUATION 2 2 BUILDING A2 BUILDING A1 S.O.V S.O.V CW CW CW CW CW CW CW CWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCW CW CW PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 0 10'20'5' 1/20" = 1'-0" 30' 1SITE PLAN P-1.1 SITE PLAN SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # KEY NOTES - WATER 1/2" NOMINAL I.D. DOMESTIC WATER PIPE 3/4" NOMINAL I.D. DOMESTIC WATER PIPE 1" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/4" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/2" NOMINAL I.D. DOMESTIC WATER PIPE 2" NOMINAL I.D. DOMESTIC WATER PIPE CW CW HW HW HWR HW_RETURN G GAS_LPG MPG GAS_MPG 1 2 3 4 1 11 4 11 2 2 KEY NOTES S.O.V. W/ ACCESS PANEL1 DS DS DS DS DS 2 B C 3 4 UP FE FE 101 102 103 ALIGN ALIGN E E E E E E LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COAT INACCESSIBLE AREA UNDER STAIR DRYER DRYER WASHER / DRYER WASHERWASHER FOLDING TABLE LAUNDRY CONFERENCE ROOM COMMUNITY ROOM JAN. ALL-GENDER RESTROOM KITCHEN (RESIDENCE USE ONLY) 60"x54"48"x48 60"x54"48"x48" 60"x54"48"x36" 60"x54" 48"x36" 3 A500 UNIT A1 UNIT A1 UNIT A1 REFER TO SITE PLAN FOR CONTINUATION S.O.V. 2 1 REFER TO UNIT PLAN FOR CONTINUATION 1 1 REFER TO UNIT PLAN FOR CONTINUATION 1 1 REFER TO UNIT PLAN FOR CONTINUATION 1 1 REFER TO UNIT PLAN FOR CONTINUATION 11 4 LAUNDRY ROOM 1 1 2 CW 1 2 TP 1 SHD 1 3/4" CW TO HB-1 & 2" UP TO 2ND FLR HB 1 PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A1 - LEVEL 1 FLOOR PLAN P-2.1A BUILDING A1 LEVEL 1 FLOOR PLAN COLD WATER 1 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # KEY NOTES - WATER 1/2" NOMINAL I.D. DOMESTIC WATER PIPE 3/4" NOMINAL I.D. DOMESTIC WATER PIPE 1" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/4" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/2" NOMINAL I.D. DOMESTIC WATER PIPE 2" NOMINAL I.D. DOMESTIC WATER PIPE CW CW HW HW HWR HW_RETURN G GAS_LPG MPG GAS_MPG 1 2 3 4 1 11 4 11 2 2 KEY NOTES S.O.V. W/ ACCESS PANEL1 DS DS DS DS DS DS 2 B C A 1 3 4 DN FE FE 200 201 202 203 E E E E E E E E BEDROOM 1 BEDROOM 2 KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT UNIT A1 UNIT A1 UNIT A1 UNIT A1 CW REFER TO UNIT PLAN FOR CONTINUATION1 11 4 1 11 2 2 CW CW CW CW CW CW CW CW CW CW REFER TO UNIT PLAN FOR CONTINUATION 1 11 4 1 CWCWCW REFER TO UNIT PLAN FOR CONTINUATION 111 4 1 CW CW CW CW REFER TO UNIT PLAN FOR CONTINUATION 1 11 2 11 4 CWCWCW 11 11 PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A1 - LEVEL 2 FLOOR PLAN P-2.1B BUILDING A1 LEVEL 2 FLOOR PLAN COLD WATER 1 DS DS DS DS DS 2 B B C C A 3 4 UP FE FE 101 102 103 ALIGN ALIGN E E E E E E LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COAT INACCESSIBLE AREA UNDER STAIR DRYER DRYER WASHER / DRYER WASHERWASHER FOLDING TABLE LAUNDRY CONFERENCE ROOM COMMUNITY ROOM JAN. ALL-GENDER RESTROOM KITCHEN (RESIDENCE USE ONLY) 60"x54"48"x48 60"x54"48"x48" 60"x54"48"x36" 60"x54" 48"x36" 3 A500 UNIT A1 UNIT A1 UNIT A1 WV 3.3 WV 3.1 WV 3.2 WV 3.4 REFER TO SITE PLAN FOR CONTINUATION BACKWATER VALVE3 4 4 3 3 3 3 3 3 2 3 WV 4.3 WV 4.1 WV 4.2 WV 4.4 33 3 2 2 3 3 WV 2.3 WV 2.1 WV 2.2 WV 2.4 3 3 3 3 2 4 WV 1.3 WV 1.1 WV 1.2 WV 1.4 2 2 33 3 2 3 4 3 3333 2 2 2 2 3 2 2 2 2 2 22 2 2 3 2 3 3 WSH 1 WSH 1 WSH 1 LAUNDRY ROOM HD 1 HD 1 HD 1 HD 1 3 2 3 11 2 11 2 11 2 11 2 2 4 4 4 4 4 SHD 1 11 2 2 FD 1 3 11 2 3 443 3 2 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # KEY NOTES - WASTE 2" WASTE PIPE WITH DWV FITTINGS 3" WASTE PIPE WITH DWV FITTINGS 4" WASTE PIPE WITH DWV FITTINGS KEY NOTES - VENT 1-1/2" VENT PIPE WITH DWV FITTINGS 2" VENT PIPE WITH DWV FITTINGS 3" VENT PIPE WITH DWV FITTINGS WALL CLEANOUT GROUND CLEANOUT WYE WASTE_BELOW WASTE_ABOVE VENT CD COND. DRAIN 2 3 4 11 2 2 3 GREY_ABOVE GREY_BELOW GREASE_ABOVE GREASE_BELOW GW GW GW GW GSW GSW GSW GSW PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A1 - LEVEL 1 FLOOR PLAN P-2.1C BUILDING A1 LEVEL 1 FLOOR PLAN WASTE / VENT PIPING 1 1 11 1 DRYER DRYER WASHER / DRYER WASHERWASHER FOLDING TABLE LAUNDRY COMMUNITY ROOM JAN. ALL-GENDER RESTROOM 60"x54" 60"x54"48"x48" 60"x54"48"x36" 48"x36" 3 A500 WV 1.3 WV 1.1 WV 1.2 WV 1.4 2 2 33 3 2 3 3 3 2 3 3 WSH 1 WSH 1 WSH 1 LAUNDRY ROOM HD 1 3 2 3 11 2 11 2 2 FD 1 3 11 2 3 3 2 BATH CLOSET 1 COAT 33 2 2 3 2 HD 1 11 2 BATH CLOSET 1 3 3 3 2 3 3 2 2 HD 1 BATH CLOSET 1 3 3 3 3 2 4 2 2 1 11 2 4 4 2 NCE ONLY) 3 23 DS DS DS DS DS DS 2 B C A 1 3 4 DN FE FE 200 201 202 203 E E E E E E E E BEDROOM 1 BEDROOM 2 KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT UNIT A1 UNIT A1 UNIT A1 UNIT A1 WV 3.4 WV 3.2 WV 3.1 WV 3.3 2 11 2 11 2 23 2 11 2 WV 2.4 WV 2.2 WV 2.1 WV 2.3 2 11 2 11 2 23 2 11 2 WV 4.4 WV 4.2 WV 4.1 WV 4.3 211 2 11 2 2 3 2 11 2 WV 1.4 WV 1.2 WV 1.1 WV 1.3 311 2 11 2 2 3 2 11 2 2 2 2 2 22 2 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # KEY NOTES - WASTE 2" WASTE PIPE WITH DWV FITTINGS 3" WASTE PIPE WITH DWV FITTINGS 4" WASTE PIPE WITH DWV FITTINGS KEY NOTES - VENT 1-1/2" VENT PIPE WITH DWV FITTINGS 2" VENT PIPE WITH DWV FITTINGS 3" VENT PIPE WITH DWV FITTINGS WALL CLEANOUT GROUND CLEANOUT WYE WASTE_BELOW WASTE_ABOVE VENT CD COND. DRAIN 2 3 4 11 2 2 3 GREY_ABOVE GREY_BELOW GREASE_ABOVE GREASE_BELOW GW GW GW GW GSW GSW GSW GSW 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A1 - LEVEL 2 FLOOR PLAN P-2.1D BUILDING A1 LEVEL 2 FLOOR PLAN WASTE / VENT PIPING PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 1 1 1 1 1 DS DS DS DS DS DS 2 B C A 1 3 4 DN FE FE 200 201 202 203 E E E E E E E E BEDROOM 1 BEDROOM 2 KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT UNIT A1 UNIT A1 UNIT A1 UNIT A1 WV 3.4 WV 3.2 WV 3.1 WV 3.3 2 11 2 11 2 23 2 11 2 WV 2.4 WV 2.2 WV 2.1 WV 2.3 2 11 2 11 2 23 2 11 2 WV 4.4 WV 4.2 WV 4.1 WV 4.3 211 2 11 2 2 3 2 11 2 WV 1.4 WV 1.2 WV 1.1 WV 1.3 311 2 11 2 2 3 2 11 2 2 2 2 2 22 2 DS DS DS DS DS DS 21 3 4 A A A A A A A AA A A A 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " RI D G E RIDGE RIDGE RI D G E RI D G E VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y 2 11 2 2 11 2 3 11 2 3 11 2 2 2 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # WALL CLEANOUT GROUND CLEANOUT WYE WASTE_BELOW WASTE_ABOVE VENT CD COND. DRAIN GREY_ABOVE GREY_BELOW GREASE_ABOVE GREASE_BELOW GW GW GW GW GSW GSW GSW GSW KEY NOTES - VENT 1-1/2" VENT PIPE WITH DWV FITTINGS 2" VENT PIPE WITH DWV FITTINGS 3" VENT PIPE WITH DWV FITTINGS 11 2 2 3 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A1 - ROOF PLAN P-2.1E BUILDING A1 ROOF PLAN VENT THRU ROOF PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # KEY NOTES - WATER 1/2" NOMINAL I.D. DOMESTIC WATER PIPE 3/4" NOMINAL I.D. DOMESTIC WATER PIPE 1" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/4" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/2" NOMINAL I.D. DOMESTIC WATER PIPE 2" NOMINAL I.D. DOMESTIC WATER PIPE CW CW HW HW HWR HW_RETURN G GAS_LPG MPG GAS_MPG 1 2 3 4 1 11 4 11 2 2 KEY NOTES S.O.V. W/ ACCESS PANEL1 DS DS DS DS DS DS 2 B C A 1 3 4 UP FE FE 100 101 102 103 ALIGN ALIGN E E E E E E E E BEDROOM 1 BEDROOM 2 BATH KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT INACCESSIBLE AREA UNDER STAIR UNIT A1 UNIT A1 UNIT A1 UNIT A1 REFER TO SITE PLAN FOR CONTINUATION S.O.V.2 REFER TO UNIT PLAN FOR CONTINUATION 1 REFER TO UNIT PLAN FOR CONTINUATION 1 REFER TO UNIT PLAN FOR CONTINUATION 1 REFER TO UNIT PLAN FOR CONTINUATION 1 TP 1 SHD 1 1 1 2 CW 1 2 3/4" CW TO HB-1 & 2" UP TO 2ND FLR HB 1 11 11 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A2 - LEVEL 1 FLOOR PLAN P-2.2A BUILDING A2 LEVEL 1 FLOOR PLAN COLD WATER PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # KEY NOTES - WATER 1/2" NOMINAL I.D. DOMESTIC WATER PIPE 3/4" NOMINAL I.D. DOMESTIC WATER PIPE 1" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/4" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/2" NOMINAL I.D. DOMESTIC WATER PIPE 2" NOMINAL I.D. DOMESTIC WATER PIPE CW CW HW HW HWR HW_RETURN G GAS_LPG MPG GAS_MPG 1 2 3 4 1 11 4 11 2 2 KEY NOTES S.O.V. W/ ACCESS PANEL1 DS DS DS DS DS DS 2 B C A 1 3 4 DN FE FE 200 201 202 203 E E E E E E E E BEDROOM 1 BEDROOM 2 KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT UNIT A1 UNIT A1 UNIT A1 UNIT A1 CW 11 4 1 11 2 2 CW CW CW CW CW CW CW CW CW CW 11 4 1 CWCWCW 11 4 1 CW CW CW CW 11 4 1 CWCWCW 11 11 REFER TO UNIT PLAN FOR CONTINUATION1 REFER TO UNIT PLAN FOR CONTINUATION 1 REFER TO UNIT PLAN FOR CONTINUATION 1REFER TO UNIT PLAN FOR CONTINUATION 1 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A2 - LEVEL 2 FLOOR PLAN P-2.2B BUILDING A2 LEVEL 2 FLOOR PLAN COLD WATER PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 DS DS DS DS DS DS 2 B B C C A A 1 3 4 UP FE FE 100 101 102 103 ALIGN ALIGN E E E E E E E E BEDROOM 1 BEDROOM 2 BATH KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT INACCESSIBLE AREA UNDER STAIR UNIT A1 UNIT A1 UNIT A1 UNIT A1 WV 3.3 WV 3.1 WV 3.2 WV 3.4 3 3 3 3 3 2 2 WV 4.3 WV 4.1 WV 4.2 WV 4.4 33 3 2 3 3 3 WV 2.3 WV 2.1 WV 2.2 WV 2.4 3 3 3 3 2 2 WV 1.3 WV 1.1 WV 1.2 WV 1.4 33 3 2 4 4 333 2 2REFER TO SITE PLAN FOR CONTINUATION BACKWATER VALVE 3 4 4 2 333 3 2 2 2 2 2 2 2 2 2 22 2 2 HD 1 HD 1 HD 1HD 1 11 2 11 2 11 2 11 2 2 44 SHD 1 4 4 4 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # KEY NOTES - WASTE 2" WASTE PIPE WITH DWV FITTINGS 3" WASTE PIPE WITH DWV FITTINGS 4" WASTE PIPE WITH DWV FITTINGS KEY NOTES - VENT 1-1/2" VENT PIPE WITH DWV FITTINGS 2" VENT PIPE WITH DWV FITTINGS WALL CLEANOUT GROUND CLEANOUT WYE WASTE_BELOW WASTE_ABOVE VENT CD COND. DRAIN 2 3 4 11 2 2 GREY_ABOVE GREY_BELOW GREASE_ABOVE GREASE_BELOW GW GW GW GW GSW GSW GSW GSW 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A2 - LEVEL 1 FLOOR PLAN P-2.2C BUILDING A2 LEVEL 1 FLOOR PLAN WASTE / VENT PIPING PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 1 1 1 1 DS DS DS DS DS DS 21 3 4 UP FE FE 100 101 102 103 ALIGN ALIGN E E E E E E E E BEDROOM 1 BEDROOM 2 BATH KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT INACCESSIBLE AREA UNDER STAIR UNIT A1 UNIT A1 UNIT A1 UNIT A1 WV 3.3 WV 3.1 WV 3.2 WV 3.4 3 3 3 3 3 2 2 WV 4.3 WV 4.1 WV 4.2 WV 4.4 33 3 2 3 3 3 WV 2.3 WV 2.1 WV 2.2 WV 2.4 3 3 3 3 2 2 WV 1.3 WV 1.1 WV 1.2 WV 1.4 33 3 2 4 4 333 2 2EFER TO SITE PLAN FOR CONTINUATION BACKWATER VALVE 3 4 4 2 333 3 2 2 2 2 2 2 2 2 2 22 2 2 HD 1 HD 1 HD 1HD 1 11 2 11 2 11 2 11 2 2 44 SHD 1 4 4 4 DS DS DS DS DS DS 2 B C A 1 3 4 DN FE FE 200 201 202 203 E E E E E E E E BEDROOM 1 BEDROOM 2 KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT UNIT A1 UNIT A1 UNIT A1 UNIT A1 WV 3.4 WV 3.2 WV 3.1 WV 3.3 2 11 2 11 2 23 2 11 2 WV 2.4 WV 2.2 WV 2.1 WV 2.3 2 11 2 11 2 23 2 11 2 WV 4.4 WV 4.2 WV 4.1 WV 4.3 211 2 11 2 2 3 2 11 2 WV 1.4 WV 1.2 WV 1.1 WV 1.3 211 2 11 2 2 3 2 11 2 2 2 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # KEY NOTES - WASTE 2" WASTE PIPE WITH DWV FITTINGS 3" WASTE PIPE WITH DWV FITTINGS 4" WASTE PIPE WITH DWV FITTINGS KEY NOTES - VENT 1-1/2" VENT PIPE WITH DWV FITTINGS 2" VENT PIPE WITH DWV FITTINGS WALL CLEANOUT GROUND CLEANOUT WYE WASTE_BELOW WASTE_ABOVE VENT CD COND. DRAIN 2 3 4 11 2 2 GREY_ABOVE GREY_BELOW GREASE_ABOVE GREASE_BELOW GW GW GW GW GSW GSW GSW GSW 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A2 - LEVEL 2 FLOOR PLAN P-2.2D BUILDING A2 LEVEL 2 FLOOR PLAN WASTE / VENT PIPING PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 1 1 1 1 DS DS DS DS DS DS DN FE FE 200 201 202 203 E E E E E E E E BEDROOM 1 BEDROOM 2 KITCHEN LIVING DINING LIVING BEDROOM 1 BEDROOM 2 DINING BATH KITCHEN KITCHEN DININGDINING KITCHEN BEDROOM 2 BEDROOM 2 BATHBATH BEDROOM 1BEDROOM 1 LIVING LIVING CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CL O S E T 2 CL O S E T 2 CLOSET 1 CLOSET 1COATCOAT COATCOAT UNIT A1 UNIT A1 UNIT A1 UNIT A1 WV 3.4 WV 3.2 WV 3.1 WV 3.3 2 11 2 11 2 23 2 11 2 WV 2.4 WV 2.2 WV 2.1 WV 2.3 2 11 2 11 2 23 2 11 2 WV 4.4 WV 4.2 WV 4.1 WV 4.3 211 2 11 2 2 3 2 11 2 WV 1.4 WV 1.2 WV 1.1 WV 1.3 211 2 11 2 2 3 2 11 2 2 2 DS DS DS DS DS DS 21 3 4 A A A A A A A AA A A A 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " 4" / 1 ' - 0 " 4" / 1'-0"4" / 1'-0" 4" / 1 ' - 0 " RI D G E RIDGE RIDGE RI D G E RI D G E VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y VAL L E Y 2 11 2 2 11 2 2 11 2 2 11 2 2 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # WALL CLEANOUT GROUND CLEANOUT WYE WASTE_BELOW WASTE_ABOVE VENT CD COND. DRAIN GREY_ABOVE GREY_BELOW GREASE_ABOVE GREASE_BELOW GW GW GW GW GSW GSW GSW GSW KEY NOTES - VENT 1-1/2" VENT PIPE WITH DWV FITTINGS 2" VENT PIPE WITH DWV FITTINGS 11 2 2 12' 1/4" = 1'-0" 2'8'4'0 1BUILDING A2 - ROOF PLAN P-2.2E BUILDING A2 ROOF PLAN VENT THRU ROOF PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 SYMBOLS LEGEND PIPE CAP 90 DEG ELBOW DOWN 90 DEG ELBOW UP TEE, DOWN TEE, UP RISER ID TAG # TAG EQUIPMENT ID TAG TAG # WALL CLEANOUT GROUND CLEANOUT WYE CW CW HW HW HWR HW_RETURN G GAS_LPG MPG GAS_MPG WASTE_BELOW WASTE_ABOVE VENT CD COND. DRAIN KEY NOTES - WATER 1/2" NOMINAL I.D. DOMESTIC WATER PIPE 3/4" NOMINAL I.D. DOMESTIC WATER PIPE 1" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/4" NOMINAL I.D. DOMESTIC WATER PIPE 1-1/2" NOMINAL I.D. DOMESTIC WATER PIPE 2" NOMINAL I.D. DOMESTIC WATER PIPE KEY NOTES - WASTE 2" WASTE PIPE WITH DWV FITTINGS 3" WASTE PIPE WITH DWV FITTINGS 4" WASTE PIPE WITH DWV FITTINGS KEY NOTES - VENT 1-1/2" VENT PIPE WITH DWV FITTINGS 2" VENT PIPE WITH DWV FITTINGS 1 2 3 4 1 11 4 11 2 2 2 3 4 11 2 2 GREY_ABOVE GREY_BELOW GREASE_ABOVE GREASE_BELOW GW GW GW GW GSW GSW GSW GSW DRYER DRYER WASHER / DRYER WASHERWASHER FOLDING TABLE LAUNDRY CONFERENCE ROOM COMMUNITY ROOM JAN. ALL-GENDER RESTROOM KITCHEN (RESIDENCE USE ONLY) 60"x54"48"x48" 60"x54"48"x48" 60"x54"48"x36" 60"x54" 48"x36" 3 A500 KS 1 DW 1 S.O.V.CW IMB 1 CW CW CW CW HW HW HW L 1 WC 1 FCMS 1 WV - HD 1 WSH 1 3 4 3 4 11 4 3 4 1 3 4 WSH 1 1/2" CW TO L-1 & 3/4" CW TO WSH-1 WSH 1 1 2TP 2 FD 1 WH 1 ET 1 WH 1 ET 1 3 4 3/4" CD DN TO L-1 TAILPIECE FOR CONTINUATION REFER TO BUILDING PLAN S.O.V. W/ ACCESS PANEL 1 11 4 3 4 3 4 1 2 DS 103 ALIGN E KITCHEN DINING BEDROOM 2 BATH BEDROOM 1 LIVING CL O S E T 2 CLOSET 1COAT 3 Xref G:\66467\XREF\OliveCrest (MR230056-00)_BLDG PLANS_240610-Sheet - A102 - BUILDING LEVEL 1 PLAN.dwg WH 1 WH 1 ET 1 ET 1 1 KS 1 DW 1 S.O.VCW 1 2 IMB 1 3 4 REFER TO BUILDING PLAN FOR CONTINUATION CW CW CW CW 1 2 3 4 HW HW HW 1 3 4 L 1 WC 1 FC 3/4" CD DN TO L-1 TAILPIECE BT 1 WV - WV - WV - 3 4 3 4 WV - HD 1 WV - 1 S.O.V. W/ ACCESS PANEL DS 203 A KITCHEN DINING BEDROOM 2 BATH BEDROOM 1 LIVING CL O S E T 2 CLOSET 1COAT Xref G:\66467\XREF\OliveCrest (MR230056-00)_BLDG PLANS_240610-Sheet - A103 - BUILDING LEVEL 2 PLAN.dwgXref G:\66467\XREF\A103.dwg REFER TO BUILDING PLAN FOR CONTINUATION S.O.V. W/ ACCESS PANEL 1 1 KS 1 DW 1 IMB 1 3 4 CW CW CW CW 1 2 3 4 HW HW HW L 1 WC 1 FC 3/4" CD DN TO L-1 TAILPIECE BT 1 WV - WV - WV - 3 4 3 4 3 4 WV - CW 1 2 S.O.V PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 P-3.1 UNIT FLOOR PLANS COLD / HOT WATER WASTE / VENT PIPIPNG AND FC CONDENSATE 1UNIT A-1 LEVEL 1 12' 1/4" = 1'-0" 2'8'4'0 2UNIT A-1 LEVEL 2 12' 1/4" = 1'-0" 2'8'4'0 3LAUNDRY ROOM (BLDG A1) - LEVEL 1 12' 1/4" = 1'-0" 2'8'4'0 11 1 DRYER DRYER WASHER / DRYER WASHERWASHER FOLDING TABLE LAUNDRY CONFERENCE ROOM COMMUNITY ROOM JAN. ALL-GENDER RESTROOM KITCHEN (RESIDENCE USE ONLY) 60"x54"48"x48" 60"x54"48"x48" 60"x54"48"x36" 60"x54" 48"x36" 3 A500 KS 1 DW 1 S.O.V.CW IMB 1 CW CW CW CW HW HW HW L 1 WC 1 FCMS 1 WV - HD 1 WSH 1 3 4 3 4 11 4 3 4 1 3 4 WSH 1 1/2" CW TO L-1 & 3/4" CW TO WSH-1 WSH 1 1 2TP 2 FD 1 WH 1 ET 1 WH 1 ET 1 3 4 3/4" CD DN TO L-1 TAILPIECE FOR CONTINUATION REFER TO BUILDING PLAN S.O.V. W/ ACCESS PANEL 1 11 4 3 4 3 4 1 2 1 DS 103 ALIGN E KITCHEN DINING BEDROOM 2 BATH BEDROOM 1 LIVING CL O S E T 2 CLOSET 1COAT 3 Xref G:\66467\XREF\OliveCrest (MR230056-00)_BLDG PLANS_240610-Sheet - A102 - BUILDING LEVEL 1 PLAN.dwg WH 1 WH 1 ET 1 ET 1 1 KS 1 DW 1 S.O.VCW 1 2 IMB 1 3 4 REFER TO BUILDING PLAN FOR CONTINUATION CW CW CW CW 1 2 3 4 HW HW HW 1 3 4 L 1 WC 1 FC 3/4" CD DN TO L-1 TAILPIECE BT 1 WV - WV - WV - 3 4 3 4 WV - HD 1 WV - 1 S.O.V. W/ ACCESS PANEL DS 203 A KITCHEN DINING BEDROOM 2 BATH BEDROOM 1 LIVING CL O S E T 2 CLOSET 1COAT Xref G:\66467\XREF\OliveCrest (MR230056-00)_BLDG PLANS_240610-Sheet - A103 - BUILDING LEVEL 2 PLAN.dwg DS DS A851 15 DN AA A FE U4 U1 U5 U2 U3 U3 U4 U1 U3 203 REFER TO BUILDING PLAN FOR CONTINUATION S.O.V. W/ ACCESS PANEL 1 1 KS 1 DW 1 IMB 1 3 4 CW CW CW CW 1 2 3 4 HW HW HW L 1 WC 1 FC 3/4" CD DN TO L-1 TAILPIECE BT 1 WV - WV - WV - 3 4 3 4 3 4 WV - CW 1 2 S.O.V 1PLAN A1 - LEVEL 1 4BUILDING A1 5BUILDING A2 3LAUNDRY ROOM (BLDG A1) - LEVEL 1 ROOF 2ND FLR 1ST FLR REFER TO BUILDING PLAN FOR CONTINUATION 3/4" HW 5.7 HWFU CW CW CW WH-1 CW L-1 0.8 CWFU 0.8 HWFU 1/2" C & HW WC-1 2.5 CWFU 3/4" CW BT-1 3 CWFU 3 HWFU 3/4" C & HW KS-1 & DW-1 1.2 CWFU 2.7 HWFU IMB-1 1/2" CW 3/4" CW & 3/4" HW S.O.V. HW HW 1" CW 6.5 CWFU 3/4" CW 4.2 CWFU 3/4" CW 3.3 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 2PLAN A1 - LEVEL 2 ROOF 2ND FLR 1ST FLR REFER TO BUILDING PLAN FOR CONTINUATION CW CW CW WH-1 CW HW L-1 0.8 CWFU 0.8 HWFU 1/2" C & HW WC-1 2.5 CWFU 3/4" CW BT-1 3 CWFU 3 HWFU 3/4" C & HW KS-1 & DW-1 1.2 CWFU 2.7 HWFU IMB-1 1/2" CW 3/4" CW & 3/4" HW S.O.V. HW HW 1" CW 6.5 CWFU 1" CW 10.5 CWFU CW 3/4" HW 5.7 HWFU 3/4" CW 4.2 CWFU 3/4" CW 3.3 CWFU 1" CW 7.5 CWFU 1" CW 10.5 CWFU ROOF 2ND FLR 1ST FLR REFER TO BUILDING PLAN FOR CONTINUATION 3/4" HW 5.7 HWFU CW CW CW CW CW CW CW CW CW WH-2 CW CW CW L-1 0.8 CWFU 1/2" CW WC-1 2.5 CWFU 3/4" CW MS-1 3 CWFU 3 HWFU 3/4" C & HW KS-1 & DW-1 1.2 CWFU 2.7 HWFU IMB-1 1/2" CW 3/4" CW & 3/4" HW S.O.V. HW HW HW HW HW 1-1/4" HW 15.5 HWFU 3/4" CW 4.2 CWFU 1-1/4" CW 22.5 CWFU 1-1/4" CW (SDR 11) 22.5 CWFU WSH-1 3 CWFU 3 HWFU 3/4" C & HW WSH-1 3 CWFU 3 HWFU 3/4" C & HW HW HW HW 1" HW 6.8 HWFU 1" CW 6.3 CWFU 1" CW 9.3 CWFU 1-1/4" CW (PEX) 22.5 CWFU ROOF 2ND FLR 1ST FLR HB-1 2.5 CWFU CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO LAUNDRY ROOM FOR CONTINUATION CW CW CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION SHD-1 TP-1S.O.V. 1-1/4" CW 22.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU ROOF 2ND FLR 1ST FLR CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION CW CW CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION 1" CW 10.5 CWFU 3/4" CW TP-2 FD-1 1/2" CW 1-1/4" CW 21 CWFU 1-1/4" CW 21 CWFU 1-1/2" CW 42 CWFU 1-1/4" CW 21 CWFU 1-1/2" CW 33 CWFU 2" CW 96 CWFU 2" CW 98.5 CWFU 1/2" CW 1" CW 10.5 CWFU SHD-1 TP-1 1/2" CW 1" CW 10.5 CWFU 1-1/4" CW 21 CWFU 1-1/4" CW 21 CWFU 1-1/2" CW 42 CWFU 1-1/4" CW 21 CWFU 1-1/4" CW 21 CWFU 2" CW 84 CWFU 2" CW 86.5 CWFU CW CW CW CW CW CW CW CW CW CW 2" WATER METER 2" BACKFLOW PREVENTER CW CW CW CW CW CW CW CW CW CW 2" WATER METER 2" BACKFLOW PREVENTER ET-1 ET-1 ET-1 CHECK VALVE CHECK VALVE CHECK VALVE 1" HW 6.5 HWFU 1" HW 6.5 HWFU 1-1/4" CW 15.5 CWFU P.R.V. HB-1 2.5 CWFU S.O.V. 3/4" CW P.R.V. S.O.V. W/ ACCESS PANEL S.O.V. W/ ACCESS PANEL S.O.V. W/ ACCESS PANEL S.O.V. W/ ACCESS PANEL, TYPICAL S.O.V. W/ ACCESS PANEL, TYPICAL L-1 0.8 HWFU WSH-1 3 CWFU 3 HWFU 3/4" C & HW 1" CW 5.5 CWFU 1/2" HW 3/4" HW 3.8 HWFU PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 P-4.1 WATER DIAGRAM 1 1 BUILDING A1 BUILDING A2 LAUNDRY ROOM (BLDG A1) - LEVEL 1 ROOFROOF REFER TO BUILDING PLAN FOR CONTINUATION CW CW CW HW HW 1" CW 10.5 CWFU CW 3/4" HW 5.7 HWFU 3/4" CW 4.2 CWFU 3/4" CW 3.3 CWFU 1" CW 7.5 CWFU 1" CW 10.5 CWFU ROOF 2ND FLR 1ST FLR REFER TO BUILDING PLAN FOR CONTINUATION 3/4" HW 5.7 HWFU CW CW CW CW CW CW CW CW CW WH-2 CW CW CW L-1 0.8 CWFU 1/2" CW WC-1 2.5 CWFU 3/4" CW MS-1 3 CWFU 3 HWFU 3/4" C & HW KS-1 & DW-1 1.2 CWFU 2.7 HWFU IMB-1 1/2" CW 3/4" CW & 3/4" HW S.O.V. HW HW HW HW HW 1-1/4" HW 15.5 HWFU 3/4" CW 4.2 CWFU 1-1/4" CW 22.5 CWFU 1-1/4" CW (SDR 11) 22.5 CWFU WSH-1 3 CWFU 3 HWFU 3/4" C & HW WSH-1 3 CWFU 3 HWFU 3/4" C & HW HW HW HW 1" HW 6.8 HWFU 1" CW 6.3 CWFU 1" CW 9.3 CWFU 1-1/4" CW (PEX) 22.5 CWFU ROOF 2ND FLR 1ST FLR HB-1 2.5 CWFU CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO LAUNDRY ROOM FOR CONTINUATION CW CW CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION CW REFER TO UNIT A1 - LEVEL 2 FOR CONTINUATION REFER TO UNIT A1 - LEVEL 1 FOR CONTINUATION SHD-1 TP-1S.O.V. 1-1/4" CW 22.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1" CW 10.5 CWFU 1ST FLR 3/4" CW TP-2 FD-1 1/2" CW 1-1/4" CW 21 CWFU 1-1/4" CW 21 CWFU 1-1/2" CW 42 CWFU 1-1/4" CW 21 CWFU 1-1/2" CW 33 CWFU 2" CW 96 CWFU 2" CW 98.5 CWFU 1/2" CW 1" CW 10.5 CWFU SHD-1 TP-1 1/2" CW 2" CW 86.5 CWFU CW CW CW CW CW CW CW CW CW CW 2" WATER METER 2" BACKFLOW PREVENTER 2" WATER METER 2" BACKFLOW PREVENTER ET-1 CHECK VALVE 1-1/4" CW 15.5 CWFU P.R.V. HB-1 2.5 CWFU S.O.V. 3/4" CW P.R.V. S.O.V. W/ ACCESS PANEL S.O.V. W/ ACCESS PANEL S.O.V. W/ ACCESS PANEL, TYPICAL L-1 0.8 HWFU WSH-1 3 CWFU 3 HWFU 3/4" C & HW 1" CW 5.5 CWFU 1/2" HW 3/4" HW 3.8 HWFU 1 1BUILDING A1 2BUILDING A1 ROOF 2ND FLR 1ST FLR GCO WSH 2" 6 DFU 3" 3" CO 2" FD 2 DFU 1-1/2" 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" 2" HD 1 DFU WSH 2" 6 DFU 3" WSH 2" 6 DFU 3" 1-1/2" 2" HD 1 DFU 3"CO 2" CO 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 2" V 5 DFU BT 2 DFU 1-1/2" V 2" W 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 1-1/2" V 4 DFU 2" W BT 2 DFU 1-1/2" V 2" W BT 2 DFU 1-1/2" V KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO WV 1.1 WV 1.2 WV 1.3 WV 4.1 WV 4.2 WV 4.3 WV 1.4 WV 4.4 KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO WV 3.4 WV 2.4 1-1/2" 2" HD 1 DFU 3" CO 2" CO 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 1-1/2" V 4 DFU 2" W BT 2 DFU 1-1/2" V 2" W BT 2 DFU 1-1/2" V WV 3.1 WV 3.2 WV 3.3 ROOF 2ND FLR 1ST FLR REFER TO CIVIL PLAN FOR CONTINUATION GCOGCO 3" CO 2" CO 3" CO 2" CO REFER TO DIAGRAM #2/ SHEET P-4.2 FOR CONTINUATION REFER TO DIAGRAM #1/ SHEET P-4.2 FOR CONTINUATION 3" CO 2" CO BACKWATER VALVE 2" VTR 8 DFU 3" VTR 26 DFU 2" VTR 13 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 2" VTR 13 DFU 3" W 6 DFU 3" W 8 DFU 3" W 9 DFU 3" W 7 DFU 3" W 16 DFU 3" W 9 DFU 3" W 25 DFU 3" W 3 DFU 3" W 28 DFU 3" W 2 DFU 3" W 5 DFU 2" W 2 DFU 3" W 35 DFU 4" W 37 DFU 3" W 7 DFU 4" W 39 DFU 4" W 41 DFU 4" W 43 DFU 4" W 43 DFU 3" W 2 DFU 2" 4" SHD 6 DFU CO 1-1/2" 2" HD 1 DFU 2" CO 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 1-1/2" V 4 DFU 2" W BT 2 DFU 1-1/2" V 2" W BT 2 DFU 1-1/2" V WV 2.1 WV 2.2 WV 2.3 3" CO 2" CO 2" VTR 6 DFU 2" VTR 13 DFU 3" W 5 DFU 3" W 2 DFU 3" W 7 DFU 4" W 50 DFU 4" W 7 DFU 4" W 8 DFU 4" W 11 DFU 2" W 2 DFU 4" W 13 DFU 4" W 63 DFU 3" W 1 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 1 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 12 DFU 3" W 14 DFU 3" W 16 DFU 3" W 18 DFU 3" W 20 DFU 3" W 20 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 26 DFU 3" W 1 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 32 DFU 3" W 32 DFU 4" W 95 DFU 3" W 1 DFU 2" V 6 DFU 2" V 12 DFU 2" V 14 DFU 2" V 20 DFU 1-1/2" V 5 DFU 1-1/2" V 7 DFU 1-1/2" V 5 DFU 1-1/2" V 7 DFU 1-1/2" V 5 DFU 1-1/2" V 7 DFU MS 3 DFU CO 2" 3" PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 P-4.2 WASTE / VENT DIAGRAM 1 1 1 1 1 REFER TO CIVIL PLAN FOR CONTINUATION VALVE 4" W 95 DFU ROOF 2ND FLR 1ST FLR WSH 2" 6 DFU 3" 3" CO 2" FD 2 DFU 1-1/2" 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" 2" HD 1 DFU WSH 2" 6 DFU 3" WSH 2" 6 DFU 3" 1-1/2" 2" HD 1 DFU 3"CO 2" CO 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 2" V 5 DFU BT 2 DFU 1-1/2" V 2" W 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 1-1/2" V 4 DFU 2" W BT 2 DFU 1-1/2" V 2" W BT 2 DFU 1-1/2" V KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO WV 1.1 WV 1.2 WV 1.3 WV 4.1 WV 4.2 WV 4.3 WV 1.4 WV 4.4 KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO WV 3.4 WV 2.4 3" CO 2" CO 3" CO 2" CO REFER TO DIAGRAM #2/ SHEET P-4.2 FOR CONTINUATION 2" VTR 8 DFU 3" VTR 26 DFU 2" VTR 13 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 3" W 6 DFU 3" W 8 DFU 3" W 9 DFU 3" W 7 DFU 3" W 16 DFU 3" W 9 DFU 3" W 25 DFU 3" W 3 DFU 3" W 28 DFU 3" W 2 DFU 3" W 5 DFU 2" W 2 DFU 3" W 35 DFU 4" W 37 DFU 3" W 7 DFU 4" W 39 DFU 4" W 41 DFU 4" W 43 DFU 3" W 1 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 1 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 12 DFU 3" W 14 DFU 3" W 16 DFU 3" W 18 DFU 3" W 20 DFU 2" V 6 DFU 2" V 12 DFU 2" V 14 DFU 2" V 20 DFU 1-1/2" V 5 DFU 1-1/2" V 7 DFU MS 3 DFU CO 2" 3" 2" 4" SHD 6 DFU CO 1-1/2" 2" HD 1 DFU 3" CO 2" CO 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 1-1/2" V 4 DFU 2" W BT 2 DFU 1-1/2" V 2" W BT 2 DFU 1-1/2" V WV 1.1 WV 1.2 WV 1.3 3" CO 2" CO 2" VTR 6 DFU 2" VTR 13 DFU 1BUILDING A2 2BUILDING A2 ROOF 2ND FLR 1ST FLR GCO 1-1/2" 2" HD 1 DFU 3" CO 2" CO 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 1-1/2" V 4 DFU 2" W BT 2 DFU 1-1/2" V 2" W BT 2 DFU 1-1/2" V KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO WV 3.1 WV 3.2 WV 3.3 WV 2.4 WV 3.4 KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO KS&DW 2 DFU KS&DW 2 DFU 1-1/2" V 4 DFU 1-1/2" V 2" W 2" W 1-1/2" V CO WV 4.4 WV 1.4 ROOF 2ND FLR 1ST FLR REFER TO CIVIL PLAN FOR CONTINUATION GCOGCO 3" CO 2" CO REFER TO DIAGRAM #2/ SHEET P-4.3 FOR CONTINUATION REFER TO DIAGRAM #1/ SHEET P-4.3 FOR CONTINUATION BACKWATER VALVE 2" VTR 13 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 1-1/2" VTR 4 DFU 1-1/2" 2" HD 1 DFU 3" CO CO 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 1-1/2" V 4 DFU 2" W BT 2 DFU 1-1/2" V 2" W BT 2 DFU 1-1/2" V WV 2.1 WV 2.2 WV 2.3 CO 2" VTR 13 DFU 1-1/2" 2" HD 1 DFU 3" CO CO 1-1/2" V 2 DFU 1-1/2" V 2" W LAV 1 DFU 1-1/2" V 2" W LAV 1 DFU 2" V 6 DFU WC 3 DFU 2" V 3" W WC 3 DFU 2" V 3" W 1-1/2" V 4 DFU 2" W BT 2 DFU 1-1/2" V 2" W BT 2 DFU 1-1/2" V WV 4.1 WV 4.2 WV 4.3 CO 2" VTR 13 DFU 3" W 2 DFU 3" W 5 DFU 2" W 2 DFU 3" W 1 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 7 DFU 3" CO 3" W 2 DFU 3" W 5 DFU 2" W 2 DFU 3" W 7 DFU 3" W 14 DFU 3" W 16 DFU 3" W 18 DFU 3" W 20 DFU 3" W 22 DFU 3" W 22 DFU 4" W 7 DFU 4" W 8 DFU 4" W 11 DFU 2" W 2 DFU 4" W 13 DFU 4" W 35 DFU 3" W 2 DFU 3" CO 3" W 5 DFU 2" W 2 DFU 3" W 7 DFU 4" W 42 DFU 3" W 1 DFU 3" W 4 DFU 3" W 6 DFU 2" W 2 DFU 3" W 12 DFU 3" W 14 DFU 3" W 16 DFU 3" W 18 DFU 3" W 20 DFU 3" W 20 DFU 3" W 1 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 26 DFU 3" W 1 DFU 3" W 4 DFU 2" W 2 DFU 3" W 6 DFU 3" W 32 DFU 3" W 32 DFU 4" W 74 DFU 1-1/2" V 5 DFU 1-1/2" V 7 DFU 1-1/2" V 5 DFU 1-1/2" V 7 DFU 1-1/2" V 5 DFU 1-1/2" V 7 DFU 1-1/2" V 5 DFU 1-1/2" V 7 DFU PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25 P-4.3 WASTE / VENT DIAGRAM 90" ELBOW SINK IN 2-45" 1 1/2" DISTANCE VARIES ISLAND TAILPIECE FIN. FLOOR WALL CLEANOUT 1 1/2" VENT UP ELBOWS 1 1/2" 2" 2" 2" ISLAND COUNTER CABINET & P-TRAP SLOPE WITH ESCUTCHEON IN WALL SCH. 40 PVC SLEEVE COLD WATER HOT WATER INSULATION NOTE:*WHEN PEX TUBING IS PLACED IN SOIL AND IS USED IN POTABLE WATER SYSTEM INTENDED TO SUPPLY DRINKING WATER TO FIXTURES OR APPLIANCES, AND TUBING OR PIPING SHALL BE SLEEVED WITH MATERIAL APPROVED FOR POTABLE WATER USE IN SOIL OR OTHER MATERIAL THAT IS IMPERMEABLE TO SOLVENTS OR PETROLEUM PRODUCTS. CPC TABLE 604.1 NOTE 3. LINE SIZE CLEANOUT SLOPE IF CLOSED SYSTEM, PROVIDE EXPANSION TANK, REFER TO EQUIPMENT SCHEDULES Optional Heat Trap Piping NOTES: 1.ALL PIPING SHOWN IS DIAGRAMMATIC ONLY. PIPING SHALL BE ROUTED IN FIELD TO MEET ACTUAL CONDITIONS AND INSTALLATION REQUIREMENTS. 2.ELECTRICAL POWER SHALL BE PROVIDED PER NEC REQUIREMENTS AND WATER HEATER MANUFACTURER'S RECOMMENDATIONS. 3.WATER HEATER SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND VENTILATION REQUIREMENTS 4.WATER HEATERS INSTALLED WITHIN RESIDENTIAL GARAGES OR OTHER AREAS SUBJECT TO MECHANICAL DAMAGE SHALL BE PROTECTED FROM DAMAGE USING A PHYSICAL BARRIER OR LOCATED OUT OF THE NORMAL PATH OF VEHICLES 5.A WATER HEATER SUPPORTED FROM THE EARTH SHALL REST ON LEVEL CONCRETE OR OTHER APPROVED BASE EXTENDING NOT LESS THAN 3 INCHEAS ABOVE THE ADJOINING GROUND LEVEL. CPC 507.4 4 1 2 3 5 6 7 8 4 T&P RELIEF VALVE, DISCHARGE TO APPROVED LOCATION PER CPC 608.5 2 9 3 CONDENSATE DRAIN TO INDIRECT WASTE RECEPTOR OR ALTERNATE APPROVED LOCATION COLD WATER SUPPLY 8 HOT WATER TO SUPPLY TO FIXTURES 6 SHUT OFF VALVES, SIZED PER PIPE SIZE 1 7 1 PROVIDE DIELECTRIC UNION AT CONNECTIONS TO WATER HEATER 5 5 9 DRIP PAN WITH DRAIN TO APPROVED LOCATION PROVIDE SEISMIC BRACING PER CPC SECTION 507.2 10 10 PROVIDE VACUUM RELIEF VALVE ON COLD WATER INLET PER CPC 608.7, AS REQUIRED 3 6 145 ROOFING IN PLASTIC CEMENT LEAD BASE SET 4 LB. SHEET OVER BASE 8"MIN. 4 LB. SHEET LEAD 12"MIN. SOLDER WATERTIGHT VENT (FOR SIZE SEE DWGS.) INCREASE ONE PIPE SIZE INDIRECT WASTE RECEPTOR, WALL PLUGGED WYE AT END OF RUNS. CLEANOUT PLUG. LABELED SEWER COVER CONCRETE WALK HYBRID ELECTRIC HEAT PUMP WATER HEATER VENT THRU ROOF CONDENSATE DRAIN TO LAVATORY TAILPIECE GROUND CLEAN OUT (GCO)WALL CLEAN OUT (WCO)KITCHEN SINK & DISHWASHER 29 " M I N . 27 " M I N . NOTE: SEE ARCHITECT'S DRAWING FOR ACCESSIBLITY REQUIREMENT LAVATORY OR SINK. 3/4" CONDENSATE DRAIN IN WALL CPVC / PVC ESCUTCHEON PLATE WALL FINISHED FLOOR AREA CLEAR FOR ACCESSIBLITY TRAP SLIP-JOINT FITTING . 3/4" CPVC / PVC, SLOPED @ 1/4" /FT 2" TRAP AND WASTE PIPE 2" WASTE 1 1/2" VENT FLOOR ISOMETRIC VIEW 6" MIN NOT TO SCALE CONDENSATE PIPING FROM EQUIPMENT 1-1/2" WASTE PIPE MAY BE USED FOR CONDENSATE DISCHARGE NOT EXCEEDING 7.5 GALLONS PER MINUTE PER CPC TABLE 702.2(2) MINIMUM CONDENSATE PIPE SIZE (TABLE 814.3) EQUIPMENT REFRIGERATION TONNAGE PIPE DIAMETER (IN) UP TO 20 3/4 21-40 1 41-90 1-1/4 91-125 1-1/2 126-250 2 18" MAX 18" MIN 30" MAX 1.VENT OR SEWER STACK 2.FACE OF WALL 3.SANITARY TEE 4.CHROME PLATED COVER & SCREW 5.THREADED PLUG 6.NO-HUB COUPLING WITH STAINLESS STEEL COVER FOR 1 2 3 4 5 6 CAST IRON PIPING FIN FLOOR DISHWASHER AIRGAP FITTING POINT OF CONNECTION TO DISHWASHER GARBAGE DISPOSAL WASTE INLET HOT & COLD WATER OUTLET TO SINK FAUCET HOT WATER OUTLET WITH WATER HAMMER ARRESTOR TO DISHWASHER SUPPLY BOX MODEL 696 BY SIOUX CHIEF IAMPO APPROVED AIR GAP FITTING FROM DISHWASHER TO SINK TAILPIECE OR GARBAGE DISPOSAL 1 2 3 4 5 6 8 9 1 VENT 2 SLOPE DOWN TOWARD DRAIN. 3 CLEANOUT 4 5 6 7 9 AC-UNIT DRAIN PAN CONNECTION PROVIDE THERMAL INSULATION NOTE: 1.ALL CONDENSATE PIPING SHALL BE CPVC OR 11 8 DIELECTRIC UNION. 10 7 11 10 CEILING INSTALLED INDOOR ON CONDENSATE DRAIN PIPING PRIMARY CONDENSATE DRAIN. SEE PLANS FOR SIZE AND CONTINUATION. 1.5 X FAN STATIC PRESSURE RATING (MINIMUM 4" DEEP TRAP) SECONDARY CONDENSATE DRAIN PIPING. ROUTE THE CONDENSATE OVERFLOW DRAIN OUTDOOR AT A VISIBLE LOCATION. TYPE "M" COPPER. 12 PROVIDE CONDENSATE FLOAT12 OFD CANNOT BE ROUTED TO VISIBLE SWITCH FOR INSTALLATIONS WHERE LOCATION. 8" MIN. FINISHED FLOOR5. ESCUTCHEON PLATE4. FIXTURE STOP VALVE3. FIXTURE SUPPLY LINE2. GYPSUM BOARD1. 5 4 3 2 16 WATER SUPPLY 6. 9 10CONDENSATE DRAIN 7 FIXTURE STOP 8 2ISLAND SINK VENT CONNECTION & PIPE PROTECTION COLD WATER HOSE BIBBS WASHING MACHINE BOX 2" TRAP AND WASTE PIPE 2" WASTE 1 1/2" VENT WATER HAMMER ARRESTOR FLOOR (TYPICAL) 18" MIN 30" MAX HOT WATER 6" MIN 18" MAX 11CLOTHES WASHING MACHINE OUTLET BOX P-D.1 DETAILS PC COMMENTS RESPONSE #1 01/29/2025A al l i d e a s , d e s i g n s a n d p l a n s r e p r e s e n t e d b y t h i s d r a w i n g a r e t h e e x c l u s i v e p r o p e r t y o f Go u v i s E n g i n e e r i n g a n d s h a l l n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t w i t h o u t t h e e x p r e s s p r i o r w r i t t e n p e r m i s s i o n o f s a i d e n g i n e e r s , a n y u n a u t h o r i z e d r e u s e o f t h e s e p l a n s o t h e r t h a n f o r t h e p r o j e c t a n d l o c a t i o n s h o w n i s p r o h i b i t e d . JOB NO. SUBMITTAL DATE SHEET TITLE SHEET NO. CLIENT: REVISION DATE 21 3 0 E 4 T H S T # 2 0 0 SA N T A A N A , C A 9 2 7 0 5 BSB: MR230056; Gouvis: 66467 WATER REVISIONS 09/12/2025 1ST PLAN CHECK SUBMITTAL 08/20/2024 2ND PLAN CHECK SUBMITTAL 1/29/2025 PC COMMENTS RESPONSE #2 04/17/2025B 3RD PLAN CHECK SUBMITTAL 04/17/2025 PC COMMENTS RESPONSE #3 07/10/2025C 4TH PLAN CHECK SUBMITTAL 07/10/2025 WATER REVISIONS 09/12/2025D WATER REVISIONS 09/12/2025 PC COMMENTS RESPONSE #4 10/10/2025E CLIENT REVISIONS 10/10/20251 OL I V E C R E S T R E S I D E N T I A L 21 5 0 E . F O U R T H A N D 2 1 6 0 E . F O U R T H SA N T A A N A C A 9 2 7 0 5 OL I V E C R E S T DATE SIGNED: 7/8/25