Loading...
HomeMy WebLinkAbout2301 W Marty Ln Unit #2 & 3 - Plan0 0 I CD 0 = -r"' (~ ., " ..18 ..18 ..1 8 ..18 ..18 ..18 ..18 ..18 ..18 L I,--~!' v Verify location of FAU. for tusses(AA04 ,AA05,AA06) ca: N "' / N .., 31-09-00 19-09-00 L 12-00-00 -I I ::11. ! u~l~U ~L~ Ill ~ ~ • ~ I ~~ N 6 ~ -~ao~c-o=no1# • -'-' ,--:--,____, ."'ao'r ~ 111 111 ~~ I 1 ! I • t t >0 u Ill ' ' I • N N N , ~~~ ' / ; :X: a: N ~ !~V l .--"'.' ~eE l !/i/ I ~I I I •P ,, r OR f S ' ~--=-·-,.o;o;,_.,:;,M -... v I i ~~"· /' I I I : ~ I I • !· j ~ .-------.,- / 1 ~ I N I ~ 1 1 I ~ ~~ .... ~ 0 ;AA94(3), ~~ I= ' ' ~ " N N N N ~ ~ .., .., .., .., 31-09-00 -- - BA BB 0 8C 0 I CD 0 8D I -r"' 8E N 8D 8C BB BA ~ 1----' ,, ~ psf:) Pacifi c StrucFrame, LLC 1600 Chicag o Av e, St e R3 Riversid e, Ca 9 2 507 Tel : (951 ) 4 5 6 -18 0 1 THIS lS ~ TRUSS PLACEMENT DIAGRAM QNJ.Y ~-w.r .. cangllYIJqtq<:t-ll.s.\tiJIUbex~QJ trpu-qtqw_. h qt'rl11Tu:W-lg ~ >kh ex l!Qj qlw!)qg,w.n-~.thl'<Wrq r i V; U,l:Jj g~qh..l.'lhh ll'J~hVtfq ~ ..... 2"Uh:ID:: U:W h'kq Ql"ql.litq rqWth•~ tqvguh'qjl"''khu:lg}aj ghv\;q ~Minlv:lodt in:!ohp•nd:.:j "*6 •h:.p dl!qw e w.UO ri.t.h .n-1 l'l :ar1.!\1 ~w-;. cq, hnlch !'ytuhl\on t!v"...h:lf'd'!.gl'r.ijq zhkh CW'«nniiVIUtblah l;Jt:xgl:fj k..'d#Ut/el'ql \"/Zcb.-/d;!:g ro:pqvliWchl.hwrqv"ali.j ri'llth•~J::Ij gh\.tqtd. 0 z • " -I <( c _J ::» u D... lXI -1-Q U) z c( <i " -I w u c ~ z <( 0 1-w z -..I <( 0 <( 0 q N <( > 1-II z -I _J ..... <( -I 0... z II 1-.. ri en 0 :;,oliO O:::w .. 1- (f) a_;: a: wCLz (!) C1) ca: ..... ~oQ •• ca: w c( 0...11-.. z :x:-::J Z>..l 1-W<( oc 0:: ca: w ca: :E <n>U !::~ 1-~ iit ~ ::JWQ U0-1 D.. -I PROJECT NUMBER: 8339 DRAWN BY: HAIDY DATE: OCT.1, 2025 REVISION BY: DATE: Job 8339-NEW ADU SANTA ANA Truss A Truss Type RAFTER Qty 2 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:27 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-uBtvYYRCh2FopafqaZDWMXWlDoDO0ECjvQvFFwyXmH6 Scale = 1:5.9 T1 1 3 2 1-11-4 1-11-4 0-5-0 0-5-0 1-11-4 1-6-4 0- 5 - 7 0- 1 1 - 8 0- 3 - 8 0- 4 - 4 0- 7 - 4 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.19 0.00 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.01 -0.00 (loc) 1-2 1-2 2 l/defl >999 >999 n/a L/d 240 180 n/a PLATES Weight: 3 lb FT = 20% GRIP LUMBER- TOP CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 1-11-4 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=68/0-5-8 (min. 0-1-10), 2=68/Mechanical Max Horz1=18(LC 12) Max Uplift1=-13(LC 12), 2=-19(LC 12) Max Grav1=298(LC 24), 2=298(LC 25) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 3) A plate rating reduction of 20% has been applied for the green lumber members. 4) Refer to girder(s) for truss to truss connections. 5) Bearing at joint(s) 1 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 2. 7) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss AA01 Truss Type CAL HIP Qty 1 Ply 2 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:28 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-MNRImuRqRLNfRkE07Gkluk2uyCQdlgOt84fonMyXmH5 Scale = 1:33.8 Camber = 3/16 in T1 T2 T1 B1 W1 W2 W3 W4 W3 W2 W1 1 2 3 4 5 6 7 8 12 11 10 9 13 14 15 16 17 18 19 20 21 22 23 24 25 26 5x10 4x6 3x6 3x6 3x4 1x4 3x4 3x10 3x4 1x4 4-5-5 4-5-5 7-5-1 2-11-12 11-0-15 3-7-14 14-0-11 2-11-12 18-6-0 4-5-5 -1-1-0 1-1-0 4-5-5 4-5-5 7-5-1 2-11-12 7-11-11 0-6-10 10-6-5 2-6-10 11-0-15 0-6-10 14-0-11 2-11-12 18-6-0 4-5-5 19-7-0 1-1-0 0- 3 - 1 5 2- 8 - 4 2- 1 1 - 1 3 0- 3 - 1 5 2- 8 - 4 4.00 12 Plate Offsets (X,Y)-- [4:0-5-0,0-1-6] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.32 0.58 0.07 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.08 -0.30 0.09 (loc) 10-11 10-11 7 l/defl >999 >736 n/a L/d 240 180 n/a PLATES MT20 Weight: 160 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 2=1942/0-3-8 (min. 0-1-8), 7=1942/0-3-8 (min. 0-1-8) Max Horz2=29(LC 7) Max Uplift2=-254(LC 8), 7=-254(LC 8) Max Grav2=2053(LC 15), 7=2053(LC 15) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-13=-5239/664, 3-13=-5191/679, 3-14=-5092/828, 4-14=-5071/833, 4-15=-4875/820, 15-16=-4875/820, 16-17=-4875/820, 5-17=-4875/820, 5-18=-5071/832, 6-18=-5093/827, 6-19=-5191/680, 7-19=-5239/664 BOT CHORD 2-20=-592/4900, 12-20=-592/4900, 12-21=-592/4900, 11-21=-592/4900, 11-22=-745/4874, 22-23=-745/4874, 23-24=-745/4874, 10-24=-745/4874, 10-25=-593/4900, 9-25=-593/4900, 9-26=-593/4900, 7-26=-593/4900 WEBS 3-12=0/412, 3-11=-290/107, 4-11=0/413, 5-10=0/331, 6-10=-289/109, 6-9=0/411 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) A plate rating reduction of 20% has been applied for the green lumber members. 9) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2 and 7. This connection is for uplift only and does not consider lateral forces. 10) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 11) Girder carries hip end with 8-0-0 end setback. 12) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 815 lb down and 266 lb up at 10-11-2, and 815 lb down and 266 lb up at 7-6-14 on top chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) StandardContinued on page 2 Job 8339-NEW ADU SANTA ANA Truss AA01 Truss Type CAL HIP Qty 1 Ply 2 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:28 2025 Page 2 ID:PnXkgddMlicu3G1IrO25DtyXtn8-MNRImuRqRLNfRkE07Gkluk2uyCQdlgOt84fonMyXmH5 LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-72, 4-15=-72, 15-17=-175, 5-17=-72, 5-8=-72, 2-7=-49(F=-29) Concentrated Loads (lb) Vert: 4=-624 5=-624 Job 8339-NEW ADU SANTA ANA Truss AA02 Truss Type COMMON Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:28 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-MNRImuRqRLNfRkE07Gkluk2qoCNbleit84fonMyXmH5 Scale = 1:32.7 Camber = 3/16 in T1 T1 B1 W2 W1 W2 W1 1 2 3 4 5 6 7 9 8 10 11 12 13 14 15 16 17 18 19 20 4x4 3x6 3x6 3x4 1x4 3x4 1x4 6-5-7 6-5-7 12-0-9 5-7-1 18-6-0 6-5-7 -1-1-0 1-1-0 5-2-15 5-2-15 9-3-0 4-0-1 13-3-1 4-0-1 18-6-0 5-2-15 19-7-0 1-1-0 0- 3 - 1 5 3- 4 - 1 5 0- 3 - 1 5 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.52 0.77 0.24 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.16 -0.36 0.07 (loc) 2-9 2-9 6 l/defl >999 >607 n/a L/d 240 180 n/a PLATES MT20 Weight: 72 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 4-1-8 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=929/0-3-8 (min. 0-1-8), 6=929/0-3-8 (min. 0-1-8) Max Horz2=37(LC 11) Max Uplift2=-90(LC 12), 6=-90(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-10=-1931/321, 10-11=-1876/324, 3-11=-1872/334, 3-12=-1709/288, 12-13=-1662/295, 4-13=-1656/302, 4-14=-1656/302, 14-15=-1662/295, 5-15=-1709/288, 5-16=-1872/334, 16-17=-1876/324, 6-17=-1931/321 BOT CHORD 2-18=-263/1772, 9-18=-263/1772, 9-19=-134/1216, 8-19=-134/1216, 8-20=-266/1772, 6-20=-266/1772 WEBS 4-8=-63/672, 5-8=-402/150, 4-9=-63/672, 3-9=-402/150 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-1-9 to 1-10-7, Interior(1) 1-10-7 to 9-3-0, Exterior(2R) 9-3-0 to 12-3-0, Interior(1) 12-3-0 to 19-7-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) A plate rating reduction of 20% has been applied for the green lumber members. 6) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2 and 6. This connection is for uplift only and does not consider lateral forces. 7) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss AA03 Truss Type COMMON Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:29 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-qa?gzDSSCfVW3upCh_F_RybzUch7U4U0MkOLJoyXmH4 Scale = 1:32.7 Camber = 3/16 in T1 T1 B1 W2 W1 W2 W1 1 2 3 4 5 6 7 9 8 10 11 12 13 14 15 16 17 18 19 20 4x4 3x6 3x6 3x4 1x4 3x4 1x4 6-5-7 6-5-7 12-0-9 5-7-1 18-6-0 6-5-7 -1-1-0 1-1-0 5-2-15 5-2-15 9-3-0 4-0-1 13-3-1 4-0-1 18-6-0 5-2-15 19-7-0 1-1-0 0- 3 - 1 5 3- 4 - 1 5 0- 3 - 1 5 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-3-0 1.15 1.15 NO IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.65 0.88 0.27 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.16 -0.38 0.07 (loc) 2-9 2-9 6 l/defl >999 >572 n/a L/d 240 180 n/a PLATES MT20 Weight: 72 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD 2-0-0 oc purlins (3-9-10 max.) (Switched from sheeted: Spacing > 2-0-0). BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 2=1046/0-3-8 (min. 0-1-8), 6=1046/0-3-8 (min. 0-1-8) Max Horz2=-42(LC 10) Max Uplift2=-101(LC 12), 6=-101(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-10=-2173/361, 10-11=-2111/364, 3-11=-2106/376, 3-12=-1922/324, 12-13=-1870/331, 4-13=-1863/340, 4-14=-1863/340, 14-15=-1870/331, 5-15=-1922/324, 5-16=-2106/376, 16-17=-2111/364, 6-17=-2173/361 BOT CHORD 2-18=-296/1994, 9-18=-296/1994, 9-19=-150/1368, 8-19=-150/1368, 8-20=-299/1994, 6-20=-299/1994 WEBS 4-8=-70/713, 5-8=-421/169, 4-9=-70/713, 3-9=-421/169 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-1-9 to 1-10-7, Interior(1) 1-10-7 to 9-3-0, Exterior(2R) 9-3-0 to 12-3-0, Interior(1) 12-3-0 to 19-7-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) A plate rating reduction of 20% has been applied for the green lumber members. 6) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2 and 6. This connection is for uplift only and does not consider lateral forces. 7) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss AA04 Truss Type COMMON Qty 3 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:30 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-ImZ2BZT4zzdNg2OPFhmD_987W?1ADWJ9bO8vsEyXmH3 Scale = 1:32.7 Camber = 5/16 in T1 T1 B1 W1 W1 W2 1 2 3 4 5 6 7 8 9 11 10 12 13 14 15 16 17 18 19 20 21 22 23 24 3x4 3x6 3x6 1x4 1x4 1x4 1x4 3x6 3x6 2- 4 - 1 0 5-0-0 6-7-4 6-7-4 11-10-12 5-3-8 18-6-0 6-7-4 -1-1-0 1-1-0 6-7-4 6-7-4 8-0-0 1-4-12 9-3-0 1-3-0 10-6-0 1-3-0 11-10-12 1-4-12 18-6-0 6-7-4 19-7-0 1-1-0 0- 3 - 1 5 3- 4 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [5:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.76 0.89 0.36 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.30 -0.65 0.07 (loc) 2-11 2-11 8 l/defl >720 >336 n/a L/d 240 180 n/a PLATES MT20 Weight: 65 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.1&Btr G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 3-6-12 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=969/0-3-8 (min. 0-1-8), 8=969/0-3-8 (min. 0-1-8) Max Horz2=-37(LC 10) Max Uplift2=-92(LC 12), 8=-92(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-12=-1849/298, 12-13=-1773/304, 13-14=-1761/316, 3-14=-1705/317, 3-15=-1640/335, 4-15=-1612/338, 4-16=-159/990, 5-16=-156/1013, 5-17=-156/1013, 6-17=-158/990, 6-18=-1612/338, 7-18=-1640/335, 7-19=-1705/317, 19-20=-1761/316, 20-21=-1773/304, 8-21=-1848/298 BOT CHORD 2-22=-221/1665, 11-22=-221/1665, 11-23=-221/1665, 10-23=-221/1665, 10-24=-221/1665, 8-24=-221/1665 WEBS 3-11=0/360, 7-10=0/360, 4-6=-2736/513 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-1-9 to 1-10-7, Interior(1) 1-10-7 to 9-3-0, Exterior(2R) 9-3-0 to 12-3-0, Interior(1) 12-3-0 to 19-7-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) A plate rating reduction of 20% has been applied for the green lumber members. 6) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2 and 8. This connection is for uplift only and does not consider lateral forces. 7) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 80 lb down and 23 lb up at 9-3-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-5=-72, 5-9=-72, 2-8=-20 Continued on page 2 Job 8339-NEW ADU SANTA ANA Truss AA04 Truss Type COMMON Qty 3 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:30 2025 Page 2 ID:PnXkgddMlicu3G1IrO25DtyXtn8-ImZ2BZT4zzdNg2OPFhmD_987W?1ADWJ9bO8vsEyXmH3 LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 23=-80(F) Job 8339-NEW ADU SANTA ANA Truss AA05 Truss Type COMMON Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:30 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-ImZ2BZT4zzdNg2OPFhmD_985o??lDWM9bO8vsEyXmH3 Scale = 1:30.5 Camber = 5/16 in T1 T2 B1 W1 W1 W2 1 2 3 4 5 6 7 8 10 9 11 12 13 14 15 16 17 18 19 20 21 22 3x6 3x4 3x6 1x4 1x4 1x4 1x4 3x6 3x6 2- 4 - 1 0 5-0-0 6-4-4 6-4-4 11-7-12 5-3-8 18-3-0 6-7-4 6-4-4 6-4-4 7-9-0 1-4-12 9-0-0 1-3-0 10-3-0 1-3-0 11-7-12 1-4-12 18-3-0 6-7-4 19-4-0 1-1-0 0- 4 - 1 5 3- 4 - 1 5 0- 3 - 1 5 4.00 12 D=2201# Plate Offsets (X,Y)-- [4:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.87 0.98 0.36 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.30 -0.66 0.07 (loc) 7-9 7-9 7 l/defl >713 >329 n/a L/d 240 180 n/a PLATES MT20 Weight: 62 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.1&Btr G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-3 oc purlins. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=867/Mechanical, 7=965/0-3-8 (min. 0-1-8) Max Horz1=-39(LC 10) Max Uplift1=-84(LC 25), 7=-93(LC 12) Max Grav1=869(LC 24), 7=965(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-11=-2172/451, 11-12=-1747/330, 2-12=-1688/332, 2-13=-1624/352, 3-13=-1596/354, 3-14=-176/981, 4-14=-173/1005, 4-15=-184/1007, 5-15=-186/984, 5-16=-1594/344, 6-16=-1622/341, 6-17=-1686/319, 17-18=-1742/317, 18-19=-1754/307, 7-19=-2187/544 BOT CHORD 1-20=-237/1647, 10-20=-537/2030, 10-21=-537/2030, 9-21=-537/2030, 9-22=-537/2030, 7-22=-537/2030 WEBS 2-10=0/360, 6-9=0/358, 3-5=-2710/558 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-0-12 to 3-0-12, Interior(1) 3-0-12 to 9-0-0, Exterior(2R) 9-0-0 to 12-0-0, Interior(1) 12-0-0 to 19-4-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) A plate rating reduction of 20% has been applied for the green lumber members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1. 8) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 7. This connection is for uplift only and does not consider lateral forces. 9) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 10) This truss has been designed for a total seismic drag load of 2201 lb. Lumber DOL=(1.33) Plate grip DOL=(1.33) Connect truss to resist drag loads along bottom chord from 0-0-0 to 3-0-0 for 733.7 plf. 11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 80 lb down and 23 lb up at 9-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 12) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard Continued on page 2 Job 8339-NEW ADU SANTA ANA Truss AA05 Truss Type COMMON Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:30 2025 Page 2 ID:PnXkgddMlicu3G1IrO25DtyXtn8-ImZ2BZT4zzdNg2OPFhmD_985o??lDWM9bO8vsEyXmH3 LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-72, 4-8=-72, 1-7=-20 Concentrated Loads (lb) Vert: 21=-80(F) Job 8339-NEW ADU SANTA ANA Truss AA06 Truss Type COMMON Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:31 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-my7QOvUikGlEICybpPHSWNgIGPNNyzcJq2tSOhyXmH2 Scale = 1:30.5 Camber = 5/16 in T1 T2 B1 W1 W1 W2 1 2 3 4 5 6 7 8 10 9 11 12 13 14 15 16 17 18 19 20 21 22 3x6 3x4 3x6 1x4 1x4 1x4 1x4 3x6 3x6 2- 4 - 1 0 5-0-0 6-4-4 6-4-4 11-7-12 5-3-8 18-3-0 6-7-4 6-4-4 6-4-4 7-9-0 1-4-12 9-0-0 1-3-0 10-3-0 1-3-0 11-7-12 1-4-12 18-3-0 6-7-4 19-4-0 1-1-0 0- 4 - 1 5 3- 4 - 1 5 0- 3 - 1 5 4.00 12 Plate Offsets (X,Y)-- [4:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.76 0.89 0.36 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.30 -0.66 0.07 (loc) 7-9 7-9 7 l/defl >713 >329 n/a L/d 240 180 n/a PLATES MT20 Weight: 62 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.1&Btr G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-3 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=867/Mechanical, 7=965/0-3-8 (min. 0-1-8) Max Horz1=-39(LC 10) Max Uplift1=-49(LC 12), 7=-93(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-11=-1830/318, 11-12=-1747/330, 2-12=-1688/332, 2-13=-1624/352, 3-13=-1596/354, 3-14=-176/981, 4-14=-173/1005, 4-15=-184/1007, 5-15=-186/984, 5-16=-1594/344, 6-16=-1622/341, 6-17=-1686/319, 17-18=-1742/317, 18-19=-1754/307, 7-19=-1829/301 BOT CHORD 1-20=-237/1647, 10-20=-237/1647, 10-21=-237/1647, 9-21=-237/1647, 9-22=-237/1647, 7-22=-237/1647 WEBS 2-10=0/360, 6-9=0/358, 3-5=-2710/558 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-0-12 to 3-0-12, Interior(1) 3-0-12 to 9-0-0, Exterior(2R) 9-0-0 to 12-0-0, Interior(1) 12-0-0 to 19-4-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) A plate rating reduction of 20% has been applied for the green lumber members. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1. 8) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 7. This connection is for uplift only and does not consider lateral forces. 9) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 10) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 80 lb down and 23 lb up at 9-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 11) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-4=-72, 4-8=-72, 1-7=-20 Continued on page 2 Job 8339-NEW ADU SANTA ANA Truss AA06 Truss Type COMMON Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:31 2025 Page 2 ID:PnXkgddMlicu3G1IrO25DtyXtn8-my7QOvUikGlEICybpPHSWNgIGPNNyzcJq2tSOhyXmH2 LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 21=-80(F) Job 8339-NEW ADU SANTA ANA Truss AA07 Truss Type CALIFORNIA GIRDER Qty 1 Ply 2 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:32 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-E9hocFUKVat5wMXnM6ph3aDa0ponhTOS2id?w7yXmH1 Scale = 1:31.5 Camber = 3/16 in T1 T2 T3 B1 W1 W2 W3 W4 W3 W2 W1 1 2 3 4 5 6 7 11 10 9 8 12 13 14 15 16 17 18 19 20 21 22 23 3x6 5x10 4x6 3x6 3x4 1x4 3x4 3x10 3x4 1x4 0-3-0 0-3-0 4-5-5 4-2-5 7-5-1 2-11-12 11-0-15 3-7-14 14-0-11 2-11-12 18-6-0 4-5-5 0-3-0 0-3-0 4-5-5 4-2-5 7-5-1 2-11-12 7-11-11 0-6-10 10-6-5 2-6-10 11-0-15 0-6-10 14-0-11 2-11-12 18-6-0 4-5-5 19-7-0 1-1-0 0- 4 - 1 5 2- 8 - 4 2- 1 1 - 1 3 0- 3 - 1 5 2- 8 - 4 4.00 12 Plate Offsets (X,Y)-- [3:0-5-0,0-1-6] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.31 0.56 0.07 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.08 -0.28 0.09 (loc) 9 9-10 6 l/defl >999 >772 n/a L/d 240 180 n/a PLATES MT20 Weight: 155 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 5-10-15 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 1=1816/Mechanical, 6=1894/0-3-8 (min. 0-1-8) Max Horz1=-31(LC 6) Max Uplift1=-204(LC 8), 6=-239(LC 8) Max Grav1=1936(LC 15), 6=1991(LC 15) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-12=-4993/642, 2-12=-4957/650, 2-13=-4895/790, 3-13=-4874/795, 3-14=-4682/774, 14-15=-4682/774, 4-15=-4682/774, 4-16=-4872/785, 5-16=-4894/779, 5-17=-5008/636, 6-17=-5056/621 BOT CHORD 1-18=-564/4658, 11-18=-564/4658, 11-19=-564/4658, 10-19=-564/4658, 10-20=-708/4685, 20-21=-708/4685, 9-21=-708/4685, 9-22=-551/4727, 8-22=-551/4727, 8-23=-551/4727, 6-23=-551/4727 WEBS 2-11=0/413, 3-10=0/387, 4-9=0/331, 5-9=-305/88, 5-8=0/413 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) A plate rating reduction of 20% has been applied for the green lumber members. 9) Refer to girder(s) for truss to truss connections. 10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=204. 11) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 6. This connection is for uplift only and does not consider lateral forces. 12) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 13) Girder carries hip end with 8-0-0 right side setback, 7-3-15 left side setback, and 8-0-0 end setback. 14) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 746 lb down and 243 lb up at 10-8-1, and 746 lb down and 243 lb up at 7-3-15 on top chord. The design/selection of such connection device(s) is the responsibility of others.Continued on page 2 Job 8339-NEW ADU SANTA ANA Truss AA07 Truss Type CALIFORNIA GIRDER Qty 1 Ply 2 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:32 2025 Page 2 ID:PnXkgddMlicu3G1IrO25DtyXtn8-E9hocFUKVat5wMXnM6ph3aDa0ponhTOS2id?w7yXmH1 LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-72, 3-15=-175, 4-15=-72, 4-7=-72, 1-6=-49(F=-29) Concentrated Loads (lb) Vert: 3=-572 4=-572 Job 8339-NEW ADU SANTA ANA Truss AB01 Truss Type COMMON GIRDER Qty 1 Ply 2 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:33 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-iLFBpbVzGu0yXV6zwqKwbomlmD3NQqUcHMMZSZyXmH0 Scale = 1:20.7 Camber = 1/8 in T1 T2 B1 W3 W2W1 W2 W1 1 2 3 4 5 6 9 8 7 10 11 12 13 14 15 16 17 183x10 4x4 3x10 3x10 3x10 3x10 3x10 3x10 3-11-11 3-11-11 6-0-0 2-0-5 8-0-5 2-0-5 12-0-0 3-11-11 3-11-11 3-11-11 6-0-0 2-0-5 8-0-5 2-0-5 12-0-0 3-11-11 13-1-0 1-1-0 0- 3 - 1 5 2- 3 - 1 5 0- 3 - 1 5 4.00 12 D=2201# LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.31 0.86 0.46 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.04 -0.16 0.04 (loc) 9 9 5 l/defl >999 >867 n/a L/d 240 180 n/a PLATES MT20 Weight: 111 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x6 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 5-3-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size) 1=2490/0-3-8 (min. 0-1-8), 5=1362/0-3-8 (min. 0-1-8) Max Horz1=-53(LC 21) Max Uplift1=-143(LC 8), 5=-117(LC 8) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-10=-5729/329, 2-10=-5692/336, 2-11=-3218/197, 3-11=-3200/204, 3-12=-3206/204, 4-12=-3225/197, 4-13=-3223/181, 5-13=-3273/168 BOT CHORD 1-14=-275/5406, 14-15=-275/5406, 9-15=-275/5406, 9-16=-275/5406, 8-16=-275/5406, 8-17=-125/3061, 7-17=-125/3061, 7-18=-125/3061, 5-18=-125/3061 WEBS 3-8=-103/1823, 2-8=-2797/180, 2-9=-76/2088, 4-8=-271/121 NOTES- 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-5-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) A plate rating reduction of 20% has been applied for the green lumber members. 8) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 1 and 5. This connection is for uplift only and does not consider lateral forces. 9) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 10) This truss has been designed for a total seismic drag load of 2201 lb. Lumber DOL=(1.33) Plate grip DOL=(1.33) Connect truss to resist drag loads along bottom chord from 0-0-0 to 3-0-0 for 733.7 plf. 11) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 1816 lb down and 106 lb up at 3-10-8, and 867 lb down and 50 lb up at 1-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. LOAD CASE(S) Standard Continued on page 2 Job 8339-NEW ADU SANTA ANA Truss AB01 Truss Type COMMON GIRDER Qty 1 Ply 2 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:33 2025 Page 2 ID:PnXkgddMlicu3G1IrO25DtyXtn8-iLFBpbVzGu0yXV6zwqKwbomlmD3NQqUcHMMZSZyXmH0 LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-72, 3-6=-72, 1-5=-20 Concentrated Loads (lb) Vert: 9=-1816(F) 14=-867(F) Job 8339-NEW ADU SANTA ANA Truss AB02 Truss Type COMMON Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:33 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-iLFBpbVzGu0yXV6zwqKwbomf5D6iQvecHMMZSZyXmH0 Scale = 1:22.5 Camber = 1/16 in T1 T1 B1 W1 1 2 3 4 5 6 7 8 9 10 11 12 4x6 3x4 3x4 1x4 6-0-0 6-0-0 12-0-0 6-0-0 -1-1-0 1-1-0 6-0-0 6-0-0 12-0-0 6-0-0 13-1-0 1-1-0 0- 3 - 1 5 2- 3 - 1 5 0- 3 - 1 5 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.67 0.65 0.13 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.13 -0.24 0.02 (loc) 2-6 2-6 4 l/defl >999 >575 n/a L/d 240 180 n/a PLATES MT20 Weight: 40 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 4-7-14 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 2=630/0-3-8 (min. 0-1-8), 4=630/0-3-8 (min. 0-1-8) Max Horz2=-25(LC 10) Max Uplift2=-73(LC 12), 4=-73(LC 12) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-7=-980/251, 7-8=-930/256, 3-8=-930/268, 3-9=-930/268, 9-10=-930/256, 4-10=-980/251 BOT CHORD 2-11=-171/879, 6-11=-171/879, 6-12=-171/879, 4-12=-171/879 WEBS 3-6=0/414 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-1-9 to 1-10-7, Interior(1) 1-10-7 to 6-0-0, Exterior(2R) 6-0-0 to 9-0-0, Interior(1) 9-0-0 to 13-1-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) A plate rating reduction of 20% has been applied for the green lumber members. 6) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2 and 4. This connection is for uplift only and does not consider lateral forces. 7) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss AB03 Truss Type GABLE Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:34 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-AXoZ0xWb1B8o9fhAUXr98?IuTdYv9NalW066?0yXmH? Scale = 1:22.5 T1 T1B1 T2 T2 W1ST2 ST1 ST2 ST1 1 2 3 4 5 6 7 12 11 10 9 8 17 18 19 20 21 22 23 24 4x6 4x6 3x6 3x6 5x6 1x4 6-0-0 6-0-0 12-0-0 6-0-0 -1-1-0 1-1-0 6-0-0 6-0-0 12-0-0 6-0-0 13-1-0 1-1-0 0- 3 - 1 5 2- 3 - 1 5 0- 3 - 1 5 4.00 12 D=280 PLF Plate Offsets (X,Y)-- [2:0-3-0,Edge], [3:0-3-0,Edge], [5:0-3-0,Edge], [6:0-3-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-S 0.38 0.26 0.09 DEFL. Vert(LL) Vert(CT) Horz(CT) in 0.00 0.02 0.01 (loc) 6 7 10 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 52 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G *Except* T2: 2x6 DF No.2 G BOT CHORD 2x4 DF No.2 G WEBS 2x4 DF Std G OTHERS 2x4 DF Std G BRACING- TOP CHORD Structural wood sheathing directly applied or 4-7-7 oc purlins. BOT CHORD Rigid ceiling directly applied or 5-0-4 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings 12-0-0. (lb) - Max Horz2=24(LC 11) Max Uplift All uplift 100 lb or less at joint(s) 10 except 2=-461(LC 25), 6=-461(LC 26), 11=-140(LC 36), 9=-140(LC 41) Max Grav All reactions 250 lb or less at joint(s) except 2=717(LC 24), 6=717(LC 23), 10=484(LC 44), 11=261(LC 43), 12=354(LC 42), 9=261(LC 45), 8=354(LC 46) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1848/1719, 3-17=-932/1040, 4-17=-899/853, 4-18=-899/853, 5-18=-932/1040, 5-6=-1848/1719 BOT CHORD 2-19=-1558/1709, 12-19=-1184/1262, 12-20=-718/795, 11-20=-531/608, 11-21=-307/384, 9-22=-307/384, 9-23=-531/608, 8-23=-718/795, 8-24=-1184/1262, 6-24=-1558/1709 WEBS 4-10=-430/277 NOTES- 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=2ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Corner(3E) -1-1-9 to 1-10-7, Exterior(2N) 1-10-7 to 6-0-0, Corner(3R) 6-0-0 to 9-0-0, Exterior(2N) 9-0-0 to 13-1-9 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 1-4-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 8) A plate rating reduction of 20% has been applied for the green lumber members. 9) One RT7 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2 and 6. This connection is for uplift only and does not consider lateral forces. 10) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 10, 11, and 9. This connection is for uplift only and does not consider lateral forces. 11) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 12) This truss has been designed for a total seismic drag load of 280 plf. Lumber DOL=(1.33) Plate grip DOL=(1.33) Connect truss to resist drag loads along bottom chord from 0-0-0 to 12-0-0 for 280.0 plf. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss B Truss Type Rafter Qty 2 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:35 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-fkMxEHXDoVGfnpGM2EMOhDr2J0yGurAvlgrgXSyXmH_ Scale = 1:9.2 T1 1 3 2 3-11-4 3-11-4 0-5-4 0-5-4 3-11-4 3-6-0 0- 5 - 8 1- 7 - 8 0- 3 - 8 0- 4 - 4 1- 3 - 4 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.44 0.00 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.05 -0.09 -0.00 (loc) 1-2 1-2 2 l/defl >815 >472 n/a L/d 240 180 n/a PLATES Weight: 6 lb FT = 20% GRIP LUMBER- TOP CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-4 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=131/0-5-8 (min. 0-1-9), 2=131/Mechanical Max Horz1=36(LC 12) Max Uplift1=-26(LC 12), 2=-38(LC 12) Max Grav1=326(LC 24), 2=326(LC 25) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-2-12 to 3-2-12, Interior(1) 3-2-12 to 3-10-8 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 3) A plate rating reduction of 20% has been applied for the green lumber members. 4) Refer to girder(s) for truss to truss connections. 5) Bearing at joint(s) 1 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 2. 7) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss CR-1 Truss Type JACK-OPEN GIRDER Qty 3 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:36 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-7wwJRdYrZpOWOzrYbytdDQN6fQHVdIQ2zJbD2uyXmGz Scale = 1:23.6 T1 W1 1 2 3 5 6 4 6x6 3x10 3x10 3x10 3x10 3x10 4x6 13-4-9 1-6-0 1-6-0 1-8-8 0-2-8 12-11-2 11-2-10 13-0-8 0-1-7 14-5-14 1-5-6 14-6-4 0-0-6 12-8-4 12-8-4 14-5-14 1-9-10 14-6-4 0-0-6 0- 3 - 1 1 3- 8 - 1 2 0- 4 - 0 0- 4 - 0 3- 4 - 1 2 2.83 12 Plate Offsets (X,Y)-- [2:0-7-2,Edge], [3:0-1-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-MS 0.85 0.00 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.33 -0.74 -0.00 (loc) 2-3 2-3 4 l/defl >409 >185 n/a L/d 240 180 n/a PLATES MT20 Weight: 37 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G WEBS 2x4 DF No.1&Btr G BRACING- TOP CHORD Structural wood sheathing directly applied or 2-4-4 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 4=57/Mechanical, 2=525/0-4-15 (min. 0-1-8), 3=461/0-4-4 (min. 0-1-8) Max Horz2=119(LC 4) Max Uplift4=-19(LC 4), 2=-167(LC 4), 3=-147(LC 4) Max Grav4=293(LC 23), 2=525(LC 1), 3=473(LC 22) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 3) A plate rating reduction of 20% has been applied for the green lumber members. 4) Refer to girder(s) for truss to truss connections. 5) Bearing at joint(s) 2 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 4. This connection is for uplift only and does not consider lateral forces. 7) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2 and 3. This connection is for uplift only and does not consider lateral forces. 8) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 3. 9) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord, nonconcurrent with any other live loads. 10) This truss is designed for a creep factor of 2.50, which is used to calculate the Vert(CT) deflection per ANSI/TPI 1. The building designer shall verify that this parameter fits with the intended use of this component. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss CR-2 Truss Type JACK-OPEN GIRDER Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:36 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-7wwJRdYrZpOWOzrYbytdDQN5iQHVdIQ2zJbD2uyXmGz Scale = 1:19.8 T1 W1 1 2 4 5 3 5x8 3x10 3x10 3x10 3x10 3x10 4x6 13-4-9 1-10-4 0-1-12 12-11-2 11-0-14 13-0-8 0-1-7 14-5-14 1-5-6 14-6-4 0-0-6 12-8-4 12-8-4 14-5-14 1-9-10 14-6-4 0-0-6 3- 8 - 1 2 0- 4 - 0 0- 4 - 0 3 4 1 2 2.83 12 Plate Offsets (X,Y)-- [1:Edge,0-3-8], [2:0-1-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IBC2021/TPI2014 CSI. TC BC WB Matrix-MS 0.91 0.00 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.28 -0.63 -0.00 (loc) 1-2 1-2 3 l/defl >458 >206 n/a L/d 240 180 n/a PLATES MT20 Weight: 33 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G WEBS 2x4 DF No.1&Btr G BRACING- TOP CHORD Structural wood sheathing directly applied or 4-5-7 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=389/Mechanical, 3=57/Mechanical, 2=447/0-4-4 (min. 0-1-8) Max Horz1=103(LC 4) Max Uplift1=-101(LC 4), 3=-19(LC 4), 2=-146(LC 4) Max Grav1=441(LC 21), 3=293(LC 23), 2=467(LC 22) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 3) A plate rating reduction of 20% has been applied for the green lumber members. 4) Refer to girder(s) for truss to truss connections. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=101. 7) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 3. This connection is for uplift only and does not consider lateral forces. 8) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 9) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 2. 10) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. 11) This truss is designed for a creep factor of 2.50, which is used to calculate the Vert(CT) deflection per ANSI/TPI 1. The building designer shall verify that this parameter fits with the intended use of this component. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J2A Truss Type JACK-OPEN Qty 3 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:37 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-b6UhfyYTK6WN07Ql9fOsmewSoqbmMlgBCzKmaKyXmGy Scale = 1:7.5 T1 B11 2 5 3 6 42x4 2-0-0 2-0-0 -1-1-0 1-1-0 1-11-11 1-11-11 0- 3 - 1 5 0- 1 1 - 1 3 0- 3 - 9 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.18 0.19 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.01 -0.00 (loc) 2-4 2-4 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 1-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=45/Mechanical, 2=198/0-3-8 (min. 0-1-8), 4=20/Mechanical Max Horz2=36(LC 12) Max Uplift3=-9(LC 9), 2=-52(LC 12) Max Grav3=288(LC 25), 2=367(LC 24), 4=288(LC 27) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 3. This connection is for uplift only and does not consider lateral forces. 7) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 8) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J2AS Truss Type JACK-OPEN Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:37 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-b6UhfyYTK6WN07Ql9fOsmewS?qbCMlgBCzKmaKyXmGy Scale = 1:7.6 T1 B1 1 4 2 5 32x4 2-0-0 1-9-0 0-3-0 0-3-0 1-11-11 1-8-11 2-0-0 0-0-5 0- 4 - 1 5 0- 1 1 - 1 3 0- 3 - 9 4.00 12 Plate Offsets (X,Y)-- [1:0-0-9,0-0-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.17 0.16 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.01 -0.00 (loc) 1-3 1-3 2 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 5 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 1-9-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=78/Mechanical, 3=17/Mechanical, 2=61/Mechanical Max Horz1=20(LC 12) Max Uplift2=-19(LC 12) Max Grav1=312(LC 24), 3=285(LC 27), 2=295(LC 25) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) Refer to girder(s) for truss to truss connections. 7) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 8) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J2B Truss Type JACK-OPEN Qty 3 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:38 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-3J24sIZ55QeEeH?xjNv5IrTYEEx?5CwLRd4K7nyXmGx Scale = 1:10.9 T1 B1 1 2 5 6 3 7 4 2x4 2-0-0 2-0-0 -1-1-0 1-1-0 2-0-0 2-0-0 3-11-11 1-11-11 0- 3 - 1 5 1- 7 - 1 3 0- 4 - 4 1- 3 - 9 1- 7 - 1 3 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.46 0.19 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.01 -0.00 (loc) 2-4 2-4 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=127/Mechanical, 2=255/0-3-8 (min. 0-1-8), 4=20/Mechanical Max Horz2=55(LC 12) Max Uplift3=-34(LC 12), 2=-59(LC 12) Max Grav3=325(LC 25), 2=392(LC 24), 4=288(LC 27) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-1-9 to 1-10-7, Interior(1) 1-10-7 to 3-10-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 3. This connection is for uplift only and does not consider lateral forces. 7) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 8) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J2BS Truss Type JACK-OPEN Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:38 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-3J24sIZ55QeEeH?xjNv5IrTZWExR5CwLRd4K7nyXmGx Scale = 1:10.9 T1 B1 1 4 5 2 6 3 2x4 2-0-0 1-9-0 0-3-0 0-3-0 2-0-0 1-9-0 3-11-11 1-11-11 0- 4 - 1 5 1- 7 - 1 3 0- 4 - 4 1- 3 - 9 1- 7 - 1 3 4.00 12 Plate Offsets (X,Y)-- [1:0-0-9,0-0-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.44 0.16 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.01 -0.00 (loc) 1-3 1-3 2 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 8 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 1-9-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=149/Mechanical, 2=131/Mechanical, 3=17/Mechanical Max Horz1=39(LC 12) Max Uplift1=-14(LC 12), 2=-39(LC 12) Max Grav1=344(LC 24), 2=326(LC 25), 3=285(LC 27) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-0-2 to 3-0-2, Interior(1) 3-0-2 to 3-7-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1. 8) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 9) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J2C Truss Type JACK-OPEN Qty 3 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:39 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-XVcS4eajskm5FQa7H4RKr3?eEeHEqfAUfHptfDyXmGw Scale = 1:14.3 T1 B1 1 2 5 6 3 7 4 2x4 2-0-0 2-0-0 -1-1-0 1-1-0 2-0-0 2-0-0 5-11-11 3-11-11 0- 3 - 1 5 2- 3 - 1 3 0- 4 - 4 1- 1 1 - 9 2- 3 - 1 3 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.82 0.19 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.01 -0.00 (loc) 2-4 2-4 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=204/Mechanical, 2=323/0-3-8 (min. 0-1-8), 4=20/Mechanical Max Horz2=74(LC 12) Max Uplift3=-57(LC 12), 2=-71(LC 12) Max Grav3=358(LC 25), 2=422(LC 24), 4=288(LC 27) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) -1-1-9 to 1-10-7, Interior(1) 1-10-7 to 5-10-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 3. This connection is for uplift only and does not consider lateral forces. 7) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 8) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J2CS Truss Type JACK-OPEN Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:39 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-XVcS4eajskm5FQa7H4RKr3?ekeHgqfAUfHptfDyXmGw Scale = 1:14.3 T1 B1 1 4 5 2 6 32x4 2-0-0 1-9-0 0-3-0 0-3-0 2-0-0 1-9-0 5-11-11 3-11-11 0- 4 - 1 5 2- 3 - 1 3 0- 4 - 4 1- 1 1 - 9 2- 3 - 1 3 4.00 12 Plate Offsets (X,Y)-- [1:0-0-9,0-0-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.79 0.16 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.01 -0.01 -0.00 (loc) 1-3 1-3 2 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 1-9-0 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=221/Mechanical, 2=203/Mechanical, 3=17/Mechanical Max Horz1=59(LC 12) Max Uplift1=-28(LC 12), 2=-59(LC 12) Max Grav1=376(LC 24), 2=358(LC 25), 3=285(LC 27) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional) and C-C Exterior(2E) 0-0-2 to 3-0-2, Interior(1) 3-0-2 to 5-7-15 zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1. 8) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 9) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J8A Truss Type JACK-OPEN Qty 4 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:40 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-?hAqH_bMd1uyta8KqoyZNGYvT1ayZ6QeuxZRBfyXmGv Scale = 1:17.2 Camber = 1/8 in T1 B1 1 2 8 9 3 4 3x6 8-0-0 8-0-0 -1-1-0 1-1-0 1-11-11 1-11-11 0- 3 - 1 5 0- 1 1 - 1 3 0- 3 - 9 4.00 12 Plate Offsets (X,Y)-- [2:0-0-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-MP 0.41 0.35 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.07 -0.20 0.00 (loc) 4-7 4-7 3 l/defl >999 >467 n/a L/d 240 180 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 1-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=142/Mechanical, 2=183/0-3-8 (min. 0-1-8), 4=56/Mechanical Max Horz2=36(LC 8) Max Uplift2=-58(LC 8) Max Grav3=385(LC 23), 2=353(LC 21), 4=111(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 7) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J8B Truss Type JACK-OPEN Qty 4 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:40 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-?hAqH_bMd1uyta8KqoyZNGYus1Z7Z6QeuxZRBfyXmGv Scale = 1:17.0 Camber = 1/4 in T1 B1 1 2 8 9 3 4 3x6 8-0-0 8-0-0 -1-1-0 1-1-0 3-11-11 3-11-11 0- 3 - 1 5 1- 7 - 1 3 0- 3 - 9 4.00 12 Plate Offsets (X,Y)-- [2:0-0-9,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-MP 0.51 0.40 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.10 -0.32 0.00 (loc) 4-7 4-7 2 l/defl >997 >301 n/a L/d 240 180 n/a PLATES MT20 Weight: 19 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=155/Mechanical, 2=300/0-3-8 (min. 0-1-8), 4=66/Mechanical Max Horz2=55(LC 8) Max Uplift3=-9(LC 8), 2=-35(LC 8) Max Grav3=358(LC 23), 2=435(LC 21), 4=124(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 3. This connection is for uplift only and does not consider lateral forces. 7) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 8) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J8C Truss Type JACK-OPEN Qty 4 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:41 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-TukCUKb_OL0pVkjWOVTowU5?vRutIZfn7bI_k6yXmGu Scale = 1:16.8 Camber = 5/16 in T1 B1 1 2 8 9 3 4 3x6 8-0-0 8-0-0 -1-1-0 1-1-0 5-11-11 5-11-11 0- 3 - 1 5 2- 3 - 1 3 0- 3 - 9 4.00 12 Plate Offsets (X,Y)-- [2:0-1-1,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-MP 0.75 0.50 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.12 -0.48 0.00 (loc) 4-7 4-7 2 l/defl >796 >200 n/a L/d 240 180 n/a PLATES MT20 Weight: 21 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.2 G BOT CHORD 2x4 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 5-11-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=198/Mechanical, 2=383/0-3-8 (min. 0-1-8), 4=85/Mechanical Max Horz2=75(LC 8) Max Uplift3=-38(LC 8), 2=-39(LC 8) Max Grav3=367(LC 23), 2=480(LC 21), 4=138(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-8=-280/0 NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 3. This connection is for uplift only and does not consider lateral forces. 7) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 8) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J8D Truss Type JACK-OPEN Qty 4 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:41 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-TukCUKb_OL0pVkjWOVTowU5?dRtQIZfn7bI_k6yXmGu Scale = 1:17.0 Camber = 5/16 in T1 B1 1 2 8 9 3 4 3x6 8-0-0 8-0-0 -1-1-0 1-1-0 7-11-11 7-11-11 0- 3 - 1 5 2- 1 1 - 1 3 0- 3 - 9 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-MP 0.77 0.53 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.17 -0.52 0.01 (loc) 4-7 4-7 2 l/defl >576 >185 n/a L/d 240 180 n/a PLATES MT20 Weight: 24 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.1&Btr G BOT CHORD 2x4 DF No.1&Btr G BRACING- TOP CHORD Structural wood sheathing directly applied or 5-7-10 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 3=247/Mechanical, 2=451/0-3-8 (min. 0-1-8), 4=111/Mechanical Max Horz2=94(LC 8) Max Uplift3=-59(LC 8), 2=-47(LC 8) Max Grav3=385(LC 23), 2=513(LC 21), 4=153(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-8=-306/0 NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 3. This connection is for uplift only and does not consider lateral forces. 7) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2. This connection is for uplift only and does not consider lateral forces. 8) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord, nonconcurrent with any other live loads. 9) This truss is designed for a creep factor of 2.50, which is used to calculate the Vert(CT) deflection per ANSI/TPI 1. The building designer shall verify that this parameter fits with the intended use of this component. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss J8E Truss Type JACK-OPEN Qty 2 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:42 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-x4Haigcc8f8g6uIiyC_1Thd9DrCS10vwMF2XGYyXmGt Scale = 1:19.3 Camber = 5/16 in T1 B1 1 2 9 10 3 11 4 53x6 8-0-0 8-0-0 -1-1-0 1-1-0 8-0-0 8-0-0 9-1-15 1-1-15 0- 3 - 1 5 3- 4 - 9 0- 4 - 4 3- 0 - 5 3- 4 - 9 4.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IBC2021/TPI2014 CSI. TC BC WB Matrix-MP 0.78 0.54 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.17 -0.52 0.01 (loc) 5-8 5-8 2 l/defl >566 >182 n/a L/d 240 180 n/a PLATES MT20 Weight: 26 lb FT = 20% GRIP 220/195 LUMBER- TOP CHORD 2x4 DF No.1&Btr G BOT CHORD 2x4 DF No.1&Btr G BRACING- TOP CHORD Structural wood sheathing directly applied or 4-8-11 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.All bearings Mechanical except (jt=length) 2=0-3-8, 5=Mechanical, 3=0-3-0. (lb) - Max Horz2=106(LC 8) Max Uplift All uplift 100 lb or less at joint(s) 4, 2, 3 Max Grav All reactions 250 lb or less at joint(s) 5 except 4=286(LC 25), 2=514(LC 22), 3=403(LC 24) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-9=-306/0 NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left exposed ; end vertical left exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) Refer to girder(s) for truss to truss connections. 7) One RT3A MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 4. This connection is for uplift only and does not consider lateral forces. 8) One RT4 MiTek connectors recommended to connect truss to bearing walls due to UPLIFT at jt(s) 2 and 3. This connection is for uplift only and does not consider lateral forces. 9) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 3. 10) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord, nonconcurrent with any other live loads. 11) This truss is designed for a creep factor of 2.50, which is used to calculate the Vert(CT) deflection per ANSI/TPI 1. The building designer shall verify that this parameter fits with the intended use of this component. LOAD CASE(S) Standard Job 8339-NEW ADU SANTA ANA Truss R-1 Truss Type RAFTER Qty 1 Ply 1 8339-New ADU Santa Ana Job Reference (optional) 8.710 s Aug 17 2023 MiTek Industries, Inc. Wed Oct 1 21:49:42 2025 Page 1 ID:PnXkgddMlicu3G1IrO25DtyXtn8-x4Haigcc8f8g6uIiyC_1ThdGZrKv10vwMF2XGYyXmGt Scale = 1:10.6 T1 1 3 2 5-7-15 5-7-15 5-6-4 5-6-4 5-7-15 0-1-11 0- 3 - 9 0- 2 - 1 0- 2 - 0 0- 1 - 9 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 16.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IBC2021/TPI2014 CSI. TC BC WB Matrix-P 0.37 0.00 0.00 DEFL. Vert(LL) Vert(CT) Horz(CT) in -0.04 -0.09 0.00 (loc) 1-2 1-2 l/defl >999 >740 n/a L/d 240 180 n/a PLATES Weight: 12 lb FT = 20% GRIP LUMBER- TOP CHORD 2x6 DF No.2 G BRACING- TOP CHORD Structural wood sheathing directly applied or 5-7-15 oc purlins. BOT CHORD Rigid ceiling directly applied or 10-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS.(lb/size) 1=196/Mechanical, 2=196/0-3-8 (min. 0-1-8) Max Uplift1=-72(LC 4), 2=-72(LC 4) Max Grav1=355(LC 20), 2=355(LC 21) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES- 1) Wind: ASCE 7-16; Vult=110mph (3-second gust) Vasd=87mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed; MWFRS (directional); cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 4) A plate rating reduction of 20% has been applied for the green lumber members. 5) Refer to girder(s) for truss to truss connections. 6) Bearing at joint(s) 2 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 2. 8) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 2. 9) This truss has been designed for a moving concentrated load of 250.0lb live and 18.0lb dead located at all mid panels and at all panel points along the Top Chord and Bottom Chord, nonconcurrent with any other live loads. LOAD CASE(S) Standard