Loading...
HomeMy WebLinkAbout3100 W Segerstrom Ave - PlanSHEET NAME: DATE: SCALE: DRAWN BY: PROJECT #: SHEET NUMBER:REV: AI R B O R N E S Y S T E M S 31 0 0 W . S E G E R S T R O M A V E . SA N T A A N A , C A 9 2 7 0 4 02.27.2025 JM 03 . 0 5 . 2 4 _ A I R B O R N E S Y S T E M S _ S Y 8 8 4 0 4 1 _ R 1 . D W G SY884041 1 STRUCTURAL STAMP CU S T O M E R : REV.14 SANTA FE SPRINGS, CA 9939 NORWALK BLVD, SANTA FE SPRINGS, CA 90670 PHONE: 562.944.8067 This drawing is the property of Raymond West and is only to be used only by the party described in the "Customer" section and then only in connection with its purchase or use of Raymond West products, services or systems. Copying in part or as a whole is prohibited. This is subject to a Confidentiality Agreement between Raymond West and the party described under "Customer". All dimensions are to be field verified by the customer. Raymond West assumes no responsibility for incorrect dimensions, location of lights or other equipment outside of Raymond West's scope of work. https://raymondwest.com RE V I S I O N S RE V . B Y : DE S C R I P T I O N : RE V . N O . RE V . D A T E : 0 I N I T I A L R E L E A S E            TITLE SHEET SS1 X" = 1'-0" NORTH SITE LOCATION A.STORAGE CAPACITY SIGNS 1. PER RMI 1.4.2, ONE OR MORE PLAQUES WILL BE PLACED CONSPICUOUSLY IN CLEAR AND LEGIBLE MANNER TO IDENTIFY EACH DIFFERENT RACK CONFIGURATION. 2. EACH PLAQUE TO BE A MINIMUM OF 50 SQUARE INCHES. IT IS THE OWNERS RESPONSIBILITY TO ENSURE THE RACK SYSTEM IS NOT ALTERED SO THAT THE PLAQUE INFORMATION IS INVALIDATED. 3. EACH PLAQUE TO DISPLAY: i. THE MAXIMUM PERMISSIBLE LOAD AND/OR THE MAXIMUM DISTRIBUTED LOAD PER LEVEL ii. THE AVERAGE LOAD IF APPLICABLE AND iii. MAXIMUM TOTAL LOAD PER BAY. B. WELDING 1. ALL WELDING, EXCEPT WHEN PERFORMED AT THE SHOP OF AN APPROVED FABRICATOR, SHALL BE DONE BY CERTIFIED WELDERS. WELDING CERTIFICATES PROVIDED UPON REQUEST. 2. SPECIAL INSPECTIONS REQUIRED FOR ANY STRUCTURAL FIELD WELDING. C. ANCHORING/HARDWARE 1. PER IBC, SPECIAL INSPECTION IS REQUIRED FOR THE INSTALLATION OF ANCHOR BOLTS. 2. ANCHOR SIZE, PLACEMENT, AND EMBEDMENT SPECIFIED BY A LICENSED PROFESSIONAL STRUCTURAL ENGINEER. 3. PER IBC, PERIODIC SPECIAL INSPECTION IS REQUIRED FOR THE INSTALLATION OF CONCRETE ANCHOR BOLTS OF STORAGE RACKS 8 FEET OR GREATER FOR STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORIES D, E, OR F. 4. HARDWARE OTHER THAN ANCHORS TO BE SPECIFIED BY A LICENSED PROFESSIONAL STRUCTURAL ENGINEER. D. MAINTENANCE 1. THE OWNER SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF THE RACK SYSTEM BY ASSURING PROPER OPERATIONAL, HOUSEKEEPING, AND MAINTENANCE PROCEDURES, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: i. PROHIBIT ANY OVER LOADING OF ANY PALLET POSITIONS AND OF THE OVERALL RACK SYSTEM ii. REGULAR INSPECTIONS FOR DAMAGE. IF DAMAGED COLUMNS OR BEAMS ARE FOUND, IMMEDIATELY UNLOAD THE AFFECTED AREA AND REPLACE OR REPAIR ANY DAMAGED COLUMNS, BEAMS, OR OTHER STRUCTURAL COMPONENTS. iii. REQUIRE ALL PALLETS BE MAINTAINED IN GOOD, SAFE OPERATING CONDITION. iv. ENSURE THAT PALLETS ARE PROPERLY PLACED ONTO PALLET LOAD SUPPORT MEMBERS IN STACKED AND STABLE POSITIONS. v. ALL GOODS STORED ON EACH PALLET ARE STACKED AND IN STABLE POSITIONS. vi. ENSURE THAT THE RACKS ARE NOT MODIFIED OR REARRANGED IN A MANNER NOT WITHIN THE ORIGINAL DESIGN CONFIGURATIONS. vj. IF CONFIGURATION CHANGES ARE REQUIRED, NEW STRUCTURAL ANALYSIS MUST BE PERFORMED TO ENSURE PROPER LOADING. vk. THE MAXIMUM TOP TO BOTTOM OUT-OF PLUMB RATIO AND OUT-OF STRAIGHT RATIO PER RACK COLUMN IS 1/240 (FOR EXAMPLE 1/2" PER 10 FEET OF HEIGHT). COLUMNS WHOSE OUT-OF-PLUMB RATIO OR OUT-OF-STRAIGHT RATIO EXCEEDS THIS LIMIT SHOULD BE UNLOADED AND RE-PLUMBED. ANY DAMAGES PARTS MUST BE REPAIRED OR REPLACED. E. CONFIGURATION CHANGES 1. THIS SET OF DRAWINGS SHOWS ALL THE PERMISSABLE CONFIGURATIONS OF THESE COMPONENTS PER THIS PERMITTED DRAWING SET. OTHER CONFIGURATIONS MAY PERMITTED UPON REVIEW OF THE ENGINEER OF RECORD FOR THIS PROJECT AND REVISIONS TO THE DRAWING ACCORDINGLY. 2. ANY CHANGES TO THE CONFIGURATION OF THE RACK SYSTEM COMPONENTS INCLUDING RELOCATION OR REMOVAL OF THE SHELF BEAM OR ANY OTHER COMPONENTS WITHOUT PERMISSION IS NOT PERMITTED VICINITY MAP PROJECT TEAMSHEET INDEX   DEFERRED SUBMITTALS            GENERAL NOTES: PROJECT/SITE INFORMATION                   APPLICABLE CODES              PRODUCTS TO BE STORED ARE THE FOLLOWING: STEEL PARACHUTE COMPONENTS, CARDBOARD AND WOOD PACKING MATERIALS, 99% NYLON FABRIC PARACHUTES, NYLON TAPES, NYLON WEBBINGS, AND SHORT ROLLS OF PALLETIZED NYLON FABRIC MATERIAL. THIS IS A CLASS I - IV COMMODITY NON-ENCAPSULATED, EXPOSED.            (6)6,2 251$3 /'((15*(7 ,16,(*((55 $&/),)2 2(571$,7 $6 9 ,,/& ((55 $&/),)2 2(555555555555555555555555555555555555555555555555555555555777777777777777777777777777777777777777777777777111111111111111111111111111111111111111111111111111111111$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$7 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,7$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$66666666666666666666666666666666666666666666666 9 ,,/////////////&&&&&&&&&&&&&&&&&&&&&&&&&&&&&& 1R1R (([S[S THE P.E. CERTIFICATION PROVIDED HEREIN PERTAINS 505)&"%&26"$: 0'5)&4503"(& 3"$, 4536$563"-$0.10/&/540/-:"-- 05)&3"3&"4"3&0654*%&5)&4$01&0' 803,0'5)*4$&35*'*$"5*0/. 3/12/25Bldg #101121507 APPROVALS: PLNG - F. Arias BLDG - CSG PUBLIC WORKS - Y. Soto SHEET NAME: DATE: SCALE: DRAWN BY: PROJECT #: SHEET NUMBER:REV: AI R B O R N E S Y S T E M S 31 0 0 W . S E G E R S T R O M A V E . SA N T A A N A , C A 9 2 7 0 4 02.27.2025 JM 03 . 0 5 . 2 4 _ A I R B O R N E S Y S T E M S _ S Y 8 8 4 0 4 1 _ R 1 . D W G SY884041 1 STRUCTURAL STAMP CU S T O M E R : REV. 14 SANTA FE SPRINGS, CA 9939 NORWALK BLVD, SANTA FE SPRINGS, CA 90670 PHONE: 562.944.8067 This drawing is the property of Raymond West and is only to be used only by the party described in the "Customer" section and then only in connection with its purchase or use of Raymond West products, services or systems. Copying in part or as a whole is prohibited. This is subject to a Confidentiality Agreement between Raymond West and the party described under "Customer". All dimensions are to be field verified by the customer. Raymond West assumes no responsibility for incorrect dimensions, location of lights or other equipment outside of Raymond West's scope of work. https://raymondwest.com RE V I S I O N S RE V . B Y : DE S C R I P T I O N : RE V . N O . RE V . D A T E : 0 I N I T I A L R E L E A S E             SITE PLAN FOR REFERENCE SS2 N.T.S. 2 SITE PLAN - FOR REFERENCE Scale: NTS NORTH SCOPE OF WORK4 SS4 49X9650X6017X70 K- 501 6-E TD EXT ERC _URI NALSVI TREOUS CH INA K- 501 6-E TD EXT ERC _URI NALSVI TREOUS CH INA K- 501 6-E TD EXT ERC _URI NALSV ITRE OU S C HI NA K- 501 6-E TD EXT ERC _URI NALSVI TREOUS CH INA A 16 X 3 6 24X60 31'X3'6 K -5016-E TD EXTERC _URINA LSV ITR EOU S CH IN A SR 2 7 SR44 A A 10'11' REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0REV.0 A REV.0REV. 0 A REV. 0 REV. 0REV.0 A REV.0REV. 0 A REV.0REV.0 A REV.0 B REV. 0 REV.0REV. 0 B REV.0REV.0 B REV.0REV.0 B REV. 0 REV. 0REV. 0 B REV.0REV.0 B REV.0 REV.0 REV.0 B REV.0 8'-11" REV.0 B REV. 0 REV.0REV. 0 B REV.0REV.0 B REV.0REV.0 B REV. 0 REV.0 REV.0 B REV.0 REV.0 B 28'-1" REV.0REV.0 B REV.0REV.0 B REV.0REV.0 B REV. 0REV. 0 B REV.0 REV.0 A 1'-6" REV.0REV.0 A REV.0REV. 0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A 1'-9" REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 15'-1" EXIT FE EXIT EXIT EXIT EXIT EX I T EX I T EXIT EXIT EXIT EXIT FE FE FE FE FE FEFEFE FE FE PATH OF TRAVEL 195'-11" PATH OF TRAVEL 193'-1" SHEET NAME: DATE: SCALE: DRAWN BY: PROJECT #: SHEET NUMBER:REV: AI R B O R N E S Y S T E M S 31 0 0 W . S E G E R S T R O M A V E . SA N T A A N A , C A 9 2 7 0 4 02.27.2025 JM 03 . 0 5 . 2 4 _ A I R B O R N E S Y S T E M S _ S Y 8 8 4 0 4 1 _ R 1 . D W G SY884041 1 STRUCTURAL STAMP CU S T O M E R : REV. 14 SANTA FE SPRINGS, CA 9939 NORWALK BLVD, SANTA FE SPRINGS, CA 90670 PHONE: 562.944.8067 This drawing is the property of Raymond West and is only to be used only by the party described in the "Customer" section and then only in connection with its purchase or use of Raymond West products, services or systems. Copying in part or as a whole is prohibited. This is subject to a Confidentiality Agreement between Raymond West and the party described under "Customer". All dimensions are to be field verified by the customer. Raymond West assumes no responsibility for incorrect dimensions, location of lights or other equipment outside of Raymond West's scope of work. https://raymondwest.com A 1 ATH E B B A ITT RE V I S I O N S RE V . B Y : DE S C R I P T I O N : RE V . N O . RE V . D A T E : 0 I N I T I A L R E L E A S E             FLOOR PLAN SCOPE OF WORK EGRESS PLAN SS3 N.T.S. 3 FLOOR PLAN - SCOPE OF WORK Scale: NTS NORTH SCOPE OF WORK SS4 4 (6)6,2 251$3 /'((15*(7 ,16,(*((55 $&/),)2 2(571$,7 $6 9 ,,/& ((55 $&/),)2 2(555555555555555555555555555555555555555555555555555555555777777777777777777777777777777777777777777777777111111111111111111111111111111111111111111111111111111111$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$7 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,7$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$66666666666666666666666666666666666666666666666 9 ,,/////////////&&&&&&&&&&&&&&&&&&&&&&&&&&&&&& 1R1R (([S[S THE P.E. CERTIFICATION PROVIDED HEREIN PERTAINS 505)&"%&26"$: 0'5)&4503"(& 3"$, 4536$563"-$0.10/&/540/-:"-- 05)&3"3&"4"3&0654*%&5)&4$01&0' 803,0'5)*4$&35*'*$"5*0/. 3/12/25 REV. 0 REV. 0REV. 0 A REV. 0REV. 0 B REV. 0 17X70 31'X3'6 A A 10'11' REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV. 0REV.0 A REV. 0REV. 0 A REV.0 REV.0REV.0 A REV.0REV. 0 A REV.0REV. 0 A REV. 0 B REV.0 REV.0REV. 0 B REV.0REV.0 B REV. 0REV.0 B REV. 0 REV. 0REV.0 B REV.0REV. 0 B REV.0 REV.0 REV.0 B REV.0 8'-11" REV. 0 B REV.0 REV.0REV. 0 B REV.0REV.0 B REV. 0REV.0 B REV. 0 REV.0 REV.0 B REV.0 REV.0 B 28'-1" REV.0REV.0 B REV. 0REV.0 B REV.0REV. 0 B REV.0REV. 0 B REV.0 REV.0 A 1'-6" REV.0REV.0 A REV.0REV.0 A REV. 0 REV. 0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A 1'-9" REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 REV.0 A REV.0 15'-1" EXIT FE EX I T EX I T EXIT EXIT EXIT FEFEFE FE FE PATH OF TRAVEL 195'-11" PATH OF TRAVEL 193'-1" SHEET NAME: DATE: SCALE: DRAWN BY: PROJECT #: SHEET NUMBER:REV: AI R B O R N E S Y S T E M S 31 0 0 W . S E G E R S T R O M A V E . SA N T A A N A , C A 9 2 7 0 4 02.27.2025 JM 03 . 0 5 . 2 4 _ A I R B O R N E S Y S T E M S _ S Y 8 8 4 0 4 1 _ R 1 . D W G SY884041 1 STRUCTURAL STAMP CU S T O M E R : REV. 14 SANTA FE SPRINGS, CA 9939 NORWALK BLVD, SANTA FE SPRINGS, CA 90670 PHONE: 562.944.8067 This drawing is the property of Raymond West and is only to be used only by the party described in the "Customer" section and then only in connection with its purchase or use of Raymond West products, services or systems. Copying in part or as a whole is prohibited. This is subject to a Confidentiality Agreement between Raymond West and the party described under "Customer". All dimensions are to be field verified by the customer. Raymond West assumes no responsibility for incorrect dimensions, location of lights or other equipment outside of Raymond West's scope of work. https://raymondwest.com A A F TRAVEL 195'-11 A 8 B B XEXEX RE V I S I O N S RE V . B Y : DE S C R I P T I O N : RE V . N O . RE V . D A T E : 0 I N I T I A L R E L E A S E             ENLARGED FLOOR PLAN SCOPE OF WORK EGRESS PLAN SS4 N.T.S. 4 ENLARGED FLOOR PLAN - SCOPE OF WORK Scale: NTS NORTH FE EXIT SIGNS WITH LIGHTING 4A:60B:C RATED FIRE EXTINGUISHER EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED EXIT SCOPE OF WORK: THIS REPORT IS THE PROPERTY OF RAYMOND HANDLING SOLUTIONS AND WAS PREPARED EXCLUSIVELY FOR THE USE BY AIRBORNE SYSTEMS FOR BUILDING PERMIT OF STORAGE RACK REQUIREMENTS AS DESCRIBED IN THIS REPORT. THE DESCRIPTION OF THE PRODUCTS TO BE STORED AND THE STORAGE HEIGHTS ARE BASED ON INFORMATION PROVIDED BY AIRBORNE SYSTEMS DISCREPANCIES BETWEEN THE INFORMATION PRESENTED HEREIN AND ACTUAL CONDITIONS PRESENTED ON THE PLANS ARE THE SOLE RESPONSIBILITY OF AIRBORNE SYSTEMS VERIFICATION OF COMPLIANCE WITH THE CODE REQUIREMENTS AND PROVISIONS ADDRESSED HEREIN IS OUTSIDE THE SCOPE OF THIS REPORT. COPIES OF THIS REPORT RETAINED BY AIRBORNE SYSTEMS SHALL BE UTILIZED ONLY BY AIRBORNE SYSTEMS. OWNER/TENANT SHALL OBTAIN A LICENSED CONTRACTOR TO PERFORM SUCH WORK. ALONG WITH THE NECESSARY PERMIT FOR SUCH WORK. 1. THE COMMON PATH OF EGRESS TRAVEL DISTANCE NOT TO EXCEED CBC TABLE 1006.2.1 2. THE EXIT ACCESS TRAVEL DISTANCE, MEASURED FROM THE MOST REMOTE POINT TO AN EXIT, NOT TO EXCEED THE ALLOWABLE PER CBC TABLE 1017.2 3. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED IN ACCORDANCE WITH SECTION 1013.3 4. THE MAXIMUM OUT OF PLUMBNESS SHALL BE 0.5 INCHES PER 10 FT. OF HEIGHT. NOTES: SELECTIVE RACK - TYPE A 42" X 144" UPRIGHTS / 96" BEAMS SELECTIVE RACK - TYPE B 42" X 196" UPRIGHTS / 96" BEAMS EXISTING RACKING  POINT OF ORIGIN MAX PATH OF TRAVEL 195'-11" (6)6,2 251$3 /'((15 *(7 ,16,(*((55 $&/),)2 2(571$,7 $6 9 ,,/& ((55 $&/),)2 2(555555555555555555555555555555555555555555555555555555555777777777777777777777777777777777777777777777777111111111111111111111111111111111111111111111111111111111$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$7 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,7$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$66666666666666666666666666666666666666666666666 9 ,,/////////////&&&&&&&&&&&&&&&&&&&&&&&&&&&&&& 1R1R (([S[S THE P.E. CERTIFICATION PROVIDED HEREIN PERTAINS 505)&"%&26"$: 0'5)&4503"(& 3"$, 4536$563"-$0.10/&/540/-:"-- 05)&3"3&"4"3&0654*%&5)&4$01&0' 803,0'5)*4$&35*'*$"5*0/. 3/12/25 3" c.c. 1 1/2" 1 1/2" 1/4" HORIZ. BRACE DIAG. BRACE CONNECTOR BASE PLATE & ANCHOR COLUMN ROW SPACER BEAM 42" SIDE VIEW 144" 36" 48" 48" 6 2 42" SIDE VIEW 144" 36" 48" 48" 42" 6 2 12" 7 96" FRONT VIEW TYPE A SELECTIVE RACK 144" 54" 1B 4 3 1 54" 42" SIDE VIEW 192" 36" 48" 48" 6 2 42" SIDE VIEW 192" 36" 48" 48" 42" 6 2 12" 7 96" FRONT VIEW TYPE B SELECTIVE RACK 192" 60" 1B 3 3 1 48"48" 60" 60" 12" 3/8"Ø X 7/8" SLOT 4 PLCS 3/4"1 1/2" 3/4" 11/16" 3/4" 3-5/8" 2-1/2" MIN. EMBED. 1/2" BASE PLATE F.F. O.A.L. 1 11/16" 6" 1" 3 3/16" 2" 2" 7/16" Ø GR. 55 RIVET 5/16" Ø SAFETY PIN 1" 1" 8" 5" 3/8" 3" 3" 3/4" 4 1/8" 1" 1 5/8" 1 3/4" 3 3/4" 1" 1 5/8" 1 3/4" DESCRIPTION STEEL YIELD MATERIAL NOTES: USE @ ALL HANNIBAL BRACE LOCATIONS TYP .ASTM A570, Fy=55,000 PSI 16 GAGE STEEL BRACING: HORIZ. & DIAG.NOT A DEPICTION OF THIS PROJECT GENERAL RACK INFORMATION1 MATERIAL STEEL YIELD DESCRIPTION STD ROW SPACER ASTM A570, Fy =55,000 PSI 16 GAGE NOTES: ATTACH WITH (4) 3/8"Ø GR. 5 BOLTS, (2) @ EACH END SIZE 1/2"Ø x 2-1/2" MIN. EMBED. POWERS SD2 ANCHOR NOTES: SEE NOTE #4 ABOVE FOR ANCHOR SPECS. DESCRIPTION ESR # 2502 DESCRIPTION STORAGE RACK ELEVATIONS 7 GAGE 3-PIN CONNECTOR ASTM A570, Fy=55,000 PSISTEEL YIELD MATERIAL DESCRIPTION NOTES: USE @ ALL HANNIBAL BEAM TO COLUMN CONNECTION LOCATIONS TYP. GENERAL PROJECT NOTES 1. DESIGNED PER REQUIREMENTS OF THE 2022 CBC, ASCE 7-16, SECTION 15.5.3, & 2012 RMI RACK DESIGN MANUAL 2. SEISMIC CRITERIA SS=1.306, S1=0.468, FA=1.200, FV=1.840 IP=1.0 (NO PUBLIC ACCESS), SDS=1.045, SD1=0.574, OCC UPANCY CATAG. II SITE CLASS D-DEFAULT, SEISMIC DESIGN CATAG. D 3. STORAGE CAPACITY: TYPE A=4000 LBS @ LVL 1, 2500 LBS @ LVL 2 TYP. TYPE B=2500 LBS @ LVL 1-2, 1400 LBS @ LVL 3 TYP. 4. ANCHORS: POWERS SD2 ESR#2502, OR HILTI KWIKBOLT TZ2 ESR#4266 1/2"Ø X 2-1/2" MIN. EMBEDT. 50 FT-LBS TORQUE (HILTI KWIKBOLT TZ2) 40 FT-LBS TORQUE (POWERS SD2) (2) ANCHORS PER BASE PLATE. 5. PERIODIC SPECIAL INSPECTION IS REQUIRED DURING ANCHOR INSTALLATION. ANCHORS SHALL BE INSTALLED PER ICC ESR#2502. 6. EXISTING S.O.G. CONCRETE THICKNESS & COMPRESSIVE STRENGTH, 4" X 8233 PSI 7. SOIL BEARING PRESSURE 750 PSF. 8. ALL RACK INSTALLATIONS AND RACKS MANUFACTURED IN CONFORMITY WITH THIS STANDARD SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE EACH NOT LESS THAN 50 SQUARE INCHES IN AREA AND SHOWING THE MAXIMUM PERMISSIBLE UNIT LOAD IN CLEAR, LEGIBLE PRINT. 9. ALL BOLTS GR. 5 OR BETTER, INSTALL TO SNUG TIGHT FIT OR BETTER 10. ALL WELDING PERFORMED IN THE SHOP OF AN APPROVED FABRICATOR BY AWS CERTIFIED WELDERS USING E70XX ELECTRODE OR BETTER. FIELD WELDS, IF ANY, SHALL BE PROVIDED UNDER THE SUPERVISION OF A LICENSED DEPUTY INSPECTOR. SPECIAL INSPECTION IS REQUIRED FOR ALL STRUCTURAL WELDS EXCEPT FOR WELDING DONE IN AN APPROVED FABRICATOR'S SHOP. 11. THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MIN. OF 18" BETWEEN TOP OF THE STORAGE AND THE CEILING SPRINKLER DEFLECTOR. 12. THE PRODUCT SHOWN ON THE DETAILS HEREIN IS ASSUMED TO BE IN GOOD, UNDAMAGED CONDITION. THE PRODUCT MUST BE FREE OF ANY DAMAGE AND/OR FABRICATION DEFICIENCIES OR IRREGULARITIES. IT IS THE RESPONSIBILITY OF THE OWNER, USER, PRODUCT PROVIDER AND/OR INSTALLER OF THE COMPONENTS TO NOTIFY SED, INC IN WRITING, OF ANY DAMAGE, DEFICIENCIES OR IRREGULARITIES. 13. IT IS THE RESPONSIBILITY OF THE OWNER AND/OR USER OF THE COMPONENTS SHOWN HEREIN TO NOTIFY SED, INC OF ANY DAMAGE OR DEFICIENCIES IN THE SYSTEM DURING USE.THIS INCLUDES SUCH OCCURRENCES SUCH AS IMPACT DAMAGE TO THE COMPONENTS FROM FORKLIFT OR HEAVY MACHINERY, IMPACT FROM DROPPED LOADS ON THE SYSTEM, DAMAGE TO SYSTEMS BY IMPROPER USE OR INSTALLATION, ETC. THE USER OF THE PRODUCT MUST NOTIFY SED, INC IN WRITING SHOULD ANY DAMAGE OR DEFICIENCY OCCUR TO THE PRODUCT SHOWN HEREIN. IT IS THE RESPONSIBILITY OF THE OWNER AND/OR USER TO MAINTAIN THE SAFETY AND PROPER USE OF THE STORAGE PRODUCT SHOWN HEREIN. 14. IT IS THE RESPONSIBILITY OF THE OWNER/USER OF THE STORAGE SYSTEM SHOWN HEREIN TO REPAIR OR REPLACE ANY COMPONENT THAT IS DAMAGED OR OTHERWISE DEFICIENT. 15. THE OWNER SHALL MAINTAIN THE STRUCTURAL INTEGRITY OF THE RACK SYSTEM BY ASSURING PROPER OPERATIONAL, HOUSE KEEPING AND MAINTENANCE PROCEDURES, BUT NOT LIMITED TO THE FOLLOWING: A. PROHIBIT ANY OVER LOADING OF ANY PALLET POSITIONS AND OF OVERALL RACK SYSTEMS. B. REGULARLY INSPECT FOR DAMAGE. IF DAMAGE IS FOUND, IMMEDIATELY UNLOAD THE AFFECTED AREA AND REPLACE OR REPAIR ANY DAMAGED COLUMNS, BEAMS, OR OTHER STRUCTURAL COMPONENTS. C. REQUIRE ALL PALLETS TO BE MAINTAINED IN GOOD, SAFE, OPERATING CONDITION. D. ENSURE THAT PALLETS ARE PROPERLY PLACED ONTO PALLET LOAD SUPPORT MEMBERS IN PROPERLY STACKED AND STABLE POSITION. E. REQUIRE THAT ALL GOODS STORED ON EACH PALLET TO BE PROPERLY STACKED AND STABLE. F. PROHIBIT DOUBLE STACKING OF ANY PALLET POSITION, INCLUDING THE TOP MOST POSITION, UNLESS THE RACK SYSTEM IS SPECIFICALLY DESIGNED FOR SUCH LOADING. G. THE OWNER AND/OR USER OF THE RACK SYSTEM MUST PROVIDE MEASURES TO MITIGATE DAMAGE TO THE STORAGE RACK BY USE OF IMPACT PROTECTIVE DEVICES IN AREAS WHERE FORKLIFT AND/OR HEAVY MACHINERY ARE IN USE. H. ENSURE THAT THE RACKS ARE NOT MODIFIED OR REARRANGED IN A MANNER NOT WITHIN THE ORIGINAL DESIGN CONFIGURATION. 16. MINIMUM DISTANCE BETWEEN THE ANCHOR BOLT CENTER TO ANY CONSTRUCTION JOINTS, CONTROL/EXPANSION JOINTS OR SLAB CRACKS=3.5". 17. THE MAXIMUM TOP TO BOTTOM OUT-OF-PLUMB RATIO AND OUT-OF-STRAIGHT RATIO RACK COLUMN IS 1/240 (FOR EXAMPLE 1/2" PER 10 FEET OF HEIGHT). COLUMN WHOSE OUT-OF-PLUMB RATIO OR OUT-OF-STRAIGHT RATIO EXCEEDS THIS LIMIT SHOULD BE UNLOADED AND RE-PLUMBED. ANY DAMAGED PARTS MUST BE REPAIRED OR REPLACED. 18. FOR 192" H FRAMES: MINIMUM DISTANCE BETWEEN RACK AND BUILDING COMPONENTS IS 2% (OR 3.84") OF TOP SHELF LEVEL HEIGHT @ BRACED DIRECTION AND 5% (OR 9.6") OF TOP SHELF LEVEL HEIGHT @ UNBRACED DIRECTION. FOR 144" H FRAMES: MINIMUM DISTANCE BETWEEN RACK AND BUILDING COMPONENTS IS 2% (OR 2.88") OF TOP SHELF LEVEL HEIGHT @ BRACED DIRECTION AND 5% (OR 7.2") OF TOP SHELF LEVEL HEIGHT @ UNBRACED DIRECTION.                                 25-0221-14 SED 1 OF 1 03 / 0 7 / 2 0 2 5 HA N N I B A L J. M ST O R A G E R A C K SA N T A A N A , C A 9 2 7 0 4 31 0 0 W S E G E R S T R O M A V E NOTES: USE (2) STD ROW SPACERS PER FRAME ATTACHMENT NOTES: CONFIRM O.A.L. OF ANCHORS WITH INSTALLER TO ENSURE REQUIRED EMBEDMENT IS OBTAINED. COLUMN NOTES: USE @ ALL HANNIBAL COLUMN/BASE LOCATIONS U.O.N. STEEL YIELD DESCRIPTION MATERIAL BASE PLATE: 8" x 5" 3/8" THICK PLATE ASTM A36, Fy=36,000 PSISTEEL YIELD DESCRIPTION MATERIAL ASTM A570, Fy=55,000 PSI 14 GAGE THK. COLUMN: HMH IF 3014 2 3 5 7 1B 6 NOTES: USE @ TYPE A BEAM LOCATIONS. 16 GAGE STEEL YIELD MATERIAL DESCRIPTION ASTM A570, Fy=55,000 PSI 4-1/8" BEAM (HMH#41160) NOTES: USE @ TYPE B BEAM LOCATIONS. 16 GAGE STEEL YIELD MATERIAL DESCRIPTION ASTM A570, Fy=55,000 PSI 3-3/4" BEAM (HMH#36160) 4 (6)6,2 251$3 /'((15*(7 ,16,(*((55 $&/),)2 2(571$,7 $6 9 ,,/& ((55 $&/),)2 2(555555555555555555555555555555555555555555555555555555555777777777777777777777777777777777777777777777777111111111111111111111111111111111111111111111111111111111$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$7 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,7$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$66666666666666666666666666666666666666666666666 9 ,,/////////////&&&&&&&&&&&&&&&&&&&&&&&&&&&&&& 1R1R (([S[S 3/12/25 Structural Engineering & Design, Inc. 1815 Wright Ave La Verne, CA 91750 Phone: 909.596.1351 Fax: 909.596.7186 Project Name : AIRBORNE SYSTEMS Project Number : 25-0228-13 Date : 03/11 /25 Street Address: 3100 W SEGERSTORM AVE City/State : SANT A ANA, CA 92704 Scope of Work : STORAGE RACK (6)6,2 251$3 /'((15*(7 ,16,(*((55 $&/),)2 2(571$,7 $6 9 ,,/& ((55 $&/),)2 2(555555555555555555555555555555555555555555555555555555555777777777777777777777777777777777777777777777777111111111111111111111111111111111111111111111111111111111$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$7 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,7$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$66666666666666666666666666666666666666666666666 1R1R (([S[S12-31-25 3/17/25 Structural Engineering & Design Inc. Bob S TABLE OF CONTENTS Project: Airborne TitlePage............................................................... 1 Tableof Contents ................................................................................................... 2 Design Data and Definition of Components ......................... ......... ........................ 3 Critical Configuration.................................................... 4 SeismicLoads ....................................................................................................... 5 to 6 Column.................................................................................................................. 7 Beam and Connector ...................................................... ............. 8 to 9 Bracing.................................................................................................................. 10 Anchors ................................................................................. 11 BasePlate ............................................................................... .............. 12 Slabon Grade ....................................................................................................... 13 OtherConfigurations .................................... I... ...................... ........................... 14 CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE -14 type a eelect-airborne-revcU15 Page of 3/G/2025 Structural Engineering & Design Inc. CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE By. Bob S Project: Airborne Systems "'W2S 0221-14 Data 1) The analyses herein conforms to the requirements of the: 2022 CBC Section 2209 ANSI MH 16.1-2012 Specifications for the Design of Industrial Steel Storage Racks '2012 RMI Rack Design Manual- ASCE 7-16, section 15.5.3 2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=55 ksi Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy=55 ksi All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi 3) Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein. 4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. 5) The existing slab on grade is 4" thick with minimum 8233 psl compressive strength. Allowable Soil bearing capacity is 750 psf. The design of the existing slab is by others. 6) Load combinations for rack components correspond to 2012 RMI Section 2.1 for ASD level load criteria Definition of Components 7 lufm Beam to GAynm {emsarastw Fra�aae� Helm Beam W-p-,44 spacing Sise Pate and Anc rs; Front View.- Down Xvjl RonvAutfinai# Fr me T ftrA- ..,.,,, . Section At Crow AlAe if Transvt rse I F anie or. al Wace uagorsl trace type a 5elect-airborne-revcIA5 Page of 3/G/2025 Structural Engineering & Design Inc. Bob S & Sul 1.306, Fa=1.2 i roject: Airborne A Selective Rack CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE *Ek5-0221-14 **RACK COLUMN REACTIONS ASD LOADS AXIAL DL= 40 /b AXIAL LL= 3,250 /b SE15MICAXIAL Ps=f/- 2,017lb BASE MOMENT= 8, 000 in -lb �— 96" 42" # Bm Lvls Frame Depth Frame Height #Diagonals Beam Length Frame Type 2 42 in 1.44.0 in 3 96 in Description Column Column & Backer F =55 ksi Hannibal IF3014-3x3x14 a g P=3290 Ib, M=13650 in -lb STRESS 0,52-OK Beam None Fy=55 ksi None HMH 41160/4.125" Face x 0.057" thk Lu=96 in None N/A Capacity: 5075 Ib/pr 0.79-OK Beam Connector Fy=55 ksi Lvl 1: 3 pin OK Mconn=9619 in -lb Mcap=12691 in -lb Brace -Horizontal Fy=55 ksi Hannibal 1-1/2xl-1/2x16ga 0.76-OK Brace -Diagonal F =55 ksi y- Hannibal 1-1/2x1-1/2x16ga 0.16-OK Base Plate Anchor Fy=36 ksi 8x5x3/8 0.24-OK Fixity= 8000 in -lb 0.64-OK 2 per Base 0.5" x 2.5" Embed Powers SD2 ESR 2502 Inspection Reqd (Net Seismic Uplift=2376 Ib) 0.9-OK Slab &Soil 4 thk x 8233 psi slab on grade. 750 psf Soil Bearing Pressure Level Load** Story Force Story Force Column 0.2-OK Column Conn. Beam 1 Per Level 4,000 Ib Beam Spcg Brace Transv Longit. Axial Moment Moment Connector 2 2,500 lb 54.0 in 54.0 in 36.0 in 512 lb 376 lb 3,290 lb 48.0 in 646 lb 13,650 "# 9,619 "# 3 pin OK 474 lb 1,270 Ib 6,392 "# 3,865 "# 3 pin OK 48.0 in ** Load deflned as product weight per pair of beams Total; 1,158 lb 849 lb type a 5elect-airborne-revd.A5 Page of 3/G/2025 Structural CITY OF SANTA ANA Planning and Building Agency Engineering & Design Inc. Bob S Project: Airborne Selsmlc Forces Configuration: Type A Selective Rack Lateral analysls is Performed with regard to the requirements of the 2012 RMI ANSI MH 16.1-2012 Sec 2.6 & ASCE 7-16 sec 16.5.3 Transverse (Cross Aisle I Seismic Load V= Cs*IP*Ws=Cs*IP*(0.67*P*PrF+D) vt Cs1= Sds/R = 0.2612 Cs -max * Ip= 0.2612 Cs2= 0.044*Sds Vmin= 0,015 = 0.0460 Eff Base Shear=Cs= 0.2612 Transverse Elevafton Cs3= 0.5*Si/R Ws= (0.67*PLRF1 * PL)+DL (RMI 2.6.2) = 0.0585 = 4,435 lb Cs -max= 0.2612 Vtransv=Vt= 0.2612 * (80 lb + 4355 Ib) Ett�f� Etransverse= 1,158 lb Limit States Leve/ Transverse seismic shear per upright Level PRODUCT LOAD P P*0.67*PRFl DL hi wi*hi 1 4,000 lb 2 2,500lb sum: P=6500lb 2,680 lb 1,675 lb 4,355 lb 40 lb 40 lb 80 lb 54 in 108 in W=4435 lb 146,880 185,220 332,100 Approved FOR PERMIT ISSUANCE -14 S1= 0.468 Fa= 1,200 Fv= 1.840 Sds=2/3*Ss*Fa= 1.045 Sd1=2/3*S1*Fv= 0.574 Ca=0.4*2/3*Ss*Fa= 0.4179 (Transverse, Braced Frame Dir,) R= 4,0 Ip= 1.0 PRR Pallet Height=hp= 48.0 in DL per Beam Lvl= 40 lb Fi G* Similarly for longitudinal seismic loads, using R=6.0 Ws= (0.67 * PLRF2 * P) + DL p RF2= 1.0 Cs1=Sd1/(T*R)= 0,1914 = 4,435 lb (Longitudinal, unbraced Dir.) R= 6.0 Cs2= 0,0460 Cs=Cs-max*Ip= 0.1914 T= 0.50 sec Cs3= 0.0390 ng0.1914 * (80 lb + 4355 lb) Cs -max= 0.1914 [El.�ng7ilt.dinw== 849 lb Limit State.Leve/Longk.se/sm/a shear per upright Level PRODUC LOAD P P*0.67*PRF2 DL hi wi*hi 1 4,000lb 2,680lb 2 2,500lb 1,675lb 40 lb 54 in 146,880 40 lb 108 in 185,220 512.2lb 39,952-# 645.8lb 85,246-# 1,158lb 1=125,197 FI Front View 375.5 lb 473.5 lb sum: 4 355 lb 80 lb W=4435 lb 332 100 849 fb type a 5e1ect-airborne-revd.xl5 Page of 3/6/2025 Structural Engineering & Design Inc. CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE By: Bob S Project: Airborne Systems 1I 5-0221-14 Downaisle Seismic Loads Configuration: Type A Selective Rack story moments by applying portal analysis. The base plate is assumed to provide Seismic Story Forces Typical frame made Vlong= 849lb Tvibutaryarea ortwocolumos Vcol=Vlong/2= 425 lb ofrackframe F1= 376lb lb .. .<; ... ; .,:... .... Typical Frame made F3= 0lb RE]: F77q `/oriwocolumns , To few 96" `--- ---- -- Front Vie 51de Vie Seismic Story Moments Conceptual System COL Mbase-max= 8,000 in -lb <__= Default capacity hl-eff= hl - beam clip height/2 Mbase-v= (Vcol*hleff)/2 = 51 in Vcol = 10,825 In -lb <__= Moment going to base Mbase-eff= Minimum of Mbase-max and Mbase-v = 8,000 in -lb M 1-1= [Vcol * hleft] -Mbase-eff M 2-2= [Vcol-(F1)/2] * h2 = (425 Ib * 51 in)-8000 in -lb = [425 lb - 236.8 Ib]*54 in/2 = 13,650 in -lb = 6,392 in -lb I Mseis= (Mupper+Mlower)/2 Beam to Column Mseis(1-1)= (13650 in -lb + 6392 in-lb)/2 Mseis(2-2)= (6392 in -lb + 0 in-lb)/2 Elevation = 10,021 in -lb = 3,196 in -lb rho= 1.0000 Summary of Forces LEVEL hi Axial Load Column Moment** Mseismic** Mend -fixity Mconn** Beam Connector 1 54 in 3,290 lb 13,650 in -lb 10,021 in -lb 3,720 in -lb 9,619 in -lb 3 pin OK 2 54 in 1,270 lb 6,392 in -lb 3,196 in -lb 2,325 in -lb 3,865 in -lb 3 pin OK Mconn= (Mseismic + Mend-fixity)*0.70*rho Mconn-allow(3 Pin)= 12,691 in -lb **all moments based on limit states level loading type a 5e1ect-airborne-revd.xl5 Page of 3/G/2025 Structural Engineering & Design Inc. Bob S Column Section Properties Section: Hannibal IF3014-3x3xl4ga Project: Airborne A Selective Rack Aeff = 0.643 inA2 Iy = 0,749 InA4 Ix = 1,130 inA4 Sy = 0.493 in3 Sx = 0.753 inA3 ry = 1.080 in rx = 1.326 in Fy= 55 ksi Qf= 1.67 Cmx= 0.85 E= 29,500 ksi COLUMN DL= 40 lb COLUMN PL= 3,250 lb Mcol= 13,649 in -lb Sds= 1,0448 1+0.105*Sds= 1.1097 1.4+0.14Sds= 1.5463 1+0.14Sds= 1,1463 0.85+0.14*Sds= 0.9963 B= 0.7000 rho= 1.0000 = 1.7*51.93 = 66.6 Fe= n^2E/(KL/r)max^2 = 65.7ksi Pn= Aeff*Fn = 27,960 lb CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE 1-14 Date: 3.000 in Kx = 1.7 x Lx= 51.9in Ky = 1.0 J n Ly = 36.0 in Y_ 7_1007,5in Y 3.000 i Cb= 1.0 �L �0.75 in c,nricai ioao cases are: RMI Sec 2.1 Load Case 5:: (1+0.105*Sds)D + 0.75*(1.4+0.145ds)*B*P + 0.75*(0.7*rho*E)<= 1.0, ASD Method axial /bad coeff 0,8117928 * P seismic moment coeff, 0.5625 * Mcol Load Case 6., : (1+0.14*56s)D + (0.85d-0.1456s)*B*P + (0.7*rho*E)<= 1.0, ASD Method axial load coeff.• 0.69739 seismic moment coeff, 0.7 * Mcol By analysis, Load case 6 governs utilizing loads as such Axial Load=Pax= 1.146272*401b+0.996272*0.7*3250lb Moment=Mx= 0.7*rho*Mcol = 2,312 lb = 0.7 * 13649 in -lb = 9,554 in -lb KyLy/ry = 1*36"/1,08" Fe > Fy/2 = 33.3 Fn= Fy(1-Fy/4Fe) = 55 ksi*[1-55 ksi/(4*65.7 ksi)] Fy/2= 27.5 ksi = 43.5 ksi Pa= Pn/S2c Qc= 1.92 = 27960lb/1.92 = 14 562 Ib P/Pa= 0.16 > 0.15 Bending Analysis Check Pax/Pa + (Cmx*Mx)/(Max*ux) 5 1.0 P/Pao + Mx/Max 5 1.0 Pno= Ae*Fy Pao= Pno/52c Myield=My= Sx*Fy = 0.643 inA2 *55000 psi = 35365lb/1.92 = 0.753 inA3 * 55000 psi = 35,365 lb = 18,419 lb = 41,415 in -lb Max= My/Qf = 41415 in-Ib/1.67 = 24,799 in -lb px= {1/[1-(QC*P/Pcr)]}A-1 _{i/fl-(1.92*2312lb/42203lb)]}A-1 = 0.89 Combined Stresses Pcr= nA2EI/(KL)maxA2 = nA2*29500 ksi/(1.7*51.9375 in)A2 = 42,203 lb (2312 Ib/14562 lb) + (0.85*9554 in-Ib)/(24799 in-Ib*0.89) = 0.52 < 1.0, OK (EQ C5-1) (2312 ib/18419 lb) + (9554 in-Ib/24799 in -lb) = 0.51 < 1.0, OK (EQ C5-2) ** For com arlson total column stress com uted for /oad case 5 is. 46.0°/o n %ads 2682.71476lb Axra/and M= 71651n-lb type a select-airborne-revd.xls Page of 3/6/2025 Structural Engineering & Design Inc. Bob S Airborne CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Ma lb":25-0221-14 BEAM Contiguration: Type A Selective Rack I uaie: A) Check compression flange for local bucklina (B2.1 w= c - 2*t -2*r = 1.75 in - 2*0.057 in - 2*0.057 in = 1.522 in w/t= 26.7 1=lambda= [1.052/(k)^0.5] * (w/t) * (Fy/E)^0.5 = [1.052/(4)^0.5] * 26.7 * (55/29500)^0.5 = 0.606 < 0.673, Flange is fully effective B) check web for local buckling per section b2 3 fi(comp)= Fy*(y3/y2)= 50.53 ksi f2(tension)= Fy*(y1/y2)= 102.29 ksi Y= f2/f1 Eq. B2.3-5 = -2.024 k= 4 + 2*(1-Y)-3 + 2*(1-Y) Eq. B2.3-4 = 65.35 flat depth=w= y1+y3 = 3.897 in w/t= 68.36842105 1=lambda= [1.052/(k)^0.51 * (w/t) * (f1/E)^0.5 = [1.052/(65.35)^0.5] * 3.897 * (50.53/29500)^0.5 = 0.368 < 0.673 be=w= 3.897 in b2= be/2 b1= be(3-Y) = 1.95 in = 0.776 b1+b2= 2.726 in > 1.2885 in, Web is fully effective Determine effect of cold working on steel yield point (Fya) per section A7 2 Fya= C*Fyc + (1-C)*Fy (EQ A7.2-1) Lcorner=Lc= (p/2) * (r + t/2) 0.134 in C= 2*Lc/(Lf+2*Lc) Lflange-top=Lf= 1.522 in = 0.150 in m= 0.192*(Fu/Fy) - 0.068 (EQ A7.2-4) = 0.1590 Bc= 3.69*(Fu/Fy) - 0.819*(Fu/Fy)^2 - 1.79 = 1.427 since fu/Fv= 1.18 < 1.2 and r/t= 1 < 7 OK then Fyc= Bc * Fy/(R/t)^m (EQ A7.2-2) = 78.485 ksi Thus, Fya-top= 58.52 ksi (tension stress at top) Fya-bottom= Fya*Ycg/(depth -Ycg) = 113.59 ksi (tension stress at bottom) Check allowable tension stress for bottom flange Lflange-bot=Lfb= Lbottom - 2*r*-2*t = 2.522 in Cbottom=Cb= 2*Lc/(Lfb+2*Lc) = 0.096 Fy-bottom=Fyb= Cb*Fyc + (I-Cb)*Fyf = 57.2V ksi Fya= (Fya-top)*(Fyb/Fya-bottom) = 29.50 ksi 75 in v Eq. B2.1-4 4.125 in Eq. B2.1-1 Beam= HMH 41160/4_]: X3 Eq B2.3-2 (EQ A7.2-3) if F= 0.95 Then F*Mn=F*Fya*Sx= 20.73 in-k depth 1.625 in 0.057 in Ix= 1.617 in Sx= 0.740 in Ycg 2.723 in t= 0.057 in Bend Radius=r= 0.057 in Fy=Fyv= 55.00 k: Fu=Fuv= 65.00 ks E= 29500 k! top Flange=b= 1.750 in bottom flange= 2.750 in Web depth= 4.' '1z t^ Fy Me mo) y1= Ycg-t-r= 2.609 in y2= depth-Ycg= 1.403 In y3= y2-t-r= 1.289 in Structural Engineering & Design Inc. CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE By: Bob S Project: Airborne Systems Master ject #: 25-0221-14 BEAM I vdLe. Configuration; Type A Selective RacK Section Beam= HMH 41160/4,125" Face x 0.057" thk Ix=lb= 1.617 in^4 2.75 in Sx= 0.740 inA3 t= 0.057 in E= 29500 ksi 1.75 in Fy=Fyv= 55 ksi F= 300.0 Fu=Fuv= 65 ksi L= 96 in Fya= 58.5 ksi Beam Level= 1 P=Product Load= 4,000 lb/pair D=Dead Load= 40 lb/pair 1. Check Bending Stress Allowable Loads Mcenter=F*Mn= W*L*W*Rm/8 W=LRFD Load Factor= 1.2*D + 1.4*P+1.4*(0.125)*P RAMZ2, item 8 FOR DL=2% of PL, W= 1.599 Rm= 1 - [(2*F*L)/(6*E*Ib + 3*F*L)] 1 - (2*300*96 in)/[(6*29500 ksi*1.617 in^3)+(3*300*96 in)] = 0.845 if F= 0.95 Then F*Mn=F*Fya*Sx= 41.14 in-k Thus, allowable load per beam pair=W= F*Mn*8*(# of beams)/(L*Rm*W) = 41.14 in-k * 8 * 2/(96in * 0.845 * 1.599) = 5,075 lb/pair allowable load based on bending stress Mend= W*L*(i-Rm)/8 = (5075 lb/2) * 96 in * (1-0.845)/8 = 4,720 in -lb @ 5075 lb max allowable load = 3,720 in -lb @ 4000 lb imposed product load 2. Check Deflection Stress Allowable Loads 4.125 In 0.057 in 1111111111111111111111111111 11 I111IIIIl II III ----------------- P.eduek . . . . . . .... Beam -� Dmax= Dss*Rd Rd= 1 - (4*F*L)/(5*F*L + 10*E*Ib) Allowable Deflection= L/180 = 1 - (4*300*96 In)/[(5*300*96 in)+(10*29500 ksi*1.617 inA4)] = 0.533 in = 0.814 in Deflection at imposed Load= 0.420 in If Dmax= L/180 Based on L1180 Deflection Criteria and Dss= 5*W*LA3/(384*E*Ib) L/180= 5*W*L^3*Rd/(384*E*Ib*# of beams) solving for W yields, W= 384*E*I*2/(180*5*L^2*Rd) = 384*1.617 in^4*2/[180*5*(96 in)^2*0.814) = 5,426 Ib/pair allowable load based on deflection limits Thus, based on the least capacity of item 1 and 2 above: Allowable load= 5,075 Ib/pair Imposed Product Load= 4,000 lb/pair Beam Stress= 0.79 Beam atLevel 1 Structural CITY OF SANTA ANA Planning and Building Agency Engineering & Design Inc. Approved FOR PERMIT ISSUANCE By: Bob S Project: Airborne Systems Project #: 25-0221-14 iviaxci i Pin Beam to Column Connection Type A Selective Rack I ce. mandated minimum value of 1.5%(DL+PL) Mconn max= (MSeismic + Mend-fixity)*0.70*Rho = 9,619 in -lb Load at level 1 Connector Type= 3 Pin Shear Capacity of Pin Pin Diam= 0.44 in Fy= 55,000 psi Ashear= (0.438 in)-2 * PI/4 = 0,15071n^2 Pshear= 0.4 * Fy * Ashear = 0.4 * 55000 psi * 0.1507inA2 = 3,315 Ib Bearing Capacity of Pin tcol= 0.075 in Omega= 2.22 Fu= 65,000 psi a= 2.22 Pbearing= alpha * Fu * diam * tcol/omega = 2.22 * 65000 psi * 0.438 in * 0.075 in/2.22 = 2,135 lb < 3315 lb Moment Capacity of Bracket Edge Dlstance=E= 1.00 in Pin Spacing= 2.0 in C= P1+P2+P3 tclip= 0.18 in = P1+P1*(2.5"/4.5")+Pi*(0.5"/4.5") = 1.667 * P1 Mcap= Sclip * Fbending = 0.127 in A 3 * 0.66 * Fy = 4,610 in -lb Pclip= Mcap/(1.667 * d) = 4610.1 in-lb/(1.667 * 0.5 in) = 5,531 lb P3 112" C*d= Mcap = 1.667 Thus, P1= 2,135 lb Mconn-allow=[P1*4.5"+P1*(2.5"/4.5")*2.5"+P1*(0.5"/4.5")*0.5"] = 2135 L13*[4.5"+(2.5"/4.5")*2.5"+ (0.5"/4.5")*0.51'1 = 12,691 in -lb > Mconn max, OK Fy= 55,000 psi Sclip= 0.127 inA3 d= E/2 = 0.50 in type a 5elect-airborne-revd.x15 Page of 3/G/2025 Structural Engineering & Design I nc. CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE By: Bob S Project: Airborne Systems I rawitetdAO-0221-14 Transverse Brace Section Properties A Selective Rack Date: Diagonal Member= Hannibal 1-1/2xl-1/2xl6ga Horizontal Member= Hannibal 1-1/2xl-1/2x16ga Area= 0.273 inA2 1.500 in Area= 0.273 inA2 r min= 0.496 in r min= 0.496 in 1.500 Fy= 55,000 psi Fy= 55,000 psi K= 1.0 1.500 in K= 1.0 9c= 1.92 1.500 L J 0.250 in — � 0.250 Frame Dimensions Bottom Panel Height=H= 48.0 in Clear Depth=D-B*2= 36.0 in Frame Depth=D= 42.0 in X Brace= NO Column Width=B= 3.0 in rho= 1.00 -► 0 Load Case 6.: (1+�1J.1l14�5a'sjfl j- .85+0.14Sds)*8*P + C0.7*rho*EJ<= 1.0, ASO Method Vtransverse= 1,158lb Vb=Vtransv*0.7*rho= 1158 Ib * 0.7 * 1 = 811 lb Ldiag= [(D-B*2)A2 + (H-6")A2]A1/2 = 55.3 in Pmax= V*(Ldiag/D) * 0.75 = 8001b axial load on diagonal brace member Pn= AREA*Fn = 0.273 inA2 * 23419 psi = 6,393 lb Pallow= Pn/9 = 6393 lb /1.92 = 3,3301b Pn/Pallow= 0.24 <= 1.0 OK Horizontal brace Vb=Vtransv*0.7*rho= 811 lb Vb " (ki/r)= (k * Ldiag)/r min = (1x55.3in/0.496in) = 111.5 in Ldlag Fe= piA2*E/(kl/r)A2 H = 23,419 psi Pmax Since Fe<Fy/2, 3,. typ Fn= Fe s = 23,419 psi Typical Panel Configuration (kl/r)= (k * Lhoriz)/r min Fe= piA2*E/(kl/r)A2 = (1 x 42 in) /0.496 In = 40,584 psi = 84.7 in Since Fe>Fy/2, Fn=Fy*(1-fy/4fe) Pn= AREA*Fn = 36,366 psi = 0.2731nA2*36366 psi = 9,928lb Pn/Pallow= 0.16 <= 1.0 OK Check End Weld Lweld= 3.0 in Fu= 65 ksi tmin= 0.060In Weld Capacity= 0.75 * tmin * L * Fu/2.5 = 3,510 lb OK Fy/2= 27,500 psi Pallow= Pn/Qc = 9928 lb /1.92 = 5,171 lb, type a 5elect-airborne-revcLA5 Page of 3/6/2025 Structural Engineering & Design Inc. By: Bob S Row Frame Ov+ .Ave La Verne: I Project: Airborne ration: Type A Selective Rack 1) RMI Sec 2.2, item 7: (0.9-0.2Sds)D + (0.9-0,20Sds)*B*Papp - E*rho Vtrans=V=E=Qe= 1,158lb DEAD LOAD PER UPRIGHT=D= 80 lb PRODUCT LOAD PER UPRIGHT=P= 6,500 lb Papp=P*0.67= 4,355 lb Wst LC1=Wst1=(0.69104*D + 0.69104*Papp*1)= 3,064 lb Product Load Top Level, Ptop= 2,500 lb DL/Lvl= 40 lb Seismic Ovt based on E, E(Fi*hi)= 84,733 in -lb hr. .v114/.-,,.....4, - CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE -0Df _._.. __ -„ , _, �,� , A Fully Loaded Rack n = m.0 in SIDE ELEVATION h=H+h Load case 1: 2= 132.0 in Movt= E(Fi*hi)*E*rho Mst= Wsti * Df/2 T= (Movt-Mst)/Df = 84,733 in -lb = 3064 lb * 42 in/2 = (84733 in -lb - 64344 In-lb)/42 In = 64,344 in -lb = 485 lb Net Uplift per Column 17- Net Seismic U lift*Ome a= 970 lb B Top Level Loaded Only Load case 1: 0 Vi=Vtop= Cs * Ip * Plop >= 350 lb for H/D >6.0 Movt= (Vi*h + V2 * H/21*rho = 0.2612 * 2500 lb = 87,324 in -lb = 653 lb T= (Movt-Mst)/Df V1eff= 653 lb Critical Level= 2 = (87324 in -lb - 37441 in-lb)/42 in V2=VDT= Cs*Ip*D Cs*Ip= 0.2612 = 1,188 lb Net Uplift per Column = 21 lb Mst= (0,69104*D + 0.69104*Ptop*1) * 42 in/2 = 37,441 in -lb Net Seismic U lift*Ome a= 2,376 lb Anchor Check (2) 0.5" x 2.5" Embed Powers SD2 anchor(s) per base plate. Special inspection is required per ESR 2502. Pullout Capacity=Tcap= 1,250 lb L.A. City Jurisdiction? NO Tcap*Phi= 1,250 lb Shear Capacity=Vcap= 1,250 lb Phi= 1 Vcap*Phi= 1,250 lb Fully Loaded: (485 Ib/1250 Ib)A1 + (289 Ib/1250 Ib)A1 = 0.62 <= 1.2 OK Top Level Loaded: (1188 Ib/1250 Ib)A1 + (163 Ib/1250 Ib)A1 = 1.08 <= 1.2 OK type a 56ect-airborne-revd.x15 Page of 3/G/2025 Structural CITY OF SANTA ANA Planning and Building Agency Engineering & Design Inc. Approved FOR PERMIT ISSUANCE By: Bob S Project: Airborne Systems Pro ieci #5 0221-14 Base Plate Configuration: Type A Selective Rack Section Baseplate= 8x5x3/8 Eff Width=W = 8.00 in a = 3.00 in Eff Depth=D = 5.00 in Anchor c.c. =2*a=d = 6.00 in Column Width=b = 3.00 in N=# Anchor/Base= 2 Column Depth=dc = 3.00 in Fy = 36,000 psi L = 2.50 in Plate Thickness=t = 0.375 in + 0.75Y(1.4+0,145ds)*B*P + 0.75*f0.7*rhn*F7r_ COLUMN DL= 40 Ib Axi'al=P= 1.109704 * 40 lb + 0.75 * (1.546272 COLUMN PL= 3,250 lb = 2,683 lb Base Moment= 8,000 in -lb , Mb= Base Moment* 0.75*0.7* rho 1+0.105*Sds= 1.1097 = 8000 in -lb * 0.75*0.7*rho 1.4+0.14Sds 1.5463 = 4,200In-lb B = 01(7 Axial Load P = 2,683 lb Mbase=Mb = 4,' Axial stress=fa = P/A = P/(D*W) M1= wLA2/2= fa*LA2/2 = 67 psi = 210 in -lb Moment Stress=fb = M/S = 6*Mb/[(D*BA2] Moment Stress=fb2 = 2 * fb * L/W = 78.8 psi = 49.2 psi Moment Stress=fbl = fb-fb2 M2= fbl*LA2)/2 = 29.5 psi = 92 in -lb M3 = (1/2)*fb2*L*(2/3)*L = (1/3)*fb2*LA2 Mtotal = M1+M2+M3 = 103 in -lb = 404 in-lb/in S-plate = (1)(tA2)/6 Fb = 0.75*Fy = 0.023 inA3/in = 27,000 psi fb/Fb = Mtotal/[(S-plate)(Fb)] F'p= 0.7*F'c = 0.64 OK = 5,763 psi OK Tanchor =(Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2] Tallow= 1,250 lb OK = -832 Ib No Tension Es Aisle Loads OrnA�llwdfeRM15e 2.1, iteal4-'0k0.1'Sd5A b(1+0.14SDS)PV0.754EtV..75a=1.0,ASDMeMod Check u lift load on Pstatic= 2,683 lb Movt*0.75*0.7*rho 44,485 in -lb Pseismic= Movt/Frame Depth Frame Depth= 42.0 in = 1,059 lb P=Pstatic+Pseismic= 3,742lb b =Column Depth= 3.00 in L =Base Plate Depth -Col Depth= 2.50 In fa = P/A = P/(D*W) = 94 psi Sbase/in = (1)(tA2)/6 = 0.023 inA3/in fb/Fb = M/[(S-plate)(Fb)] = 0.46 OK M= wLA2/2= fa*LA2/2 = 292 in-lb/in Fbase = 0.75*Fy = 27,000 psi Date: Mb i b I�— L i� w —► Downalsle Elevation * in -lb Eff( Effe Check uplift forces on baseplate with 2 or more anchors per RMI 7.2.2 "When the base plate configuration consists of two anchor bolts located on either side f the column and a net uplift force exists, the minimum base plate thickness hall be determined based on a design bending moment in the plate equal to the uplift force on one anchor times 1/2 the distance from he centerline of the anchor to the nearest edge of the rack column" I4—ci T T Mu a a 3 I b I ►� Elevation Uplift per Column= 2,376 lb Qty Anchor per BP= 2 Net Tension per anchor=Ta= 1,188 lb c= 2.50 in Mu=Moment on Baseplate due to uplift= Ta*c/2 = 1,485 in -lb Splate= 0.117 inA3 I'fb/Fb1*0.75= 0359 nk type a select-airborne-revd.xls Page of 3/6/2025 Structural Engineering & Design Inc. CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE By: Bob S Project: Airborne Systems NRMO* q;0-0221-14 Slab on Grade x -►I I~ c � I i y L --� SLAB ELEVATION A Selective Rack Baseplate Plan View Base Plate Effec, Basepiate width=B= 8.00 in width=a= 3.00 in Effec. Basepiate Depth=D= 5.00 in depth=b= 3.00 in midway dist face of column to edge of plate=c= 5.50 in Column Loads midway dist face of column to edge of plate=e= 4.00 in Date: Concrete fc= 8,233 psi tslab=t= 4.0 in teff= 4.0 in phi=O= 0.6 Soil fsoil= 750 psf Movt= 86,196 in -lb Frame depth= 42.0 in Sds= 1.045 0.2*Sds= 0.209 7,= 0.600 P=B/D= 1.600 FICA0.5= 90.70 psi vr-Hu wHu=u= 4u ib per column Load Case 1) (1.2+0.2Sds)D + (1.2+0.2Sds)*B*P+ rho E RMI SEC 2.2 EQTN 5 unfactored ASD load PRODUCT LOAD=P= 3,250 lb per column = 1.40896 * 40 lb + 1.40896 * 0.7 * 3250 lb + 1 * 2052 lb = 5,314 lb unfactoredASD load Load Case 2) (0.9-0.2Sds)D + (0.9-0.2Sds)*B*Papp + rho*E RMI SEC 2.2 EQTN 7 Papp= 2,178 lb, per column P-seismic=E= (Movt/Frame depth) = 0.69104 * 40 lb + 0.69104 * 0.7 * 2177.5 lb + 1 * 2052 lb = 3,133 lb = 2,052 lb per column Load Case 3) 1.2*D + 1.4*P RMI SEC2.2 EQTN 1,2 unfactoredLlmltState load = 1.2*40 lb + 1.4*3250 lb B= 0.7000 = 4,598 lb rho= 1.0000 Load Case 4) 1.2*D + 1.0*P + 1.0E ACI318-14 Sec 5.3.1 Sds= 1,0448 1.2 d- 0.2*Sds= 1.4090 = 5,350 lb Egtn 5.3.1e Effective Column Load=Pu= 5,350 lb per column 0. 9 - 0.20Sds= 0.6910 Puncture Apunct= [(c+t)+(e+t)]*2*t = 140.0 inA2 Fpunctl= [(4/3 + 8/(3*p)] * X *(F'c^0.5) fv/Fv= Pu/(Apunct*Fpunct) = 163.3 psi = 0.264 < i OK Fpunctl= 2.66 * 2, * (FICA0.5) = 144.8 psi Fpunct eff= 144.8 psi Slab Bending Pse=DL+PL+E= 5,350 lb Asoil= (Pse*144)/(fsoil) L= (Asoil)A0.5 y= (c*e)A0.5 + 2*t = 1,027 inA2 = 32.05 in = 12.7 In x= (L-y)/2 M= w*xA2/2 S-slab= 1*teffA2/6 = 9.7 in = (fsoil*xA2)/(144*2) = 2.67 inA3 Fb= 5*(phi)*(fc)A0.5 = 243.9 in -lb fb/Fb= M/(S-slab*Fb) = 272.21 psi _ type a Select-airborne-revd.xls Page of 3/6/2025 Structural Engineering & Design Inc. CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE by: Bob 5 Project: Airborne Systems 5-0221-14 Configuration & Summary: Type B Selective Rack Date: 96" 4 48" 192" 48" 3`I6" T +- 42" 4 **RACK COLUMN REACTIONS ASO LOADS AXIAL DL= 60lb AXIAL LL= 3,200lb SEISMIC AXIAL Ps=+/- 2,854 lb 8ASEMOMENT 8,0001n-lb Seismic Criteria # Bm Lvls Frame De htl # Diagonals] Beam Length Frame Type Ss=1.306, Fa=1.2 3 42 in 192.0 in 31 96 in Component Description STRESS Column Fy=55 ksi Hannibal IF3014-3x3x14ga P=3260 lb, M=8017 in -lb 0.39-OK Column & Backer None None None N/A Beam Fy=55 ksi HMH 36160/3.75" Face x 0.057" thk Lu=96 in Capacity: 4474 Ib/pr 0.56-OK Beam Connector Fy=55 ksi Lvl 1: 3 pin OK Mconn=7062 in-Ib Mcap=12691 in -lb 0.56-OK Brace -Horizontal Fy=55 ksi Hannibal 1-1/2xl-1/2xl6ga 0.16-OK Brace -Diagonal Fy=55 ksi Hannibal 1-1/2xl-1/2x16ga 0.24-OK Base Plate Fy=36 ksi 8x5x3/8 Fixity= 8000 in-Ib 0.64-01K Anchor 2 per Base 0.5" x 2.5" Embed Powers SD2 ESR 2502 Inspection Reqd (Net Seismic Uplift=2662 lb) 0.958-OK Slab & Soil 4 thk x 8233 psi slab on grade. 750 psf Soil Bearing Pressure Level Load** I Story Force Story For Column Column Conn. 0.23-01K Beam Per Level Beam Spcg Brace Transv Longit. Axial Moment Moment Connector 1 2,500 lb 60.0 in 36.0 in 244 lb 119 lb 3,260 lb 8,017 "# 7,062 "# 3 OK 7Snnlh Gnn:.. non:. pin 3 1,400 lb 60.0 in 48.0 in 40.7 iu l,yyu io b,b41 "# 5,328 "# 3 pin OK 418 lb 204 lb 720 lb 3,062 "# 2,154 "# 3 pin OK -=Iola- Oo Ni-u-ct weigh[ per pair or Deams Total: 1,151 lb 562 lb Notes type b 5elect-airborne-revd.xl5 Page of 3/6/2025 Structural Engineering & Design Inc. 1815 Wright Ave., La CA 91750 Tel: 909.596.1361 Fax: 909.593.8561 APPENDIX CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE I mate,;' . ii �.sy�naoaoar+R,,,a,�,>jjRwiprn��ra9M�ne;rxnuW�,'5�,�iaoa t l type oryfoex. �F A '.a�}trfg�".etu4f b l ` rffl 1f "watfs d: CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Master ID: Date: x. r : rn 9,.,e Y f.. : r • y�e SX, pifldiE 1r 4��rsr fC.is firfa.krsfirwr aff "fit " r�ingd iT4r+�.i:� afah.d ;pr r:krisrtaltf fir►g.i r rr.: �fes° t's�r rfYi`�rl:. sop T,0 f . OW LcSt;3tr>, It�tC'r.,ri'sr�cs' ": api9:frrI#Mp r-Sfv: �ti'ffh �i�if�' trr pr �Ct<ti� �1fir��t�"h'i�Yif �E. 4 :, Plkd err s air 40Y * ftr -tjt4f ifi . l���1x�+�Ja�#��"�srrl�s����p��lt�t��l�.��«s' ���r���`����;��crt�'r���rf��'���'�rr�p�r��irr���t���:€rt���irr�a�l�rr�tl?��t�_•�'a�t�n t r�s�'trr� arc; .}�dE�'cl�lzet� 7'�►stlrt��. ��P�tt�e�.d' .'���ftr�,�, Y�ik: ��r�a��ar� �'t�ts r+spat� .r�7rr �otz�trs.rr�r°�,r>+zr�ttare•:r��r�r�rt�dr fir: ,'r�#tntoxr trwtFrr,t 1 stt�str ti "rry;t�a!:�rtw tits r�trt;�ahl�r�dr�rt� :xpt trr riri �titot r�ltiufr rrr1rtttitr trr: ,.«.......� '�i�,,itt•Wtt�,� `_'�I ..I.'; I,'�;,�: Pu `��•;li. .'.A::::..�I`,, y,�ry,' �• ..I:.r.`;, JC '� Y..." �.: FJ: �•e,t f:�4'f�';n.. �'1f�1 �i!(j'(`ti)+� ;-lf...:;a ...�,..aaL i;::.i:�,:,y: tx. A.1s •�LIiM"gialri�rdt�4u7frN�nriArvw ' w�f� siVliZ;wiwra,lila.:ixriN dpaofft.d P. T.; CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Master ID: Date: CITY OF SANTA ANA Planning and Building Agency T f rkij N j N�111 t tl�N' <i if ltti�: li�l�iflii N At k �rl tip. `y ► t M1ib h ztth rT n: rr r #Itl Firm or, Irdiw. ilP i l stmoural #'hbmnmiffq -s a3 gn :th:a; t i D ttl t t'r tV�ri "o NA 02tii Wrist 04M NM AW.fi�a. rtk1� wr kr�[[rr. Nk r ri. iNrAa :fVt V?1d drl'H'it9iaitlrrYtaf :. 1 ` y + rt t t rxp >lY N 40"4 r, F w Ji is 1 %rrYi l h t3'ly , d c i : Air-itt tar. ter..htar�tii'..ttxarlVotry,:trdfrrrrbrr,' w� �t tw . ;r N'GY14 PO O AS i�#2 ACID 9. `vzhtl : lu. r J� a ri ft �:1it6y��'/�W1��` �►�;Y&�/'�i °�.Ayiyh��� ����iNr�i��m �y�tr����grl�Arrtt��� w irA�� J�'i��� �i�,,t�� �(;+ty���l4il �y�yy''p�:� � �1t'w��i y v��i'•�a�ry��}ii►ywMru�,ih}.ycW� q yky: TOR FI ,.W._........� _..._..... �' .:.. -,.. . _.—. . � 2•�1'. ... rr���y .,t y$.�� �i^ak:�k:R1tYi ."y%d,��i t::.4A.ft� ...A: H':9 ,,i. •H`?�P _:. :xd�. rA':a . m. w.. - .�...< ..... �.�. .......... - a� a n�nr7itr�r�ratgi��fi1t �frrtrr"tdnt;tptn1titd�?aR�euarrFipitie. *+k10)11i lti p�irl{yN(+ Itli 9tY,rirPRO long .64wl ak ltrY'r S�dYb 10 lde t t-atwit1►iY I :' FIfs"I1, i.1 t :Gt C '.PI (i1�1� 1iN i� tCii !1!JI tiP q��'i1�+�f�krrr��ap�yl d�rraiis��ra�+�'. dd'p I�W�1»i NO ��ubMIM �j�'�t��siRry'�p��iallx��j: t�tiq,��a }Pooh �kiJ�{d��ii9h�t il�Gt�it�t4�f#diiu� r��FCZSti��tY r.�rth�f���tYti� ��YK1 51�N1��Ati: ��rit�ff�Pi tid'b�'tltgiru�r'$4uravnw�f,.�rsta►v%'#gar't��a�1sF1�➢�Yu`i�lYruwirtl�'r�A9�T�_ nirwil�}bY� • � ,. CITY OF SANTA ANA Planning and Building Agency Z. :a�b�.tlirYeY,U,rT�iJ�I�¢wntirx�ti:<� ; i� ;��u;.it5unv:�P.�axa�wa.,�a.:a Approved FOR PERMIT ISSUANCE Master ID: Date: ttJ�� tn,��%r,�iPrra�i lrrtryt�r irr1rt rr: rr :rcrt 1. rlr V x, Mel "112, d1bg1ga CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Master ID: Date: � ? INZ44.4 pod res 3'm tu'pidt CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Master ID: Date: CITY OF SANTA ANA Planning and Building Agency I'y.; �i'.wsr�..i� .:rc. •p" .-:'`. .W: :9�:�f•w�'.oi.+ ::; ;�.y:•`d!�';:: fGr ¢%:';;G��Ga��n'auu fi orays�xYlb4lYJdewJ�aulw4ala'u..;u Approved FOR PERMIT ISSUANCE Master ID: Date: YES NO INSTRUCTIONS: ORAN GE COUNTY FI RE AUTHORI TY Plan Submittal Criteria COMMERCIAL projects, MULTIFAMILY RESIDENTIAL projects and RESIDENTIAL TRACT developments · Fill in the project/business address and provide a brief description of the scope of work and type of business operation that will take place. · Answer questions 1 through 10, read and initial items 11 and 12, then complete and sign the certification section. · If you answer: - “YES” to any part of questions 1 through 10, submit the type of plan indicated in italics to OCFA. · In some cases, other plan types not indicated herein may also be necessary depending on specific conditions or operations. · Visit www.ocfa.org for submittal information and locations. If you need assistance in filling out this form or have questions regarding requirements for review, please contact OCFA at 714-573-6108 or visit us at 1 Fire Authority Road, Irvine, CA 92602. Address Suite City Project Scope/Business Description 1. Construction of a new building, a new story, or increase the footprint of an existing building? Changes to roadways, curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates? Construction within 300 feet of an active or proposed oil well? Fire Master Plan (PR145) 2. Property is adjacent to a wildland area or non-irrigated native vegetation? Fire Master Plan (PR145); a Fuel Modification Plan may also be required. (PR120, PR124) 3. Located in or < 100’ from a Division of Oil, Gas, and Geothermal Resources (DOGGR) field boundary, < 300’ from an oil/gas seep, or < 1000’ from a landfill? Methane Work Plan. (PR170) 4. Installation/modification/repair of underground piping, backflow preventers, or fire department connections serving private fire hydrant/sprinkler/standpipe systems? Underground Plan. (PR470, PR475) 5. Drinking/dining/recreation/meetings/training/religious functions or other gatherings in a room > 750 sq.ft. (> 1,000 sq.ft. for training/adulteducation) or > 49 people? Healthcare/outpatient services for > 5 people who may be unable to immediately evacuate without assistance? Education for children (academic tutoring for ages 5+ is exempt unless classified as an E occupancy by the Building Official)? Adult/child daycare? 24-hour care/supervision? Incarceration or restraint? Hotel/apartment or residential facility with 3+ units and 3+ stories (3-story townhouses/rowhouses where an independent direct exit to grade is provided for dwelling are exempt)? Congregate housing/dormitories with 17+ people? High-rise structure (55+ feet to highest occupied floor level)? Architectural Plan (PR200-PR285) 6. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a card, button, or similar action to open a door in the direction of exit travel? Architectural, Sprinkler, and/or Alarm Plan depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520) 7. Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible liquids; vapor recovery; smoke control; battery back-up/charging systems (> 50 gal. electrolyte, > 1,000 lb. lithium ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations? Special Equipment Plan (PR315, PR340-PR382) 8. Storage/use/research with flammable/combustible liquids or other chemicals? Motor vehicle/aircraft maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan if H occupancy); Special Equipment Plans may be necessary. (PR315-PR360, PR232-PR240) 9. Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12’ (6’ for high-hazard commodities, plastic, rubber, foam, etc.)? High-piled Storage Plan (PR330) 10. Cooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a commercial cooking hood? Hood & Duct Extinguishing System, not just the hood mechanical plan. (PR335) Initial each of the following two items indicating that you have read and understand the statement: 11. *Sprinklers/Alarms: Consult Building/Fire Codes and ordinances to determine sprinkler/alarm requirements; if a system is required, plans shall be submitted for OCFA review. Existing buildings undergoing remodel must be evaluated by a licensed Initials contractor to determine if modification is needed; if so, contractor shall submit plans prior to making modifications. 12. Fire Hazard Severity Zone: Consult maps available at building department or on OCFA website to determine if your site is located in a FHSZ. Buildings in a FHSZ may be subject to special construction requirements detailed in CBC Chapter 7A or CRC R327— Initials the building department will determine specific requirements. I certify under penalty of perjury under the laws of the State of California that the above is true: Print Name Signature Phone Number ( ) Date / / Building Department: If you have verified that all of the questions have been answered accurately as “NO”, and the project does not otherwise require OCFA review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. Should you still require that the applicant have plans approved by OCFA, please initial here or attach an OCFA referral form and have the applicant submit the form along with the appropriate plans and fees for OCFA review. 10-08-14 EE COM O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Referral Form Required for OCFA to review plans upon the request of the Building Department when the answers on the Plan Submittal Criteria Form (on the reverse) are all “No”. City / County Official Requesting Review: City / County Reference #: Date: __________________________________ City / County: _____________________________________ E-Mail: __________________________________ Contact Name: _____________________________________ Phone #: _________________________________ Title: _____________________________________ ** Have the applicant complete and sign the OCFA Plan Submittal Criteria Form on the reverse of this form. ** Reason(s) for Review: Please describe why OCFA Plan Review is or may be required by the City/County : OCFA COMMENTS:  No further action required on this specific plan type, based on information provided on: ____/______/______.  Project to be taken in for OCFA Review. Other: Name: _________________________________________ Contact #: ______________________________________ Date: _________________________________ OCFA Authorization Updated: 06/02/2020 rs CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Master ID: Date: $p+ectalizod Testing Proiect No. STCR9331 J Dater 172120N Type C.i` Servlt a F'ieldlCoring Job Address; i tt tIV SergerstroM Ave, Equipment Used 3 Diameter Care Bit Senta Ana, CA 92704 ... _..... Job Name. structural Engineering i Tech nidiart(s) ; Marco Macias Design.: Client Name: Bob Sharifi Area(s) Worked: Warehouse Slab sialized Testing inc took 3 core samples from the slab forcompressive strength testing. Samples were tested at least 5 days being cored as per ASTM d421CWC1231 standards of core retrieval and testing. Repairs were made after core retrieval. Table `t for core measurements. LoWtIon I' rdinal Cora Moisture Conditioning Core No, Cote Length. (in) Comments (SeeAttodbirnent2) Diameter (In) History 1 Coll 4 Placed in seabed bag Cdmoressive strength data in after e0 ing Attachment 4 C2 3 4,6 , placed in sealed bag Compressive strength data in after coring Attachment 1 3 C33 laced in sea..16460g, Compressive strength data in after caring Attachment 1 Results ra'leted only to the speclrtyens tested. Laboratory lesfs and.rss°00 reported herein mra performed thr Structural Engineering & Design by Specialized Testing, Inc. (€Iba Specialized Testing), SpocialIzed.Tetting, Inc. authored this report using jobsite information submitted by 5truCt`ural Engineering & Design. Specialized Testing, Inc. employs the labrototy etlgln"r This report shall not be reproduced, except in full, without written permission from Specialized Testing, Ina Technfe an Signature: . Approved By: 'VinC0. Benitez Signed .For The Cotnpaany. CITY OF SANTA ANA Planning and Building Agency ��"�mRu�du�r+�t �4� istakr"�}paa:x�lrx�. Specialized Testing Prgtect No. STCR93319 Attachment 1 RAW TO st:Dma Approved FOR PERMIT ISSUANCE Master ID: Date: .Results related only to t* spedh7efis.ttsied. Laboratory tests and results reported herein were.:performed fo� StrucA tel Englneedng a Design by Speclallzed Testing, inc, (dba Sp ialtzed Testing). Specialized' .Testing, Inc, authored this .report using jobslte Information submitted by 5trircttirel Engineering & Design. Spoclatized Testing; Inc, employs the labratory engineer. This report shalt not: bb meoroduced, except In full, 'Without written permission from Specialized Testing�.ih CITY OF SANTA ANA Planning and Building Agency ISO since TEST SP90MEN AND COM PUSSIVE STRENOTH DATA S r ID: R PROJECT DATA PERFORMED BY OTHER$ AND: NOT VOIF111110, BY LAB � Date: PeoJoIdt NA!"at Airborne S'ystarns North Atharlto Inspection FirroarCill"U. StrUctural Eoginearing.& OssIgn, -Inc, 11119000toeo LIMA" 14111"er'. Oh File Ihopector's NOM41 NR job Address,.. 3100 West SagerstrCirn AV$Ouq NR Santa Ana, CA 13*16"It Not :NR plaid Idiontme"atifflIh- Nk Cast bate. 0NI22025 pastrillixtion. Plaid Cores co"Orets suppillen NA sociffed rt - PSI.. For information only AdmIxtare: plaht. NA Cast Syr OR slump fcua . 114 mix *Osig" Noi. NA Wo(samplaw Wr C"Unt 4=711 Ticket Number.: NR votat Yarrow. NA Alfe. Tamp (G110041; Cast I MI* Time: NR CoftCraft 10*0 (C1064), OF NR Not0st NR NR = Not Reported. Results reliAe only to the tested specimens. LABORATORY COMPRESSIVO ST.REN"14 DATA.091111 A$TU C42 AND C39 Date sp"Ifflons Received.. 02/12/2026 0q4#Pft1*fkt Usted: On File Report Date: 02117/2025 AN of, Ittiolpmentl On File T16chnition Name: Michael Ahduoko Vallbi / Recoi. 1000 On File Test Data specimen Avis at Date Time SpatiMe" DIMensio"02 . in. Are*3 Avg Lead PIC Break trend tication Usti Of or i 2 3 4 S 6 10 In2 Lbs. PSI lVpe4 WIRMW MAWS)" crest T60 N/d -5 62/110026 4-:as Am 2,98 2198 4.17 4.17 1,40 6.07 65,396 ........... 8,907 ..... . .............. .... a 1280311,;2 11 5 021,17/202.5 - ` - - 4148 AM 2198 - - 2,98 ' '4160 4,60 LS4 . . 15,97 5,9,270 0,150 3 — 128032,1.3 5 01n7/2626 4.,40 AM .... . ............. 1, 2.98 Z98 1 SAS 5.45 ­­­ . . . . . . . ........ _..--I_-- . ...... 1.83 6b7 53,240 71033 3 $-DAY Avg. fIt PSI., 11423 Test SchodWla PftvldW by theilefit �1 0 MOO 43 24 0 1041 Mr % -�Clnno 0"'��"ZpVel A C"11`100 feM, for hffl _ 1 4. amkvo wonatlo' Pat ASTM C39 no�'r. to, 6 Side Fracture PoInt THE TEST RE$ULTS ARE FOR INfORMATIOWONLY THE Authoritaid Signature Wbotatosy tew and tasots ropolt ct" & posionj int. by Speelblizod lbql IAC. (dbA Specialized Testing). Specialized Testing, Int, authONd MS. mptvri U ,. hic- sftl�diltzdd Toadoo, th affililloys ttiO 14b&�toty orqlnoar. ,id herain were perfoftedforStm . Intormatloh r5trudufa tvaindeflng 4 0wort, o report shall not be moNduced, eXcoot In full, With6kViddetf F*ftNSIW patfolload IhAno, bit, 1060or Plonsor Ifoulov'W, ISORO 0 Onto Fe oodnovi California 106yo mt'01:0014 CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Master ID: Date: . pg,dalf ed Testing. Pr Iepj No,,,: h IRS.. O Attachment 2: E= Results relatedurrfy to Me 400OWw MOW Laboratory tests ° and results reported her in mom performed for ,Structutal EngirteWng & Design by Specialized Test, Inc fts Spede0a resting)'. Speclahzed resting, Inc, authored this repart using jab.51te intdrrttetiett submitted by Structural' Engineering A Deg*. od'restfrtgr,, Inc. emplays the iebretury engineer, This repoa shaft not be reproduced, except in tuft, Wthouat written permimlon from Spectsllxed Tostirlg, Inc, CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Master ID: Date: pedal zed Testing Project No., StCR9,3,319 North Not Drawn To O/ CITY OF SANTA ANA Planning and Building Agency �S'i�rt.gca.�+vl�txwr ma �tn"rF peclali ed Testing project No,, T R93311 Ire -Situ Picture; Approved FOR PERMIT ISSUANCE Master ID: Date: Results related only to the spedihWO'tad. Laboratory tests and results roportodhorein wers firmed tor Strw raf r gineering'& Design by Specialized 7'esft, irrc { ape feiized 'tin } tr nl It 7 sttn p. In aut t red this report using jabsite lrrrr,�tion subrnitt t by Stfucturel EngirmerirV & 0e907. ,Specialized Inc. employs the febretery engineer: ''rhfs report shall not be reproduced, except in tall;. Without written permission from Specialized -resting, Inc.. CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSUANCE Master ID: Date: pedall ed Testing,Project No. SICIR9331