Laserfiche WebLink
DRIVING DIRECTIONS <br />TO: 2677 3/4 N. MAIN, UNIT WCC01 <br />SANTA ANA, CA 92705 <br />FROM:VERIZON OFFICE <br />15505 SAND CANYON AVE <br />IRVINE, CA 92618 <br />GENERAL CONTRACTOR NOTES <br />DO NOT SCALE DRAWINGS <br />THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS <br />MATCH THE DRAWINGS AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING OF ANY <br />DISCREPANCIES. PROCEEDING WITH CONSTRUCTION WITHOUT SUCH NOTIFICATION OF <br />DISCREPANCIES INDICATES THE GENERAL CONTRACTOR ACCEPTS RESPONSIBILITY FOR THE <br />EXISTING CONDITIONS AND HAS INCLUDED RESOLUTION OF THOSE DISCREPANCIES IN THE <br />BID FOR CONSTRUCTION. <br />ASSESSOR'S PARCEL NUMBER: <br />APN: 003-013-18, 003-013-13 <br />APPLICANT: <br />PROJECT SUMMARY <br />APPLICANT'S REPRESENTATIVE: <br />SITE NAME:FISHER FLORAL <br />SITE ADDRESS:2677 3/4 N. MAIN, UNIT WCC01 <br />SANTA ANA, CA 92705 <br />JURISDICTION:CITY OF SANTA ANA <br />PROPERTY INFORMATION: <br />LEGAL DESCRIPTION: <br />FISHER FLORAL <br />2677 3/4 N. MAIN, UNIT WCC01 <br />SANTA ANA, CA 92705 <br />15505 SAND CANYON AVENUE, BLDG C. <br />IRVINE, CA 92618 <br />OFFICE: (949) 286-7000 <br />TELECOMMUNICATIONS PROJECT MANAGEMENT <br />16776 BERNARDO CENTER DRIVE, UNIT 203 <br />SAN DIEGO, CA 92128 <br />15 <br />5 <br />0 <br />5 <br /> <br />S <br />A <br />N <br />D <br /> <br />C <br />A <br />N <br />Y <br />O <br />N <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />, <br /> <br />B <br />L <br />D <br />G <br /> <br />C <br />. <br />IR <br />V <br />I <br />N <br />E <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />1 <br />8 <br />SHEET TITLE: <br />ISSUE STATUS <br />DATEREV.DESCRIPTION BY <br />FI <br />S <br />H <br />E <br />R <br /> <br />F <br />L <br />O <br />R <br />A <br />L <br />26 <br />7 <br />7 <br /> <br />3 <br />/ <br />4 <br /> <br />N <br />. <br /> <br />M <br />A <br />I <br />N <br />, <br /> <br />U <br />N <br />I <br />T <br /> <br />W <br />C <br />C <br />0 <br />1 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />0 02/28/2024 90% CD REVIEW jd <br />1 03/15/2024 90% CD DRM COMMENTS jd <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />03/29/2024 <br />05/17/2024 <br />06/21/2024 <br />08/01/2024 <br />09/25/2024 <br />05/07/2025 <br />90% CD DRM COMNTS #2 <br />100% FINAL CD <br />REVISED DIESEL TANK <br />REGULATORY HEIGHT <br />BP SUBMITTAL <br />BP PLANCHECK <br />jd <br />jd <br />rl <br />jd <br />jd <br />jd <br />T-1 <br />PROPRIETARY INFORMATION <br />THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS <br />IS PROPRIETARY TO VERIZON WIRELESS <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />I <br />. <br />D <br />. <br /> <br />1 <br />5 <br />8 <br />6 <br />1 <br />0 <br />6 <br />7 <br />Ren. 4-30-27 <br />No. C 11978 <br />LICENSED A RCHITECT <br />STATE OF CALIFORNIA <br />WILLIAM M. BOOTH <br />TITLE SHEET <br />CODE COMPLIANCE <br />·2022 CALIFORNIA ENERGY CODE <br />·2022 CALIFORNIA BUILDING CODE <br />·2022 CALIFORNIA ELECTRICAL CODE <br />·2022 CALIFORNIA FIRE CODE <br />·2022 CALIFORNIA GREEN BUILDING CODE <br />·2022 CALIFORNIA MECHANICAL CODE <br />·2022 CALIFORNIA PLUMBING CODE <br />IN THE EVENT OF A CONFLICT, THE MORE RESTRICTIVE CODE SHALL GOVERN. <br />SHEET DESCRIPTION <br />T-1 <br />A-2 <br />A-3 <br />EXTERIOR ELEVATIONS <br />EQUIPMENT PLAN <br />TITLE SHEET <br />CONSTRUCTION DRAWINGS <br />A-0 SITE PLAN <br />A-0.0 GENERAL NOTES & SPECIFICATIONS <br />A-0.1 STATEMENT OF SPECIAL INSPECTIONS <br />A-0.2 <br />SPECIFICATIONS, RFDS & ANTENNA SCHEDULEA-0.3 <br />STRUCTURAL CONCRETE & MASONRY SPECIFICATIONSA-0.4 <br />D-1 DETAILS <br />A-0.5 <br />STATEMENT OF SPECIAL INSPECTIONS <br />GENERAL SPECIFICATIONS <br />A-4 <br />A-5 <br />A-6 <br />A-7 <br />A-8 <br />D-2 DETAILS <br />E-1 ELECTRICAL NOTES, SYMBOLS, P.S.L.D. & PANEL SCHEDULE <br />E-2 UTILITY ROUTE PLAN <br />E-3 POWER, ELECTRICAL AND LIGHTING PLAN <br />E-4 EQUIPMENT GROUNDING PLAN <br />E-5 <br />E-6 <br />A-1 <br />A-9 <br />D-3 DETAILS <br />SCREEN FRAMING ELEVATIONS <br />D-4 <br />D-5 <br />D-6 <br />DETAILS <br />DETAILS <br />DETAILS <br />GROUNDING SCHEMATIC & GENERAL NOTES <br />A-0.6 <br />FOUNDATION PLAN <br />SECTIONS A & B <br />ANTENNA PLAN "ALPHA" <br />CHAINLINK LID PLAN <br />A-10 <br />LARR REPORT <br />D-7 DETAILS <br />A-11 <br />SCREEN FRAMING PLANS <br />PROJECT I.D. 15861067 <br />D-8 DETAILS <br />D-9 DETAILS <br />Call before you dig. <br />below.Know what's <br />R <br />TO OBTAIN LOCATION OF PARTICIPANTS <br />UNDERGROUND FACILITIES BEFORE <br />YOU DIG IN CALIFORNIA (SOUTH), CALL <br />DIG ALERT <br />TOLL FREE: 1-800-227-2600 OR <br />www.digalert.org <br />CALIFORNIA STATUTE <br />REQUIRES MIN OF 2 <br />WORKING DAYS NOTICE <br />BEFORE YOU EXCAVATE <br />E-7 ELECTRICAL DETAILS <br />PROJECT DESCRIPTION <br />PROJECT TEAM <br />VICINITY MAP <br />SITE ACQUISITION:PLANNING: <br />OVERALL HEIGHT <br />56'-9" A.G.L. <br />·INSTALL (3) SECTORS OF (4) PANEL ANTENNAS EACH, TOTAL OF (12) ANTENNAS, MOUNTED <br />INSIDE (N) RF TRANSPARENT SCREENS <br />·INSTALL (2) (N) RRU RADIO UNITS PER SECTOR, TOTAL OF (6) RADIO UNITS, MOUNTED INSIDE (N) <br />RF TRANSPARENT SCREENS <br />·INSTALL (1) (N) RAYCAP DC SURGE SUPPRESSOR PER SECTOR, TOTAL OF (3) SURGE <br />SUPPRESSORS, MOUNTED INSIDE (N) RF TRANSPARENT SCREENS <br />·INSTALL (2) (N) EQUIPMENT CABINETS INSIDE A (N) 8'-0" TALL CONCRETE BLOCK EQUIPMENT <br />ENCLOSURE. SPACE IS PROVIDED FOR A THIRD CABINET. <br />·INSTALL (1) (N) 6 x 12 HYBRID CABLES FROM (N) EQUIPMENT CABINETS TO EACH (N) DC SURGE <br />SUPPRESSOR UNITS (TOTAL 3) <br />·INSTALL (1) (N) 30KW AC STANDY-BY GENERATOR WITH 203 GALLON TRIPLE WALL TERTIARY <br />DIESEL FUEL TANK WITH CONTAINMENT ON CONCRETE PAD INSIDE (N) EQUIPMENT ENCLOSURE <br />·INSTALL (1) (N) GPS ANTENNA MOUNTED TO AND 12" ABOVE CABLE SHROUD. <br />·INSTALL (N) ELECTRICAL SERVICE CONNECTION <br />·INSTALL (N) FIBER SERVICE CONNECTION <br />VERIZON PROPOSES TO CONSTRUCT AN UNMANNED WIRELESS TELECOMMUNICATION FACILITY <br />THAT WILL CONSIST OF THE FOLLOWING: <br />ARCHITECT: <br />PLANCOM, INC. <br />16776 BERNARDO CENTER DR, UNIT 203 <br />SAN DIEGO, CA 92128 <br />CONTACT: WILLIAM BOOTH <br />TELEPHONE: (760) 891-6107 <br />PLANCOM, INC. <br />250 EL CAMINO REAL, SUITE 117 <br />TUSTIN, CA 92780 <br />CONTACT: ERIC MEURS <br />TELEPHONE: (949) 370-5939 <br />PLANCOM, INC. <br />250 EL CAMINO REAL, SUITE 117 <br />TUSTIN, CA 92780 <br />CONTACT: PETER BLIED <br />TELEPHONE: (714) 262-0651 <br />NORTH <br />RFDS INFORMATION <br />SURVEYOR: <br />AJK ENGINEERING & SURVEY <br />23072 LAKE CENTER DRIVE, SUITE 211 <br />LAKE FOREST, CALIFORNIA 92630 <br />CONTACT: ANDREW KOLTAVARY <br />TELEPHONE: (714) 624-9027 <br />·TURN RIGHT ONTO VALLEY OAK DR. <br />·TURN LEFT ONTO IRVINE CENTER DR. <br />·TURN RIGHT ONTO JEFFREY RD. <br />·TAKE THE RAMP AND MERGE ONTO I-5 N. <br />·TAKE EXIT 105B TOWARD MAIN ST. <br />·KEEP RIGHT, FOLLOW SIGNS FOR MAIN STREET. <br />·TURN SLIGHT RIGHT ONTO MAIN ST. <br />·TURN ONTO MEMORY LANE <br />DESTINATION IS THE PARKING GARAGE ON THE RIGHT. <br />PLANCOM, INC. <br />250 EL CAMINO REAL, SUITE 117 <br />TUSTIN, CA 92780 <br />CONTACT: ERIC MEURS <br />TELEPHONE: (949) 370-5939 ALL THAT CERTAIN REAL PROPERTY <br />SITUATED IN THE CITY OF SANTA ANA, <br />COUNTY OF ORANGE, STATE OF <br />CALIFORNIA, DESCRIBED AS FOLLOWS: <br />PARCEL 1, OF PARCEL MAP NO. 85-365, IN <br />THE CITY OF SANTA ANA, COUNTY OF <br />ORANGE, STATE OF CALIFORNIA, AS <br />SHOWN ON A MAP FILED IN BOOK 214, <br />PAGES 11 AND 12 OF PARCEL MAPS, <br />RECORD OF ORANGE COUNTY, <br />CALIFORNIA <br />PROPERTY OWNER: <br />OC MAIN STREET OWNER, LLC <br />1920 MAIN STREET STE. 100 <br />IRVINE, CA 92614 <br />CONTACT: STEVE LIU - NAI CAPITAL <br />TELEPHONE: (714) 349-3547 <br />ZONING CLASSIFICATION: <br />TYPE OF CONSTRUCTION:TYPE I NON-SPRINKLERED <br />S-2, LOW HAZARD STORAGE <br />CONSTRUCTION INFORMATION: <br />OCCUPANCY: <br />(PARKING GARAGE): <br />ADA COMPLIANCE: <br />USE:WIRELESS COMMUNICATIONS FACILITY <br />FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. <br />MACHINERY SPACES ARE EXEMPT FROM STATE OF <br />CALIFORNIA ACCESSIBILITY REQUIREMENTS PER THE CBC <br />SECTION 11B-203.5. <br />AREA OF CONSTRUCTION:456 S.F. <br />EQUIPMENT ENCLOSURE:293 S.F. <br />ROOFTOP SCREEN AREAS:163 S.F. <br />(EQUIPMENT ENCLOSURE):U <br />SD31 - SPECIFIC DEVELOPMENT NO. 31 <br />LATITUDE: <br />LONGITUDE: <br />BETA SECTOR: <br />33° 46' 18.48"N (33.771800°) <br />117° 51' 57.80"W (-117.866056°) <br />LATITUDE: <br />LONGITUDE: <br />ALPHA SECTOR: <br />33° 46' 19.78"N (33.772161°) <br />-117° 51' 56.44"W (-117.865678°) <br />LATITUDE: <br />LONGITUDE: <br />GAMMA SECTOR: <br />33° 46' 21.36"N (33.772600°) <br />117° 51' 57.57"W (-117.865992°) <br />ANTENNA PLANS "BETA" & "GAMMA" <br />SCREEN FRAMING ELEVATIONS <br />EXTERIOR ELEVATIONS <br />E-8 ELECTRICAL DETAILS <br />ANTENNA GROUNDING PLANS <br />D-10 DETAILS <br />PARTIAL ROOF PLAN & CONDUIT PATHA-1.1 <br />LATITUDE: <br />LONGITUDE: <br />TOP OF ELEVATOR SHAFT: <br />33° 46' 19.76"N (33.772156°) <br />117° 51' 58.70"W (-117.866306°) <br />CITY APPROVAL STAMPS <br />Bldg #101123169-70 <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - J. Lo <br />POLICE - B. Martin <br />PUBLIC WWORKS - Y. Soto