Loading...
HomeMy WebLinkAbout2232 S Lowell St - PlanEXISTING RESIDENCE 2234 S. LOWELL ST. 1,288 S.F. 2234 S. LOWELL ST. EXISTING PUBLIC SIDEWALK EXISTING PARKWAY EX I S T I N G DR I V E W A Y EXISTING FRONT YARD P.L. 50.0' EXISTING PORCH 103 S.F. ℄ EXISTING COVERED PATIO 117 S.F. 5' - 0 " 39 ' - 0 " 7' - 1 1 " 9' - 7 " 10 1 ' - 1 0 " 25 ' - 1 " 4' - 0 " 8' - 0 " 18 ' - 0 " P. L . 1 3 3 . 3 4 ' P. L . 1 3 3 . 3 4 ' P.L. 50.0' 4'-0"25'-8"20'-4" 70 ' - 4 " 37 ' - 1 1 " 0" PROPOSED ADU 1,000 S.F. 2232 S. LOWELL ST. 5'-0"15'-7"15'-4"14'-2" 5'-0"30'-11"14'-2" 2232 S. LOWELL ST, SANTA ANA, CA 92707 T1 COVER SHEET OVERALL: EXISTING GARAGE * DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ.FT DETACHED ADU (COMMON AREAS 489 S.F. / PRIVATE AREAS 511 S.F.) WITH 3 BEDROOMS, 2 BATHROOMS, 1 KITCHEN, STACKABLE WASHER AND DRYER, AND FRONT PORCH. *RETROFIT EXISTING GARAGE WALLS. *REMOVE EXISTING GARAGE ROOF. *REMOVE EXISTING STORAGE ROOM. *REMOVE AND REPLACE EXISTING FOUNDATION. * INSTALL NEW A/C MECHANICAL SYSTEM.. *INSTALL NEW ELECTRICAL METER. *INSTALL NEW TANKLESS WATER HEATER. *INSTALL NEW RECESSED CEILING LIGHT FIXTURES. PROJECT ADDRESS: APN: ZONING: LOT AREA; STORIES: CONSTRUCTION TYPE: OCCUPANCY: 2232 S. LOWELL ST, SANTA ANA, CA 92707 - APPROX. 6,667 SF. 1-STORY VB GROUP 3R SINGLE FAMILY RESIDENCE 015-172-22 PROJECT DATA APPLICABLE CODES PROJECT SCOPE GENERAL NOTES ARCHITECTURAL ABBREVIATIONS & SYMBOLS ´ SCALE: 1/16" = 1'-0"PLOT PLAN TRUE NORTH EXISTING DWELLING:NON SPRINKLERED 2022 CALIFORNIA BUILDING CODE 2022 CALIFORNIA RESIDENTIAL CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA ENERGY CODE 2022 CALIFORNIA HISTORICAL BUILDING CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA EXISTING BUILDING CODE 2022 CALIFORNIA GREEN BUILDING CODE SANTA ANA MUNICIPAL CODE CARLOS GONZALEZ 2234 S. LOWELL ST, SANTA ANA, CA 92707 TEL. 714.988.5387 PROJECT TEAM OWNER: DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU SQUARE FOOTAGE SHEET NUMBERBASIC: EXISTING RESIDENCE 1,288 S.F. EXISTING GARAGE 400 S.F. 2,391 S.F.EXISTING TOTAL SITE: EXISTING LOT AREA EXISTING TOTAL LOT COVERAGE PERCENT LOT COVERAGE 6,667 S.F. 2,391 S.F. 35.86% A-1.0 A-1.0 ROPOSED SITE INFORMATION EXISTING PORCH 103 S.F.A-1.0 NEW GARAGE ADDITION 600 S.F. (1,000 S.F.) (NEW 1000 SQ. FT. / (E) RESIDENCE 1,288 SQ.FT. = 0.78) SQUARE FOOTAGE SHEET NUMBERBASIC: EXISTING RESIDENCE 1,288 S.F. EXISTING GARAGE 400 S.F. 1,908 S.F.EXISTING TOTAL SITE: EXISTING LOT AREA EXISTING TOTAL LOT COVERAGE PERCENT LOT COVERAGE 6,667 S.F. 1,908 S.F. 28.6% A-1.0 A-1.0 EXISTING SITE INFORMATION EXISTING PORCH 103 S.F.A-1.0 117 S.F.A-1.0EXISTING METAL COVERED PATIO NOTE: ALL CABLES AND UTILITIES BETWEEN MAIN DWELLING AND DETACHED ADU TO BE UNDERGROUND PER SECTION 41-626 OF THE SAMC. HL QUALITY PLANS 3905 S. ROSS ST. SANTA ANA CA. 92707 TEL.: 714.585.0546 CONTACT: HUMBERTO LOPEZ EMAIL: hlqualityplans@gmail.com PLAN PREPARER: CARSTAIRS ENERGY INC. 2238 BAYVIEW HEIGHTS DRIVE, SUITE E LOS OSOS, CA. 92402 TEL.: 805.904.9048 EMAIL: title24@yahoo.com TITLE 24 ENERGY ANALISIS: CASTILLO ENGINEERING 1147 E MARKET ST. LONG BEACH, CA. TEL.: 562.961.5600 CONTACT: MARGARITO CASTILLO EMAIL: CASTILLOENGINEERING.COM STRUCTURAL: SHEET INDEX SHEET NO. 1 2 3 4 5 COVER SHEETT1 EXISTING SITE & NEW SITE PLAN A-1.0 A-2.0 A-3.0 A-4.0 6 8 D-1 DETAILS9 T24.1 TITLE-2410 T24.1 TITLE-2411 T24.1 TITLE-2412 STRUCTURAL NOTESS1.0 TYPICAL DETAILSS1.1 16 17 FOUNDATION PLANS2.0 ROOF FRAMING PLANS2.2 ROOF FRAMING DETAILSS5.0 TYPICAL DETAILSS1.2 TYPICAL DETAILSS1.3 STRUCTURAL 13 A-5.0 7 14 15 ADU FLOOR PLAN ADU UTILITY PLAN DEMOLITION PLAN, ADU ROOF PLAN, & BUILDING SECTIONS ADU EXTERIOR ELEVATIONS CALGREENA0.1 CALGREENA0.2 18 19 20 FOUNDATION DETAILSS3.0 1 1 NOTE: MINIMUM 2.37 KWDC PV SYSTEM IS REQUIRED. SEPARATE PERMIT IS REQUIRED AND SHALL BE ISSUED PRIOR TO BUILDING FRAMING INSPECTION IS SCHEDULED. 1 1 1 NOTE: THE GRADE SHALL FALL NOT FEWER THAN 6 INCHES WITHIN THE FIRST 10 FEET FROM THE FOUNDATION WALL. WHERE LOT LINES, WALLS, SLOPES OR OTHER PHYSICAL BARRIERS PROHIBIT 6 INCHES OF FALL WITHIN 10 FEET, DRAINS OR SWALES SHALL BE CONSTRUCTED TO ENSURE DRAINAGE AWAY FROM THE STRUCTURE. IMPERVIOUS SURFACES WITHIN 10 FEET OF THE BUILDING FOUNDATION SHALL BE SLOPED NOT LESS THAN 2 PERCENT AWAY FROM THE BUILDING. (R401.3 CRC) 1 SCALE: N.T.S. VICINITY MAP TRUE NORTH EXISTING PUBLIC TRANSIT SITE LOC. è è è è è è è è Bldg #101123271 APPROVALS: PLNG - C. Santana BLDG - T. Le POLICE - B. Martin PUBLIC WORKS - B. Sarlak 2234 S LOWELL ST.℄ P. L . 1 3 3 . 3 4 ' P.L. 50.0' (E) S (E) W (E) G (E) S(E) G (E) S (E) W (E) G P. L . 1 3 3 . 3 4 ' P.L. 50.0' EXISTING RESIDENCE 2234 S. LOWELL ST. 1,288 S.F. 8' - 0 " 4' - 0 " (E ) 2 5 ' - 1 " SE T B A C K 46 ' - 9 " 9' - 7 " (N ) 7 ' - 1 1 " SE T B A C K 39 ' - 0 " (N ) 5 ' - 0 " SE T B A C K (N) 4'-0" SETBACK 25'-8"(N) 20'-4" SETBACK 70 ' - 4 " 37 ' - 1 1 " (E ) 3 7 ' - 1 " SE T B A C K 18 ' - 0 " (E) 5'-0" SETBACK (E) 14'-2" SETBACK 15'-7"14'-7"(E) 14'-10" SETBACK (E) 14'-2" SETBACK 14'-10" (E) 5'-0" SETBACK è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è è èèè PROPOSED ADU 1,000 S.F. 2232 S. LOWELL ST. (N) S (N) S (N) S (N) S (N) S (N) S (N) S (N) S APPROX. POINT OF (N) CONNECTION, FIELD VERFIY. 1% S L O P E D SW A L E 1% S L O P E D SWA L E 5% S L O P E D SW A L E 2% S L O P E D SWA L E 1% S L O P E D SW A L E 5% S L O P E D SW A L E 2% S L O P E D SW A L E 5% SLOPED 2% S L O P E D SWA L E 2% S L O P E D SWA L E 5% SLOPED 2% S L O P E D SW A L E 5% SLOPED 2% S L O P E D SWA L E 2% S L O P E D 5% SLOPED 2% S L O P E D 5% SLOPED 1% S L O P E D SW A L E 1% S L O P E D SW A L E 1% S L O P E D SW A L E 1% S L O P E D SW A L E 5% S L O P E D SW A L E 5% S L O P E D SW A L E EXISTING RESIDENCE 1,288 S.F. 2234 S LOWELL ST.℄ P. L . 1 3 3 . 3 4 ' EXISTING PUBLIC SIDEWALK EXISTING PARKWAY EXISTING DRIVEWAY EXISTING FRONT YARD EXISTING REAR YARD P.L. 50.0' (E) PORCH 177 S.F. (E) S (E) W (E) G (E) S(E) G (E) S (E) W (E) G P. L . 1 3 3 . 3 4 ' P.L. 50.0' (E) OPEN PATIO COVERED 177 S.F. EXISTING ADJACENT PROPERTY EX I S T I N G A D J A C E N T P R O P E R T Y EX I S T I N G A D J A C E N T P R O P E R T Y EXISTING GARAGE 400 S.F. EXISTING STORAGE A-1.0 EXISTING SITE PLAN / NEW SITE PLAN NEW SITE PLAN SCALE: 1/8" = 1'-0" TRUE NORTH (E) ELECTRICAL METER. (E) PUBLIC SIDEWALK. (E) DRIVEWAY. (E) FRONT YARD. (E) BUILDING WALL. (E) WATER METER. 01 # 02 03 04 05 06 07 08 09 10 11 12 13 SITE PLAN KEYNOTES 14 15 (E) PROPERTY LINE. (E) BUILDING ROOF. (E) PARKWAY. (E) STREET CURB. (E) STREET CENTER LINE. LEGEND (E) = DENOTES EXISTING TO REMAIN (N) = DENOTES NEW (R) = DENOTES RELOCATE DENOTES NEW CONSTRUCTION (E) BLOCK FENCE (E) REAR YARD. 16 17 è è è èACCESSIBLE PATH TO TRAVEL (D) = DENOTES TO BE REMOVED EXISTING SITE PLAN SCALE: 1/8" = 1'-0" TRUE NORTH (N) ELECTRICAL METER. (E) GAS METER TO REMAIN. (N) A/C CONDENSER UNIT. (E) DECORATIVE METAL COVERED PATIO. UTILITIES LEGEND (E) S (E) G (E) W (E) E (E ) S L O P E CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU (E ) S L O P E (E ) S L O P E (E ) S L O P E (E ) S L O P E (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E ) S L O P E (E ) S L O P E (E) SLOPE (E) SLOPE (E) SLOPE (E) SLOPE (E ) S L O P E (E ) S L O P E 0102 01 02 01 02 08 03 04 05 06 07 01 09 10 11 1213 14 15 18 19 (N) BUILDING WALL. (N) BUILDING ROOF. SQUARE FOOTAGE SHEET NUMBERBASIC: EXISTING RESIDENCE 1,288 S.F. EXISTING GARAGE 400 S.F. 2,391 S.F.EXISTING TOTAL SITE: EXISTING LOT AREA EXISTING TOTAL LOT COVERAGE PERCENT LOT COVERAGE 6,667 S.F. 2,391 S.F. 35.86% A-1.0 A-1.0 ROPOSED SITE INFORMATION EXISTING PORCH 103 S.F.A-1.0 NEW GARAGE ADDITION 600 S.F. (1,000 S.F.) (NEW 1000 SQ. FT. / (E) RESIDENCE 1,288 SQ.FT. = 0.78) SQUARE FOOTAGE SHEET NUMBERBASIC: EXISTING RESIDENCE 1,288 S.F. EXISTING GARAGE 400 S.F. 1,908 S.F.EXISTING TOTAL SITE: EXISTING LOT AREA EXISTING TOTAL LOT COVERAGE PERCENT LOT COVERAGE 6,667 S.F. 1,908 S.F. 28.6% A-1.0 A-1.0 EXISTING SITE INFORMATION EXISTING PORCH 103 S.F.A-1.0 117 S.F.A-1.0EXISTING METAL COVERED PATIO 16 17 (N) (N) 1918 (N) S (N)(N) 4: 1 2 4: 1 2 4: 1 2 4: 1 2 1 13 ' - 1 0 " 9' - 0 " 2 A-2.0 2 A-2.0 1 A-2.0 1 A-2.0 10 ' - 6 " 13 ' - 1 0 " 9' - 0 " A-2.0 GARAGE DEMOLITION FLOOR PLANS, AND ROOF PLANS (E) = DENOTES EXISTING TO REMAIN (N) = DENOTES NEW (R) = DENOTES RELOCATED (D) = DENOTES TO BE REMOVED EXISTING GARAGE / EXISTING STORAGE DEMOLITION FLOOR PLANS TRUE NORTH SCALE: 1/4" = 1'-0" LEGEND EXISTING CONSTRUCTION TO BE REMOVED EXISTING CONSTRUCTION TO REMAIN 01 DEMOLITION PLAN KEYNOTES# 02 03 04 (E) CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU EXISTING ROOF TO BE REMOVED ADU ROOF PLAN SCALE: 1/4" = 1'-0" SECTION 1 SCALE: 1/4" = 1'-0"SECTION 2 SCALE: 1/4" = 1'-0" SECTION KEYNOTES 01 02 03 04 06 07 05 08 09 10 11 12 NEW 2X INTERIOR NON BEARING WOOD WALL, PER STRUCTURAL PLANS. NEW CONCRETE LANDING PAD. ATTIC VENTILATION NOTES ROOF PLAN NOTES VENTILATION SCHEDULE: TIMBER LINE ASPHALT SHINGLES MIN. CLASS "A" ICC ESR #1475 #790. ROOF AREALINE OF BUILDING WALL BELOW.01 # 02 ROOF KEYNOTES LINE OF BUILDING ROOF. 03 ASPHALT SHINGLES ROOFING MATERIAL, MIN. CLASS "B" ICC ESR #1475 #790 04 DORMER VENTS OR EQUAL, PER VENTILATION SCHEDULE. TRUE NORTH LEGEND (E) = DENOTES EXISTING TO REMAIN (N) = DENOTES NEW (R) = DENOTES RELOCATE NEW RIDGE, PER STRUCTURAL PLANS. NEW 2X CEILING JOIST, PER STRUCTURAL PLANS. NEW CONCRETE FOOTING, PER STRUCTURAL PLANS. NEW 2X WOOD FRAME STUD AT 16" O.C., PER STRUCTURAL PLANS. NEW PLYWOOD OVER ROOF RAFTERS, PER STRUCTURAL PLANS. ATTIC INSULATION R-38, PER TITLE -24. WALL INSULATION R-15, PER TITLE -24. NEW WOOD BEAM / HEADER, PER STRUCTURAL PLANS NEW 2X ROOF RAFTERS, PER STRUCTURAL PLANS. NEW CONCRETE SLAB, PER STRUCTURAL PLANS. SL O P E 4: 1 2 SL O P E 4: 1 2 SL O P E 4: 1 2 SL O P E 4: 1 2 01 TYP. 02 TYP. 03 TYP. 04 TYP. (E) (E ) (E ) (E ) (E ) (E ) 01 02 TYP. 06 TYP.TYP. 06 TYP. 07 TYP. 03 TYP. 02 TYP. 06 07 03 TYP. 05 04 05 01 02 03 04 11 06 07 01 02 03 04 11 06 07 TYP. TYP. TYP.TYP.TYP.TYP. TYP. TYP.TYP.TYP.TYP. TYP. TYP. TYP. 05 TYP. 08 TYP. 08 TYP. TYP. 09 10 TYP. TYP. 05 TYP. 09 10 TYP. 12 TYP. 03 TYP. 10 TYP. TYP. 13 13 NEW 7/8" STUCCO OVER PLYWOOD (MERLEX) P-897 HUMBOLDT. GRATE ROOMBATHVASTIBULE ATTIC 2% SLOPE F.G.2% SLOPEF.G. 2% SLOPEF.G.2% SLOPE F.G. EAVE EA V E 4" 12" 4" 12" T.O. ROOF T.O. ROOF T.O.F.F. T.O.P. T.O.F.F. T.O. ROOF T.O.P. T.O.F.F. 14 ROOF INSULATION R-19, PER TITLE -24. 14 14 TYP. 1 1 TYP. 1 1'-0" TYP. 1' - 0 " TY P . LEGEND: 1 HR. FIRE RATED ROOF EAVE1 05 AREA FOR REQUIRED PV SYSTEM, PER PV PLANS. 05 1 1 16 D-1 16 D-1 19'-3" WALL ABOVE GARAGE DOOR TO REMAIN, SEE NEW BUILDING EAST ELEVATION 3'-2" WALL TO REMAIN 1 01 16 D-1 16 D-1 16 D-1 16 D-1 1 1 1 1 1 1 EX I S T I N G U T I L I T I E S MI N . 8 ' - 6 " R O O F CL E A R A N C E S A B O V E NE W A D U R O O F 13 D-1 TYP. 13 ' - 1 0 " 8" 9' - 0 " 13 ' - 1 0 " 9' - 0 " 8" 10 ' - 8 " 19'-3" EXISTING WALL TO REMAIN V.I.F. 2' - 0 " 8' - 0 " 6'-5" 9 D-1 14 D-1 9 D-1 TYP. TYP. TYP. 6' - 8 " WD W . H D R . ( T Y P . ) A-3.0 NEW ADU EXTERIOR ELEVATIONS, ROOF PLAN AND SECTIONS SOUTH ELEVATION (REAR SIDE) EAST ELEVATION (LEFT SIDE) WEST ELEVATION (RIGHT SIDE)SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" NORTH ELEVATION (FRONT SIDE)SCALE: 1/4" = 1'-0" ELEVATION NOTES ROOF TO MATCH EXISTING MAIN HOUSE, FIELD VERIFY. 2X WOOD FASCIA BOARD. 7/8" STUCCO OVER PLYWOOD (MERLEX) P-897 HUMBOLDT. ALL WINDOWS ARE TO BE VINYL, WINDOW & TRIM TO MATCH (E) MAIN HOUSE. BUILDING SHALL HAVE APPROVED ADDRESS NUMBERS (CRC R319.1) IN A POSITION THAT IS PLAINLY VISIBLE FROM THE STREET FRONTING THE PROPERTY. NUMBERS SHALL CONTRAST WITH THEIR BACKGROUND. ADDRESS NUMBERS SHALL BE A MINIMUM 4 INCHES HIGH AND 1/2 INCH STROKE WIDTH. IF ILLUMINATED; COMPLY WITH CALIFORNIA ENERGY CODE SECTION 140.8; OR SIGN SHALL CONSUME NO MORE THAN 5 WATTS OF POWER AS DETERMINED ACCORDING TO SECTION 130.0(C). G.I. FLASHING OR EQUAL. CONCRETE STOOP/PORCH. WALL MOUNTED LIGHT FIXTURE, SEE UTILITY PLAN. STUCCO WEEP SCREED, SEE DETAIL 13/-D-1. ELECTRICAL METER & (E) GAS SERVICE METER, SEE SITE PLAN & UTILITY PLAN. INSTALL WATER-RESISTIVE VAPOR-PERMEABLE BARRIER AT LEAST EQUIVALENT TO 2 LAYERS OF GRADE D PAPER (FELT) OVER PLYWOOD SHEATHING WHERE STUCCO IS USED ON EXTERIOR WALLS (R703.7.3) FLOOR MOUNTED AIR CONDITIONER CONDENSER UNIT. 01 02 03 04 05 06 07 08 09 10 11 13 14 15 # DORMER VENT, PER ROOF PLAN. ALL EXTERIOR ELEVATIONS INCLUDING FINISHES, COLORS, AND ROOFING MATERIALS SHALL MATCH THE PRIMARY DWELLING. ROOFING TO MATCH EXISTING ASPHALT SHINGLE MIN. CLASS "B" ICCESR #1475 #790. LEGEND: EXISTING WALL TO REMAIN 12 CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU 01 TYP. 02 TYP. 03 TYP. 04 TYP. 05 TYP. 0607 TYP. 08 TYP. 09 INT. F.F. F.G. 2% SLOPE 2% SLOPE F.G. T.O.P. T.O. ROOF 10 TYP. 11 TYP. WATER HEATER ACCESS DOOR 12 TYP. 13 14 TYP. INT. F.F. F.G. 2% SLOPE T.O.P. T.O. ROOF T.O. ROOF OPEN OPEN F.G. 2% SLOPE2% SLOPE F.G. 2% SLOPE F.G. 2% SLOPE F.G.F.G. 2% SLOPE 16 16 A/C CONDENSER SHUT OFF SWITCH. 1 EX I S T I N G W A L L T O R E M A I N V . I . F . (E ) W A L L T O RE M A I N V . I . F . 1 1 1 (E) WALL TO REMAIN V.I.F. 1 STACKABLE W./D. SI N K ST O V E REF. 4'-5"8'-7"2'-4"6'-4"4'-0" 5' - 0 " 6' - 6 " 3' - 0 " 10 ' - 9 " 5' - 3 " 7'-4"5'-8"6'-8"3'-2"2'-10" 12'-8"13'-0" 25'-8" 16 ' - 0 " 23 ' - 0 " 13'-0"12'-8" 25'-8" 10 ' - 9 " 2' - 9 " 2' - 1 1 " 5' - 2 " 5' - 2 " 9' - 4 " 5' - 8 " 10 ' - 5 " 39 ' - 0 " 3' - 6 " 3' - 6 " 7'-10" 7'-10" 1' - 3 " 1' - 3 " 1'-3"1'-3" 8' - 6 " +2" BEDROOM 2 CLNG. HT. 9'-0" BATH CLNG. HT. 9'-0" BEDROOM 1 CLNG. HT. 9'-0" MASTER BEDROOM CLNG. HT. 9'-0" MASTER BATH. CLNG. HT. 9'-0" KITCHEN CLNG. HT. 9'-0" GREAT ROOM CLNG. HT. 9'-0" MAIN ENTRY 3'-9" 2" 1' - 2 " 2" 1' - 2 " 15 ' - 0 " 1'-2" 5'-1" 7' - 0 " 4' - 4 " 2" 01 02 03 04 05 8' - 2 " 06 07 05 07 09 10 11 0611 12 13 14 14 15 15 15 15 15 16 16 16 16 16 18 19 20 20 21 21 21 21 21 22 22 08 23 17 2'-4" 3'-1"2'-7" 2' - 1 0 " 24 22 2' - 6 " 2'-6" 2'-4" A-4.0 NEW ADU FLOOR PLAN & UTILITY PLAN NEW ADU FLOOR PLAN WALL LEGEND NOTES PLUMBING NOTES SIZE:WINDOW SCHED.: U-FACTOR - 0.3 SHGC - 0.23ALL WINDOWS: SIZE:DOOR SCHEDULE: SCALE: 1/4" = 1'-0" 12" 12" TRUE NORTH 1 A-2.0 1 A-2.0 2 A-2.0 2 A-2.0 05 06 07 13 14 16 18 11 FLOOR PLAN KEYNOTES 01 03 04 02 08 09 10 15 17 12 19 20 ¨ 21 " 22 LOUVER DOOR ELEVATION CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU 23 1 1 1 241 1 1 12 D-1 1 16 D-1 12 D-1 1 2 D-1 1 16 D-1 2 REF. W.H. SINK STACKABLE W./D. BEDROOM 2 CLNG. HT. 9'-0" BATH CLNG. HT. 9'-0" MASTER BEDROOM CLNG. HT. 9'-0" MASTER BATH. CLNG. HT. 9'-0" KITCHEN CLNG. HT. 9'-0" GREAT ROOM CLNG. HT. 9'-0" MAIN ENTRY ST O V E 19 18 19 18 20 1716 14 11 12 13 11 12 14 15 11 12 10 09 14 11 12 0908 08 08 08 1614 11 12 0908 07 07 07 0605 04 03 03 02 01 14 11 12 08 0301 01 01 01 BEDROOM 1 CLNG. HT. 9'-0" 14 15 11 1208 03 01 14 15 11 1208 03 01 21 A-5.0 UTILITY PLAN NEW ADU UTILITY FLOOR PLAN 01 03 10 11 12 UTILITY NOTES UTILITY LEGEND UTILITY PLAN KEYNOTES 02 04 05 06 07 08 09 13 14 15 16 SCALE: 1/4" = 1'-0" TRUE NORTH 17 18 19 " " "" """" "" “”“” 20 CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU PLUMBING SIZING CHART SANITARY DRAINAGE WATER FXT.QTY.DFU(ea)DFU WC QTY.WSFU(ea)WSFU LAV BT WB KS 2 2 2 1 1 3 2 4 3 2 WC LAV BT WB KS 1 1 2.5 1 4 4 1.5 FXT. TOTAL DFU:TOTAL WSFU: 4" MAIN TO STREET SERVICE SIZE: 1 1/4" 6 2 4 2 3 5 2 8 4 1.5 2 2 2 15 20.5 1 1 1 1 1  1 211 1 20' MAX. 5' - 1 " M I N . C L R . TANKLESS WATER HEATER REFER TO MANUFACTURER MINIMUM MOUNTING CLEARANCES UNIT MAY BE MOUNTED ON A WALL OR BE FREE STANDING USE NON-COMBUSTIBLE BASE (IF APPLICABLE) VERIFY REFER TO MANUFACTURER MINIMUM MOUNTING CLEARANCES AROUND THE UNIT TO P C L E A R A N C E SIDE CLEARANCE TANKLESS WATER HEATER FRONT CLEARANCE MIN. BACK CLEARANCE VENTING MUST COMPLY WITH ALL STATE AND LOCAL CODES AND MANUFACTURER'S INSTRUCTIONS NOTE:UNIFORM PLUMBING CODE REQUIRES THAT ALL WATER HEATERS ARE TO BE SUPPORTED AND STRAPPED TO PREVENT MOVEMENT DURING AN EARTHQUAKE GAS SHUTOFF VALVE COLD HOT 1. IDENTIFY THE INSTALLATION LOCATION AND CONFIRM THAT THE INSTALLATION WILL MEET ALL REQUIRED CLEARANCES. 2. SECURELY ATTACH THE WATER HEATER TO THE WALL USING ANY OF THE HOLES IN THE WALL INSTALLATION BRACKETS WHICH ARE AT THE TOP AND BOTTOM OF THE WATER HEATER. ENSURE THAT THE ATTACHMENT STRENGTH IS SUFFICIENT TO SUPPORT THE WEIGHT. REFER TO THE WEIGHT OF THE WATER HEATER IN THE SPECIFICATIONS SECTION. ATTACHMENT VENTING MUST COMPLY WITH NATIONAL CODES, LOCAL CODES AND MANUFACTURER'S INSTRUCTIONS SEALED COMBUSTION UNITS (ALL COMBUSTION AIR FROM OUTSIDE OF THE BUILDING) - PROVIDE CODE APPROVED CONDENSATE DRAIN SPECIFY INDOOR OR OUTDOOR UNIT POWER 120 VOLTS (REFER TO MANUFACTURER SPECIFICATIONS) GAS SHUTOFF VALVE HOT PRESSURE RELIEF VALVE WATER SHUTOFF VALVE GAS SUPPLY LINE (CHECK RATING PLATE FOR CORRECT GAS TYPE AND PRESSURE) NOTES: ·WATER HEATER MUST BE INSTALLED TO CONFORM WITH CURRENT NATIONAL ELECTRIC CODE, NATIONAL FUEL GAS CODE, AND ANY APPLICABLE LOCAL PLUMBING, ELECTRICAL, HEATING AND AIR CONDITIONING CODES, AND MANUFACTURER INSTALLATION NSTRUCTIONS ·PROTECT HEATER FROM FREEZING ·SPECIFY NATURAL GAS OR PROPANE DRAIN PAN REQUIRED IF INSTALLED IN AN AREA WHERE WATER DAMAGE CAN OCCUR PROVIDE SUITABLE DRAIN TANKLESS WATER HEATER COLD 8" MI N . 2' - 0 " 1'-0" UNDERSIDE 1-HR. FIRE RATED 8" MI N . 2' - 0 " 1'-0" D-1 DETAILS CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU 1 1 1 STRUCTURAL NOTES S1.0 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS DRAWN : CHECKED : DATE : JOB NO. MARK DATE PROJECT: 25-285 CARLOS 31 JUL 25 . . . . . . . . . . . . TITLE GA R A G E T O A D U 22 3 4 S . L O W E L L S T R E E T . 3 1 2 3 1147 E MARKET ST. LONG BEACH, CA 90805 T:562-961-5600 ext.107 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 22 3 4 S . L O W E L L S T R E E T . SA N T A A N A , C A . 9 2 7 0 7 WWW.CASTILLOENGINEERING.COM 562-506-3692 CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS TO THE C.B.C. CRISTIAN STRUCTURAL NOTES TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4 TYPICAL DETAIL5TYPICAL DETAIL6TYPICAL DETAIL7TYPICAL DETAIL8 TYPICAL DETAIL12 TYPICAL DETAIL11 TYPICAL DETAIL10 TYPICAL DETAIL9 TYPICAL DETAIL3 S1.1 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS DRAWN : CHECKED : DATE : JOB NO. MARK DATE PROJECT: 25-285 CARLOS 31 JUL 25 . . . . . . . . . . . . TITLE GA R A G E T O A D U 22 3 4 S . L O W E L L S T R E E T . 3 1 2 3 1147 E MARKET ST. LONG BEACH, CA 90805 T:562-961-5600 ext.107 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 22 3 4 S . L O W E L L S T R E E T . SA N T A A N A , C A . 9 2 7 0 7 WWW.CASTILLOENGINEERING.COM 562-506-3692 CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS TO THE C.B.C. CRISTIAN TYPICAL DETAILS TYPICAL DETAIL2TYPICAL DETAIL4 TYPICAL DETAIL5TYPICAL DETAIL8 TYPICAL DETAIL12 TYPICAL DETAIL9TYPICAL DETAIL10 S1.2 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS DRAWN : CHECKED : DATE : JOB NO. MARK DATE PROJECT: 25-285 CARLOS 31 JUL 25 . . . . . . . . . . . . TITLE GA R A G E T O A D U 22 3 4 S . L O W E L L S T R E E T . 3 1 2 3 1147 E MARKET ST. LONG BEACH, CA 90805 T:562-961-5600 ext.107 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 22 3 4 S . L O W E L L S T R E E T . SA N T A A N A , C A . 9 2 7 0 7 WWW.CASTILLOENGINEERING.COM 562-506-3692 CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS TO THE C.B.C. CRISTIAN TYPICAL DETAILS TYPICAL DETAIL1TYPICAL DETAIL2TYPICAL DETAIL4 TYPICAL DETAIL12 TYPICAL DETAIL11 TYPICAL DETAIL3 TYPICAL DETAIL9TYPICAL DETAIL10 S1.3 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS DRAWN : CHECKED : DATE : JOB NO. MARK DATE PROJECT: 25-285 CARLOS 31 JUL 25 . . . . . . . . . . . . TITLE GA R A G E T O A D U 22 3 4 S . L O W E L L S T R E E T . 3 1 2 3 1147 E MARKET ST. LONG BEACH, CA 90805 T:562-961-5600 ext.107 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 22 3 4 S . L O W E L L S T R E E T . SA N T A A N A , C A . 9 2 7 0 7 WWW.CASTILLOENGINEERING.COM 562-506-3692 CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS TO THE C.B.C. CRISTIAN TYPICAL DETAILS N1FOUNDATION PLAN S2.0 FOUNDATION PLAN SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS DRAWN : CHECKED : DATE : JOB NO. MARK DATE PROJECT: 25-285 CARLOS 31 JUL 25 . . . . . . . . . . . . TITLE GA R A G E T O A D U 22 3 4 S . L O W E L L S T R E E T . 3 1 2 3 1147 E MARKET ST. LONG BEACH, CA 90805 T:562-961-5600 ext.107 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 22 3 4 S . L O W E L L S T R E E T . SA N T A A N A , C A . 9 2 7 0 7 WWW.CASTILLOENGINEERING.COM 562-506-3692 CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS TO THE C.B.C. CRISTIAN N1ROOF FRAMING PLAN C.J. C.J.C.J. S2.2 ROOF FRAMING PLAN SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS DRAWN : CHECKED : DATE : JOB NO. MARK DATE PROJECT: 25-285 CARLOS 31 JUL 25 . . . . . . . . . . . . TITLE GA R A G E T O A D U 22 3 4 S . L O W E L L S T R E E T . 3 1 2 3 1147 E MARKET ST. LONG BEACH, CA 90805 T:562-961-5600 ext.107 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 22 3 4 S . L O W E L L S T R E E T . SA N T A A N A , C A . 9 2 7 0 7 WWW.CASTILLOENGINEERING.COM 562-506-3692 CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS TO THE C.B.C. CRISTIAN DETAIL2DETAIL4 DETAIL5DETAIL6DETAIL7DETAIL8 DETAIL12 DETAIL11 DETAIL10 DETAIL9 S3.0 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS DRAWN : CHECKED : DATE : JOB NO. MARK DATE PROJECT: 25-285 CARLOS 31 JUL 25 . . . . . . . . . . . . TITLE GA R A G E T O A D U 22 3 4 S . L O W E L L S T R E E T . 3 1 2 3 1147 E MARKET ST. LONG BEACH, CA 90805 T:562-961-5600 ext.107 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 22 3 4 S . L O W E L L S T R E E T . SA N T A A N A , C A . 9 2 7 0 7 WWW.CASTILLOENGINEERING.COM 562-506-3692 CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS TO THE C.B.C. CRISTIAN FOUNDATION DETAILS DETAIL1DETAIL2DETAIL4 DETAIL5DETAIL6DETAIL7DETAIL8 DETAIL12 DETAIL11 DETAIL10 DETAIL9 DETAIL3 S5.0 SHEET NUMBER PR O J E C T A D D R E S S : SHEETSOF REVISIONS DRAWN : CHECKED : DATE : JOB NO. MARK DATE PROJECT: 25-285 CARLOS 31 JUL 25 . . . . . . . . . . . . TITLE GA R A G E T O A D U 22 3 4 S . L O W E L L S T R E E T . 3 1 2 3 1147 E MARKET ST. LONG BEACH, CA 90805 T:562-961-5600 ext.107 ENGINEER: Margarito Castillo, S.E. CASTILLO ENGINEERING 22 3 4 S . L O W E L L S T R E E T . SA N T A A N A , C A . 9 2 7 0 7 WWW.CASTILLOENGINEERING.COM 562-506-3692 CONSTRUCTION SHALL CONFORM TO THE ENGINEER. ALL WORK. REPORT DISCREPANCIES BEFORE PROCEEDING WITH THE CHECK AND VERIFY ALL DIMENSIONS TO THE C.B.C. CRISTIAN ROOF FRAMING DETAILS CHAPTER 4 RESIDENTIAL MANDATORY MEASURES DIVISION 4.1 PLANNING AND DESIGN DIVISION 4.3 WATER EFFICIENCY AND CONSERVATION 4.406 ENHANCED DURABILITY AND REDUCED MAINTENANCE 4.406.1 RODENT PROOFING. Annular spaces around pipes, electric cables, conduits or other openings in sole/bottom plates at exterior walls shall be protected against the passage of rodents by closing such openings with cement mortar, concrete masonry or a similar method acceptable to the enforcing agency. 4.408 CONSTRUCTION WASTE REDUCTION, DISPOSAL AND RECYCLING 4.408.1 CONSTRUCTION WASTE MANAGEMENT. Recycle and/or salvage for reuse a minimum of 65 percent of the non-hazardous construction and demolition waste in accordance with either Section 4.408.2, 4.408.3 or 4.408.4, or meet a more stringent local construction and demolition waste management ordinance. Exceptions: 1. Excavated soil and land-clearing debris. 2. Alternate waste reduction methods developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist or are not located reasonably close to the jobsite. 3. The enforcing agency may make exceptions to the requirements of this section when isolated jobsites are located in areas beyond the haul boundaries of the diversion facility. 4.408.2 CONSTRUCTION WASTE MANAGEMENT PLAN. Submit a construction waste management plan in conformance with Items 1 through 5. The construction waste management plan shall be updated as necessary and shall be available during construction for examination by the enforcing agency. 1. Identify the construction and demolition waste materials to be diverted from disposal by recycling, reuse on the project or salvage for future use or sale. 2. Specify if construction and demolition waste materials will be sorted on-site (source separated) or bulk mixed (single stream). 3. Identify diversion facilities where the construction and demolition waste material collected will be taken. 4. Identify construction methods employed to reduce the amount of construction and demolition waste generated. 5. Specify that the amount of construction and demolition waste materials diverted shall be calculated by weight or volume, but not by both. 4.408.3 WASTE MANAGEMENT COMPANY. Utilize a waste management company, approved by the enforcing agency, which can provide verifiable documentation that the percentage of construction and demolition waste material diverted from the landfill complies with Section 4.408.1. Note: The owner or contractor may make the determination if the construction and demolition waste materials will be diverted by a waste management company. 4.408.4 WASTE STREAM REDUCTION ALTERNATIVE [LR]. Projects that generate a total combined weight of construction and demolition waste disposed of in landfills, which do not exceed 3.4 lbs./sq.ft. of the building area shall meet the minimum 65% construction waste reduction requirement in Section 4.408.1 4.408.4.1 WASTE STREAM REDUCTION ALTERNATIVE. Projects that generate a total combined weight of construction and demolition waste disposed of in landfills, which do not exceed 2 pounds per square foot of the building area, shall meet the minimum 65% construction waste reduction requirement in Section 4.408.1 4.408.5 DOCUMENTATION. Documentation shall be provided to the enforcing agency which demonstrates compliance with Section 4.408.2, items 1 through 5, Section 4.408.3 or Section 4.408.4.. Notes: 1. Sample forms found in "A Guide to the California Green Building Standards Code (Residential)" located at www.hcd.ca.gov/CALGreen.html may be used to assist in documenting compliance with this section. 2. Mixed construction and demolition debris (C & D) processors can be located at the California Department of Resources Recycling and Recovery (CalRecycle). 4.410 BUILDING MAINTENANCE AND OPERATION 4.410.1 OPERATION AND MAINTENANCE MANUAL. At the time of final inspection, a manual, compact disc, web-based reference or other media acceptable to the enforcing agency which includes all of the following shall be placed in the building: 1. Directions to the owner or occupant that the manual shall remain with the building throughout the life cycle of the structure. 2. Operation and maintenance instructions for the following: a. Equipment and appliances, including water-saving devices and systems, HVAC systems, photovoltaic systems, electric vehicle chargers, water-heating systems and other major appliances and equipment. b. Roof and yard drainage, including gutters and downspouts. c. Space conditioning systems, including condensers and air filters. d. Landscape irrigation systems. e. Water reuse systems. 3. Information from local utility, water and waste recovery providers on methods to further reduce resource consumption, including recycle programs and locations. 4. Public transportation and/or carpool options available in the area. 5. Educational material on the positive impacts of an interior relative humidity between 30-60 percent and what methods an occupant may use to maintain the relative humidity level in that range. 6. Information about water-conserving landscape and irrigation design and controllers which conserve water. 7. Instructions for maintaining gutters and downspouts and the importance of diverting water at least 5 feet away from the foundation. 8. Information on required routine maintenance measures, including, but not limited to, caulking, painting, grading around the building, etc. 9. Information about state solar energy and incentive programs available. 10. A copy of all special inspections verifications required by the enforcing agency or this code. 11. Information from the Department of Forestry and Fire Protection on maintenance of defensible space around residential structures. 12. Information and/or drawings identifying the location of grab bar reinforcements. 4.410.2 RECYCLING BY OCCUPANTS. Where 5 or more multifamily dwelling units are constructed on a building site, provide readily accessible area(s) that serves all buildings on the site and are identified for the depositing, storage and collection of non-hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waster, and metals, or meet a lawfully enacted local recycling ordinance, if more restrictive. Exception: Rural jurisdictions that meet and apply for the exemption in Public Resources Code Section 42649.82 (a)(2)(A) et seq. are note required to comply with the organic waste portion of this section. DIVISION 4.4 MATERIAL CONSERVATION AND RESOURCE EFFICIENCY DIVISION 4.5 ENVIRONMENTAL QUALITY 4.303 INDOOR WATER USE 4.303.1 WATER CONSERVING PLUMBING FIXTURES AND FITTINGS. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the sections 4.303.1.1, 4.303.1.2, 4.303.1.3, and 4.303.4.4. Note: All noncompliant plumbing fixtures in any residential real property shall be replaced with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a certificate of final completion, certificate of occupancy, or final permit approval by the local building department. See Civil Code Section 1101.1, et seq., for the definition of a noncompliant plumbing fixture, types of residential buildings affected and other important enactment dates. 4.303.1.1 Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush. Tank-type water closets shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for Tank-type Toilets. Note: The effective flush volume of dual flush toilets is defined as the composite, average flush volume of two reduced flushes and one full flush. 4.303.1.2 Urinals. The effective flush volume of wall mounted urinals shall not exceed 0.125 gallons per flush. The effective flush volume of all other urinals shall not exceed 0.5 gallons per flush. 4.303.1.3 Showerheads. 4.303.1.3.1 Single Showerhead. Showerheads shall have a maximum flow rate of not more than 1.8 gallons per minute at 80 psi. Showerheads shall be certified to the performance criteria of the U.S. EPA WaterSense Specification for Showerheads. 4.303.1.3.2 Multiple showerheads serving one shower. When a shower is served by more than one showerhead, the combined flow rate of all the showerheads and/or other shower outlets controlled by a single valve shall not exceed 1.8 gallons per minute at 80 psi, or the shower shall be designed to only allow one shower outlet to be in operation at a time. Note: A hand-held shower shall be considered a showerhead. 4.303.1.4 Faucets. 4.303.1.4.1 Residential Lavatory Faucets. The maximum flow rate of residential lavatory faucets shall not exceed 1.2 gallons per minute at 60 psi. The minimum flow rate of residential lavatory faucets shall not be less than 0.8 gallons per minute at 20 psi. 4.303.1.4.2 Lavatory Faucets in Common and Public Use Areas. The maximum flow rate of lavatory faucets installed in common and public use areas (outside of dwellings or sleeping units) in residential buildings shall not exceed 0.5 gallons per minute at 60 psi. 4.303.1.4.3 Metering Faucets. Metering faucets when installed in residential buildings shall not deliver more than 0.2 gallons per cycle. 4.303.1.4.4 Kitchen Faucets. The maximum flow rate of kitchen faucets shall not exceed 1.8 gallons per minute at 60 psi. Kitchen faucets may temporarily increase the flow above the maximum rate, but not to exceed 2.2 gallons per minute at 60 psi, and must default to a maximum flow rate of 1.8 gallons per minute at 60 psi. Note: Where complying faucets are unavailable, aerators or other means may be used to achieve reduction. 4.303.1.4.5 Pre-rinse spray valves. When installed, shall meet the requirements in the California Code of Regulations, Title 20 (Appliance Efficiency Regulations), Sections 1605.1 (h)(4) Table H-2, Section 1605.3 (h)(4)(A), and Section 1607 (d)(7) and shall be equipped with an integral automatic shutoff. FOR REFERENCE ONLY: The following table and code section have been reprinted from the California Code of Regulations, Title 20 (Appliance Efficiency Regulations),Section 1605.1 (h)(4) and Section 1605.3 (h)(4)(A). Title 20 Section 1605.3 (h)(4)(A): Commercial prerinse spray values manufactured on or after January 1, 2006, shall have a minimum spray force of not less than 4.0 ounces-force (ozf)[113 grams-force(gf)] 4.303.2 Submeters for multifamily buildings and dwelling units in mixed-used residential/commercial buildings. Submeters shall be installed to measure water usage of individual rental dwelling units in accordance with the California Plumbing Code. 4.303.3 Standards for plumbing fixtures and fittings. Plumbing fixtures and fittings shall be installed in accordance with the California Plumbing Code, and shall meet the applicable standards referenced in Table 1701.1 of the California Plumbing Code. TABLE - MAXIMUM FIXTURE WATER USE FIXTURE TYPE FLOW RATE SHOWER HEADS (RESIDENTIAL)1.8 GMP @ 80 PSI LAVATORY FAUCETS (RESIDENTIAL)MAX. 1.2 GPM @ 60 PSI MIN. 0.8 GPM @ 20 PSI LAVATORY FAUCETS IN COMMON & PUBLIC USE AREAS 0.5 GPM @ 60 PSI KITCHEN FAUCETS 1.8 GPM @ 60 PSI METERING FAUCETS 0.2 GAL/CYCLE WATER CLOSET 1.28 GAL/FLUSH URINALS 0.125 GAL/FLUSH 4.304 OUTDOOR WATER USE 4.304.1 OUTDOOR POTABLE WATER USE IN LANDSCAPE AREAS. Residential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources' Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent. NOTES: 1. The Model Water Efficient Landscape Ordinance (MWELO) is located in the California Code Regulations, Title 23, Chapter 2.7, Division 2. MWELO and supporting documents, including water budget calculator, are available at: https://www.water.ca.gov/ ABBREVIATION DEFINITIONS: HCD Department of Housing and Community Development BSC California Building Standards Commission DSA-SS Division of the State Architect, Structural Safety OSHPD Office of Statewide Health Planning and Development LR Low Rise HR High Rise AA Additions and Alterations N New NOTE: THIS TABLE COMPILES THE DATA IN SECTION 4.303.1, AND IS INCLUDED AS A CONVENIENCE FOR THE USER. SECTION 4.102 DEFINITIONS 4.102.1 DEFINITIONS The following terms are defined in Chapter 2 (and are included here for reference) FRENCH DRAIN. A trench, hole or other depressed area loosely filled with rock, gravel, fragments of brick or similar pervious material used to collect or channel drainage or runoff water. WATTLES. Wattles are used to reduce sediment in runoff. Wattles are often constructed of natural plant materials such as hay, straw or similar material shaped in the form of tubes and placed on a downflow slope. Wattles are also used for perimeter and inlet controls. 4.106 SITE DEVELOPMENT 4.106.1 GENERAL. Preservation and use of available natural resources shall be accomplished through evaluation and careful planning to minimize negative effects on the site and adjacent areas. Preservation of slopes, management of storm water drainage and erosion controls shall comply with this section. 4.106.2 STORM WATER DRAINAGE AND RETENTION DURING CONSTRUCTION. Projects which disturb less than one acre of soil and are not part of a larger common plan of development which in total disturbs one acre or more, shall manage storm water drainage during construction. In order to manage storm water drainage during construction, one or more of the following measures shall be implemented to prevent flooding of adjacent property, prevent erosion and retain soil runoff on the site. 1. Retention basins of sufficient size shall be utilized to retain storm water on the site. 2. Where storm water is conveyed to a public drainage system, collection point, gutter or similar disposal method, water shall be filtered by use of a barrier system, wattle or other method approved by the enforcing agency. 3. Compliance with a lawfully enacted storm water management ordinance. Note: Refer to the State Water Resources Control Board for projects which disturb one acre or more of soil, or are part of a larger common plan of development which in total disturbs one acre or more of soil. (Website: https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.html) 4.106.3 GRADING AND PAVING. Construction plans shall indicate how the site grading or drainage system will manage all surface water flows to keep water from entering buildings. Examples of methods to manage surface water include, but are not limited to, the following: 1. Swales 2. Water collection and disposal systems 3. French drains 4. Water retention gardens 5. Other water measures which keep surface water away from buildings and aid in groundwater recharge. Exception: Additions and alterations not altering the drainage path. 4.106.4 Electric vehicle (EV) charging for new construction. New construction shall comply with Section 4.106.4.1 or 4.106.4.2. Electric vehicle supply equipment (EVSE) shall comply with the California Electrical Code. Exceptions: 1. On a case-by-case basis, where the local enforcing agency has determined EV charging and infrastructure are not feasible based upon one or more of the following conditions: 1.1 Where there is no local utility power supply or the local utility is unable to supply adequate power. 1.2 Where there is evidence suitable to the local enforcing agency substantiating that additional local utility infrastructure design requirements, directly related to the implementation of Section 4.106.4, may adversely impact the construction cost of the project. 2. Accessory Dwelling Units (ADU) and Junior Accessory Dwelling Units (JADU) without additional parking facilities. 4.106.4.1 New one- and two-family dwellings and townhouses with attached private garages. For each dwelling unit, install a listed raceway to accommodate a dedicated 208/240-volt branch circuit. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter). The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or other enclosure in close proximity to the proposed location of an EV charger. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel and/or subpanel shall provide capacity to install a 40-ampere 208/240-volt minimum dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overcurrent protective device. Exemption: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the proposed location of an EV charger at the time of original construction in accordance with the California Electrical Code. 4.106.4.1.1 Identification. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging as "EV CAPABLE". The raceway termination location shall be permanently and visibly marked as "EV CAPABLE". CHAPTER 3 GREEN BUILDING SECTION 301 GENERAL 301.1 SCOPE. Buildings shall be designed to include the green building measures specified as mandatory in the application checklists contained in this code. Voluntary green building measures are also included in the application checklists and may be included in the design and construction of structures covered by this code, but are not required unless adopted by a city, county, or city and county as specified in Section 101.7. 301.1.1 Additions and alterations. [HCD] The mandatory provisions of Chapter 4 shall be applied to additions or alterations of existing residential buildings where the addition or alteration increases the building's conditioned area, volume, or size. The requirements shall apply only to and/or within the specific area of the addition or alteration. The mandatory provision of Section 4.106.4.2 may apply to additions or alterations of existing parking facilities or the addition of new parking facilities serving existing multifamily buildings. See Section 4.106.4.3 for application. Note: Repairs including, but not limited to, resurfacing, restriping and repairing or maintaining existing lighting fixtures are not considered alterations for the purpose of this section. Note: On and after January 1, 2014, residential buildings undergoing permitted alterations, additions, or improvements shall replace noncompliant plumbing fixtures with water-conserving plumbing fixtures. Plumbing fixture replacement is required prior to issuance of a certificate of final completion, certificate of occupancy or final permit approval by the local building department. See Civil Code Section 1101.1, et seq., for the definition of a noncompliant plumbing fixture, types of residential buildings affected and other important enactment dates. 301.2 LOW-RISE AND HIGH-RISE RESIDENTIAL BUILDINGS. [HCD] The provisions of individual sections of CALGreen may apply to either low-rise residential buildings high-rise residential buildings, or both. Individual sections will be designated by banners to indicate where the section applies specifically to low-rise only (LR) or high-rise only (HR). When the section applies to both low-rise and high-rise buildings, no banner will be used. SECTION 302 MIXED OCCUPANCY BUILDINGS 302.1 MIXED OCCUPANCY BUILDINGS. In mixed occupancy buildings, each portion of a building shall comply with the specific green building measures applicable to each specific occupancy. Exceptions: 1. [HCD] Accessory structures and accessory occupancies serving residential buildings shall comply with Chapter 4 and Appendix A4, as applicable. 2. [HCD] For purposes of CALGreen, live/work units, complying with Section 419 of the California Building Code, shall not be considered mixed occupancies. Live/Work units shall comply with Chapter 4 and Appendix A4, as applicable. 4.106.4.2 New multifamily dwellings, hotels and motels and new residential parking facilities. When parking is provided, parking spaces for new multifamily dwellings, hotels and motels shall meet the requirements of Section 4.106.4.2.2. Calculations for spaces shall be rounded up to the nearest whole number. A parking space served by electric vehicle supply equipment or designed as an EV charging space shall count as at least one standard automobile parking space only for the purpose of complying with any applicable minimum parking space requirements established by a local jurisdiction. See Vehicle Code Section 22511.2 for further details. 4.106.4.2.1 Reserved. 4.106.4.2.2 Multifamily dwellings, hotels and motels 1. EV ready parking spaces with receptacles. a. Hotels and motels. Forty (40) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles. b. Multifamily parking facilities. Forty (40) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles. EV charging receptacles required by this section shall be located in at least one assigned parking space per dwelling unit where assigned parking is provided but need not exceed forty (40) percent of the total number of assigned parking spaces provided on the site. Exception: Areas of parking facilities served by parking lifts, including but not limited to automated mechanical-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging. c. Receptacle power source. EV charging receptacles in multifamily parking facilities shall be provided with a dedicated branch circuit connected to the dwelling unit’s electrical panel, unless determined as infeasible by the project builder or designer and subject to concurrence of the local enforcing agency. Exception: Areas of parking facilities served by parking lifts, including but not limited to automated mechanical-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging. d. Receptacle configurations. 208/240V EV charging receptacles shall comply with one of the following configurations: 1. For 20-ampere receptacles, NEMA 6-20R 2. For 30-ampere receptacles, NEMA 14-30R 3. For 50-ampere receptacles, NEMA 14-50R 2. EV ready parking spaces with EV chargers. a. Hotels and motels. Ten (10) percent of the total number of parking spaces shall be equipped with Level 2 EV chargers. At least fifty (50) percent of the required EV chargers shall be equipped with J1772 connectors. b. Multifamily parking facilities. Ten (10) percent of the total number of parking spaces shall be equipped with Level 2 EV chargers. At least fifty (50) percent of the required EV chargers shall be equipped with J1772 connectors. Where common use parking or unassigned parking is provided, EV chargers shall be located in common use or unassigned parking areas and shall be available for use by all residents or guests. Where low power Level 2 EV charging receptacles or Level 2 EV chargers are installed beyond the minimum required, an automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS. The electrical system and any on-site distribution transformers shall have sufficient capacity to deliver at least 3.3 kW simultaneously to each EV charging station (EVCS) served by the ALMS. The branch circuit shall have a minimum capacity of 40 amperes, and installed EV chargers shall have a capacity of not less than 30 amperes. 4.106.4.2.2.1 Electric vehicle charging stations (EVCS). Electric vehicle charging stations required by Section 4.106.4.2.2, Item 2, with EV chargers installed shall comply with Section 4.106.4.2.2.1.1. Exception: Electric vehicle charging stations serving public accommodations, public housing, motels and hotels shall not be required to comply with this section. See California Building Code, Chapter 11B, for applicable requirements. 4.106.4.2.2.1.1 Electric vehicle charging stations (EVCS) spaces with EV chargers installed; dimensions and location. EVCS spaces shall be designed to comply with the following: 1.The minimum length of each EVCS space shall be 18 feet (5486 mm). 2.The minimum width of each EVCS space shall be 9 feet (2743 mm). 3.One in every 25 EVCS spaces, but not less than one, shall also have an 8-foot (2438 mm) wide minimum aisle. A 5-foot (1524 mm) wide minimum aisle shall be permitted provided the minimum width of the EVCS space is 12 feet (3658 mm). Surface slope for this EVCS space and the aisle shall not exceed 1 unit vertical in 48 units horizontal (2.083 percent slope) in any direction. These EVCS spaces shall also comply with at least one of the following: a. The EVCS space shall be located adjacent to an accessible parking space meeting the requirements of the California Building Code, Chapter 11A, to allow use of the EV charger from the accessible parking space. b. The EVCS space shall be located on an accessible route, as defined in the California Building Code, Chapter 2, to the building. Exception: Electric vehicle charging stations designed and constructed in compliance with the California Building Code, Chapter 11B, are not required to comply with Section 4.106.4.2.2.1.1. 4.106.4.2.2.1.2 Accessible electric vehicle charging station spaces. In addition to the requirements in Section 4.106.4.2.2.1.1, all EV chargers, where installed, shall comply with the accessibility provisions for EV chargers in the California Building Code, Chapter 11B. EV ready spaces and EVCS in multifamily developments shall comply with California Building Code, Chapter 11A, Section 1109A. 4.106.4.2.3 Reserved. 4.106.4.2.4 Reserved. 4.106.4.2.5 Electric vehicle ready space signage. Electric vehicle ready spaces shall be identified by signage or pavement markings, in compliance with Caltrans Traffic Operations Policy Directive 13-01 (Zero Emission Vehicle Signs and Pavement Markings) or its successor(s). 4.106.4.3 Electric vehicle charging for additions and alterations of parking facilities serving existing multi-family buildings. Where new parking facilities are added, or electrical systems or lighting of existing parking facilities are added or altered and the work requires a building permit, ten (10) percent of the total number of parking spaces added or altered shall be EV capable spaces to support future Level 2 electric vehicle supply equipment. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging purposes as “EV CAPABLE.” Notes: 1.Construction documents are intended to demonstrate the project’s capability and capacity for facilitating future EV charging. 2.There is no requirement for EV spaces to be constructed or available until EV chargers are installed for use. SECTION 4.501 GENERAL 4.501.1 Scope The provisions of this chapter shall outline means of reducing the quality of air contaminants that are odorous, irritating and/or harmful to the comfort and well being of a building's installers, occupants and neighbors. SECTION 4.502 DEFINITIONS 5.102.1 DEFINITIONS The following terms are defined in Chapter 2 (and are included here for reference) AGRIFIBER PRODUCTS. Agrifiber products include wheatboard, strawboard, panel substrates and door cores, not including furniture, fixtures and equipment (FF&E) not considered base building elements. COMPOSITE WOOD PRODUCTS. Composite wood products include hardwood plywood, particleboard and medium density fiberboard. "Composite wood products" does not include hardboard, structural plywood, structural panels, structural composite lumber, oriented strand board, glued laminated timber, prefabricated wood I-joists or finger-jointed lumber, all as specified in California Code of regulations (CCR), title 17, Section 93120.1. DIRECT-VENT APPLIANCE. A fuel-burning appliance with a sealed combustion system that draws all air for combustion from the outside atmosphere and discharges all flue gases to the outside atmosphere. Y N/AYN/AYN/AYN/A RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE RESIDENTIAL MANDATORY MEASURES, SHEET 1 (July 2024 Supplement)Y = YES N/A =NOT APPLICABLE RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.) 4.201 GENERAL 4.201.1 SCOPE. For the purposes of mandatory energy efficiency standards in this code, the California Energy Commission will continue to adopt mandatory standards. DIVISION 4.2 ENERGY EFFICIENCY TABLE H-2 STANDARDS FOR COMMERCIAL PRE-RINSE SPRAY VALUES MANUFACTURED ON OR AFTER JANUARY 28, 2019 PRODUCT CLASS [spray force in ounce force (ozf)]MAXIMUM FLOW RATE (gpm) Product Class 1 (≤1.00 Product Class 2 (> 5.0 ozf and ≤1.20 Product Class 3 (> 8.0 ozf)1.28 A0.1 CAL GREEN BUILDING STANDARDS G.C. INSPECTOR SHEET A-1.0 G.C. INSPECTOR SHEET A-1.0 G.C. INSPECTOR SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-3.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 G.C. INSPECTOR G.C. INSPECTOR G.C. INSPECTOR G.C. INSPECTOR G.C. INSPECTOR G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 SHEET A-1.0 CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU MAXIMUM INCREMENTAL REACTIVITY (MIR). The maximum change in weight of ozone formed by adding a compound to the "Base Reactive Organic Gas (ROG) Mixture" per weight of compound added, expressed to hundredths of a gram (g O³/g ROC). Note: MIR values for individual compounds and hydrocarbon solvents are specified in CCR, Title 17, Sections 94700 and 94701. MOISTURE CONTENT. The weight of the water in wood expressed in percentage of the weight of the oven-dry wood. PRODUCT-WEIGHTED MIR (PWMIR). The sum of all weighted-MIR for all ingredients in a product subject to this article. The PWMIR is the total product reactivity expressed to hundredths of a gram of ozone formed per gram of product (excluding container and packaging). Note: PWMIR is calculated according to equations found in CCR, Title 17, Section 94521 (a). REACTIVE ORGANIC COMPOUND (ROC). Any compound that has the potential, once emitted, to contribute to ozone formation in the troposphere. VOC. A volatile organic compound (VOC) broadly defined as a chemical compound based on carbon chains or rings with vapor pressures greater than 0.1 millimeters of mercury at room temperature. These compounds typically contain hydrogen and may contain oxygen, nitrogen and other elements. See CCR Title 17, Section 94508(a). 4.503 FIREPLACES 4.503.1 GENERAL. Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with U.S. EPA New Source Performance Standards (NSPS) emission limits as applicable, and shall have a permanent label indicating they are certified to meet the emission limits. Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. 4.504 POLLUTANT CONTROL 4.504.1 COVERING OF DUCT OPENINGS & PROTECTION OF MECHANICAL EQUIPMENT DURING CONSTRUCTION. At the time of rough installation, during storage on the construction site and until final startup of the heating, cooling and ventilating equipment, all duct and other related air distribution component openings shall be covered with tape, plastic, sheet metal or other methods acceptable to the enforcing agency to reduce the amount of water, dust or debris which may enter the system. 4.504.2 FINISH MATERIAL POLLUTANT CONTROL. Finish materials shall comply with this section. 4.504.2.1 Adhesives, Sealants and Caulks. Adhesives, sealant and caulks used on the project shall meet the requirements of the following standards unless more stringent local or regional air pollution or air quality management district rules apply: 1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 VOC limits, as shown in Table 4.504.1 or 4.504.2, as applicable. Such products also shall comply with the Rule 1168 prohibition on the use of certain toxic compounds (chloroform, ethylene dichloride, methylene chloride, perchloroethylene and tricloroethylene), except for aerosol products, as specified in Subsection 2 below. 2. Aerosol adhesives, and smaller unit sizes of adhesives, and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than 1 pound and do not consist of more than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with section 94507. 4.504.2.2 Paints and Coatings. Architectural paints and coatings shall comply with VOC limits in Table 1 of the ARB Architectural Suggested Control Measure, as shown in Table 4.504.3, unless more stringent local limits apply. The VOC content limit for coatings that do not meet the definitions for the specialty coatings categories listed in Table 4.504.3 shall be determined by classifying the coating as a Flat, Nonflat or Nonflat-High Gloss coating, based on its gloss, as defined in subsections 4.21, 4.36, and 4.37 of the 2007 California Air Resources Board, Suggested Control Measure, and the corresponding Flat, Nonflat or Nonflat-High Gloss VOC limit in Table 4.504.3 shall apply. 4.504.2.3 Aerosol Paints and Coatings. Aerosol paints and coatings shall meet the Product-weighted MIR Limits for ROC in Section 94522(a)(2) and other requirements, including prohibitions on use of certain toxic compounds and ozone depleting substances, in Sections 94522(e)(1) and (f)(1) of California Code of Regulations, Title 17, commencing with Section 94520; and in areas under the jurisdiction of the Bay Area Air Quality Management District additionally comply with the percent VOC by weight of product limits of Regulation 8, Rule 49. 4.504.2.4 Verification. Verification of compliance with this section shall be provided at the request of the enforcing agency. Documentation may include, but is not limited to, the following: 1. Manufacturer's product specification. 2. Field verification of on-site product containers. CHAPTER 7 INSTALLER & SPECIAL INSPECTOR QUALIFICATIONS 702 QUALIFICATIONS 702.1 INSTALLER TRAINING. HVAC system installers shall be trained and certified in the proper installation of HVAC systems including ducts and equipment by a nationally or regionally recognized training or certification program. Uncertified persons may perform HVAC installations when under the direct supervision and responsibility of a person trained and certified to install HVAC systems or contractor licensed to install HVAC systems. Examples of acceptable HVAC training and certification programs include but are not limited to the following: 1. State certified apprenticeship programs. 2. Public utility training programs. 3. Training programs sponsored by trade, labor or statewide energy consulting or verification organizations. 4. Programs sponsored by manufacturing organizations. 5. Other programs acceptable to the enforcing agency. 702.2 SPECIAL INSPECTION [HCD]. When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition to other certifications or qualifications acceptable to the enforcing agency, the following certifications or education may be considered by the enforcing agency when evaluating the qualifications of a special inspector: 1. Certification by a national or regional green building program or standard publisher. 2. Certification by a statewide energy consulting or verification organization, such as HERS raters, building performance contractors, and home energy auditors. 3. Successful completion of a third party apprentice training program in the appropriate trade. 4. Other programs acceptable to the enforcing agency. Notes: 1. Special inspectors shall be independent entities with no financial interest in the materials or the project they are inspecting for compliance with this code. 2. HERS raters are special inspectors certified by the California Energy Commission (CEC) to rate homes in California according to the Home Energy Rating System (HERS). [BSC] When required by the enforcing agency, the owner or the responsible entity acting as the owner's agent shall employ one or more special inspectors to provide inspection or other duties necessary to substantiate compliance with this code. Special inspectors shall demonstrate competence to the satisfaction of the enforcing agency for the particular type of inspection or task to be performed. In addition, the special inspector shall have a certification from a recognized state, national or international association, as determined by the local agency. The area of certification shall be closely related to the primary job function, as determined by the local agency. Note: Special inspectors shall be independent entities with no financial interest in the materials or the project they are inspecting for compliance with this code. 703 VERIFICATIONS 703.1 DOCUMENTATION. Documentation used to show compliance with this code shall include but is not limited to, construction documents, plans, specifications, builder or installer certification, inspection reports, or other methods acceptable to the enforcing agency which demonstrate substantial conformance. When specific documentation or special inspection is necessary to verify compliance, that method of compliance will be specified in the appropriate section or identified applicable checklist. 4.505 INTERIOR MOISTURE CONTROL 4.505.1 General. Buildings shall meet or exceed the provisions of the California Building Standards Code. 4.505.2 CONCRETE SLAB FOUNDATIONS. Concrete slab foundations required to have a vapor retarder by California Building Code, Chapter 19, or concrete slab-on-ground floors required to have a vapor retarder by the California Residential Code, Chapter 5, shall also comply with this section. 4.505.2.1 Capillary break. A capillary break shall be installed in compliance with at least one of the following: 1. A 4-inch (101.6 mm) thick base of 1/2 inch (12.7mm) or larger clean aggregate shall be provided with a vapor barrier in direct contact with concrete and a concrete mix design, which will address bleeding, shrinkage, and curling, shall be used. For additional information, see American Concrete Institute, ACI 302.2R-06. 2. Other equivalent methods approved by the enforcing agency. 3. A slab design specified by a licensed design professional. 4.505.3 MOISTURE CONTENT OF BUILDING MATERIALS. Building materials with visible signs of water damage shall not be installed. Wall and floor framing shall not be enclosed when the framing members exceed 19 percent moisture content. Moisture content shall be verified in compliance with the following: 1. Moisture content shall be determined with either a probe-type or contact-type moisture meter.Equivalent moisture verification methods may be approved by the enforcing agency and shall satisfy requirements found in Section 101.8 of this code. 2. Moisture readings shall be taken at a point 2 feet (610 mm) to 4 feet (1219 mm) from the grade stamped end of each piece verified. 3. At least three random moisture readings shall be performed on wall and floor framing with documentation acceptable to the enforcing agency provided at the time of approval to enclose the wall and floor framing. Insulation products which are visibly wet or have a high moisture content shall be replaced or allowed to dry prior to enclosure in wall or floor cavities. Wet-applied insulation products shall follow the manufacturers' drying recommendations prior to enclosure. 4.506 INDOOR AIR QUALITY AND EXHAUST 4.506.1 Bathroom exhaust fans. Each bathroom shall be mechanically ventilated and shall comply with the following: 1. Fans shall be ENERGY STAR compliant and be ducted to terminate outside the building. 2. Unless functioning as a component of a whole house ventilation system, fans must be controlled by a humidity control. a. Humidity controls shall be capable of adjustment between a relative humidity range less than or equal to 50% to a maximum of 80%. A humidity control may utilize manual or automatic means of adjustment. b. A humidity control may be a separate component to the exhaust fan and is not required to be integral (i.e., built-in) Notes: 1. For the purposes of this section, a bathroom is a room which contains a bathtub, shower or tub/shower combination. 2. Lighting integral to bathroom exhaust fans shall comply with the California Energy Code. 4.507 ENVIRONMENTAL COMFORT 4.507.2 HEATING AND AIR-CONDITIONING SYSTEM DESIGN. Heating and air conditioning systems shall be sized, designed and have their equipment selected using the following methods: 1. The heat loss and heat gain is established according to ANSI/ACCA 2 Manual J - 2011 (Residential Load Calculation), ASHRAE handbooks or other equivalent design software or methods. 2. Duct systems are sized according to ANSI/ACCA 1 Manual D - 2014 (Residential Duct Systems), ASHRAE handbooks or other equivalent design software or methods. 3. Select heating and cooling equipment according to ANSI/ACCA 3 Manual S - 2014 (Residential Equipment Selection), or other equivalent design software or methods. Exception: Use of alternate design temperatures necessary to ensure the system functions are acceptable. TABLE 4.504.1 - ADHESIVE VOC LIMIT1,2 (Less Water and Less Exempt Compounds in Grams per Liter) ARCHITECTURAL APPLICATIONS VOC LIMIT INDOOR CARPET ADHESIVES 50 CARPET PAD ADHESIVES 50 OUTDOOR CARPET ADHESIVES 150 WOOD FLOORING ADHESIVES 100 RUBBER FLOOR ADHESIVES 60 SUBFLOOR ADHESIVES 50 CERAMIC TILE ADHESIVES 65 VCT & ASPHALT TILE ADHESIVES 50 DRYWALL & PANEL ADHESIVES 50 COVE BASE ADHESIVES 50 MULTIPURPOSE CONSTRUCTION ADHESIVE 70 STRUCTURAL GLAZING ADHESIVES 100 SINGLE-PLY ROOF MEMBRANE ADHESIVES 250 OTHER ADHESIVES NOT LISTED 50 SPECIALTY APPLICATIONS PVC WELDING 510 CPVC WELDING 490 ABS WELDING 325 PLASTIC CEMENT WELDING 250 ADHESIVE PRIMER FOR PLASTIC 550 CONTACT ADHESIVE 80 SPECIAL PURPOSE CONTACT ADHESIVE 250 STRUCTURAL WOOD MEMBER ADHESIVE 140 TOP & TRIM ADHESIVE 250 SUBSTRATE SPECIFIC APPLICATIONS METAL TO METAL 30 PLASTIC FOAMS 50 POROUS MATERIAL (EXCEPT WOOD)50 WOOD 30 FIBERGLASS 80 1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES TOGETHER, THE ADHESIVE WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED. 2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC CONTENT SPECIFIED IN THIS TABLE, SEE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1168. TABLE 4.504.2 - SEALANT VOC LIMIT (Less Water and Less Exempt Compounds in Grams per Liter) SEALANTS VOC LIMIT ARCHITECTURAL 250 MARINE DECK 760 NONMEMBRANE ROOF 300 ROADWAY 250 SINGLE-PLY ROOF MEMBRANE 450 OTHER 420 SEALANT PRIMERS ARCHITECTURAL NON-POROUS 250 POROUS 775 MODIFIED BITUMINOUS 500 MARINE DECK 760 OTHER 750 TABLE 4.504.5 - FORMALDEHYDE LIMITS1 MAXIMUM FORMALDEHYDE EMISSIONS IN PARTS PER MILLION PRODUCT CURRENT LIMIT HARDWOOD PLYWOOD VENEER CORE 0.05 HARDWOOD PLYWOOD COMPOSITE CORE 0.05 PARTICLE BOARD 0.09 MEDIUM DENSITY FIBERBOARD 0.11 THIN MEDIUM DENSITY FIBERBOARD2 0.13 1. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIF. AIR RESOURCES BOARD, AIR TOXICS CONTROL MEASURE FOR COMPOSITE WOOD AS TESTED IN ACCORDANCE WITH ASTM E 1333. FOR ADDITIONAL INFORMATION, SEE CALIF. CODE OF REGULATIONS, TITLE 17, SECTIONS 93120 THROUGH 93120.12. 2. THIN MEDIUM DENSITY FIBERBOARD HAS A MAXIMUM THICKNESS OF 5/16" (8 MM). TABLE 4.504.3 - VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS2,3 GRAMS OF VOC PER LITER OF COATING, LESS WATER & LESS EXEMPT COMPOUNDS COATING CATEGORY VOC LIMIT FLAT COATINGS 50 NON-FLAT COATINGS 100 NONFLAT-HIGH GLOSS COATINGS 150 SPECIALTY COATINGS ALUMINUM ROOF COATINGS 400 BASEMENT SPECIALTY COATINGS 400 BITUMINOUS ROOF COATINGS 50 BITUMINOUS ROOF PRIMERS 350 BOND BREAKERS 350 CONCRETE CURING COMPOUNDS 350 CONCRETE/MASONRY SEALERS 100 DRIVEWAY SEALERS 50 DRY FOG COATINGS 150 FAUX FINISHING COATINGS 350 FIRE RESISTIVE COATINGS 350 FLOOR COATINGS 100 FORM-RELEASE COMPOUNDS 250 GRAPHIC ARTS COATINGS (SIGN PAINTS)500 HIGH TEMPERATURE COATINGS 420 INDUSTRIAL MAINTENANCE COATINGS 250 LOW SOLIDS COATINGS1 120 MAGNESITE CEMENT COATINGS 450 MASTIC TEXTURE COATINGS 100 METALLIC PIGMENTED COATINGS 500 MULTICOLOR COATINGS 250 PRETREATMENT WASH PRIMERS 420 PRIMERS, SEALERS, & UNDERCOATERS 100 REACTIVE PENETRATING SEALERS 350 RECYCLED COATINGS 250 ROOF COATINGS 50 RUST PREVENTATIVE COATINGS 250 SHELLACS CLEAR 730 OPAQUE 550 SPECIALTY PRIMERS, SEALERS & UNDERCOATERS 100 STAINS 250 STONE CONSOLIDANTS 450 SWIMMING POOL COATINGS 340 TRAFFIC MARKING COATINGS 100 TUB & TILE REFINISH COATINGS 420 WATERPROOFING MEMBRANES 250 WOOD COATINGS 275 WOOD PRESERVATIVES 350 ZINC-RICH PRIMERS 340 1. GRAMS OF VOC PER LITER OF COATING, INCLUDING WATER & EXEMPT COMPOUNDS 2. THE SPECIFIED LIMITS REMAIN IN EFFECT UNLESS REVISED LIMITS ARE LISTED IN SUBSEQUENT COLUMNS IN THE TABLE. 3. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA AIR RESOURCES BOARD, ARCHITECTURAL COATINGS SUGGESTED CONTROL MEASURE, FEB. 1, 2008. MORE INFORMATION IS AVAILABLE FROM THE AIR RESOURCES BOARD. DIVISION 4.5 ENVIRONMENTAL QUALITY (continued) 4.504.3 CARPET SYSTEMS. All carpet installed in the building interior shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.3.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.3.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 4.504.1. 4.504.4 RESILIENT FLOORING SYSTEMS. Where resilient flooring is installed , at least 80% of floor area receiving resilient flooring shall meet the requirements of the California Department of Public Health, "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers," Version 1.2, January 2017 (Emission testing method for California Specification 01350) See California Department of Public Health's website for certification programs and testing labs. hhtps://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx. 4.504.5 COMPOSITE WOOD PRODUCTS. Hardwood plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the buildings shall meet the requirements for formaldehyde as specified in ARB's Air Toxics Control Measure for Composite Wood (17 CCR 93120 et seq.), by or before the dates specified in those sections, as shown in Table 4.504.5 4.504.5.1 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: 1. Product certifications and specifications. 2. Chain of custody certifications. 3. Product labeled and invoiced as meeting the Composite Wood Products regulation (see CCR, Title 17, Section 93120, et seq.). 4. Exterior grade products marked as meeting the PS-1 or PS-2 standards of the Engineered Wood Association, the Australian AS/NZS 2269, European 636 3S standards, and Canadian CSA 0121, CSA 0151, CSA 0153 and CSA 0325 standards. 5. Other methods acceptable to the enforcing agency. Y N/AYN/AYN/AYN/A RESPON. PARTY RESPON. PARTY RESPON. PARTY RESPON. PARTY 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE RESIDENTIAL MANDATORY MEASURES, SHEET 2 (July 2024 Supplement)Y = YES N/A =NOT APPLICABLE RESPON. PARTY =RESPONSIBLE PARTY (ie: ARCHITECT, ENGINEER, OWNER, CONTRACTOR, INSPECTOR ETC.) A0.2 CAL GREEN BUILDING STANDARDS G.C. INSPECTOR SHEET A-1.0 SHEET A-3.0 G.C. INSPECTOR G.C. INSPECTOR G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 INSPECTOR G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 G.C. INSPECTOR SHEET A-3.0 CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU T24.1 TITLE 24 CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU T24.2 TITLE 24 CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU T24.3 TITLE 24 CA R L O S G O N Z A L E Z 2232 S. LOWELL ST, SANTA ANA, CA 92707 22 3 2 S . L O W E L L S T , SA N T A A N A , C A 9 2 7 0 7 3905 S. ROSS ST. #B SANTA ANA CA. 92707 TEL. 714.585.0546 HL QUALITY PLANS hlqualityplans@gmail.com APN: 015-172-22 DEMOLITION OF EXISTING GARAGE AND STORAGE TO PROPOSE A NEW 1000 SQ. FT. DETACHED ADU Planning & Building Agency Building and Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714)-647-5800 www.santa-ana.org DETACHED ADU GRADING PERMIT WAIVER REQUEST THIS WAIVER SHALL BE COMPLETED BY THE LEGAL PROPERTY OWNER(S) A grading permit is required for all new detached buildings including new detached Accessory Dwelling Unit (ADU) projects. Precise grading plans prepared and stamped by a registered professional engineer shall be required to be submitted before or concurrently with the architectural plans submittal to the Building Safety Division. Grading Permit Waiver: Residential detached Accessory Dwelling Unit (ADU) projects with a total building area of 1,200 sq. feet or less may be eligible for a grading permit waiver request if all of the following conditions are met. The property owner(s) shall take full responsibility for the site drainage by signing this waiver request agreement below. In order to qualify for the grading permit waiver, the property owner(s) shall complete all sections, check appropriate boxes, and sign this waiver request. A copy of this completed checklist shall be made part of the each set of plans. If answering NO to any of the questions, a grading plan and permit shall be required. Project Property Address: Yes No 1. ☐ ☐ 2. ☐ ☐ 3. ☐ ☐ The site drainage shall be constructed such that surface water flows away from buildings and adjoining property lines, in accordance with all applicable codes. 4. ☐ ☐ The site drainage shall be constructed such that the drainage will not adversely affect the adjoining properties. 5. ☐ ☐ The project plans includes a site plan that shows site drainage patterns. Grading Permit Waiver Request I/we are requesting a waiver from the standard requirements for a precise grading plan and permit for our ADU project to be constructed at the project address indicated above. In doing so, I/we accept that the design of the site drainage patterns must adhere to the minimum requirements set forth in the current building codes and the County of Orange Drainage Design Manual. By signing this waiver request: (1) I/we certify that I/we are the legal property owner(s); (2) I/we agree to take full liability for the site drainage; (3) I/we agree that the checked box conditions above are true; and (4) I/we agree to defend, indemnify, and hold harmless the City of Santa Ana, its officials, employees, and agents against any and all claims for damages and costs arising out of the site drainage at the project property. Owner Name(s): (Print) Owner Signature(s): Date: Phone Number: Notes: 1. The building official reserves the right to require a grading permit based on site conditions. 2. This grading permit waiver request does not apply to projects in the FEMA Flood Zones. 714.988.5387 Carlos Gonzalez Carlos Gonzalez 07.31.2025 O R A N G E C O U N T Y F I R E A U T H O R I T Y Plan Submittal Criteria Form Required for Single Family or Duplex Residences (Use Commercial form for lots with 3+ dwelling units or new residential tracts) Complete the Project Information and Questionnaire below, then sign and date the Applicant Certification. Project Information  New Single Family Residence/Duplex  Addition/Remodel  ADU  Other Address: Unit #: City or Unincorporated County Area: ZIP: Scope of Work: Existing Area: Area to be Added: Total Resulting Area: Stories: Area Added in Past 2 Years (excluding this project): Yes No Questionnaire OCFA Plan Type if “Yes” 1.   New – Is this a new single family residence or duplex? *(PR160) Residential Site with Water Availability (PR400-402) Fire Sprinkler 2.   ADU – Is this a new Accessory Dwelling Unit (ADU) on the same property as a house that already has fire sprinklers or a house that will have fire sprinklers added as part of this project? (PR400-402) Fire Sprinkler 3.   Addition – Is this (A) an addition to a currently sprinklered building, or (B) an addition requiring a fire sprinkler retrofit based on a threshold set by local ordinance? (PR400-402) Fire Sprinkler 4.   Distance – Is the most remote portion of the addition, ADU or other detached structure greater than 140-feet from the fire access roadway? *(PR160) Residential Site 5.   Total Area – Will the addition result in a total area of greater than 3,600 square feet (sf) for non- sprinklered buildings, or greater than 6,200 sf for sprinklered buildings, including the area of all enclosed spaces, such as garages, stairs, and detached structures separated by less than 10-feet? *(PR160) Residential Site with Water Availability 6.   Remodel – Is this a remodel of a sprinklered building with a scope of work that includes adding or removing any interior walls? Note: If “Yes”, then project must be evaluated by a C-16 licensed contractor to determine if a fire sprinkler modification is needed. (PR400-402) Fire Sprinkler 7.   Detached Structure – Is this a new detached utility or accessory structure (not an ADU), such as a garage, workshop, game room, pool house, barn, etc., requiring fire sprinklers based on a threshold set by local ordinance? *(PR160) Residential Site (PR400-402) Fire Sprinkler 8.   Gate – Is a gate being installed across a driveway or road that is designated as a fire department access roadway, or a driveway or road that serves more than a single home/duplex? (PR180) Gate 9.   Methane – Is project located in or less than 100’ from a “Division of Oil, Gas, and Geothermal Resources” (DOGGR) field boundary or well (active or abandoned), less than 300-feet from an oil/gas seep, or less than 1000-feet from a landfill? (Note: For projects in Yorba Linda, this requirement only applies to new homes, enclosed accessory structures, addition to existing structure greater than 1000 sf, and ADU’s). *(PR160) Residential Site *(PR172-174) Methane Test/Mitigation Plans 10.   Vegetation – Is the property/structure (A) on the perimeter of a community containing, or adjacent to slopes or hills, or (B) adjacent to an open space or wildland area containing non-irrigated vegetation, or (C) in a State Responsibility Area or Local Responsibility Area “Fire Hazard Severity Zone”, as defined by the State, or (D) near an area that could be affected by a wildfire in the open space. *(PR125) Fuel Modification (PR182) Accessory Structure *OCFA approval required before issuance of a grading/building permit. All other plans types may be deferred submittals. Applicant Certification I certify, under penalty of perjury, under the laws of the State of California, that the information above is true: Print Name:_______________________________________ Signature:___________________________________________ Date:______________ Phone Number:_____________________________________________ Email:_____________________________________________________________ Attention Building Department Staff – After you’ve verified all questions were answered accurately as “No”, then you may accept this signed form as a written release that an OCFA review is not required. If any questions were answered as “Yes”, then the plan type on the right side may be required. ______If all answers are “No” and the Building Department still requires the applicant to have their plans reviewed by OCFA, or if any answers are “Yes” and the Building Department prefers for OCFA to determine if a review is required, please initial this line and provide an explanation on the Plan Referral Form (on the reverse), to be submitted along with the appropriate plans to OCFA for a determination. For questions and submittal information, please visit ocfa.org, or call OCFA at (714) 573-6100 SFR Certificate of Compliance Payment of School Facility Fees Santa Ana Unified School District CITY OF SANTA ANA Planning and Building Agency App=1 FOR PERMIT ISSUANCE Name (First, MI, Last) Carlos Gon ale Telephone Mastet I-D. Date: 414-_q -b3 Project Address 2232 S LOVveI I 5�` Tract/Parcel Number 10112.;2T1 City, State, Zip Code Scin+a A Lo, , CA 92101 Name (First, MI, Last) Telephone Nature of Work Use of Building (check) Type of Project (check) Residential E� Commercial ❑ Senior Housing ❑ New M Addition ❑ Alteration ❑ Description of Project Adding a00 sf -A aiterin ex1,-hn 400 sf ara e for a 1,000 sf A�DU Number of Square Feet of Residential Space woo Number of Square Feet of Commercial Space Sq. Ft x $ 5. I _+ (Dev. Fee) Sq.Ft x $ (Dev. Fee) Total S 5: 110.00 Total S The above representations as to square footage are true. Applicant agrees that if it is later determined that such representations are not true, then this certificate shall automatically terminate, and the appropriate City/County shall be notified. Applicant is hereby noticed that any party filing a protest regarding the imposition of fees pursuant to Government Code Section 53080 must do so within 90 days from the payment of the fee. ,M"t1t 6,6�J 0 S--2 2 Applicant Name (Please Print) Date Signatu e This certifies that the above -named Applicant has paid school facility fees in compliance with all existing and applicable sections of the Government Code and Education Code. Qmu 2 _q'NA Z-� S n Ana Unified School District Authorize epresentative I Date DISTRIBUTION White - City/County Canary - Applicant Pink - Facilities Page 1 of 1 EXISTING ONE & TWO FAMILY DWELLINGS ELECTRICAL SERVICES UNDERGROUND EXCEPTION CEC 2022 ELC-04 All new utility connections are required to be installed below grade by Santa Ana Municipal Code 41- 626(b). There is a standing exception for one and two family dwellings. This exception applies only when the new electrical service is designed to be fed from below grade as well as overhead. This diagram is a typical unit. The utility is able to feed this cabinet from the top or the bottom without interfering with the distribution wiring. All the circuit breakers and branch circuits are contained in the circuit breaker side of this cabinet. Only listed combination overhead and underground feed service boxes may be used to connect to an overhead utility drop. This exception to an underground fed service applies only to existing single family and two family residences. Planning & Building Agency Permits & Plan Check Section 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 Rigid Conduit Service Entrance Conductor Riser Underground Service Lateral METER Rev. 1/21/2020 GEOTECH WEST INC. Cell: 909-634-0313 VICTORVILLE, CA Support@Geotechwest.com Carlos Gonzalez Date: 03/11/2025 2234 S Lowell St. Project# 25-R-109 SANTA ANA, CA 92707 (714) 988-5387 Geotechnical Investigation Report Detached ADU 2234 S Lowell St., Santa Ana, CA 92707 Dear Carlos, This report presents the results of the geotechnical investigation carried out at your request to collect information on the subsurface formations underlying the site of the proposed detached ADU and to provide recommendations for the design and construction of the proposed structure. Project’s plans by HL Quality were used in outlining the scope of the investigation and preparing this report in accordance with generally accepted geotechnical engineering practice. Based on analysis and evaluation of the data obtained, it has been concluded from a geotechnical perspective that the proposed structure can be supported safely on shallow foundations (spread and/or continuous footings). Thank you for this opportunity to be of service. If you have any questions concerning this report or if we can be of further assistance, please do not hesitate to contact us. Very truly yours, GEOTECH WEST, INC. Shadi Dweab, P.E. GEOTECH WEST INC. Cell: 909-634-0313 VICTORVILLE, CA Support@Geotechwest.com TABLE OF CONTENT INTRODUCTION .......................................................................................................................................................................... 1 SCOPE OF WORK .........................................................................................................................................................................1 SITE LOCATION AND DESCRIPTION ............................................................................................................................................ 1 FIGURE 1 – AERIAL IMAGERY………………………………......................................................................................................................2 FIELD INVESTIGATION AND FIELD-TESTING PROGRAM.............................................................................................................. 2 SUBSURFACE EXPLORATION ....................................................................................................................................................... 2 FIGURE 2 – SITE PLAN......………....................................................................................................................................................3 SURFACE CONDITIONS ................................................................................................................................................................3 SUBSURFACE CONDITIONS...........................................................................................................................................................3 CAVINGPOTENTIAL...................................................................................................................................................................... 4 EXPANSION POTENTIAL............................................................................................................................................................... 4 SOIL CORROSIVITY………............................................................................................................................................................... 4 SOIL SHRINKAGE AND BULKING.................................................................................................................................................. 4 GROUNDWATER ......................................................................................................................................................................... 4 SITE GEOLOGY............................................................................................................................................................................. 5 FIGURE-3 REGIONAL EOLOGY MAP….......................................................................................................................................... 5 SEISMIC DESIGN INFORMATION................................................................................................................................................. 5 EARTHQUAKE RESPONSE SPECTRAL PARAMETERS..................................................................................................................... 5 SITE SOIL PROFILE........................................................................................................................................................................ 6 LIQUEFACTION ........................................................................................................................................................................... 6 SURFACE FAULT RUPTURE.......................................................................................................................................................... 6 FIGURE-4 EARTHQUAKE ZONES OF REQUIRED INVESTIGATION MAP........................................................................................ 6 EARTHQUAKE-INDUCED LANDSLIDES......................................................................................................................................... 6 BACKFILL ..................................................................................................................................................................................... 7 LATERAL EARTH PRESSURE …………………..…………......................................................................................................................... 7 SEISMIC ACTIVE EARTH PRESSURE COEFFICIENT........................................................................................................................ 7 FOUNDATION RECOMMENDATIONS.......................................................................................................................................... 8 FOUNDATION TYPE..................................................................................................................................................................... 8 FOUNDATION DEPTH.................................................................................................................................................................. 8 BEARING CAPACITY FOR SPREAD AND CONTINUOUS FOOTINGS............................................................................................... 8 LATERAL BEARING PRESSURE...................................................................................................................................................... 8 FOUNDATION SETTLEMENT........................................................................................................................................................ 8 CEMENT TYPE…………………........................................................................................................................................................... 8 EARTHWORK……………………......................................................................................................................................................... 9 CONCRETE SLABS..……………....................................................................................................................................................... 10 SURFACE AND SUBSURFACE DRAINAGE................................................................................................................................... 11 LIMITATION APPENDICES: APPENDIX I: SOIL PROFILE LOGS APPENDIX II: SITE’S SEISMIC REPORT APPENDIX III: LAB TESTING APPENDIX IV: GENERAL EARTHWORK AND GRADING GUIDELINES Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 1 Geotechnical Investigation Report Detached ADU 2234 S Lowell St., Santa Ana, CA 92707 INTRODUCTION This report presents the results of the geotechnical investigation conducted for the subject project. The purpose of this investigation was to: 1) Determine the type and condition of the earth materials at the site. 2) Determine soil strength parameters. 3) Determine groundwater conditions. 4) Evaluate geologic and seismic conditions at the site. 5) Liquefaction potential evaluation and 6) Provide recommendations for the proposed structures. SCOPE OF WORK The scope of work for this geotechnical investigation consisted of the following: - Review of the project plans. - Perform field and laboratory testing. - Determine the current and the historical high groundwater elevations. - Evaluate geologic and seismic conditions at the site. - Evaluation of liquefaction potential (if warranted based on the estimated groundwater depth). - Presentation of findings, conclusions, and recommendations for the proposed project. SITE LOCATION AND DESCRIPTION The project site is a developed rectangular lot covering an area of 6667 S.F., developed with an existing 1288 S.F. single family residence, located on S Lowell Street in Santa Ana as shown in the aerial imagery Figure-1. The existing garage and storage will be demolished for the construction of the proposed ADU. The new 1000 S.F. ADU is proposed in the backyard as shown in the site plan Figure-2. Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 2 Figure-1: Aerial Imagery FIELD INVESTIGATION AND FIELD-TESTING PROGRAM Subsurface Exploration A site reconnaissance was performed on March 8, 2025, to evaluate the site conditions, drilling boreholes and to perform field penetration testing. Borehole approximate locations are shown on the site plan, Figure-2. N Existing SFR Existing Garage Existing Storage Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 3 : Borehole Approximate Location Figure-2: Site Plan BH-1 BH-2 Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 4 Surface Conditions The topography of the project site and the surrounding area is relatively flat, and the area is residentially developed. The site’s topsoil consists of clayey fine sand. Based on the ASCE Hazard Tool, the site’s elevation is 46 feet with respect to north American Vertical Datum of 1988 (NAVD 88). Subsurface Conditions Based on the extracted soil samples, the subsurface formations are mainly alluvium deposits consisting of clayey fine sand. The field penetration resistance testing indicates that the apparent density of the subsurface formations within the investigated depth is loose to medium dense. Caving Potential The proposed site is underlain mainly by coarse-grained sandy soils with relatively little apparent cohesion; therefore, caving potential is expected during foundation’s excavation work. Shallow temporary non-surcharged excavations (less than 5 feet deep) sloped (1H:1V) should be considered stable during the foundation construction time. Cal/OSHA safety regulations should be taken into consideration for any underground construction. Expansion Potential The subsurface formations consisted mainly of cohesionless coarse-grained sandy soils; therefore, expansion potential was not tested and considered not exist for the project site. Soil Corrosivity During the investigation, a bulk soil sample was collected from the top two (2) feet for corrosion testing. The result of the corrosion test indicates that the subsurface soil is not corrosive to the foundation’s concrete. Corrosion test results are presented in Table -1: Table 1– Corrosion Test Results Sample Materials Elevation (feet) Minimum Resistivity (Ohm-cm) PH Chloride content (ppm) Sulfate Content (ppm) Corrosive? Clayey fine sand 46-42 3242 7.0 37 397 No Soil Shrinkage and Bulking Bulking is the increase of volume of the earth material when it is excavated. Shrinkage is the decrease in volume of the earth material when it is compacted. Contingencies should be made to adjust the earthwork balance when grading is in progress and the bulk-shrink is better defined. The bulking factor is estimated to range from 10 to 20 percent. The shrinkage factor is estimated to range from 10 to 20 percent. These estimated values are based on the limited data collected from the subsurface exploration, available information at the time of this report, Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 5 and our experience in the site area. These estimates may vary depending on contractor methods and few known & unknown factors during the site grading. Actual shrinkage/bulking of the soil may vary. GROUNDWATER Groundwater was not encountered during the time of our investigation. Department of Water Resources Water Data Library well number 337105N1178932W001 located about 0.9-mile southwest of the project location; indicates groundwater elevation of -61.29 feet that was measured on 12/09/2024. The project site’s elevation is 46 feet; therefore, the estimated groundwater depth at the project site is 107 feet below ground surface. SITE GEOLOGY The Regional Geologic Map of the area indicates the subject’s site is in an area underlain by Alluvium deposits (Q) unconsolidated and semi-consolidated. The subsurface soil encountered during the investigation consisted mainly of clayey fine sand. Regional Geology Map is shown in Figure-3 below. Map Legend: : Alluvium, lake, playa, and terrace deposits. Figure-3: Regional Geology Map Project Location N Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 6 SEISMIC DESIGN INFORMATION Earthquake Response Spectral Parameters ASCE Hazard Tool (ASCE/SEI 7-16) was used to provide the maximum earthquake design parameters for the project site (Latitude 33.716704°, Longitude -117.879032°) as listed in Table- 2. Table 2– Maximum Considered Earthquake Response Spectral Parameters PGAm SS S1 SMS SM1 SDS SD1 0.656 1.285 0.46 1.542 N/A 1.028 N/A Appendix II presents the site’s seismic report. SITE SOIL PROFILE According to the California Building Code, the site’s soil profile type is classified as class D. LIQUEFACTION Based on the CGS Earthquake Zones of Required Investigation Map, all or portion of this parcel lies within a liquefaction zone. A significant seismic event may trigger a liquefaction hazard in loose and medium dense cohesionless soils located under groundwater level. Since the depth of groundwater at this site exceeds 50 feet (the limit for liquefaction effect), even if there are loose or medium dense cohesionless soils below the depth of 50 feet, the liquefaction hazard doesn’t propagate to the ground surface and there will be no impact on the structures. SURFACE FAULT RUPTURE The project site is not located within an Alquist-Priolo earthquake fault zone as established by the California Geologic Survey, nor is it located within 1000 feet from any Holocene or younger aged faults. Therefore, this site is not susceptible to surface fault rupture hazard, refer to Figure- 4. Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 7 Figure 4: Earthquake Zones of Required Investigation Map EARTHQUAKE-INDUCED LANDSLIDES Based on the CGS Earthquake Zones of Required Investigation map “Figure-4”, the project site is not within a landslide zone, moreover, the site is not adjacent to any natural hills or manmade embankments; therefore, the earthquake-induced landslide hazard does not exist for this site. BACKFILL The backfill (if proposed or needed) should consist of cohesionless soils or structural backfill, compacted to at least 90% of relative compaction. The estimated parameters for the structural backfill compacted to at least 90% of relative compaction are: - Unit weight: 120 pcf. - Friction angle: 33 degrees The site’s soil that is classified as clayey fine sand (SC) is suitable for backfilling work in general, provided that deleterious materials and construction debris (if any) have been screened out. LATERAL EARTH PRESSURE For cohesionless / structural backfill, the earth pressure coefficients can be as the following: Project Location Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 8 Active earth pressure coefficient 𝑘=𝑡𝑎𝑛45 −∅= 0.30 Passive earth pressure coefficient 𝑘=𝑡𝑎𝑛45 +∅= 3.40 At-rest earth pressure coefficient 𝑘°= 1 − sin (∅) = 0.45 Equivalent fluid active pressure p = 0.30 × 120 = 36 pcf Equivalent fluid passive pressure p = 3.40 × 120 = 408 pcf Equivalent fluid at-rest pressure p = 0.45 × 120 = 54 pcf The friction coefficient between the bottom of foundation concrete and the soil is 0.25. SEISMIC ACTIVE EARTH PRESSURE COEFFICIENT Mononobe-Okabe method can be used to estimate the seismic lateral earth pressure on the retaining walls. For a horizontal backfill behind a vertical retaining wall, considering the backfill strength parameters (∅ = 33 𝐷𝑒𝑔𝑟𝑒𝑒,𝛾= 120 𝑝𝑐𝑓), seismic peak ground acceleration (𝑃𝐺𝐴= 0.656𝑔), horizontal seismic acceleration coefficient 𝑘 and seismic lateral earth pressure coefficient can be as in the following table: Table 3– Horizontal acceleration coefficient and seismic lateral pressure coefficient Wall Movement (inches) 𝒌𝒉 (g) 𝑲𝒂𝒆 More than: 2 0.22 0.43g Note: For 𝐾 calculation, the horizontal seismic acceleration coefficient 𝑘=𝑃𝐺𝐴 if the wall can rotate and move laterally more than 2 inches. If the wall is not capable /allowed to move laterally use 𝑘=𝑃𝐺𝐴. For 1 to 2 inches lateral movement use 𝑘= 0.5 𝑃𝐺𝐴 Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 9 FOUNDATION RECOMMENDATIONS FOUNDATION TYPE Spread and continuous footing are the most suitable and economical foundations to support the proposed new building safely. FOUNDATION DEPTH Based on the subsurface formation types and density, the recommended foundations should be placed at a depth of not less than 18 inches below ground surface/finished grade level. Two- foot-thick over-excavation is required. The over-excavation should be compacted to at least 95% of relative compaction. BEARING CAPACITY FOR SPREAD AND CONTINUOUS FOOTINGS The allowable bearing capacity for spread and continuous footings placed at a minimum depth of 18 inches below ground surface/finished grade is 1500 psf. The bearing capacity can be increased by 1/3 for temporary loads such as wind and seismic loads. LATERAL BEARING PRESSURE The recommended allowable lateral bearing pressure for the native undisturbed soil below the natural grade is 150 psf/ft. The lateral bearing pressures shall be permitted to be increased by 150 psf/ft for each additional foot of depth to a value that is not greater than 15 times the recommended value. FOUNDATION SETTLEMENT The allowable bearing pressure of 1500 psf may induce a foundation settlement less than 1-inch and a differential settlement of less than 0.5 inch. CEMENT TYPE Our laboratory testing of a representative sample of the near surface indicated a negligible concentration of soluble sulfates. Based on the guidelines presented in the current edition of the California Building Code, a minimum Type II cement may be utilized in concrete that will be in direct contact with the near-surface soil. EARTHWORK Grading and earthwork should be performed in accordance with the following recommendations and the General Earthwork and Grading Guidelines included in Appendix IV. In case of conflict, the following recommendations shall supersede those presented in Appendix IV. - General: Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 10 Grading should conform to the guidelines presented in the 2022 California Building Code (CBC, 2022), as well as the requirements of the City of Santa Ana. Additionally, general Earthwork and Grading Guidelines are provided herein as Appendix IV. During earthwork construction, removals and reprocessing of fill materials, as well as general grading procedures of the contractor should be observed, and the fill placed selectively tested by representatives of the geotechnical engineer. If any unusual or unexpected conditions are exposed in the field, they should be reviewed by the geotechnical engineer and if warranted, modified and/or additional remedial recommendations will be offered. Specific guidelines and comments pertinent to the planned development are provided herein. The recommendations presented herein have been completed using the information provided to us regarding site development. If information concerning the proposed development is revised, or any changes in the design and location of the proposed property should be approved in writing by this office. - Site Preparation: In general, prior to earthwork or construction operations, the site should be cleared of surface and subsurface obstructions and stripped of any vegetation in the areas proposed for development. Removed vegetation and debris should then be properly disposed of off-site. Holes resulting from removal of trees and buried obstructions which extend below finish site grades should be backfilled with suitable fill soils compacted to a minimum 90 percent relative compaction (based on ASTM Test Method D 698). - Fill Placement and Compaction: If necessary, the on-site soils are suitable for reuse as compacted fill, provided they are free of organic materials and debris and material larger than 6 inches in diameter (in case encountered). Should imported soils be utilized for near-surface fills, these soils should be predominately granular, possess a low or very low expansion potential, and be approved by the geotechnical engineer prior to their transportation to the site. Lift thickness will be dependent upon the size and type of equipment used. In general, fill should be placed in uniform lifts not exceeding 8 inches. Placement and compaction of fill should be performed in accordance with local grading ordinances under the observation and testing of the geotechnical consultant. We recommend that if encountered, oversize materials (materials greater than 6 inches in maximum dimension) be removed from the upper 4 feet of fill or placed in accordance with the General Earthwork and Grading Guidelines contained in Appendix IV. - Trench Excavations and Backfill: Trenches are anticipated to be excavated with moderate effort using conventional construction equipment in good operating condition. Deep trenches may require the use of heavy equipment operations. The encountered soils at the site consisted of loose to medium dense clayey fine sand, as such these soils may be subject to collapse and cave-ins (refer to the caving potential section). Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 11 After clearing and grading the site, excavate at least two (2) feet below the building’s footprint, scarify the upper 8 inches of the soil, bring the moisture content to near optimum moisture (around 8%) and compact it to at least 90% of relative compaction, then replace the removed soil using 6-8 inch-thick lifts compacted to at least 95% of relative compaction. Upon completing the over-excavation work, the foundation trenches can be excavated to the recommended foundation depth. The foundation bottom surface should be the over-excavated soils. The on-site soils may be used as trench backfill provided, they are screened of rock sizes over 6 inches in maximum dimension and organic matter (in case encountered). Trench backfills should be compacted in uniform lifts (not exceeding 8 inches in compacted thickness) by mechanical means to at least 90 percent relative compaction (based on ASTM D 698). CONCRETE SLABS Interior concrete slabs should have a minimum thickness of 4 inches and be underlain by a 10- mil visqueen moisture retarder barrier underlain with a 2-inch layer of clean sand (sand equivalent of at least 30). The visqueen moisture barrier should be overlain by a 2-inch layer of clean sand to aid in concrete curing. All slabs should be constructed with preferred minimum reinforcement consisting of No. 3 bars placed mid-height in the slab and spaced on 18-inch centers in both directions. Crack control joints should be provided in accordance with the recommendations of the project structural engineer. Exterior concrete flatwork (sidewalks, etc.) should have a minimum thickness of 4 inches, be underlain by a 2-inch layer of clean sand, and reinforced with a minimum. No. 3 bars placed mid- height in the slab and spaced 18-inch on centers in both directions. Care should be taken by the contractor to ensure that the reinforcement is placed and maintained at slab mid-height. We recommend that crack control joints for exterior flatwork be provided with a minimum spacing of 12 feet and a maximum of 15 feet, or in accordance with the structural engineer's recommendations. We also recommend that every third control joint be converted to an expansion joint. Some slab cracking due to shrinkage should be anticipated. The potential for this slab cracking may be reduced by careful control of water/cement ratios. The contractor should take appropriate curing precautions during the pouring of concrete in hot weather to minimize cracking of slabs. We recommend that a slipsheet (or equivalent) be utilized if crack-sensitive flooring is planned directly on concrete slabs. All slabs should be designed in accordance with structural considerations. SURFACE AND SUBSURFACE DRAINAGE We recommend that measures be taken to properly finish grade the site, such that surface drainage is directed away from structure foundations, floor slabs, and tops of slopes, at a 2 percent minimum grade for a minimum distance of 5 feet for subgrade, and 1 percent minimum grade for a minimum distance of 5 feet for hard finish surface (pavement, walkways etc.). Ponding of water should not be permitted, and installation of roof gutters which outlet into a drainage system is considered prudent. Planting areas at grade should be provided with positive drainage directed away from all buildings. Geotechnical Investigation Report 03/11/2025 2234 S Lowell St., Santa Ana, CA 92707 Page | 12 LIMITATIONS This report presents recommendations pertaining to the subject site based on the assumption that the subsurface conditions do not deviate appreciably from those disclosed by our exploratory excavations. Our recommendations are based on the technical information gathered, our understanding of the proposed construction, and our experience in the geotechnical field. We do not provide a guarantee or warranty (either expressed or implied) of the performance of the project, only that our engineering work and judgments meet the standard of care of our profession at this time. In view of the general conditions in the area, the possibility of different local soil conditions cannot be discounted. Any deviations or unexpected conditions observed during construction should be brought to the attention of the Geotechnical Engineer. In this way, any required supplemental recommendations can be made with a minimum of delay to the project. If the proposed construction will differ from our present understanding of the project, the existing information and possibly new factors may have to be evaluated. Any design changes and the final grading and foundation plans should be reviewed by the Geotechnical Consultant. Of particular importance would be extending development to new areas, changes in structural loading conditions, postponed development for more than one year, or changes in ownership. This report is issued with the understanding that it is the responsibility of the owner or owner’s representative to ensure that the information and recommendations contained herein are called to the attention of the Architects and Engineers for the project and incorporated into the plans and that the necessary steps are taken to ensure that the Contractors and Subcontractors carry out such recommendations in the field. This report is also subject to review by the controlling authorities for this project. Appendices Appendix I: Soil Profile Logs Appendix II: Site’s Seismic Report Appendix III: Lab Testing Appendix IV: General Earthwork and Grading Guidelines Appendix I Soil Profile Logs 0 1.25 2.5 3.75 5 6.25 7.5 8.75 45 43.75 42.5 41.25 40 38.75 37.5 4/6 4/6 4/6 4/6 4/6 4/6 5/6 5/6 5/6 4/6 4/6 4/6 6/6 6/6 6/6 SC SC SC SC SC Clayey fine Sand, loose, brown, moist. Clayey fine Sand, loose, brown, moist. Clayey fine Sand, medium dense, brown, moist. Clayey fine Sand, loose, brown, moist. Clayey fine Sand, medium dense, brown, moist. 8 8 10 8 12 2.8 2.97 3.12 1 2 3 4 5 TEST BORING LOG BORING NO.: BH-1 PROJECT :Detached ADU CLIENT :Carlos Gonzalez DATE FINISHED :03/08/2025 LOCATION :2234 S. Lowell St. Santa Ana, CA 92707 GEOLOGIST :S.D. ELEVATION :46 ft.GWD :N/A GWL :N/A DRILLER :M.D. BORING NO.:BH-1 SOUTH:TOTAL DEPTH : 8 ft. PROJ. NO. :25-R-109 WEST:PAGE 1 OF ELEVATION/ DEPTH SOIL SYMBOLS, SAMPLERS AND TEST DATA USCS Description SPT (N) WC (%) LL (%) PI (%) LL (%) REC (%) Sample No. 1 0 1.25 2.5 3.75 5 6.25 7.5 8.75 45 43.75 42.5 41.25 40 38.75 37.5 5/6 5/6 5/6 4/6 4/6 4/6 4/6 4/6 4/6 4/6 4/6 4/6 5/6 5/6 5/6 SC SC SC SC SC Clayey fine Sand, Medium dense, brown, moist. Clayey fine Sand, loose, brown, moist. Clayey fine Sand, loose, brown, moist. Clayey fine Sand, loose, brown, moist. Clayey fine Sand, medium dense, brown, moist. 10 8 8 8 10 1 2 3 4 5 TEST BORING LOG BORING NO.: BH-2 PROJECT :Detached ADU CLIENT :Carlos Gonzalez DATE FINISHED :03/08/2025 LOCATION :2234 S. Lowell St. Santa Ana, CA 92707 GEOLOGIST :S.D. ELEVATION :46 ft.GWD :N/A GWL :N/A DRILLER :M.D. BORING NO.:BH-2 SOUTH:TOTAL DEPTH : 8 ft. PROJ. NO. :25-R-109 WEST:PAGE 1 OF ELEVATION/ DEPTH SOIL SYMBOLS, SAMPLERS AND TEST DATA USCS Description SPT (N) WC (%) LL (%) PI (%) LL (%) REC (%) Sample No. 1 Symbol Description Strata symbols Clayey fine sand Soil Samplers Standard penetration test KEY TO SYMBOLS Appendix II Site’s Seismic Report ASCE Hazards Report Address: 2234 S Lowell St Santa Ana, California 92707 Standard:ASCE/SEI 7-16 Latitude:33.716704 Risk Category:II Longitude:-117.879032 Soil Class:D - Default (see Section 11.4.3) Elevation:46.38661698305936 ft (NAVD 88) Page 1 of 3https://ascehazardtool.org/Sun Mar 09 2025 SS : 1.285 S1 : 0.46 F a : 1.2 F v : N/A SMS : 1.542 SM1 : N/A SDS : 1.028 SD1 : N/A T L : 8 PGA : 0.547 PGA M : 0.656 F PGA : 1.2 Ie : 1 C v : 1.357 Seismic Site Soil Class: Results: Data Accessed: Date Source: D - Default (see Section 11.4.3) USGS Seismic Design Maps Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8. Sun Mar 09 2025 Page 2 of 3https://ascehazardtool.org/Sun Mar 09 2025 The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE. ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE Hazard Tool. Page 3 of 3https://ascehazardtool.org/Sun Mar 09 2025 Appendix III Lab Testing Particle Size Distribution Report PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 0.0 0.0 0.0 7.4 62.8 12.5 17.3 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 TEST RESULTS Opening Percent Spec.*Pass? Size Finer (Percent) (X=Fail) Material Description Atterberg Limits (ASTM D 4318) Classification Coefficients Date Received:Date Tested: Tested By: Checked By: Title: Source of Sample: BH-1 Depth: 0 Sample Number: 1 Client: Project: Project No: Clay fine Sand 4.75mm 3.35mm 2.36mm 2mm 1.18mm 0.85mm 0.425mm 0.15mm 0.075mm 100.0 98.9 95.4 92.6 50.7 39.0 29.8 20.2 17.3 SC 1.8912 1.7538 1.3286 1.1679 0.4324 Carlos Gonzalez Detached ADU 25-R-109 PL=LL=PI= USCS (D 2487)=AASHTO (M 145)= D90=D85=D60= D50=D30=D15= D10=Cu=Cc= Remarks *(no specification provided) GRAIN SIZE DISTRIBUTION TEST DATA Client: Carlos Gonzalez Project: Detached ADU Project Number: 25-R-109 Location:BH-1 Depth:0 Sample Number:1 Material Description: Clay fine Sand USCS Classification: SC Sieve Test Data Dry Sample and Tare (grams) Tare (grams) Cumulative Pan Tare Weight (grams) Sieve Opening Size Cumulative Weight Retained (grams) Percent Finer 1234.60 176.00 0.00 4.75mm 0.00 100.0 3.35mm 11.40 98.9 2.36mm 48.90 95.4 2mm 78.30 92.6 1.18mm 522.30 50.7 0.85mm 645.30 39.0 0.425mm 743.00 29.8 0.15mm 845.00 20.2 0.075mm 875.60 17.3 Fractional Components Cobbles 0.0 Gravel Coarse 0.0 Fine 0.0 Total 0.0 Sand Coarse 7.4 Medium 62.8 Fine 12.5 Total 82.7 Fines Silt Clay Total 17.3 D5 D10 D15 D20 0.1457 D30 0.4324 D40 0.8933 D50 1.1679 D60 1.3286 D80 1.6494 D85 1.7538 D90 1.8912 D95 2.2551 Fineness Modulus 2.74 Particle Size Distribution Report PE R C E N T F I N E R 0 10 20 30 40 50 60 70 80 90 100 GRAIN SIZE - mm. 0.0010.010.1110100 % +3"Coarse % Gravel Fine Coarse Medium % Sand Fine Silt % Fines Clay 100.0 6 i n . 3 i n . 2 i n . 1½ i n . 1 i n . ¾ i n . ½ i n . 3/ 8 i n . #4 #1 0 #2 0 #3 0 #4 0 #6 0 #1 0 0 #1 4 0 #2 0 0 TEST RESULTS Opening Percent Spec.*Pass? Size Finer (Percent) (X=Fail) Material Description Atterberg Limits (ASTM D 4318) Classification Coefficients Date Received:Date Tested: Tested By: Checked By: Title: Source of Sample: BH-2 Depth: 1.5 Sample Number: 2 Client: Project: Project No: Clay fine Sand 4.75mm 3.35mm 2mm 1.18mm 0.85mm 0.425mm 0.075mm 0.015mm 100.0 99.2 94.4 74.0 54.0 31.8 17.5 19.3 SC Carlos Gonzalez Detached ADU 25-R-109 PL=LL=PI= USCS (D 2487)=AASHTO (M 145)= D90=D85=D60= D50=D30=D15= D10=Cu=Cc= Remarks *(no specification provided) GRAIN SIZE DISTRIBUTION TEST DATA Client: Carlos Gonzalez Project: Detached ADU Project Number: 25-R-109 Location:BH-2 Depth:1.5 Sample Number:2 Material Description: Clay fine Sand USCS Classification: SC Sieve Test Data Dry Sample and Tare (grams) Tare (grams) Cumulative Pan Tare Weight (grams) Sieve Opening Size Cumulative Weight Retained (grams) Percent Finer 1415.60 176.00 0.00 4.75mm 0.00 100.0 3.35mm 9.40 99.2 2mm 69.40 94.4 1.18mm 322.50 74.0 0.85mm 570.30 54.0 0.425mm 845.00 31.8 0.015mm 1000.00 19.3 0.075mm 1023.00 17.5 Fractional Components Cobbles Gravel Coarse Fine Total Sand Coarse Medium Fine Total Fines Silt Clay Total D5 D10 D15 D20 D30 D40 D50 D60 D80 D85 D90 D95 PROJECT CLIENT BH-1 Soil Dry density (pcf)112.47 S -2 Soil Moisture Contenet (%)2.97 Shear Device 2 Shear Strength Values:Test Type Clayey fine sand 30.85 43Cohesion (PSF) Sample NO.Single Shear Apparatus Depth (ft )Ultimate Sample Description: Friction Angle (Degree)Sample Test State Moist, Remolded TEST RESULT FOR DIRECT SHEAR OF SOILS ASTM D3080 2234 S Lowell St., Santa Ana, CA 92707 Carlos Gonzalez Boring NO. Date March 10, 2025 0 500 1000 1500 2000 2500 3000 0 500 1000 1500 2000 2500 3000 Sh e a r S t r e s s ( P S F ) Normal Stress (PSF) PROJECT CLIENT BH-2 Soil Dry density (pcf)112.92 S -3 Soil Moisture Contenet (%)3.12 Shear Device 4 Shear Strength Values:Test Type Clayey fine sand 31.12 38Cohesion (PSF) Sample NO.Single Shear Apparatus Depth (ft )Ultimate Sample Description: Friction Angle (Degree)Sample Test State Moist, Remolded TEST RESULT FOR DIRECT SHEAR OF SOILS ASTM D3080 2234 S Lowell St., Santa Ana, CA 92707 Carlos Gonzalez Boring NO. Date March 10, 2025 0 500 1000 1500 2000 2500 3000 0 500 1000 1500 2000 2500 3000 Sh e a r S t r e s s ( P S F ) Normal Stress (PSF) Appendix IV General Earthwork and Grading Guidelines I. GENERAL A. These guidelines present general procedures and requirements for earthwork and grading, including preparation of areas to be filled, placement of fill, installation of sub-drains and excavations. The recommendations contained in the geotechnical report are part of the earthwork and grading guidelines and would supersede the provisions contained hereafter in the case of conflict. Evaluation performed by the consultant during the course of grading may result in new recommendations which could supersede these guidelines or the recommendations contained in the geotechnical report. B. The contractor is responsible for the satisfactory completion of all earthwork in accordance with provisions of the project plans and specifications. The project soil engineer and engineering geologist (geotechnical consultant) or their representatives should provide observation and testing services, and geotechnical consultation during the duration of the project. II. EARTHWORK OBSERVATIONS AND TESTING A. Geotechnical Consultant Prior to the commencement of grading, a qualified geotechnical consultant (soil engineer and engineering geologist) should be employed for the purpose of observing earthwork procedures and testing the fills for conformance with the recommendations of the geotechnical report, the approved grading plans, and applicable grading codes and ordinances. The geotechnical consultant should provide testing and observation so that determination may be made that the work is being accomplished as specified. It is the responsibility of the contractor to assist the consultants and keep them appraised of anticipated work schedules and changes, so that they may schedule their personnel accordingly. All clean-outs, prepared ground to receive fill, key excavations, and sub-drains should be observed and documented by the project engineering geologist and/or soil engineer prior to placing any fill. It is the contractor’s responsibility to notify the engineering geologist and soil engineer when such areas are ready for observation. B. Laboratory and Field Tests Maximum dry density tests to determine the degree of compaction should be performed in accordance with American Standard Testing Materials test method ASTM designation D- 1557. Random field compaction tests should be performed in with method ASTM designations D-1556-82, D-2937 or D-2922 & D-3017, at intervals of approximately two (2) feet of fill height or every 1000 cubic yards of fill placed. These criteria would vary depending on the soil conditions sand the size of the project. The locations and frequency of testing would be at the discretion of the geotechnical consultant. C. Contractor’s Responsibility All clearing, site preparation, and earthwork performed on the project should be conducted by the contactor, with observation by geotechnical consultants and staged approval by the governing agencies. It is the contractor’s responsibility to prepare the ground surface to receive the fill, to the satisfaction of the soil engineer. And to place, spread, moisture condition, mix and compact the fill in accordance with the recommendations of the soil engineer. The contractor should also remove all major non-earth material considered unsatisfactory by the soil engineer. It is the sole responsibility of the contactor to provide adequate equipment and methods to accomplish the earthwork in accordance with applicable grading guidelines, codes or agency ordinances, and approved grading plans. Sufficient watering apparatus and compaction equipment should be provided by the contractor with due consideration for the fill material, rate of placement, and climatic conditions. If, the opinion of the geotechnical consultant, unsatisfactory conditions such as questionable weather, excessive oversized rock, or deleterious material, insufficient support equipment, etc., are resulting in a quality of work that is not acceptable, the consultant will inform the contractor, and the contractor is expected to rectify the conditions, and if necessary, stop work until conditions are satisfactory. During construction, the contractor shall properly grade all surfaces to maintain good drainage and prevent ponding of water. The contractor shall take remedial measures to control surface water and to prevent erosion of graded areas until such time as permanent drainage and erosion control measures have been installed. III.SITE PREPARATION A. All major vegetation, including brush, trees, thick grasses, organic debris, and other deleterious material should be removed and disposed of off-site. These removals must be concluded prior to placing fill. Existing fill, soil, alluvium, colluvium, or rock materials determined by the soil engineer or engineering geologist as being unsuitable in-place should be removed prior to fill placement. Depending upon the soil conditions, these materials may be reused as compacted fill. Any materials incorporated as part of the compacted fills should be approved by the soil engineer. B. Any underground structures such as cesspools, cisterns, mining shafts, tunnels, septic tanks, wells, pipelines, or other structures not located prior to grading are to be removed or treated in a manner recommended by the soil engineer. Soft, dry, spongy, highly fractured, or otherwise unsuitable ground extending to such a depth that surface processing cannot adequately improve the condition should be over excavated down to firm ground and approved by the soil engineer before compaction and filling operations continue. Over excavated and processed soils which have been properly mixed and moisture-conditioned should be recompacted to the minimum relative compaction as specified in these guidelines. C. Existing ground which is determined to be satisfactory for support of the fills should be scarified to a minimum depth of six (6) inches or as directed by the soil engineer. After the scarified ground is brought to optimum moisture or greater and mixed, the materials should be compacted as specified herein. If the scarified zone is greater than 6 inches in depth, it may be necessary to remove the excess and place the material in lifts restricted to about six (6) inches in compacted thickness. D. Existing ground which is not satisfactory to support compacted fill should be over excavated as required in the geotechnical report or by the on-site soils engineering geologist. Scarification, dicing, or other acceptable form of mixing should continue until the soils are broken down and free of large lumps or clods, until the working surface is reasonably uniform and free from ruts, hollows, hummocks, or other uneven features which would inhibit compaction as described in Item III, C, above. E. Where fills are to be placed on ground with slopes steeper than 5:1 (horizontal to vertical), the ground should be stepped or benched. The lowest bench, which will act as a key, should be a minimum of 15 feet wide and should be at least two (2) feet deep into firm material, and approved by the soil engineer and/or engineering geologist. In fill over cut slope conditions the recommended minimum width of the lowest bench or key is also 15 feet with the key founded on firm material, and designated by the Geotechnical Consultant. As a general rule, unless specifically recommended otherwise by the Soil Engineer, the minimum width of fill keys should be approximately equal to one-half (1/2) the height of the slope. F. Standard benching is generally four feet (minimum) vertically, exposing firm, acceptable material. Benching may be used to remove unsuitable materials, although it is understood that the vertical height of the bench may exceed four feet. Pre-stripping may be considered for unsuitable materials in excess of four feet in thickness. G. All areas to receive fill, including processed areas, removal areas, and toe of fill benches should be observed and approved by the soil engineer and/or engineering geologist prior to placement of fill. Fills may then be properly placed and compacted until design grades are attained. IV. COMPACTED FILLS A. Any earth materials imported or excavated on the property may be utilized in the fill provided that each material has been determined to be suitable by the soil engineer. These materials should be free of roots, tree branches, other organic matter or other deleterious materials. All unsuitable materials should be removed from the fill as directed by the soil engineer. Soils of poor gradation, undesirable expansion potential, or substandard strength characteristics may be designated by the consultant as unsuitable and may require blending with other soils to serve as a satisfactory fill material. B. Fill materials derived from benching operations should be dispersed throughout the fill area and blended with other bedrock-derived material. Benching operations should not result in the benched material being placed only within a single equipment width away from the fill/bedrock contact. C. Oversized materials defined as rock or other irreducible materials with a maximum dimension greater than 12 inches should not be buried or placed in fills unless the location of materials and disposal methods are specifically approve by the soil engineer. Oversized material should be taken off-site or placed in accordance with recommendations of the soil engineer in areas designated as suitable for rock disposal. Oversized material should not be placed within 10 feet vertically of finish grade or within 20 feet horizontally of slope faces. To facilitate trenching, rock should not be placed within the range of foundation excavations, future utilities, or underground construction unless specifically approved by the soil engineer and/or the developers’ representative. D. If import material is required for grading, representative samples of the material to be utilized as compacted fill should be analyzed in the laboratory by the soil engineer to determine its physical properties. If any material other than that previously tested is encountered during grading, an appropriate analysis of this material should be conducted by the soil engineer as soon as possible. E. Approved fill material should be placed in areas prepared to receive fill in near-horizontal layers that when compacted should not exceed six (6) inches in thickness. The soil engineer may approve thicker lifts if testing indicates the grading procedures are such that adequate compaction is being achieved with lifts of greater thickness. Each layer should be spread evenly and blended to attain uniformity of material and moisture suitable for compaction. F. Fill layers at a moisture content less than optimum should be watered and mixed, and wet fill layers should be aerated by scarification or should be blended with drier material. Moisture conditioning, blending, and mixing of the fill layers should continue until the fill materials have a uniform moisture content at or above optimum moisture. G. After each layer has been evenly spread, moisture-conditioned and mixed, it should be uniformly compacted to a minimum of 90 percent of maximum density as determined by ASTM test designation, D 1557-78, or as otherwise recommended by the soil engineer. Compaction equipment should be adequately sized and should be specifically designed for soil compaction or of proven reliability to efficiently achieve the specified degree of compaction. Where tests indicate that the density of any layer of fill, or portion thereof, is below the required density and/or moisture content has been attained. No additional fill shall be placed in an area until the last placed lift of till has been tested and found to meet the density and moisture requirements, and is approved by the soil engineer. H. Compaction of slopes should be accomplished by over-building a minimum of three (3) feet horizontally, and subsequently trimming back to the design slope configuration. Testing shall be performed as the fill is elevated to evaluated compaction as the fill core is being developed. Special efforts may be necessary to attain the specified compaction in the fill slope zone. Final slope shaping should be performed by trimming and removing loose materials with appropriate equipment. A final determination of fill slope compaction should be based on observation and/or testing of the finished slope face. Where compacted fill slopes are designed steeper that 2:1, specific material types, a higher minimum relative compaction, and special grading procedures, may be recommended. I. If an alternative to over-building and cutting back the compacted fill slopes is selected, then special effort should be made to achieve the required compaction in the outer 10 feet of each lift of fill by undertaking the following: Ia. An extra piece of equipment consisting of a heavy short-shanked sheepsfoot should be used to roll (horizontal) parallel to the slopes continuously as fill is placed. The sheepsfoot roller should also be used to roll perpendicular to the slopes, and extend out over the slope to provide adequate compaction to the face of the slope. Ib. Loose fill should not be spilled out over the face of the slope as each lift is compacted. Any loose fill spilled over a previously completed slope face should be trimmed off or be subject to re-rolling. Ic. Field compaction tests will be made in the outer (horizontal) two (2) to eight (8) feet of the slope at appropriate vertical intervals, subsequent to compaction operations. Id. After completion of the slope, the slope face should be shaped with a small tractor and then re-rolled with a sheepsfoot to achieve compaction to near the slope face. Subsequent to testing to verify compaction, the slopes should be grid-rolled to achieve compaction to the slope face. Final testing should be used to confirm compaction after grid rolling. Ie. Where testing indicates less than adequate compaction, the contractor will be responsible to rip, water, mix and recompact the slope materials as necessary to achieve compaction. Additional testing should be performed to verify compaction. If. Erosion control and drainage devices should be designed by the project civil engineer in compliance with the ordinances of the controlling governmental agencies, and/or in accordance with the recommendations of the soil engineer or engineering geologist. V. SUB-DRAIN INSTALLATION A. Sub-drains should be installed in approved ground in accordance with the approximate alignment and details indicated by the geotechnical consultant. Sub-drain locations or materials should not be changed or modified without approval of the geotechnical consultant. The soil engineer and/or engineering geologist may recommend and direct changes in sub- drain line, grade and drain material in the field, pending exposed conditions. The location of constructed sub-drains should be recorded by the project civil engineer. VI. EXCAVATIONS A. Excavations and cut slopes should be examined during grading by the engineering geologist and/or geotechnical engineer. If directed by the engineer geologist, further excavations or over-excavation and refilling of cut areas should be performed and/or remedial grading of cut slopes should be performed. When fill over cut slopes are to be graded, unless otherwise approved, the cut portion of the slope should be observed by the engineer geologist prior to placement of materials for construction of the fill portion of the slope. B. The engineer geologist should observe all cut slopes and should be notified by the contractor when cut slopes are started. C. If, during the course of grading, unforeseen adverse or potentially adverse geologic conditions are encountered, the engineering geologist and soil engineer should investigate, evaluate and make recommendations to treat these problems. The need for cut slope buttressing or stabilizing, should be based on in-grading evaluations by the engineering geologist, whether anticipated previously or not. D. Unless otherwise specified in soil and geological reports, no cut slopes should be excavated higher or steeper than that allowed by the ordinances of controlling governmental agencies. Additionally, short-term stability of temporary cut slopes or temporary excavation is the contractors responsibility. E. Erosion control and drainage devices should be designed by the project civil engineer and should be constructed in compliance with the ordinances of the controlling governmental agencies, and/or in accordance with the recommendations of the soil engineer or engineering geologist. VII. COMPLETION A. Observation, testing and consultation by the geotechnical consultant should be conducted during the grading operations in order to state an opinion that all cut and filled areas are graded in accordance with the approved project specifications. B. After completion of grading and after the soil engineer and engineering geologist have finished their observations of the work, final reports should be submitted subject to review by the controlling governmental agencies. No further excavation or filling should be undertaken without prior notification of the soil engineer and/or engineering geologist. C. All finished cut and fill slopes should be protected from erosion and/or be planted in accordance with the project specifications and/or as recommended by a landscape architect. Such protection and/or planning should be undertaken as soon as practical after completion of grading CITY OF SANTA ANA Planning and Building Agency o/"lS. n .,_._..........� FOR PERMIT ISSUANCE Master ID: Date: TYPICAL RETAINING WALL DRAINAGE DET SOIL BACKFILL, COMPACTED TO 90 PERCENT RELATIVE COMPACTION PER ASTM D1557. RETAINING WALL. -----,,__ ----------------- =___===----MIN. —------------- -------------- 6°MIN, . WATERPROOFING AS NOTED' al q d = FILTER FABRIC ENVELOPE IN THE ATTACHED FIGURE. — MIRAFI 140N OR APPROVED EQUIVALENT) I' _ _ — 3/4" — 1-1 /2" CLEAN GRAVEL I: 4" (MIN.) DIAMETER PERFORATED PVC PIPE (SCHEDULE 40 OR FINISHED GRADE `.d .. - EQUIVALENT) WITH PERFORATIONS ____________________ d.. _— ORIENTED DOWN AS DEPICTED ___--------------- __= <I ; MINIMUM 1 PERCENT GRADIENT TO =COMPACTED FILL = _ _ .I �" — SUITABLE OUTLET. -IF APPLICABLE --- <. --- - —-—————————————————— L=-- ° -- -111-111 3 " MIN. II I II I II I I=11 III=III=1 i!:I I1=1I I III COMPETENT, BEDROCK OR MATERIAL III -III -III II -III -III -III -III -III -III- AS EVALUATED BY THE WALL FOOTING GEOTECHNICAL CONSULTANT. NOT TO SCALE CITY OF SANTA ANA Planning and Building Agency CANYON SUBDRAIN DETAIL \\ NATURAL GROUND _ -�__- ---- _______ - _____ - - COMPACTED FILL - - - -- - BENCHING =1------------------- ---- _____________ _- - Approved FOR PERMIT ISSUANCE ,zlz EW04� REMOVE UNSUITABLE MATERIAL SUBDRAIN TRENCH -TI=III- SEE ALTERNATES A&B ALTERNATE A-1 4" kN. PERFORATED PIPE 6" 0 MIN. SUBDRAIN 1 1 /2" ALTERNATE B: FILTER 8" ALTERNATE B-1 FILTER MATERIAL: FILTER MATERIAL SHALL BE CLASS 2 PERMEABLE MATERIAL PER STATE OF CALIFORNIA STANDARD SPECIFICATIONS, OR APPROVED ALTERNATE. CLASS 2 GRADING AS FOLLOWS: SIEVE SIZE 1" 3/4" 3/8" ALTERNATE A-2 NO. 4 GRAVEL WRAPPED IN FABRIC MIN. OVE IIRAFI 140 ILTER FABF IR APPROVI QUIVALENT 1/2" MIN. GRAVEL OR APPROVED EQUIVALENT 9 FT. 3/FT. NO. 8 NO. 30 NO. 50 NO. 200 NOTE: PERCENT PASSING 100 90-100 40-100 25-40 18-33 5-15 0-7 0-3 IN ADDITION TO THE WRAPPED GRAVEL, OUTLET PORTION OF THE SUBDRAIN SHOULD BE EQUIPPED WITH A MINIMUM OF 10 FEET LONG PERFORATED PIPE CONNECTED TO A NONPERFORATED PIPE HAVING A MINIMUM OF 5 FEET IN LENGTH INSIDE THE WRAPPED GRAVEL. ALTERNATE B-2 ' SUBDRAIN INSTALLATION — SUBDRAIN PIPE SHALL BE INSTALLED WITH PERFORATIONS DOWN OR AT LOCATIONS DESIGNATED BY THE GEOTECHNICAL CONSULTANT, SHALL BE NONPERFORATED PIPE. • SUBDRAIN TYPE — SUBDRAIN TYPE SHALL BE ASTM D2751, SDR 23.5 OR ASTM D1527, SCHEDULE 40 ACRYLONITRILE BUTADIENE STYRENE (ABS) OR ASTM D3034 SDR 23.5 OR ASTM D1785, SCHEDULE 40 POLYVINAL CHLORIDE PLASTIC (PVC) PIPE OR APPROVED EQUIVALENT. NOT TO SCALE BENCHING DETAILS CITY OF SANTA ANA Planning and Building Agency Approved FOR PERMIT ISSU NCE Master ID: FILL SLOPE =_ _ = Co PACTED = � _ PROJECTED PLANE 1 TO ------- _y== 1 MAXIMUM FROM TOE - — _ � _ _ _ __ - OF SLOPE TO APPROVED =__________-� _�=1I1-j11 I -I GROUND. - -y== _ -- -- - - - - -� --- NATURAL REMOVE UNSUITABLE GROUND_ — _- - 4 MIN. MATERIAL BENCH - f = _ _ _ _ = (TYPICAL) BENCH ---- HEIGHT _ --- - - ( - = 2% MIN. — — I VARIES — _ 15' MIN. II 2' MIN LOWEST BENCH KEY (KEY) DEPTH - - COMPACTED FILL OVER CUT SLOPE - _ _ - FILL _ __--- - --- _ -- _- REMOVE NATURAL UNSUITABLE GROUND--,,, _ MATERIALi = _ --- 4' MIN. BENCH BENCH HEIGHT 2% MIN. = I (TYPICAL) VARIES / 15' MIN. II / LOWEST BENCH / / i CUT FACE TO BE CONSTRUCTED PRIOR TO FILL PLACEMENT NOTES: LOWEST BENCH: DEPTH AND WIDTH SUBJECT TO FIELD CHANGE BASED ON CONSULTANT'S INSPECTION. SUBDRAINAGE: BACK DRAINS MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL CONSULTANT. NOT TO SCALE CITY OF SANTA ANA Planning and Building Agency IVI I I V 1IVI V IVI DOWNSLOPE KEY DEPTH FILL SLOPE ABOVE NATURAL GROUND D�TAIL PERMIT ISSUANCE 1\L-wU11\LV rLl\ RECOMMENDATIONS OF SOILS ENGINEER DURING GRADING WHERE NATURAL SLOPE GRADIENT IS 5:1 OR LESS, BENCHING IS NOT NECESSARY. HOWEVER, FILL IS NOT TO BE PLACED ON COMPRESSIBLE OR UNSUITABLE MATERIAL. NOT TO SCALE CITY OF SANTA ANA Planning and Building Agency FILL SLOPE ABOVE CUT SLOPE DETAIL REMOVE ALL TOPSOIL, COLLUVIU AND CREEP MATERIAL FROM TRANSITION CUT/FILL CONTACT SHO ON GRADING PLAN CUT/FILL CONTACT SHO ON "AS —BUILT" NATURAL TOPOGRAPHY i i i CUT SLOPEW Approved FOR PERMIT ISSUANC Master ID: Date: FI LL R //P CRE jai v 4' MIN. i BEDROCK OR APPROVED FOUNDATION MATERIAL )KNOTE: CUT SLOPE PORTION SHALL BE MADE PRIOR TO PLACEMENT OF FI LL. NOT TO SCALE CITY OF SANTA ANA Planning and Building Agency SLOPE BUTTRESS OR REPLACEMENT FILL DETAIL Approve FOR PERMIT ISSU NCE Masi.,r ID: D� FILL BLANKET 15' MIN. I 1 30" MIN. OUTLET PIPES 4" 0 NONPERFORATED PIPE, 100' MAX. O.C. HORIZONTALLY, 30' MAX. O.C. VERTICALLY. KEY 1' IIMIN -�=====-__ _-_ DEPTH i = ==_ =__: =__.�% ----�--=--------- _--___ =-2% MIN. 2' MIN. KEY WIDTH EQUIPMENT SIZE -GENERALLY 15 FEET / TEMPORARY FILL \ LEVEL _ RECOMPACTED FILL —_-- 6" MIN. SELECT BEDDING BACKFI \ _4""MIN. NONPERFORATED PIPE DETAIL A -A BACK CUT 1:1 OR FLATTER ENCHING - ___---- --- SUBDRAIN SEE __________ - ALTERNATES A & B FILTER MATERIAL 3 FT. 3/FT T-CONNECTIONG " MIN N. _ - 5% MIN._ NOTES: • FILL BLANKET, BACK CUT, KEY WIDTH AND KEY DEPTH ARE SUBJECT TO FIELD CHANGE, PER REPORT/PLANS. • KEY HEEL SUBDRAIN, BLANKET DRAIN, OR VERTICAL DRAIN MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL CONSULTANT. U E.1 P1Pe `� PERFORATED 4 MIN . PIPE 4" MIN. ALTERNATE A / MIN. OVERLAP\ POSITIVE SEAL SHOULD BE PROVIDED AT 1 1/2" MIN. THE JOINT GRAVEL OR APPROVED 5_ MIN, EQUIVALENT IRAFI 140 FILTER FABRIC OV(� OR APPROVED \ EQUIVALENT / ALTERNATE B FILTER MATERIAL: FILTER MATERIAL SHALL BE CLASS 2 PERMEABLE MATERIAL PER STATE OF CALIFORNIA STANDARD SPECIFICATIONS, OR APPROVED ALTERNATE. CLASS 2 GRADING AS FOLLOWS: • SUBDRAIN INSTALLATION - SUBDRAIN PIPE SHALL BE SIEVE SIZE INSTALLED WITH PERFORATIONS DOWN OR AT LOCATIONS DESIGNATED BY THE GEOTECHNICAL CONSULTANT, SHALL 1" BE NONPERFORATED PIPE. 3/4" 3/8" • SUBDRAIN TYPE - SUBDRAIN TYPE SHALL BE ASTM NO. 4 D2751, SDR 23.5 OR ASTM D1527, SCHEDULE 40 NO. 8 ACRYLONITRILE BUTADIENE STYRENE (ABS) OR ASTM NO. 30 D3034 SDR 23.5 OR ASTM D1785, SCHEDULE 40 NO. 50 POLYVINYL CHLORIDE PLASTIC (PVC) PIPE OR APPROVED NO. 200 EQUIVALANT. NOT TO SCALE PERCENT PASSING 100 90-100 40-100 25- 40 18-33 5-15 0-7 0-3 CITY OF SANTA ANA Planning and Building Agency TYPICAL SHEAR KEY DETAIL ATURAL GROUND PANE OF WE KN ESS PROVIDE BACKDRAIN PER BACKDRAIN DETAIL. AN ADDITIONAL BACKDRAIN AT MID -SLOPE WILL BE REQUIRED FOR BACK SLOPES IN EXCESS OF 40 FEET HIGH. LOCATIONS OF BACKDRAINS AND OUTLETS PER SOILS ENGINEER AND/OR ENGINEERING GEOLOGIST DURING GRADING. COMPACTED FILL NOT TO SCALE FOR PERMIT ISSUANCE I Master ID: Date: ROPOSED GRADING OF ESS BASE WIDTH "W" DETERMINED BY SOILS ENGINEER CITY OF SANTA ANA Planning and Building Agency FOR PERMIT ISSUANCE Master ID: ROCK DISPOSAL DETAIL Date: _ = == - =� ___ -____________ __ COMPACTED SLOPE FACE _ _ _ _ - _ FILL - _-_____--- —------� ---- ___--- ---------------------------- -�= _ _______---- ------ _ 10 -=-4' MIN.�-------- - ---- =_ -__ -------�-- _= -------- = ---- --------------------------------- _ _--- ----------- OVERSIZE ------- WINDROW --- ��--- GRANUALAR SOIL TO FILL VOIDS, DENSIFIED BY FLOODING PROFILE ALONG WINDROW NOT TO SCALE CITY OF SANTA ANA Planning and Building Agency TRANSITION LOT DETAILS CUT -FILL LOT i I' FOR PERMIT ISSUANCE Master ID: Date: GROUND 5'� MIN. ----------- ___-__ _�_ =_ COMPACTED FILL �_=--- R\P\-_ _ _____________ 36 MIN. OVEREXCAVATE AND RECOMPACT UNWEATHERED BEDROCK OR� MATERIAL APPROVED BY GEOTECHNICAL CONSULTANT CUT LOT [NATURAL GROUND ---REMOVE � i 5, UNSUITABLE--__MATFIRIAI � MIN. ------------ _-_______________ _- COMPACTED FILL -____- ---------------- 36' MIN. OVEREXCAVATE AND RECOMPACT UNWEATHERED BEDROCK OR� MATERIAL APPROVED BY GEOTECHNICAL CONSULTANT NOTE: DEEPER OVEREXCAVATION AND RECOMPACTION SHALL BE PERFORMED IF DETERMINED TO BE NECCESSARY BY GEOTECHNICAL CONSULTANT. NOT TO SCALE CITY OF SANTA ANA Planning and Building Agency NOTES: TRENCH PERFORATED ' PIP E� NON -PERFORATE OUTLET PIPE OUTLET PIPE DETAIL NOT TO SCALE 1. FILTER MATERIAL SHOULD CONFORM TO ASTM C-33-81, PARAGRAPH 4.1 (CONCRETE FINE AGGREGATE). ALTERNATIVELY, 3/4" GRAVEL COMPLETELY SURROUNDED IN APPROVED FILTER FABRIC MAY BE USED IN LIEU OF CONCRETE SAND. 2. PERFORATED DRAIN PIPE TO HAVE A MINIMUM DRAINAGE GRADIENT OF 1.0 PERCENT. 3. UPGRADIENT END OF OF SUBDRAIN PIPE SHALL BE CAPPED. 4. SUBDRAIN PIPE SHOULD BE CONNECTED TO A BURIED UNPERFORATED PIPE LEADING TO A WATER COLLECTOR UNPERFORATED PIPE SHALL HAVE A MINIMUM DRAINAGE GRADIENT OF 2.0 PERCENT. 5. LOCATION AND DETAILS OF SUBSURFACE DRAIN INSTALLATION ARE SUBJECT TO REVISION BY THE SOIL ENGINEER IN THE FIELD DURING CONSTRUCTION. CITY OF SANTA ANA Planning and Building Agency FINAL LIMIT OF EXCAVATION 20' MAXIMUM Approved FOR PERMIT ISSUANCE DAYLIGHT SHEAR KEY DETAIL DAYLIGHT LINE 2' MINIMUM VEREXC FINISH P OVEREXCAVATE 3' AND REPLACE WITH COMPACTED FILL -------------------------- -------------------------- -------------------------- ------------------------ SOUND BEDROCK -____ _=� TYPICAL BENCHING OVERBURDEN "-PROVIDE BACKDRAIN PER BACKDRAIN (CREEP -PRONE) DETAIL. LOCATION OF BACKDRAIN AND OUTLETS PER SOILS ENGINEER AND/OR ENGINEERING GEOLOGIST DURING GRADING. NOT TO SCALE QUIPMENT WIDTH (MINIMUM 15') structural calculations for 2234 S. LOWELL STREET garage to adu 2234 S. LOWELL STREET SANTA ANA, CA. 92707 31-JUL-25 CE JOB NO. : 25-285 S T R U C T U R A L 3 2 4 E S O U T H S T , L O N G B E A C H , C A L I F O R N I A 9 0 8 0 5 T : 5 6 2 . 9 6 1 . 5 6 0 0 W W W . C A S T I L L O E N G I N E E R I N G . C O M 1 ARCHITECT CASTILLO ENGINEERING, INC.JOB 1205 Pine Avenue, Suite 201 Long Beach, CA 90813 ENGR. MC JOB NO. SHEET NO. DESIGN CRITERIA 1 Soil supporting footings is natural grade or engineered fill. 2 Soil allowable bearing pressure used in design_______________________________ 3 Footing shall extend_____ minimum into undisturbed soil or_____ below finish grade whichever is lower. 4 All concrete shall develop a minimum compressive strength of 2500 psi in 28 days. 5 Reinforcing steel shall conform to ASTM 615, Grade 60. 6 Structural steel shall conform to the following: Wide flange shapes ASTM A992 TS shapes ASTM A500, Grade B Pipe shapes ASTM A53 , Grade B Other rolled shapes, Bars and plates ASTM A36 7 Structural steel shall be fabricated in a shop of an approved fabricator. 8 All welding shall be done by Certified Welders. 9 Concrete Block shall conform to ASTM C90, Grade N-1. 10 Grout shall develop 2000 psi in 28 days. 11 Mortar shall be Type S and develop 1800 psi in 28 days. 12 All lumber shall be grade marked Douglas Fir. (Grading rule No. 17) Light Framing Construction Joist & Planks No. 2 Beams & Stringers No. 1 Posts & Timbers No. 1 13 Glue Laminated Timbers shall be combination No. 24F-V8. 14 Plywood shall conform to PS 1-95, Structural 1. 15 All material and workmanship shall conform to the requirements of 2019 California Building Code. 2 ARCHITECT ENGR. DATE: CASTILLO ENGINEERING, INC. 1205 Pine Avenue, Suit.e 201 Long Beach, CA 80813 SHEET NO. D □UGLAS F"IR.-LAR.CH DESIGN VALUES DESIGNATION GRADE FB FT Fcperp. LIGHT FRAMING CONSTRUCTION 1000 650 625 2" TO 4" THICK 2"TO4' WIDE JOIST & PLANKS NO. 2 900 575 625 2" TO 4" THICK 6"&WIDER POST & TIMBER NO.1 1200 825 625 5x5 AND LARGER WIDTH NOT MORE THAN 2" GREATER THAN THICKNESS BEAM & STRINGER NO.1 1350 675 625 5" & THICKER WIDTH MORE THAN 2" GREATER THAN THICKNESS GLU-LAM BEAMS COMBINATION 2400 1100 650 NO. 24F-V8 Y-DIR 1450 1100 560 ( 1 )THE ABOVE VALUES ARE TAKEN FROM THE NOS. (2)USE STANDARD GRADING RULE NO. 1 7. Fe Fv 1650 180 1350 180 1000 170 925 170 1650 265 1650 230 E E MIN 1,500,000 550,000 1,600,000 580,000 1,600,000 580,000 1,600,000 580,000 1,800,000 930,000 1,600,000 830,000 3 PROJECT:CASTILLO ENGINEERING 324 E South St, Long Beach, CA 90805 37683.00 Wood :Douglas-Fir/Larch Cr = 1.15 (repetitive member factor)Fv =180 psi (for Light Framing and Joists & Planks) E = 1,500,000 psi (Const Light Framing)Fv =170 psi (for Beams & Stringers and Posts & Timbers) E = 1,600,000 psi (#2 Joists & Planks, #1 Beams & Stringers, #1 Posts & Timbers) FLOO ROOF MEMBER:SIZE:(35 PCF)PROPERTIES:BENDING STRESS:1.00 (k-ft & k)Cd =1.00 (k-ft & k)Cd =1.25 Nominal Grade Type B (in)D (in)PLF (in^2)S(in^3)I(in^4)Fb(psi)CF Fb x CF max Mmax Mmax(rep)max Mmax Mmax(rep) 2x4 Const. LF 1.5 3.50 1.3 5.3 3.1 5.4 1000 1.00 1000 0.63 0.26 0.29 0.79 0.32 0.37 2x6 #2 JP 1.5 5.50 2.0 8.3 7.6 20.8 900 1.30 1170 0.99 0.74 0.85 1.24 0.92 1.06 2x8 #2 JP 1.5 7.25 2.6 10.9 13.1 47.6 900 1.20 1080 1.31 1.18 1.36 1.63 1.48 1.70 2x10 #2 JP 1.5 9.25 3.4 13.9 21.4 98.9 900 1.10 990 1.67 1.76 2.03 2.08 2.21 2.54 2x12 #2 JP 1.5 11.25 4.1 16.9 31.6 178.0 900 1.00 900 2.03 2.37 2.73 2.53 2.97 3.41 2x14 #2 JP 1.5 13.25 4.8 19.9 43.9 290.8 900 0.90 810 2.39 2.96 3.41 2.98 3.70 4.26 4x4 Const LF 3.5 3.50 3.0 12.3 7.1 12.5 1000 1.00 1000 1.47 0.60 0.68 1.84 0.74 0.86 4x6 #2 JP 3.5 5.50 4.7 19.3 17.6 48.5 900 1.30 1170 2.31 1.72 1.98 2.89 2.15 2.47 4x8 #2 JP 3.5 7.25 6.2 25.4 30.7 111.1 900 1.30 1170 3.05 2.99 3.44 3.81 3.74 4.30 4x10 #2 JP 3.5 9.25 7.9 32.4 49.9 230.8 900 1.20 1080 3.89 4.49 5.17 4.86 5.62 6.46 4x12 #2 JP 3.5 11.25 9.6 39.4 73.8 415.3 900 1.10 990 4.73 6.09 7.00 5.91 7.61 8.76 4x14 #2 JP 3.5 13.25 11.3 46.4 102.4 678.5 900 1.00 900 5.57 7.68 8.83 6.96 9.60 11.0 6x4 #2 JP 5.5 3.50 4.7 19.3 11.2 19.7 900 1.00 900 2.31 0.84 2.89 1.05 6x6 #1 PT 5.5 5.50 7.4 30.3 27.7 76.3 1200 1.00 1200 3.43 2.77 4.29 3.47 6x8 #1 PT 5.5 7.50 10.0 41.3 51.6 193.4 1200 1.00 1200 4.68 5.16 5.84 6.45 6x10 #1 BS 5.5 9.50 12.7 52.3 82.7 393.0 1350 1.00 1350 5.92 9.31 7.40 11.6 6x12 #1 BS 5.5 11.50 15.4 63.3 121.2 697.1 1350 1.00 1350 7.17 13.6 8.96 17.0 6x14 #1 BS 5.5 13.50 18.0 74.3 167.1 1127.7 1350 0.99 1332 8.42 18.6 10.5 23.2 4 5 6 7 CASTILLO ENGINEERING, INC 1147 E. Market Street Long Beach, CA 90805 ROOF LOADS composite shingles 2.5 psf re-roof 2.0 psf 1/2" plywwod 1.5 psf rafters 4.0 psf insulation 0.5 psf Ceiling 3.0 psf beams/headers 1.0 psf MP&E/ misc.0.5 psf D=15.0 psf Lr=20.0 psf REDUCIBLE FLOOR LOADS flooring 1.0 psf 3/4" plywood 2.3 psf joist 3.0 psf ceiling 4.0 psf beams/headers 2.0 psf MP&E/ misc.2.7 psf D=15.0 psf L=40.0 psf EXTERIOR WALL LOADS 7/8" stucco 10.0 psf 1/2" plywood 1.5 psf 2x6 studs at 16"oc 1.5 psf insulation 0.5 psf 1/2" gyp board 2.3 psf MP&E/ misc.0.2 psf D=16.0 psf INTERIOR WALL LOADS 1/2" gyp board 2.3 psf 1/2" plywood 1.5 psf 2x6 studs at 16"oc 1.5 psf insulation 0.5 psf 1/2" gyp board 2.3 psf MP&E/ misc.1.9 psf D=10.0 psf 8 9 10 ARCHITECT JOB 1205 Pine Avenue, Suite 201 Long Beach, CA 90813 ENGR. MC DATE:JOB NO. SHEET NO. CASTILLO ENGINEERING, INC. REMARKS 4x4 4x4 4X4 4X6 4X67.15 10.83 ALLOWABLE 75% 2.31 3.42 4.23 6X6HDU14 3.075 4.565 5.645 6.970 9.535 14.445 5.23 HDU5 HDU8 HDU11 HOLDOWNS HDU2 HDU4 HD ALLOWABLE UPLIFT 11 CE E n g i n e e r i n g S o f t w a r e v 1 . 0 PR O J E C T : == T Y P I C A L S Q U A R E P A D F O O T I N G D E S I G N T A B L E = = (2 / 9 9 ) Ba r # So i l B e a r i n g P r e s s u r e : Mi s c e l l a n e o u s : 3 0 . 1 1 q = 15 0 0 ps f c o l u m n f o o t p r i n t = 4 in 4 0 . 2 0 (f o r s e l e c t i o n o f s t e e l s p a c i n g v s . s i z e o n l y ) 6 0 . 4 4 Ma t e r i a l S t r e n g t h s : 7 0 . 6 0 co n c r e t e = 25 0 0 ps i No t e s : 8 0 . 7 8 10 1 . 2 3 11 1 . 5 6 Ma r k : Si z e T h i c k (f t ) - S Q . ( i n ) ( k ) ( i n ) 1. 5 1 2 3. 0 4 8 0 . 0 1 2 . 2 Y 2 . 7 6 5 . 3 Y 7 0 . 0 2 0 . 0 2 0 . 7 2 0 . 3 9 0 . 3 9 2 # 4 2. 0 1 2 5. 4 0 8 0 . 7 1 6 . 3 Y 6 . 5 6 5 . 3 Y 1 8 0 . 0 5 0 . 0 4 0 . 9 6 0 . 5 2 0 . 5 2 3 # 4 2. 5 1 2 8. 4 4 8 2 . 3 2 0 . 4 Y 1 1 . 3 6 5 . 3 Y 3 8 0 . 0 8 0 . 0 9 1 . 2 0 0 . 6 5 0 . 6 5 4 # 4 3. 0 1 2 12 . 2 8 4 . 3 2 4 . 5 Y 1 7 . 3 6 5 . 3 Y 6 9 0 . 1 3 0 . 1 6 1 . 4 4 0 . 7 8 0 . 7 8 4 # 4 3. 5 1 2 16 . 5 8 6 . 9 2 8 . 6 Y 2 4 . 3 6 5 . 3 Y 1 1 4 0 . 1 8 0 . 2 7 1 . 6 8 0 . 9 1 0 . 9 1 5 # 4 4. 0 1 2 21 . 6 8 1 0 . 1 3 2 . 6 Y 3 2 . 4 6 5 . 3 Y 1 7 4 0 . 2 4 0 . 4 1 1 . 9 2 1 . 0 4 1 . 0 4 6 # 4 4. 5 1 2 27 . 3 8 1 3 . 8 3 6 . 7 Y 4 1 . 6 6 5 . 3 Y 2 5 3 0 . 3 1 0 . 6 0 2 . 1 6 1 . 1 7 1 . 1 7 4 # 5 5. 0 1 2 33 . 8 8 1 8 . 0 4 0 . 8 Y 5 1 . 8 6 5 . 3 Y 3 5 3 0 . 3 9 0 . 8 4 2 . 4 0 1 . 3 0 1 . 3 0 5 # 5 5. 5 1 2 40 . 8 8 2 2 . 8 4 4 . 9 Y 6 3 . 2 6 5 . 3 Y 4 7 6 0 . 4 9 1 . 1 4 2 . 6 4 1 . 4 3 1 . 5 1 5 # 5 6. 0 1 5 47 . 3 1 1 2 4 . 2 6 7 . 3 Y 7 2 . 3 1 1 2 . 2 Y 6 0 7 0 . 4 1 1 . 0 4 3 . 6 0 1 . 9 4 1 . 9 4 7 # 5 12 C.J.C.J. H1 H1 H1 H1 H2 H2 H2 H2 H3 H3 H3 RJ1 B1 B2 B1 H1 RJ2 ROOF KEYPLAN B3 H2 13 CASTILLO ENGINEERING, INC.Project 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA. 90805 Engr.Date:Job No.25-285 Sheet Tag Beam 5 L =12.66 ft Member=2x8 A =10.88 in^2 S =13.1 in^3 No. of members=1 I =47.6 in^4 CD=1.25 E =1,600,000 psi CF=1.20 Va =1.305 kips CV=1.00 Ma =0.986 k-ft Cr=1.15 Total Load L/n=180 Live Load L/n=240 L=12.66 ft 0.29 0.29 Uniform load (W1) D L Trib w1,1 (15 +20)x 1.33 =19.95 +26.6 Roof w1,2 (16 +0)x 0 =0 +0 Wall w1,3 (15 +40)x 0 =0 +0 Floor w1,4 (15 +60)x 0 =0 +0 Balcony / Deck w1,5 (5 +0)x 0 =0 +0 Ceiling W1 =19.95 +26.6 =0.047 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 2 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 4 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 TAG: p1,1 (+)x 0.00 x 0.00 =0 +0 0 p1,2 (+)x 0 x 0 =0 +0 0 p1,3 (+)x 0 x 0 =0 +0 0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 12.66 Point Load (P2) D L Trib.1 Trib.2 TAG: p2,1 (+)x 0 x 0 =0 +0 0 p2,2 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 12.66 Shear R1=0.295 kips R2=-0.295 kips Stress Ratio Vmax=0.29 kips Vallow.=1.63 x 1 =1.6313 kips OK .18 Flexure M=0.933 k-ft Mallow.=1.70 x 1 =1.7001 k-ft OK .55 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.353 +0.000 +0.000 +0.000 =0.35 =L <L OK deflection:.42 430 180 0.353 +0 D (L Only)=0.202 +0 +0 +0 =0.2 =L L OK deflection:.32 753 240 USE:1- 2X8 RAFTERS @ 16" O.C. flexure: 0 shear: 3/24/25 12:00 AM RJ1 0 0 0 0 14 CASTILLO ENGINEERING, INC.Project 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA. 90805 Engr.Date:Job No.25-285 Sheet Tag Beam 5 L =2.75 ft Member=2x4 A =5.25 in^2 S =3.1 in^3 No. of members=1 I =5.4 in^4 CD=1.25 E =1,600,000 psi CF=1.00 Va =0.630 kips CV=1.00 Ma =0.255 k-ft Cr=1.15 Total Load L/n=180 Live Load L/n=240 L=2.75 ft 0.06 0.06 Uniform load (W1) D L Trib w1,1 (15 +20)x 1.33 =19.95 +26.6 Roof w1,2 (16 +0)x 0 =0 +0 Wall w1,3 (15 +40)x 0 =0 +0 Floor w1,4 (15 +60)x 0 =0 +0 Balcony / Deck w1,5 (5 +0)x 0 =0 +0 Ceiling W1 =19.95 +26.6 =0.047 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 2 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 4 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 TAG: p1,1 (+)x 0.00 x 0.00 =0 +0 0 p1,2 (+)x 0 x 0 =0 +0 0 p1,3 (+)x 0 x 0 =0 +0 0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 2.75 Point Load (P2) D L Trib.1 Trib.2 TAG: p2,1 (+)x 0 x 0 =0 +0 0 p2,2 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 2.75 Shear R1=0.064 kips R2=-0.064 kips Stress Ratio Vmax=0.06 kips Vallow.=0.79 x 1 =0.7875 kips OK .08 Flexure M=0.044 k-ft Mallow.=0.37 x 1 =0.3669 k-ft OK .12 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.007 +0.000 +0.000 +0.000 =0.01 =L <L OK deflection:.04 4724 180 0.007 +0 D (L Only)=0.004 +0 +0 +0 =0 =L L OK deflection:.03 8267 240 USE:1- 2X4 RAFTERS @ 16" O.C. flexure: 0 shear: 3/24/25 12:00 AM RJ2 0 0 0 0 15 CASTILLO ENGINEERING, INC.Project 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA. 90805 Engr.Date:Job No.25-285 Sheet Tag Beam 5 L =4.16 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=4.16 ft 0.28 0.28 Uniform load (W1) D L Trib w1,1 (15 +20)x 3.91 =58.65 +78.2 Roof w1,2 (10 +0)x 0 =0 +0 Wall w1,3 (15 +40)x 0 =0 +0 Floor w1,4 (15 +60)x 0 =0 +0 Balcony / Deck w1,5 (5 +0)x 0 =0 +0 Ceiling W1 =58.65 +78.2 =0.137 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 2 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 4 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 TAG: p1,1 (+)x 0.00 x 0.00 =0 +0 0 p1,2 (+)x 0 x 0 =0 +0 0 p1,3 (+)x 0 x 0 =0 +0 0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 4.16 Point Load (P2) D L Trib.1 Trib.2 TAG: p2,1 (+)x 0 x 0 =0 +0 0 p2,2 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 4.16 Shear R1=0.285 kips R2=-0.285 kips Stress Ratio Vmax=0.28 kips Vallow.=2.89 x 1 =2.8875 kips OK .10 Flexure M=0.296 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .14 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.012 +0.000 +0.000 +0.000 =0.01 =L <L OK deflection:.04 4203 180 0.012 +0 D (L Only)=0.007 +0 +0 +0 =0.01 =L L OK deflection:.03 7355 240 USE:1-4X6 shear: 3/24/25 12:00 AM B1 0 0 0 0 flexure: 0 16 CASTILLO ENGINEERING, INC.Project 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA. 90805 Engr.Date:Job No.25-285 Sheet Tag Beam 5 L =5.16 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=5.16 ft 0.30 0.30 Uniform load (W1) D L Trib w1,1 (15 +20)x 3.33 =49.95 +66.6 Roof w1,2 (10 +0)x 0 =0 +0 Wall w1,3 (15 +40)x 0 =0 +0 Floor w1,4 (15 +60)x 0 =0 +0 Balcony / Deck w1,5 (5 +0)x 0 =0 +0 Ceiling W1 =49.95 +66.6 =0.117 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 2 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 4 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 TAG: p1,1 (+)x 0.00 x 0.00 =0 +0 0 p1,2 (+)x 0 x 0 =0 +0 0 p1,3 (+)x 0 x 0 =0 +0 0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 5.16 Point Load (P2) D L Trib.1 Trib.2 TAG: p2,1 (+)x 0 x 0 =0 +0 0 p2,2 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 5.16 Shear R1=0.301 kips R2=-0.301 kips Stress Ratio Vmax=0.30 kips Vallow.=2.89 x 1 =2.8875 kips OK .10 Flexure M=0.388 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .18 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.024 +0.000 +0.000 +0.000 =0.02 =L <L OK deflection:.07 2586 180 0.024 +0 D (L Only)=0.014 +0 +0 +0 =0.01 =L L OK deflection:.05 4526 240 USE:1-4X6 shear: 3/24/25 12:00 AM B2 0 0 0 0 flexure: 0 17 CASTILLO ENGINEERING, INC.Project 2234 S. LOWELL ST. 1147 E. Market Street Long Beach, CA. 90805 Engr.Date:Job No.25-285 Sheet Tag Beam 5 L = 4.50 ft Member= 4x6 A = 19.25 in^2 S = 17.6 in^3 No. of members= 1 I = 48.5 in^4 CD= 1.25 E = 1,600,000 psi CF= 1.30 Va = 2.310 kips CV= 1.00 Ma = 1.323 k-ft Cr= 1.00 Total Load L/n= 180 Live Load L/n= 240 L= 4.5 ft 0.22 0.22 Uniform load (W1) D L Trib w1,1 (15 +20) x 2.75 = 41.25 + 55 Roof w1,2 (16 +0) x 0 = 0 + 0 Wall w1,3 (15 +40) x 0 = 0 + 0 Floor w1,4 (15 +60) x 0 = 0 + 0 Balcony / Deck w1,5 (10 +0) x 0 = 0 + 0 Ceiling W1 = 41.25 + 55 =0.096 klf Triangular load (W2) D L Trib ` w2,1 (0 +0) x 0 = 0 + 0 w2,2 (0 +0) x 0 = 0 + 0 w2,3 (0 +0) x 2 = 0 + 0 w2,4 (0 +0) x 0 = 0 + 0 w2,5 (0 +0) x 4 = 0 + 0 W2 = 0 + 0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 TAG: p1,1 (+ )x 0.00 x 0.00 = 0 + 0 0 p1,2 (+) x 0 x 0 = 0 + 0 0 p1,3 (+) x 0 x 0 = 0 + 0 0 p1,4 (+) x 0 x 0 = 0 + 0 p1,5 (+) x 0 x 0 = 0 + 0 X1 (ft) X2 (ft) P1 = 0 + 0 =0.00 kips 0 4.5 Point Load (P2) D L Trib.1 Trib.2 TAG: p2,1 (+ )x 0 x 0 = 0 + 0 0 p2,2 (+ )x 0 x 0 = 0 + 0 0 p2,4 (+) x 0 x 0 = 0 + 0 0 p2,4 (+) x 0 x 0 = 0 + 0 p2,5 (+) x 0 x 0 = 0 + 0 X3 (ft) X4 (ft) P2 = 0 + 0 =0.00 kips 0 4.5 Shear R1= 0.217 kips R2= -0.217 kips Stress Ratio Vmax= 0.22 kips Vallow.=2.89 x 1 = 2.8875 kips OK .08 Flexure M= 0.244 k-ft Mallow.=2.15 x 1 = 2.1506 k-ft OK .11 Deflection D =D w1 + Dw2 + D p1 +Dp2 D (D+L)= 0.011 + 0.000 + 0.000 + 0.000 = 0.01 = L < L OK deflection:.04 4721 180 0.011 + 0 D (L Only)= 0.007 + 0 + 0 +0 = 0.01 = L L OK deflection:.03 8262 240 USE:1- 4X6 shear: 3/25/25 12:00 AM B3 0 0 0 0 flexure: 0 18 CASTILLO ENGINEERING, INC.Project 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA. 90805 Engr.Date:Job No.25-285 Sheet Tag Beam 5 L =4.00 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=4 ft 0.58 0.58 Uniform load (W1) D L Trib w1,1 (15 +20)x 7.33 =109.95 +146.6 Roof w1,2 (16 +0)x 2.16 =34.56 +0 Wall w1,3 (15 +40)x 0 =0 +0 Floor w1,4 (15 +60)x 0 =0 +0 Balcony / Deck w1,5 (5 +0)x 0 =0 +0 Ceiling W1 =144.51 +146.6 =0.291 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 2 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 4 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 TAG: p1,1 (+)x 0.00 x 0.00 =0 +0 0 p1,2 (+)x 0 x 0 =0 +0 0 p1,3 (+)x 0 x 0 =0 +0 0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 4 Point Load (P2) D L Trib.1 Trib.2 TAG: p2,1 (+)x 0 x 0 =0 +0 0 p2,2 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 4 Shear R1=0.582 kips R2=-0.582 kips Stress Ratio Vmax=0.58 kips Vallow.=2.89 x 1 =2.8875 kips OK .20 Flexure M=0.582 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .27 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.022 +0.000 +0.000 +0.000 =0.02 =L <L OK deflection:.08 2223 180 0.022 +0 D (L Only)=0.011 +0 +0 +0 =0.01 =L L OK deflection:.05 4413 240 USE:1-4X6 shear: 3/24/25 12:00 AM H1 0 0 0 0 flexure: 0 19 CASTILLO ENGINEERING, INC.Project 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA. 90805 Engr.Date:Job No.25-285 Sheet Tag Beam 5 L =4.00 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=4 ft 0.34 0.34 Uniform load (W1) D L Trib w1,1 (15 +20)x 2 =30 +40 Roof w1,2 (16 +0)x 6.25 =100 +0 Wall w1,3 (15 +40)x 0 =0 +0 Floor w1,4 (15 +60)x 0 =0 +0 Balcony / Deck w1,5 (5 +0)x 0 =0 +0 Ceiling W1 =130 +40 =0.170 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 2 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 4 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 TAG: p1,1 (+)x 0.00 x 0.00 =0 +0 0 p1,2 (+)x 0 x 0 =0 +0 0 p1,3 (+)x 0 x 0 =0 +0 0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 4 Point Load (P2) D L Trib.1 Trib.2 TAG: p2,1 (+)x 0 x 0 =0 +0 0 p2,2 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 4 Shear R1=0.340 kips R2=-0.340 kips Stress Ratio Vmax=0.34 kips Vallow.=2.89 x 1 =2.8875 kips OK .12 Flexure M=0.340 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .16 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.013 +0.000 +0.000 +0.000 =0.01 =L <L OK deflection:.05 3806 180 0.013 +0 D (L Only)=0.003 +0 +0 +0 =0 =L L OK deflection:.01 16175 240 USE:1-4X6 flexure: 0 shear: 3/24/25 12:00 AM H2 0 0 0 0 20 CASTILLO ENGINEERING, INC.Project 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA. 90805 Engr.Date:Job No.25-285 Sheet Tag Beam 5 L =3.50 ft Member=4x6 A =19.25 in^2 S =17.6 in^3 No. of members=1 I =48.5 in^4 CD=1.25 E =1,600,000 psi CF=1.30 Va =2.310 kips CV=1.00 Ma =1.323 k-ft Cr=1.00 Total Load L/n=180 Live Load L/n=240 L=3.5 ft 0.89 0.89 Uniform load (W1) D L Trib w1,1 (15 +20)x 12.7 =190.5 +254 Roof w1,2 (10 +0)x 6.16 =61.6 +0 Wall w1,3 (15 +40)x 0 =0 +0 Floor w1,4 (15 +60)x 0 =0 +0 Balcony / Deck w1,5 (5 +0)x 0 =0 +0 Ceiling W1 =252.1 +254 =0.506 klf Triangular load (W2) D L Trib ` w2,1 (0 +0)x 0 =0 +0 w2,2 (0 +0)x 0 =0 +0 w2,3 (0 +0)x 2 =0 +0 w2,4 (0 +0)x 0 =0 +0 w2,5 (0 +0)x 4 =0 +0 W2 =0 +0 =0.000 klf Point Load (P1) D L Trib.1 Trib.2 TAG: p1,1 (+)x 0.00 x 0.00 =0 +0 0 p1,2 (+)x 0 x 0 =0 +0 0 p1,3 (+)x 0 x 0 =0 +0 0 p1,4 (+)x 0 x 0 =0 +0 p1,5 (+)x 0 x 0 =0 +0 X1 (ft)X2 (ft) P1 =0 +0 =0.00 kips 0 3.5 Point Load (P2) D L Trib.1 Trib.2 TAG: p2,1 (+)x 0 x 0 =0 +0 0 p2,2 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 0 p2,4 (+)x 0 x 0 =0 +0 p2,5 (+)x 0 x 0 =0 +0 X3 (ft)X4 (ft) P2 =0 +0 =0.00 kips 0 3.5 Shear R1=0.886 kips R2=-0.886 kips Stress Ratio Vmax=0.89 kips Vallow.=2.89 x 1 =2.8875 kips OK .31 Flexure M=0.775 k-ft Mallow.=2.15 x 1 =2.1506 k-ft OK .36 Deflection D =D w1 +Dw2 +D p1 +Dp2 D (D+L)=0.022 +0.000 +0.000 +0.000 =0.02 =L <L OK deflection:.09 1908 180 0.022 +0 D (L Only)=0.011 +0 +0 +0 =0.01 =L L OK deflection:.06 3802 240 USE:1-4X6 flexure: 0 shear: 3/24/25 12:00 AM H3 0 0 0 0 21 CF-2 4.68 K CF-3 F1 0.28 K F1 0.28 K F2 0.28 K 0.30 K F2 0.28K 0.30 K FOUNDATION KEYPLAN CF-1 22 ARCHITECT CASTILLO ENGINEERING JOB 2234 S. LOWELL STREET 1147 E. MARKET ST. LONG BEACH, CA. 90805 ENGR. MC DATE JOB NO. 25-285 SHEET NO. CONTINUOUS FOOTINGS CF-1 LOADING:TRIB. ( + ) x ft = + ( + ) x ft = + ( + ) x ft = + w = + =plf B=plf = ft psf USE: CF-2 LOADING:TRIB. ( + ) x ft = + ( + ) x ft = + ( + ) x ft = + w = + =plf B=plf = ft psf USE: CF-3 LOADING:TRIB. ( + ) x ft = + ( + ) x ft = + ( + ) x ft = + w = + =plf B=plf = ft psf USE: 192.45 15 16 0 256.6 1'-0" WIDE FTG. 387.66 FLOOR: WALL: 60 1'-0" WIDE FTG. 0 0 0 12.83 133.2 133.2 0 0 254.46 387.66 0.26 1500 ROOF: 15 D L 20 1'-0" WIDE FTG.1500 671.61 222.56 0 671.61 0.45 415.01 256.6 13.91 154.56 99.9 WALL: 16 0 9.66 FLOOR:40 0 ROOF: 0 0.20 D L 6.6615 20 15 1500 292.56 222.56 40 0 0 30 0 40 0 WALL:13.91 24/03/2025 20 D L ROOF: FLOOR: 15 2 292.56 16 252.56 4015 0 F-CONTINUOUS FOOTINGS-1500 23 ARCHITECT Castillo Engineering, Inc.PROJECT 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA 90805 ENGR. MC DATE JOB NO. 25-285 SHEET NO. iven: h1 = 1 in.d = 3.in.D L TRIB D L w1 1 20 6.6 = 99.+ 133. h2 = 8 in.W = 12 in.1 40 0 = 0 + 0 16 0 9.6 = 154.+ 0 H = 26 in.254.+ 133.= 387.pl Area = 666 in.2 L = 55.5 in. 4.625 ft.2 = 4.63 ft. Conc. Wt. = 150 x 12 x 8 /144 = 100 plf Abv. Grad = 487.pl qa = 1500 ps Pa = 1500 4.63 = 6.94 kips Pload = 488 4.63 = 2.26 kips CAPACITY Pnet = 6.94 - 2.26 = 4.68 kips Pnet = 4.68 kips 3/25/2025 wuniform CF-2 FOOTING CAPACITY 24 ARCHITECT CASTILLO ENGINEERING, INC.JOB 2234 S. LOWELL STREET 1147 E. Market Street Long Beach, CA 90805 ENGR. MC DATE JOB NO. 25-285 SHEET NO. SPREAD FOOTINGS P1 =K P2 =K P3 =K P4 =K P TOTAL =K P ALLOW.=K USE:TYPE 2.0 FOOTING P1 =K P2 =K P3 =K P4 =K P TOTAL =K P ALLOW.=K USE:TYPE 2.0 FOOTING 0.3 5.4 0 0.58 F1 0.28 0 0 F2 24/03/2025 0 0 0.28 5.4 0.28 SPREAD FOOTINGS1500 USE 4x4 POST USE CF-2 CAPACITY USE 4x4 POST 25 ASCE Hazards Report Address: 2234 S Lowell St Santa Ana, California 92707 Standard:ASCE/SEI 7-22 Latitude:33.716704 Risk Category:II Longitude:-117.879032 Soil Class:Default Elevation:46.5377374472128 ft (NAVD 88) Wind Results: Wind Speed 95 Vmph 10-year MRI 66 Vmph 25-year MRI 72 Vmph 50-year MRI 76 Vmph 100-year MRI 81 Vmph 300-year MRI 89 Vmph 700-year MRI 95 Vmph 1,700-year MRI 102 Vmph 3,000-year MRI 106 Vmph 10,000-year MRI 115 Vmph 100,000-year MRI 133 Vmph 1,000,000-year MRI 151 Vmph Data Source: ASCE/SEI 7-22, Fig. 26.5-1B and Figs. CC.2-1–CC.2-4, and Section 26.5.2 Date Accessed: Mon Mar 24 2025 Page 1 of 5https://ascehazardtool.org/Mon Mar 24 202526 Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear interpolation between contours. Wind speeds are interpolated in accordance with the 7-22 Standard. Wind speeds correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability = 0.00143, MRI = 700 years). Values for 10-year MRI, 25-year MRI, 50-year MRI and 100-year MRI are Service Level wind speeds, all other wind speeds are Ultimate wind speeds. Site is not in a hurricane-prone region as defined in ASCE/SEI 7-22 Section 26.2. Page 2 of 5https://ascehazardtool.org/Mon Mar 24 202527 PGA M : 0.66 SMS : 1.73 SM1 : 1.19 SDS : 1.15 SD1 : 0.79 T L : 8 SS : 1.47 S1 : 0.52 VS30 : 260 Seismic Design Category: D Multi-Period Design Spectrum S (g) vs T(s)a Multi-Period MCE SpectrumR S (g) vs T(s)a Two-Period Design Spectrum S (g) vs T(s)a Two-Period MCE SpectrumR S (g) vs T(s)a Design Vertical Response Spectrum Vertical ground motion data has not yet been made available by USGS. MCE Vertical Response SpectrumR Vertical ground motion data has not yet been made available by USGS. Seismic DefaultSite Soil Class: Results: Page 3 of 5https://ascehazardtool.org/Mon Mar 24 202528 Data Accessed: Mon Mar 24 2025 Date Source: USGS Seismic Design Maps based on ASCE/SEI 7-22 and ASCE/SEI 7-22 Table 1.5-2. Additional data for site-specific ground motion procedures in accordance with ASCE/SEI 7-22 Ch. 21 are available from USGS. Page 4 of 5https://ascehazardtool.org/Mon Mar 24 202529 Snow Results: Ground Snow Load, p : 3 lb/ftg 2 20-year MRI Value: 1 lb/ft^2 Winter Wind Parameter: 0.25 Mapped Elevation: 53.6 ft Data Source: ASCE/SEI 7-22, Figures 7.6-1 and 7.6-2 A-D Date Accessed: Mon Mar 24 2025 Values provided are ground snow loads. In areas designated "case study required," extreme local variations in ground snow loads preclude mapping at this scale. Site-specific case studies are required to establish ground snow loads at elevations not covered. Snow load values are mapped to a 0.5 mile resolution. This resolution can create a mismatch between the mapped elevation and the site-specific elevation in topographically complex areas. Engineers should consult the local authority having jurisdiction in locations where the reported ‘elevation’ and ‘mapped elevation’ differ significantly from each other. Ground Snow Loads for IRC only, p :g(asd)2.1 lb/ft 2 The ASCE Hazard Tool is provided for your convenience, for informational purposes only, and is provided “as is” and without warranties of any kind. The location data included herein has been obtained from information developed, produced, and maintained by third party providers; or has been extrapolated from maps incorporated in the ASCE standard. While ASCE has made every effort to use data obtained from reliable sources or methodologies, ASCE does not make any representations or warranties as to the accuracy, completeness, reliability, currency, or quality of any data provided herein. Any third-party links provided by this Tool should not be construed as an endorsement, affiliation, relationship, or sponsorship of such third-party content by or from ASCE. ASCE does not intend, nor should anyone interpret, the results provided by this Tool to replace the sound judgment of a competent professional, having knowledge and experience in the appropriate field(s) of practice, nor to substitute for the standard of care required of such professionals in interpreting and applying the contents of this Tool or the ASCE standard. In using this Tool, you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers, directors, employees, members, affiliates, or agents be liable to you or any other person for any direct, indirect, special, incidental, or consequential damages arising from or related to your use of, or reliance on, the Tool or any information obtained therein. To the fullest extent permitted by law, you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data provided by the ASCE Hazard Tool. Page 5 of 5https://ascehazardtool.org/Mon Mar 24 202530 PROJECT : PAGE : CLIENT : DESIGN BY : JOB NO. : DATE : 03/24/25 REVIEW BY : INPUT DATA Exposure category (B, C or D)B Importance factor I =1.00 Category II Basic wind speed V =110 mph Topographic factor Kzt = 1 Flat Building height to eave he =9.66 ft Building height to ridge hr =13.91 ft Effective area of components A =31.07409 2 DESIGN SUMMARY ANALYSIS Velocity pressure qh = 0.00256 Kh Kzt Kd V2 I =18.43 psf where: qh = velocity pressure at mean roof height, h. Kh = velocity pressure exposure coefficient evaluated at height, h,= 0.70 Kd = wind directionality factor = 0.85 h = mean roof height ft p = qh [(G Cpf )-(G Cpi )] where:p = pressure in appropriate zone G Cp f = product of gust effect factor and external pressure coefficient G Cp i = product of gust effect factor and internal pressure coefficient =0.18 -0.18 3.08 ft Net Pressures (psf), Basic Load Cases Net Pressures (psf), Torsional Load Cases (+GCp i ) (-GCp i )(+GCp i ) (-GCp i )(+GCp i ) (-GCp i ) 3E -0.64 -15.14 -8.51 -0.53 -13.09 -6.45 (+GCp i ) (-GCp i ) ENGINEERING Surface Roof angle q = Net Pressure with Surface Roof angle q = G Cp f Net Pressure with Surface Roof angle q = G Cp f 25-285 2234 S. LOWELL STREET Wind Analysis for Low-rise Building, Based on ASCE 7-22 / IBC 2024 / CBC 2022 Roof angle q = G Cp f Net Pressure with CASTILLO Net Pressure withG Cp f 31 Basic Load Cases in Transverse Direction Basic Load Cases in Longitudinal Direction Area Area (ft2)(+GCp i ) (-GCp i )(ft2)(+GCp i ) (-GCp i ) 10 psf min.Horiz.5.42 5.42 10 psf min.Horiz.3.62 3.62 Sec. 6.1.4.1 Vert.-11.99 -11.99 Sec. 6.1.4.1 Vert.-11.99 -11.99 Torsional Load Cases in Transverse Direction Torsional Load Cases in Longitudinal Direction Area Area (ft2)(+GCp i ) (-GCp i ) (+GCp i ) (-GCp i )(ft2)(+GCp i ) (-GCp i ) (+GCp i ) (-GCp i ) 29 29 22.7 22.7 Design pressures for components and cladding p = qh[ (G Cp) - (G Cpi)] where:p = pressure on component pmin = 10 psf (Sec. 6.1.4.2, pg 21) G Cp = external pressure coefficient. Effective Area (ft2) GCP - GCP GCP - GCP GCP - GCP GCP - GCP GCP - GCP Comp.31.07409 0.40 -0.85 0.40 -1.45 0.40 -2.30 0.91 -1.01 0.91 -1.23 Positive Negative Positive Negative Positive Negative Positive Negative Positive Negative 10.72 -19.00 10.72 -30.11 10.72 -45.79 20.15 -21.99 20.15 -25.92 S Surface Pressure (k) withPressure (k) with S Surface Pressure (k) withTorsion (ft-k)Surface Torsion (ft-k) Total Horiz. Torsional Load, MT Zone 5 Zone 3 Zone 4 Zone 5 Total Horiz. Torsional Load, MT Comp. & Cladding Zone 1 ( psf ) Zone 3 Zone 4Zone 2 Surface Pressure (k) with Zone 1 Zone 2 Pressure 32 SEISMIC BASE SHEAR (ASCE7-22) Latitude:33.716704 Longitude:-117.87903 SITE CLASS:D (Table 20.3-1)ρ=1.3 R=6.5 (Table 12.2-1)Ie=1 (Section 21.4) 1.730 0 1.190 0 (11.4-3) 1.153 (11.4-4) 0.7933333 0.13757 0.68786 See on Figs. 22-14 through 22-17 0.02 13.910 0.75 0.144 W= Effective seismeic weight (GOVERNS) For S1 is equal to greater than 0.6g 0.092 W 0.847 W 0.177 0.231 W Strength Level 0.161 W Allowable Stress Design 𝑆= 𝑆 = 𝑆=3 𝑆 = 𝑆=3 𝑆 = 𝑇= 𝐶ℎ = ℎ= 𝑥= = = =. = = = = == == = = 33 SEISMIC ANALYSIS WEIGHT Level 1 W roof =20 psf x 1036 ft^2 =20.72 kips W wall =16 psf x 627 ft^2 =10.04 kips WR =30.75 kips BASE SHEAR 0.161 x 30.75 kips = 4.97 kips F1= DISTRIBUTION OF BASE SHEAR 1 Level 2 or more levels W TOTAL 30.75 kips 4.794 psf 𝑽𝑩𝑨𝑺𝑬= 𝑽 ∗ 𝑾𝑻𝑶𝑻𝑨𝑳 = 𝑉 ∗ 𝑊= 𝑭𝒙= 𝑽𝑩𝑨𝑺𝑬∗𝑾𝑿∗ 𝒉𝑻𝑶𝑻𝑨𝑳 𝑾𝟏∗ 𝒉𝟏+𝑾𝟐∗𝒉𝟏+ 𝒉𝟐+ ⋯𝑾𝒏∗ 𝒉𝑻𝑶𝑻𝑨𝑳 𝑩𝑨𝑺𝑬=∗𝑻𝑶𝑻𝑨𝑳 𝑨 34 35 SHEARWALL KEYPLAN 2.39 K 2.56 K 1.60 K 1.60 K 1.76 K X1.1 X1.2 X2.1 Y1.1 Y2.1 Y3.1 AREA: 1,035.77 SQ.FT. PERIMETER: 139'-5" X:30'-9" Y:39'-0" 36 X1.1 X1.2 X2.1 'X' DIRECTION AREA: 500.09 SQ.FT. AREA: 535.68 SQ.FT. 37 ARCHITECT JOB 2234 S. LOWELL STREET CASTILLO ENGINEERING, INC. 1147 E. Market Street ENGR. MC DATE:Long Beach, CA. 90805 JOB N 25-285 SHEET NO. TAG:X1.1 ( 5.25 ft),X1.2 ( 8.41 ft) FORCE: SEISMIC GOVERNS F1=kips Load Comb. :((0.6-.14SDS) D + 0.7 E SDS : 1.15 SHEAR STRESS X1.1 :L1= ft v= lbs = plf X1.2 :L2=ft ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 =k-f ROOF:psf x ft =plf h/w= 1.52 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 5.25 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4 x 4 POST w/H.D. height= 8.00 ft MOT= x x 8 = k-f ROOF:psf x ft =plf h/w= 0.95 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 8.41 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4 x 4 POST w/H.D. July 31, 2025 8.41 1 13.66 5.25 0.143 1.97 Unit load 15 1 Tallow=2.31 T= 15 5.06 1.14 Tallow= 16 8 128 15 2.31 Unit load WALL: Tributary 11.77 X1.2 2.39 8.41 HDU2 143 0.143 5.06 11.77 1.23 HDU2 16 8 128 143 WALL:X1.1 2.39 5.25 T= 7.3 1.97 15 8.41 13.66 7.3 Tributary 13.66 13.66 SHEARWALL CALCULATIONS 2.39 5.25 2390 175 38 ARCHITECT JOB 2234 S. LOWELL STREET CASTILLO ENGINEERING, INC. 1147 E. Market Street ENGR. MC DATE:Long Beach, CA. 90805 25-285 SHEET NO. TAG:X2.1 ( 10.08 ft),( 0.00 ft) FORCE: SEISMIC GOVERNS =:((0.6-.14SDS) D + 0.7 E SDS : 1.15 SHEAR STRESS X2.1 :L1=ft v=lbs =plf :L2=ft ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 0.79 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 10.08 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4 x 4 POST w/H.D. 10.08 SHEARWALL CALCULATIONS 2.56 10.08 2560 254 15 0.00 10.08 20.5 Tributary 10.08 WALL:X2.1 2.56 10.08 T= 20.5 7.26 1.72 HDU2 16 8 128 143 Tallow=3.08 March 24, 2025 10.08 0.143 7.26 Unit load 15 1 39 Y1.1 Y2.1 Y3.1 'Y' DIRECTION AREA: 333.80 SQ.FT. AREA: 333.80 SQ.FT. AREA: 368.61 SQ.FT. 40 ARCHITECT JOB 2234 S. LOWELL STREET CASTILLO ENGINEERING, INC. 1147 E. Market Street ENGR. MC DATE:Long Beach, CA. 90805 25-285 SHEET NO. TAG:Y1.1 ( 12.16 ft),( 0.00 ft) FORCE: SEISMIC GOVERNS =:((0.6-.14SDS) D + 0.7 E SDS : 1.15 SHEAR STRESS Y1.1 :L1=ft v=lbs =plf :L2=ft ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 0.66 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 12.16 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4 x 4 POST w/H.D. 12.16 SHEARWALL CALCULATIONS 1.60 12.16 1600 132 90 0.00 12.16 12.8 Tributary 12.16 WALL:Y1.1 1.60 12.16 T= 12.8 16.12 0.47 HDU2 16 8 128 218 Tallow=3.08 March 24, 2025 12.16 0.218 16.12 Unit load 15 6 41 ARCHITECT JOB 2234 S. LOWELL STREET CASTILLO ENGINEERING, INC. 1147 E. Market Street ENGR. MC DATE:Long Beach, CA. 90805 25-285 SHEET NO. TAG:Y2.1 ( 12.16 ft),( 0.00 ft) FORCE: SEISMIC GOVERNS =:((0.6-.14SDS) D + 0.7 E SDS : 1.15 SHEAR STRESS Y2.1 :L1=ft v=lbs =plf :L2=ft ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w= 0.66 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 12.16 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4 x 4 POST w/H.D. 12.16 SHEARWALL CALCULATIONS 1.60 12.16 1600 132 210 0.00 12.16 12.8 Tributary 12.16 WALL:Y2.1 1.60 12.16 T= 12.8 24.99 0.15 HDU2 16 8 128 338 Tallow=3.08 March 24, 2025 12.16 0.338 24.99 Unit load 15 14 42 ARCHITECT JOB 2234 S. LOWELL STREET CASTILLO ENGINEERING, INC. 1147 E. Market Street ENGR. MC DATE:Long Beach, CA. 90805 25-285 SHEET NO. TAG:Y3.1 ( 9.75 ft),( 0.00 ft) FORCE: SEISMIC GOVERNS =:((0.6-.14SDS) D + 0.7 E SDS : 1.15 SHEAR STRESS Y3.1 :L1=ft v=lbs =plf :L2=ft ft Ltotal=ft OVERTURNING height= 8.00 ft MOT=x x 8 = ROOF:psf x ft =plf h/w=0.82 OK WALL:psf x ft =plf w =plf Vallow= 340 PLF MR=x 9.75 ^2/2 =k-ft USE: TYPE 6 SHEARWALL - 0.44 x =kips kips OK USE:4 x 4 POST w/H.D. 9.75 SHEARWALL CALCULATIONS 1.60 9.75 1600 164 105 0.00 9.75 12.8 Tributary 9.75 WALL:Y3.1 1.60 9.75 T= 12.8 11.07 0.81 HDU2 16 8 128 233 Tallow=3.08 March 24, 2025 9.75 0.233 11.07 Unit load 15 7 43 Company:Date:10/26/2023 Engineer:Page:1/5 Project: Address: Phone: E-mail: Anchor Designer™ Software Version 3.0.7947.1 1.Project information Customer company: Customer contact name: Customer e-mail: Comment: Project description: Location: Fastening description: 2. Input Data & Anchor Parameters General Design method:ACI 318-14 Units: Imperial units Anchor Information: Anchor type: Bonded anchor Material: F1554 Grade 36 Diameter (inch): 0.625 Effective Embedment depth, hef (inch): 10.000 Code report: ICC-ES ESR-4057 Anchor category: - Anchor ductility: Yes hmin (inch): 11.38 cac (inch): 26.22 Cmin (inch): 1.75 Smin (inch): 3.00 Base Material Concrete: Normal-weight Concrete thickness, h (inch): 13.75 State: Cracked Compressive strength, f’c (psi): 2500 Ψc,V: 1.0 Reinforcement condition: B tension, B shear Supplemental reinforcement: Not applicable Reinforcement provided at corners: No Ignore concrete breakout in tension: No Ignore concrete breakout in shear: No Hole condition: Dry concrete Inspection: Continuous Temperature range, Short/Long: 150/110°F Ignore 6do requirement: Not applicable Build-up grout pad: No Recommended Anchor Anchor Name: SET-3G - SET-3G w/ 5/8"Ø F1554 Gr. 36 Code Report: ICC-ES ESR-4057 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc. Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. 44 Company:Date:10/26/2023 Engineer:Page:2/5 Project: Address: Phone: E-mail: Anchor Designer™ Software Version 3.0.7947.1 Load and Geometry Load factor source: ACI 318 Section 5.3 Load combination: not set Seismic design: No Anchors subjected to sustained tension: No Apply entire shear load at front row: No Anchors only resisting wind and/or seismic loads: Yes Strength level loads: Nua [lb]: 3400 Vuax [lb]: 0 Vuay [lb]: 0 <Figure 1> 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc. Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. 45 Company:Date:10/26/2023 Engineer:Page:3/5 Project: Address: Phone: E-mail: Anchor Designer™ Software Version 3.0.7947.1 <Figure 2> 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc. Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. 46 Company:Date:10/26/2023 Engineer:Page:4/5 Project: Address: Phone: E-mail: Anchor Designer™ Software Version 3.0.7947.1 Shear load y, Vuay (lb) Anchor Tension load, Nua (lb) 3. Resulting Anchor Forces Shear load combined, √(Vuax)²+(Vuay)² (lb) Shear load x, Vuax (lb) 3400.01 0.0 0.00.0 0.0 0.0Sum3400.0 0.0 Maximum concrete compression strain (‰): 0.00 Maximum concrete compression stress (psi): 0 Resultant tension force (lb): 3400 Resultant compression force (lb): 0 Eccentricity of resultant tension forces in x-axis, e'Nx (inch): 0.00 Eccentricity of resultant tension forces in y-axis, e'Ny (inch): 0.00 4. Steel Strength of Anchor in Tension (Sec. 17.4.1) Nsa (lb)Nsa (lb) 13110 0.75 9833 5. Concrete Breakout Strength of Anchor in Tension (Sec. 17.4.2) Nb = kc a f’chef1.5 (Eq. 17.4.2.2a) kc a f’c (psi)hef (in)Nb (lb) 17.0 1.00 2500 10.000 26879 Ncb =(ANc / ANco)ed,N c,N cp,NNb (Sec. 17.3.1 & Eq. 17.4.2.1a) ANc (in2)ANco (in2)ca,min (in)ed,N c,N cp,N Nb (lb)Ncb (lb) 360.00 900.00 4.75 0.795 1.00 1.000 26879 0.65 5556 6. Adhesive Strength of Anchor in Tension (Sec. 17.4.5) k,cr =k,crfshort-termKsat(f’c /2,500)n k,cr (psi)fshort-term Ksat f’c (psi)n k,cr (psi) 1356 1.00 1.00 2500 0.24 1356 Nba =a cr dahef (Eq. 17.4.5.2) a cr (psi)da (in)hef (in)Nba (lb) 1.00 1356 0.63 10.000 26625 Na =(ANa / ANa0)ed,Na cp,NaNba (Sec. 17.3.1 & Eq. 17.4.5.1a) ANa (in2)ANa0 (in2)cNa (in)ca,min (in)ed,Na cp,Na Nba (lb)Na (lb) 210.29 307.10 8.76 4.75 0.863 1.000 26625 0.65 10223 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc. Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. 47 Company:Date:10/26/2023 Engineer:Page:5/5 Project: Address: Phone: E-mail: Anchor Designer™ Software Version 3.0.7947.1 11. Results 11. Interaction of Tensile and Shear Forces (Sec. D.7)? Tension Factored Load, Nua (lb)Design Strength, øNn (lb)Ratio Status Steel 3400 9833 0.35 Pass Concrete breakout 3400 5556 0.61 Pass (Governs) Adhesive 3400 10223 0.33 Pass SET-3G w/ 5/8"Ø F1554 Gr. 36 with hef = 10.000 inch meets the selected design criteria. 12. Warnings - Designer must exercise own judgement to determine if this design is suitable. - Refer to manufacturer’s product literature for hole cleaning and installation instructions. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.comSimpson Strong-Tie Company Inc. Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility. 48