Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2100 S Fairview St - Plan
date detailed checkeddesigned ofsheet sheets project contract rev.drawing file no.date descriptionbyckd 1 1312111098765432 I H G F E D C B A CO P Y R I G H T © 2 0 1 5 B U R N S & M c D O N N E L L E N G I N E E R I N G C O M P A N Y , I N C . 1/ 2 8 / 2 0 2 5 5 : 2 0 : 0 9 P M SOUTHERN CALIFORNIA An EDISON INTERNATIONAL Company EISON R R 145 S. STATE COLLEGE BLVD, SUITE 600 BREA, CA 92821 (714) 256-1595 SCE-BRIXEN.DWG BRIXEN EVCS 2100 S FAIRVIEW ST, SANTA ANA, CA 92704 ORANGE COUNTY 01/30/25 10/04/2023 ISSUE FOR PERMIT 17ISSUE FOR PERMIT 1 C-1.0 0 DU KM COVER SHEET 0 VB KMDU SOUTHERN CALIFORNIA EISON An EDISON INTERNATIONAL Company N 1650605 Exp. 9-30-26 02/05/2025 Bldg #101121913 Elect #20184701 & 20185390 APPROVALS: PLNG - C. SantanaPUBLIC WORKS - Y. Soto BLDG/ELECT - CSG date detailed checkeddesigned ofsheet sheets project contract rev.drawing file no.date descriptionbyckd 1 1312111098765432 I H G F E D C B A CO P Y R I G H T © 2 0 1 5 B U R N S & M c D O N N E L L E N G I N E E R I N G C O M P A N Y , I N C . 1/ 2 8 / 2 0 2 5 3 : 4 2 : 4 3 P M SOUTHERN CALIFORNIA An EDISON INTERNATIONAL Company EISON R R 145 S. STATE COLLEGE BLVD, SUITE 600 BREA, CA 92821 (714) 256-1595 SCE-BRIXEN.DWG BRIXEN EVCS 2100 S FAIRVIEW ST, SANTA ANA, CA 92704 ORANGE COUNTY 01/30/25 10/04/2023 ISSUE FOR PERMIT 17ISSUE FOR PERMIT 2 C-2.0 0 DU KM NOTES 0 VB KMDU ’ 1650605 Exp. 9-30-26 02/05/2025 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UG E UG E IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY 1" = 5' N date detailed checkeddesigned ofsheet sheets project contract rev.drawing file no.date descriptionbyckd 1 1312111098765432 I H G F E D C B A CO P Y R I G H T © 2 0 1 5 B U R N S & M c D O N N E L L E N G I N E E R I N G C O M P A N Y , I N C . 1/ 2 8 / 2 0 2 5 3 : 4 2 : 5 0 P M SOUTHERN CALIFORNIA An EDISON INTERNATIONAL Company EISON R R 145 S. STATE COLLEGE BLVD, SUITE 600 BREA, CA 92821 (714) 256-1595 SCE-BRIXEN.DWG BRIXEN EVCS 2100 S FAIRVIEW ST, SANTA ANA, CA 92704 ORANGE COUNTY 01/30/25 10/04/2023 ISSUE FOR PERMIT 17ISSUE FOR PERMIT 3 C-3.0 0 DU KM OVERALL SITE PLAN 0 VB KMDU 0 5' SCALE IN FEET 10' X 1650605 Exp. 9-30-26 02/05/2025 EV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLYEV CHARGINGONLY X X X X X X X X X X X X X X X X X X X X X X X X X UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UG E UGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGEUGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UGE UG E UG E W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY 1" = 5' N date detailed checkeddesigned ofsheet sheets project contract rev.drawing file no.date descriptionbyckd 1 1312111098765432 I H G F E D C B A CO P Y R I G H T © 2 0 1 5 B U R N S & M c D O N N E L L E N G I N E E R I N G C O M P A N Y , I N C . 1/ 2 8 / 2 0 2 5 5 : 3 4 : 4 1 P M SOUTHERN CALIFORNIA An EDISON INTERNATIONAL Company EISON R R 145 S. STATE COLLEGE BLVD, SUITE 600 BREA, CA 92821 (714) 256-1595 SCE-BRIXEN.DWG BRIXEN EVCS 2100 S FAIRVIEW ST, SANTA ANA, CA 92704 ORANGE COUNTY 01/30/25 10/04/2023 ISSUE FOR PERMIT 4 C-4.0 0 17 DU KM SITE PLAN DETAILS 0 VB KMDU 0 5' SCALE IN FEET 10' ISSUE FOR PERMIT 1650605 Exp. 9-30-26 02/05/2025 GFS Division BRIXEN EVCS Design calculations for footing pad of Switchboard, Distribution Panel, Transformer, EV Chargers & Gateway. Project No: 1650605 Prepared By: DSS Reviewed By: - Rev-0 Date: 09/18/2024 Date Signed: 9.24.2024 Client - SCE Charge Ready Date - Project -Brixen EVCS Made By - Location -2100 S Fairview ST, Santa Ana, CA 92704 Orange County. Checked By - Proj. No. -Preliminary - 1.0 Index Item 1.0 Index 1.1 Scope of work 1.2 Reference Documents 1.2.1 Codes and References 1.2.2 Equipment Data 1.3 Material Specification 1.4 Basis of Design and Philosophy 1.5 Revision 1.6 Basis Load Cases 1.7 Risa Model 2.0 Design Input 3.0 Load Calculations 4.0 Subgrade Modulus 5.0 Anchor Bolt Load Calculation 6.0 Anchor Bolt Summary 7.0 Foundation Details 8.0 RISA 3D Report for H-Frame 9.0 RISA Foundation Report 10.0 Anchor Bolt Design Report 11.0 H-Frame Base Plate Design Report 12.0 Annexure A 78 85 22 21 16 21 2 3 3 4 4 3 3 6 3 1650605 5 9/18/2024 DSS - 80% Review Description Sheet No. 33 Description -Design calculations for footing pad of switchboard, Transformer, Distribution Panel, EV Charger & Gateway Final - 100% Review 25 11 15 3 Client - SCE Charge Ready Date - Project -Brixen EVCS Made By - Location -2100 S Fairview ST, Santa Ana, CA 92704 Orange County. Checked By - Proj. No. -Preliminary -1650605 9/18/2024 DSS - 80% Review Description -Design calculations for footing pad of switchboard, Transformer, Distribution Panel, EV Charger & Gateway Final - 100% Review 1.1 Scope of work This document covers load development and design calculation of concrete mat foundations to support Switchboard Panel, Transformer, Distribution Panel, EV Charger & Gateway. 1.2 Reference Documents CRP1650605 Brixen High Level Concept Plan REDLINE 8/9/2022 1.2.1 Codes & References Minimum Design Loads for Buildings and Other Structures ASCE/SEI 7 - 2016 Building code requirements for structural concrete ACI318-19 California Building Standards Code CBSC 2022 1.2.2 Equipment Data Title Date Switchgear Equipments - HC_JNT-EVC10-Hypercharge Charger - 6-Foot Pedestal Cut Sheet - 1.3 Material Specification Characteristic compressive strength of concrete f'c = 2500 psi Characteristic strength of reinforcement fy =60000 psi Modulus of elasticity of concrete Ec = 2850.00 ksi Modulus of elasticity of Steel Es = 29000.00 ksi 1.4 Basis of Design and Philosophy 1 No snow load is considered in the design as per ATC Hazard by location website. 2 Wind Exposure category is considered as C. 3 Allowable Bearing Capacity is considered to be 1500 psf. 4 Overstrength factor of 2.0 is considered for anchor bolt design. 5 Reduction in footing size due to conduit openings are neglected for foundation design and calculation of subgrade modulus. 6 Bottom cover to foundation is considered as 3" and top cover as 2". 7 Live Load of 60 psf over the Slab is considered in Risa Foundation as per Table 4.3-1 ASCE 7-16 for Elevated Platforms. 8 Subgrade Modulus is considered as 125 pci in absence of accurate data. 9 Characteristic compressive strength of the concrete is considered as 2500 psf conservatively. 10 Frost depth of the soil is neglected. 11 Pesudo dynamic forces as per ACI 351.3R-18 section 4.2.4 are not considered as the equipments are not heavy loaded. 12 Coefficient of friction is considered as 0.25 in absence of accurate data. 13 In absence of design basis, the seismic and the wind parameters are considered as per the "ATC Hazard by location" website. Reference provided in subsequent pages. 14 In absence of weight of charger & pedestal in vendor cutsheets, the weight of charger & pedestal is assumed to be 40 lbs. 15 In absence of anchorage detail for chargers, the achor details are assumed as per "CPF50-anchorage details.pdf". Refer Annexure. 16 Chargepoint Gateway is considered to be supported on H-Frame. Similar structure is modelled in RISA 3D for footing, anchor and base plate design. Client - SCE Charge Ready Date - Project -Brixen EVCS Made By - Location -2100 S Fairview ST, Santa Ana, CA 92704 Orange County. Checked By - Proj. No. -Preliminary -1650605 9/18/2024 DSS - 80% Review Description -Design calculations for footing pad of switchboard, Transformer, Distribution Panel, EV Charger & Gateway Final - 100% Review 1.5 Revision Rev. - 0:80% IFR 1.6 Basic Load Cases Following are the load cases considered for the analysis and Design of foundation in RISA. 1 DL, self-weight 2 FL, operating dead load 3 L, live load 4 WLX, wind load X-direction 5 WLZ, wind load Z-direction 6 ELX, operating earthquake X-direction. 7 ELZ, operating earthquake Z-direction. Client - SCE Charge Ready Date - Project -Brixen EVCS Made By - Location -2100 S Fairview ST, Santa Ana, CA 92704 Orange County. Checked By - Proj. No. -Preliminary -1650605 9/18/2024 DSS - 80% Review Description -Design calculations for footing pad of switchboard, Transformer, Distribution Panel, EV Charger & Gateway Final - 100% Review 1.7 Risa Model Fig.1 : RISA 3D Fig.2 : RISA FOUNDATION DISTRIBUTION PANEL EV CHARGER SWITCHBOARD TRANSFORMER H-FRAME FOR GATEWAY EV CHARGER FOUNDATION SWITCHBOARD PANEL TRANSFORMER DISTRIBUTION PANEL & GATEWAY COMBINED FOUNDATION !"#$ %&